Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “meter, test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Source detection at 100 meter standoff with a time-encoded imaging system

Here, we present the design, characterization, and testing of a laboratory prototype radiological search and localization system. The system, based on time-encoded imaging, uses the attenuation signature of neutrons in time, induced by the geometrical layout and motion of the system. We have demonstrated the ability to detect a ~1 mCi 252 Cf radiological source at 100 m standoff with 90% detection efficiency and 10% false positives against background in 12 min. As a result, this same detection efficiency is met at 15 s for a 40 m standoff, and 1.2 s for a 20 m standoff.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Infrared site testing of Mt. Lemmon and Catalina Observatory

The operation and problems involved with two sky noise meters installed in the Catalina Mountains near Tucson, Arizona are discussed. The instruments were installed at two different locations on Mt. Lemon. It was found that when photometric conditions prevailed, a positive correlation existed between the outputs of the two instruments. In particular, the strongdiurnal effect, in which the sky noise increases abruptly at sunrise and falls markedly after sunset, was reproduced by both instruments. Discrepancies in data recorded by the two instruments are analyzed and possible causes for the discrepancies are proposed.

Kuiper, G. P.↗

Eddy-Current Meter Would Check Weld Wire Online

Simple Technique samples an entire spool of welding wire to test for contamination or unauthorized filler wire. Since unit monitors entire length of wire used in welding, completed welds need not be inspected individually. Technique would save time, avoiding human interface and production delays.

Bailey, G. R.↗

SAVANNAH RIVER SITE R REACTOR DISASSEMBLY BASIN IN SITU DECOMMISSIONING

The US DOE concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate in tact, structurally sound facilities that are no longer needed for their original purpose of, i.e., generating (reactor facilities), processing(isotope separation facilities) or storing radioactive materials. The 105-R Disassembly Basin is the first SRS reactor facility to undergo the in-situ decommissioning (ISD) process. This ISD process complies with the105-R Disassembly Basin project strategy as outlined in the Engineering Evaluation/Cost Analysis for the Grouting of the R-Reactor Disassembly Basin at the Savannah River Site and includes: (1) Managing residual water by solidification in-place or evaporation at another facility; (2) Filling the below grade portion of the basin with cementitious materials to physically stabilize the basin and prevent collapse of the final cap - Sludge and debris in the bottom few feet of the basin will be encapsulated between the basin floor and overlying fill material to isolate if from the environment; (3) Demolishing the above grade portion of the structure and relocating the resulting debris to another location or disposing of the debris in-place; and (4) Capping the basin area with a concrete slab which is part of an engineered cap to prevent inadvertent intrusion. The estimated total grout volume to fill the 105-R Reactor Disassembly Basin is 24,424 cubic meters or 31,945 cubic yards. Portland cement-based structural fill materials were design and tested for the reactor ISD project and a placement strategy for stabilizing the basin was developed. Based on structural engineering analyses and work flow considerations, the recommended maximum lift height is 5 feet with 24 hours between lifts. Pertinent data and information related to the SRS 105-R-Reactor Disassembly Basin in-situ decommissioning include: regulatory documentation, residual water management, area preparation activities, technology needs, fill material designs and testing, and fill placement strategy. This information is applicable to decommissioning both the 105-P and 105-R facilities. The ISD process for the entire 105-P and 105-R reactor facilities will require approximately 250,000 cubic yards (191,140 cubic meters) of grout and 2,400 cubic yards (1,840 cubic meters) of structural concrete which will be placed over a twelve month period to meet the accelerated schedule ISD schedule. The status and lessons learned in the SRS Reactor Facility ISD process will be described.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SAVANNAH RIVER SITE R-REACTOR DISASSEMBLY BASIN IN-SITU DECOMMISSIONING -10499

The US DOE concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate intact, structurally sound facilities that are no longer needed for their original purpose, i.e., generating (reactor facilities), processing(isotope separation facilities) or storing radioactive materials. The 105-R Disassembly Basin is the first SRS reactor facility to undergo the in-situ decommissioning (ISD) process. This ISD process complies with the 105-R Disassembly Basin project strategy as outlined in the Engineering Evaluation/Cost Analysis for the Grouting of the R-Reactor Disassembly Basin at the Savannah River Site and includes: (1) Managing residual water by solidification in-place or evaporation at another facility; (2) Filling the below grade portion of the basin with cementitious materials to physically stabilize the basin and prevent collapse of the final cap - Sludge and debris in the bottom few feet of the basin will be encapsulated between the basin floor and overlying fill material to isolate it from the environment; (3) Demolishing the above grade portion of the structure and relocating the resulting debris to another location or disposing of the debris in-place; and (4) Capping the basin area with a concrete slab which is part of an engineered cap to prevent inadvertent intrusion. The estimated total grout volume to fill the 105-R Reactor Disassembly Basin is 24,384 cubic meters or 31,894 cubic yards. Portland cement-based structural fill materials were designed and tested for the reactor ISD project, and a placement strategy for stabilizing the basin was developed. Based on structural engineering analyses and material flow considerations, maximum lift heights and differential height requirements were determined. Pertinent data and information related to the SRS 105-R Reactor Disassembly Basin in-situ decommissioning include: regulatory documentation, residual water management, area preparation activities, technology needs, fill material designs and testing, and fill placement strategy. This information is applicable to decommissioning both the 105-P and 105-R facilities. The ISD process for the entire 105-P and 105-R reactor facilities will require approximately 250,000 cubic yards (191,140 cubic meters) of grout and approximately 3,900 cubic yards (2,989 cubic meters) of structural concrete which will be placed over about an eighteen month period to meet the accelerated schedule ISD schedule. The status and lessons learned in the SRS Reactor Facility ISD process will be described.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Tunnel and Subsurface Void Detection and Range to Target Measurement

Engineers and technicians at the Idaho National Laboratory invented, designed, built and tested a device capable of detecting and measuring the distance to, an underground void, or tunnel. Preliminary tests demonstrated positive detection of, and range to, a void thru as much as 30 meters of top-soil earth. Device uses acoustic driving point impedance principles pioneered by the Laboratory for well-bore physical properties logging. Data receipts recorded by the device indicates constructive-destructive interference patterns characteristic of acoustic wave reflection from a downward step-change in impedance mismatch. Prototype tests demonstrated that interference patterns in receipt waves could depict the patterns indicative of specific distances. A tool with this capability can quickly (in seconds) indicate the presence and depth/distance of a void or tunnel. Using such a device, border security and military personnel can identify threats of intrusion or weapons caches in most all soil conditions including moist and rocky.

42 ENGINEERING↗

Machine Learning Based Network Parameter Estimation Using AMI Data

The expansion of distribution power system and the growing penetration of distributed energy resources present new challenges for situational awareness. Calibrating the extended system model with sensor measurements and maintaining the usability is critical for utilities. This paper presents a distribution network parameter estimation (DNPE) approach using machine learning (ML) and metering data that improve the quality of extended distribution power system modeling. The reliability model can improve the ability of endpoint data to be translated into network-level situational awareness in real time and help distribution system operators (DSOs) solve branch flow and voltage problems. In addition, a data analytic and automate processing scheme is proposed to improve the sensor data quality and prevent misleading information. The effectiveness of the proposed method is verified with actual advanced metering infrastructure (AMI) data on a real utility feeder model, while considering the higher penetration of photovoltaic power generation. The test of DNPE and study results are demonstrated in this paper.

Parameter estimation, machine learning, power dist↗

Guide to Flow Measurement for Electric Propulsion Systems

In electric propulsion (EP) systems, accurate measurement of the propellant mass flow rate of gas or liquid to the thruster and external cathode is a key input in the calculation of thruster efficiency and specific impulse. Although such measurements are often achieved with commercial mass flow controllers and meters integrated into propellant feed systems, the variability in potential propellant options and flow requirements amongst the spectrum of EP power regimes and devices complicates meter selection, integration, and operation. At the direction of the Committee on Standards for Electric Propulsion Testing, a guide was jointly developed by members of the electric propulsion community to establish a unified document that contains the working principles, methods of implementation and analysis, and calibration techniques and recommendations on the use of mass flow meters in laboratory and spacecraft electric propulsion systems. The guide is applicable to EP devices of all types and power levels ranging from microthrusters to high-power ion engines and Hall effect thrusters. The establishment of a community standard on mass flow metering will help ensure the selection of the proper meter for each application. It will also improve the quality of system performance estimates by providing comprehensive information on the physical phenomena and systematic errors that must be accounted for during the analysis of flow measurement data. This paper will outline the standard methods and recommended practices described in the guide titled "Flow Measurement for Electric Propulsion Systems."

spacecraft electric propulsion (EP) systems↗

Canard-body-tail missile test at angles of attack to 50 deg in the Ames 11-foot transonic wind tunnel

Blunted ogive cylinder missile models with a length-to-diameter ratio of 10.4 were tested at transonic speeds and large angles of attack in an 11 foot transonic wind tunnel. The configurations are: body, body with tail panels, body with canards, and body with canards and tails. Forces and moments from the entire model and each of the eight fins were measured over the pitch range of 20 deg to 50 deg, and roll angles of 0 deg to 45 deg and canard deflection angles between 0 deg and 15 deg. The Reynolds number ranged from 3.9 x 10 to the 6th power per meter. Large side forces and yawing moments were observed for some of the test cases involving a symmetric geometry.

Allen, C. Q.↗

A programmable quantum current standard from the Josephson and the quantum Hall effects

We propose a way to realize a programmable quantum current standard (PQCS) from the Josephson voltage standard and the quantum Hall resistance standard (QHR) exploiting the multiple connection technique provided by the quantum Hall effect (QHE) and the exactness of the cryogenic current comparator. The PQCS could lead to breakthroughs in electrical metrology like the realization of a programmable quantum current source, a quantum ampere-meter, and a simplified closure of the quantum metrological triangle. Moreover, very accurate universality tests of the QHE could be performed by comparing PQCS based on different QHRs.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Testing and Development of NEA Scout Solar Sail Deployer Mechanism

The Near Earth Asteroid (NEA) Scout is a deep space CubeSat designed to use an 86 square meter solar sail to navigate to a near earth asteroid called VG 1991. The solar sail deployment mechanism aboard NEA Scout has gone through numerous design cycles and ground tests since its conception in 2014. An engineering development unit (EDU) was constructed in the spring of 2016 and since then, the NEA Scout team has completed numerous ground deployments aiming to mature the deployment system and the ground test methods used to validate that system. Testing a large, non-rigid gossamer system in 1G environments has presented its difficulties to numerous solar sailing programs before, but NEA Scout’s size, sail configuration, and budget has led the team to develop new deployment techniques and uncover new practices while improving their test methods. NEA Scout’s spooled sail and boom design differs from any solar sail design to date: a single square sail membrane spooled upon a non-circular mandrel and the booms are spooled on two separate coils. This configuration was necessitated by the 6U footprint and is not common among other solar sailing missions. The program has planned and completed 3 separate full scale sail deployments to date, with a flight sail deployment test scheduled for FY18. The sail deployment tests have helped mature flight operations plans and developed preliminary off-nominal deployment mitigation strategies. The paper entitled “Design and Development of NEA Scout Solar Sail Deployer Mechanism” was presented at the 43rd Aerospace Mechanisms Symposium. Since then, the system has matured and completed ascent vent, random vibration, boom deployment and sail deployment tests. This paper will discuss the lessons learned and advancements made while working on solar sail testing and redesign cycles.

Few, Alex↗

Optical Testing and Verification Methods for the James Webb Space Telescope Integrated Science Instrument Module Element

NASA's James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy (~40K). The JWST Observatory includes the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM) that contains four science instruments (SI) and the fine guider. The SIs are mounted to a composite metering structure. The SI and guider units were integrated to the ISIM structure and optically tested at the NASA Goddard Space Flight Center as a suite using the Optical Telescope Element SIMulator (OSIM). OSIM is a full field, cryogenic JWST telescope simulator. SI performance, including alignment and wave front error, were evaluated using OSIM. We describe test and analysis methods for optical performance verification of the ISIM Element, with an emphasis on the processes used to plan and execute the test. The complexity of ISIM and OSIM drove us to develop a software tool for test planning that allows for configuration control of observations, associated scripts, and management of hardware and software limits and constraints, as well as tools for rapid data evaluation, and flexible re-planning in response to the unexpected. As examples of our test and analysis approach, we discuss how factors such as the ground test thermal environment are compensated in alignment. We describe how these innovative methods for test planning and execution and post-test analysis were instrumental in the verification program for the ISIM element, with enough information to allow the reader to consider these innovations and lessons learned in this successful effort in their future testing for other programs.

spaceborne telescopes↗

Effects of environmental variables on the crack initiation stages of corrosion fatigue of high strength aluminum alloys

Fatigue initiation in six aluminum alloys used in the aircraft industry was investigated. Cyclic loading superimposed on a constant stress was alternated with atmospheric corrosion. Tests made at different stress levels revealed that a residual stress as low as 39% of the yield strength caused stress corrosion cracking in some of the alloys. An atmospheric corrosion rate meter developed to measure the corrosivity of the atmosphere is described. An easily duplicated hole in the square test specimen with a self-induced residual stress was developed.

Poteat, L. E.↗

Testing of In-Sodium Hydrogen Sensor

The goal of this project is to demonstrate diffusion-type in-sodium hydrogen meters (ISHMs) for real-time, in-situ monitoring of hydrogen concentration in molten sodium of a sodium-cooled fast reactor (SFR). The FY22 R&D efforts have been focused on (a) enhancement and fabrication of meshed ISHM prototype, (b) reconstruction of ISHM sodium test apparatus, (c) in-sodium test of meshed ISHM, and (d) ISHM performance and failure evaluations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Validation of strongly coupled geomechanics and gas hydrate reservoir simulation with multiscale laboratory tests

In this work, we validate a coupled flow-geomechanics simulator for gas hydrate deposits, named T+M AM , performing two meter-scale laboratory experiments of gas hydrates for production by depressurization, replicating the gas hydrate deposit in the Ulleung Basin, East Sea, South Korea. The first experiment with a sand-only specimen is a 1D 1 m-scale depressurization test based on the excess gas method, which represents the grain coating hydrate growth. On the other hand, the second is a 3D 1.5 m-scale test with the excess water method for a sand-mud alternating layer system, representing the pore filling hydrate growth. We measure production and displacement at the top with different depressurization levels. In particular, the 3D test exhibits high coupling strength of substantial deformation induced by incompressibility of water and high deformability of the specimen. For validation, we match pressure, flow rate, and displacement between the experimental data and numerical results. Thus, we identify that T+M AM is a reliable simulator, which can be applied to fields in both permafrost and deep oceanic hydrate deposits of strongly coupled flow and geomechanics systems. This validation also implies that other coupled simulators based on the same coupling formulation as T+M AM can be validated when individual flow and geomechanics simulators are stable and reliable.

02 PETROLEUM↗

Optimal Asteroid Mass Determination from Planetary Range Observations: A Study of a Simplified Test Model

Mars ranging observations are available over the past 10 years with an accuracy of a few meters. Such precise measurements of the Earth-Mars distance provide valuable constraints on the masses of the asteroids perturbing both planets. Today more than 30 asteroid masses have thus been estimated from planetary ranging data (see [1] and [2]). Obtaining unbiased mass estimations is nevertheless difficult. Various systematic errors can be introduced by imperfect reduction of spacecraft tracking observations to planetary ranging data. The large number of asteroids and the limited a priori knowledge of their masses is also an obstacle for parameter selection. Fitting in a model a mass of a negligible perturber, or on the contrary omitting a significant perturber, will induce important bias in determined asteroid masses. In this communication, we investigate a simplified version of the mass determination problem. Instead of planetary ranging observations from spacecraft or radar data, we consider synthetic ranging observations generated with the INPOP [2] ephemeris for a test model containing ~25000 asteroids. We then suggest a method for optimal parameter selection and estimation in this simplified framework.

asteroids↗

Submersible Multistage Centrifugal Pump for Versatile Test Reactor Cartridge Test Loop

Submersible multistage centrifugal pumps are ideal for pumping in narrow confined spaces and achieving necessary head pressures and flow rates. Once a diameter is determined then manipulation of the number of stages and motor speed are all that are required to meet desired flow conditions. The Versatile Test Reactor (VTR) closed loop cartridge systems will need forced convection cooling independent of the main reactor. A multistage centrifugal pump can meet the necessary flow rates and pumping pressures while minimizing space taken. The pump considered for this work was based off a deep well submersible pump, a variation of a multistage centrifugal pump. We experimented with two pump sizes, 5 cm (2 inch) and 7.5 cm (3 inch) diameters. These diameters were chosen to fit into the inner diameter of standard 5 and 7.5 (2 and 3 inch) Schedule 40 pipe, respectively. This made the design for the test loop both simpler and less expensive as the need for an engineered pump housing was eliminated. Initial test cartridge planning indicated space for only a 5 cm (2 inch) diameter pump, though early testing of this size showed the need for an abnormally high-speed and high-power motor. Fine tuning of the cartridge design allowed a pump size increase to 7.5 cm (3 inches), which was the pump size most extensively tested in this work. The test loop is composed of various sizes of PVC and aluminum piping components in a loop configuration. The pump is driven by a Pittman 250 W (1/3 horsepower) electric motor with maximum speed of 3,450 RPM. Testing consisted of running the pump at a constant motor speed while varying a control valve to restrict flow through the loop, with differential pressure and flow rate recorded. This was done for one and two stage configurations for the 5 cm (2 inch) diameter impeller design and one, two, and three stage configurations for the 7.5 cm (3 inch diameter) impeller design, respectively. Due to pumping power requirements, two and three stage 7.5 cm (3 inch) diameter impeller testing at higher flowrates lowered the motor speed substantially. In regions where motor speed could not be maintained constant, the data were discarded. The test loop was also reconfigured to allow for the pump to be tested for pressure drop in a stalled or inoperable (0 RPM) flow condition. Demonstration of adequate natural convection cooling of the test cartridge fuel type is necessary under accident conditions, and this will depend upon the flow resistance through the impeller assembly when the pump is not operating. Thus, accurate knowledge of the effective impeller assembly loss coefficient is important for safety evaluations. The test loop was modified to provide water inlet and outlets on either side of the pump impeller stack, and a metered flow of lab water was provided in order to measure the pressure drop across the cartridges as a function of flowrate. Data from the pump head curve testing developed as part of this work and supported by analysis using pump head affinity laws indicates that a three stage 7.5 cm (3 inch) pump impeller design will meet target requirements for coolant flow within the VTR cartridge sodium cartridge at full power conditions [1] with margin; this corresponds to a flowrate of 45 l/min (12 gpm) at a pressure drop of 6.1 m (20 feet) of water head. The results of the pressure loss measurements across the impeller assembly when the pump is stationary (i.e., at 0 RPM) indicate that the pressure loss coefficient is 0.921 for a two impeller stack configuration; this value is calculated based on the flow velocity through the minimum available flow area within a single stage of the impeller which corresponds to 1.4 cm2.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Estimation of unsaturated zone traveltimes for Rainier Mesa and Shoshone Mountain, Nevada Test Site, Nevada, using a source-responsive preferential-flow model

Traveltimes for contaminant transport by water from a point in the unsaturated zone to the saturated zone are a concern at Rainier Mesa and Shoshone Mountain in the Nevada Test Site, Nevada. Where nuclear tests were conducted in the unsaturated zone, contaminants must traverse hundreds of meters of variably saturated rock before they enter the saturated zone in the carbonate rock, where the regional groundwater system has the potential to carry them substantial distances to a location of concern. The unsaturated-zone portion of the contaminant transport path may cause a significant delay, in addition to the time required to travel within the saturated zone, and thus may be important in the overall evaluation of the potential hazard from contamination. Downward contaminant transport through the unsaturated zone occurs through various processes and pathways; this can lead to a broad distribution of contaminant traveltimes, including exceedingly slow and unexpectedly fast extremes. Though the bulk of mobile contaminant arrives between the time-scale end members, the fastest contaminant transport speed, in other words the speed determined by the combination of possible processes and pathways that would bring a measureable quantity of contaminant to the aquifer in the shortest time, carries particular regulatory significance because of its relevance in formulating the most conservative hazard-prevention scenarios. Unsaturated-zone flow is usually modeled as a diffusive process responding to gravity and pressure gradients as mediated by the unsaturated hydraulic properties of the materials traversed. The mathematical formulation of the diffuse-flow concept is known as Richards' equation, which when coupled to a solute transport equation, such as the advection-dispersion equation, provides a framework to simulate contaminant migration in the unsaturated zone. In recent decades awareness has increased that much fluid flow and contaminant transport within the unsaturated zone takes place as preferential flow, faster than would be predicted by the coupled Richards' and advection-dispersion equations with hydraulic properties estimated by traditional means. At present the hydrologic community has not achieved consensus as to whether a modification of Richards' equation, or a fundamentally different formulation, would best quantify preferential flow. Where the fastest contaminant transport speed is what needs to be estimated, there is the possibility of simplification of the evaluation process. One way of doing so is by a two-step process in which the first step is to evaluate whether significant preferential flow and solute transport is possible for the media and conditions of concern. The second step is to carry out (a) a basic Richards' and advection-dispersion equation analysis if it is concluded that preferential flow is not possible or (b) an analysis that considers only the fastest possible preferential-flow processes, if preferential flow is possible. For the preferential-flow situation, a recently published model describable as a Source-Responsive Preferential-Flow (SRPF) model is an easily applied option. This report documents the application of this two-step process to flow through the thick unsaturated zones of Rainier Mesa and Shoshone Mountain in the Nevada Test Site. Application of the SRPF model involves distinguishing between continuous and intermittent water supply to preferential flow paths. At Rainier Mesa and Shoshone Mountain this issue is complicated by the fact that contaminant travel begins at a location deep in the subsurface, where there may be perched water that may or may not act like a continuous supply, depending on such features as the connectedness of fractures and the nature of impeding layers. We have treated this situation by hypothesizing both continuous and intermittent scenarios for contaminant transport to the carbonate aquifer and reporting estimation of the fastest speed for both of these end members.

58 GEOSCIENCES↗