SRNL's Lessons Learned from the University of Nevada Reno{sup TM} Nuclear Packaging Internships - 19464

The U.S. Department of Energy's Packaging Certification Program (DOE PCP) and the University of Nevada, Reno (UNR) Mechanical Engineering Department have developed an accredited, graduate level nuclear packaging certificate. The mission is to ensure that the DOE staff and users of PCP services are knowledgeable and competent in packaging and transportation activities. Since 2008, the Savannah River National Laboratory (SRNL) has been teaching two classes for the DOE PCP Packaging University. This paper introduces a recently added third class, where SRNL provided Site Supervisors, targeted toward engineering interns. As part of ensuring a future workforce, the Packaging Technology and Transportation Engineering Group (PT and TE) at Savannah River National Laboratory (SRNL) normally employs two to three summer interns each year. The internships provide SRNL innovative s performing valuable research and support work related to package certification. It also provides SRNL the opportunity to bring in perspective engineers on 'trial-basis.' The interns benefit by learning valuable career skills and gaining exposure to a broad-based career field in the field of packaging. As part of the job specific training, the summer interns are provided an overview of package design, testing, and certification. This includes package operations, containment vessel leak testing, and SARP preparation. Two years ago, SRNL recognized the efficiency of using the SRNL-taught courses for the summer interns working in SRNL PT and TE. SRNL requested that UNR allow the PT and TE two summer interns, who were rising college juniors, to enroll in the SRNL-taught courses for graduate credit. UNR agreed and allowed the interns to enroll under a special admission status. Since that time, UNR developed a new class within the Graduate Certificate in Nuclear Packaging (GCNP), for the summer intern research work. This new class offers a formalized framework for the summer interns to conduct research, while ensuring that the research is performed in a rigor consistent with an accredited college level setting. Last summer, the SRNL PT and TE had three summer interns - all participating in the new course, UNR ME-699 Nuclear Packaging Summer Internship - with each earning three graduate credits from UNR in mechanical engineering. This paper provides a brief overview of the DOE PCP Packaging University/ UNR GCNP, a discussion of SRNL's use of summer interns as a tool to recruit and train the future workforce, and lessons learned from having last year's three SRNL PPT and TE summer interns enroll in the UNR Packaging Internship Class. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safeguards Lessons Learned from the Rokkasho Reprocessing Plant - 19502

Once operational, the Rokkasho Reprocessing Plant (RRP) will have an operating throughput of 800 MT of uranium in irradiated LWR fuel per year. In order to establish effective and efficient safeguards at RRP, the safeguards discussion with the IAEA was initiated in 1988. However, at that time there were no available models or guidelines that could be used as a reference and multiple difficulties were recognized for the implementation of safeguards into a large scale reprocessing plant. Therefore, from 1988 to 1992, a multinational forum, referred to as LASCAR (Large Scale Reprocessing Plant Safeguards) [1], provided the recommendations on how an effective safeguards approach could be implemented into a large scale reprocessing plant while efficiently using existing resources. During the course of safeguards discussions between the IAEA, the State, and JNFL, the use of operator's equipment and measurement systems (by signal splitting with authentication) for inspections was studied. JNFL also examined incorporating inspection requirements into the process design: to reduce the costs associated with system installation and future system maintenance and to ensure effective, efficient, and credible safeguards implementation into the RRP (this approach has essentially become the 'Safeguards by Design (SBD)' process). From these studies and JNFL's experience of implementing safeguards into a new plant [2], JNFL established and applied signal splitting from operator's equipment as a means for providing inspectors required safeguards information. In addition, the LASCAR findings were utilized to establish the safeguards implemented into the RRP. Safeguards implementation into RRP commenced March 31, 2006. On June 4, 2008, the IAEA approved the 'integrated safeguards approach' for RRP. This paper provides a high level overview of the major safeguards implemented at RRP and the lessons learned from this implementation that can be applied to existing or future similar facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from the Development of the DGR Konrad - 19619

The Federal Republic Germany builds the deep geological repository Konrad. The repository is suitable for low- and intermediate-level radioactive waste (LAW and MAW) and it is the first German repository site, which is not located in a salt geological formation. Konrad is a former iron ore mine in Salzgitter (in southeast Lower Saxony) with an active production time between 1961 and 1976. In 2007, the BGE started with the conversion of the mine infrastructure above and underground to build the repository while using the shafts and some roadways of the former mine. The experiences gained from ten years project progress with its complexities and difficulties can be used for similar repository projects in the future. The Konrad repository is designed for 303,000 m{sup 3} of LAW and MAW, which will be emplaced in chambers. The emplacement chambers are located outside of the existing mine, so an impairment by the old mine workings can be excluded. So far, the first area with emplacement chambers has been excavated. In order to be able to start repository operations in 2027, a wide range of work in building construction, civil engineering, shaft sinking and infrastructure development above and below ground has been necessary and will be completed in the next years. The main activities are focused on the Konrad 1 and 2 sites and the part of the infrastructure located in the future control area, which is used for repository operations. There are still many challenges to overcome in the Konrad repository project, although many processes have been put on the right track in recent years. Looking back on past activities and in the cautious preview, this paper gives some indications from which lessons can be drawn and should be applied to similar projects in the future. - Prefer small dimensions for the infrastructure, such as insets and roadway cross-section, and the appropriate machinery and handling equipment; - Detailed process planning for construction in existing infrastructure in the run-up to implementation; - Intensive communication with contracted partners on the preparation of planning documents for nuclear examination procedures and ensuring an excellent contract management; - Early start of the implementation planning for projects under nuclear law, taking into account the relevant boundary conditions; - Ensuring the support of the project by the local community and other stakeholders. Overall, the use of parts of the existing above and underground infrastructure for the construction of a new repository is more difficult than for a complete new construction. But using the shafts of an existing mine delivers the advantage of very good knowledge about the underground environment. In addition, the areas necessary for the construction and operation of the buildings and facilities are already available and secured and do not compete with other projects.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Hanford's Purex Tunnel 2 Structural Stabilization Project - 20509

In 2019, U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC) completed structurally stabilizing the Plutonium Uranium Extraction Plant (Purex) waste storage Tunnel 2 with engineered grout. This action significantly reduced risk to Hanford workers, the surrounding community and environment by preventing future collapse of the tunnel and possible release of radioactive materials. Decades of plutonium production at the Purex facility required construction of two large underground tunnels for storage of highly contaminated plutonium processing equipment that had failed during the operation of Purex and other facilities across the Hanford Site. Following the partial collapse of Purex Tunnel 1 on May 9, 2017, DOE and CHPRC took immediate action to safely stabilize the collapsed section of the tunnel. The hole in the tunnel was filled the next day as a temporary stabilization measure, and no contamination was detected as a result of the partial collapse of the tunnel. Workers then stabilized Tunnel 1 in its entirety by filling with engineered grout, which also encapsulated the radioactive equipment and railcars within the tunnel. Grouting eliminated the risk of further collapse and stabilized the tunnel contents, all while not precluding future remedial actions or final closure decisions. While conducting an integrity analysis of Tunnel 1 by using construction drawings, photos and other historical documents, project teams also analyzed the much larger Purex Tunnel 2. The analysis found Tunnel 2 did not meet current codes for structural integrity, and it may not be able to bear the weight of the soil above the tunnel. Therefore, it was determined that Tunnel 2 was also at risk of collapse. DoE's independent panel of experts determined grouting to be the best choice for stabilizing Tunnel 2 because it provides the highest level of stability and protection, and does not preclude future remedial actions. DOE authorized CHPRC to commence work and the Purex Tunnel 2 Structural Stabilization Project was launched in December of 2017. The paper will discuss the process of recognizing the following critical aspects and risks associated with stabilizing Tunnel 2, and the actions taken by the project team to mitigate these risks, including: - Tunnel investigation and data collection to assist with future remediation; - On-site batching and mock-ups to provide the large quantity of grout required for stabilizing the tunnel; - Workforce involvement and innovative actions that mitigated the project's most significant potential hazards, including traffic control; - Project team high level of execution translated into successful project execution. Sharing lessons learned from this critical risk-reduction effort can enhance the safety and efficiency of other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned in the Development of Industry Guidance - 20279

The availability of industry guidance on different aspects of waste management forms a valuable reference for waste practitioners. The guidance typically details the principles, processes and practices that should be consulted during each stage of the relevant activities. It also includes relevant regulatory and international requirements, appropriate case studies and examples of best practices to illustrate technical concepts and make the information available to the reader in an accessible manner. Over recent years Wood have developed (or are developing) a number of industry guidance documents on a range of topics including Solid Waste Characterization, Routine Water Quality Monitoring on Nuclear Sites: Pipeline Characterization: Determining Background Radioactivity for Land Quality Assessment: Interim Storage and Aqueous Waste Management. This talk provides an overview of lessons learned along the way including: - the importance of stakeholder engagement through the process: - how to identify 'good practice'; - the importance of iterative development; and - the selection of illustrative and informative case studies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SRS Strategy for Tank 3 Salt Dissolution - Performance and Lessons Learned - 20441

The Savannah River Site (SRS) Tank Farms have 51 underground waste tanks used to store and process liquid nuclear waste materials. There are 4 different tank types, ranging in capacity from 2,840,000 to 4,920,000 L (750,000 to 1,300,000 Gal). Twenty-four of the tanks are older style and do not meet full secondary containment standards. The older style tanks are the initial focus of waste removal efforts for tank closure at SRS. Eight of these twenty-four tanks have completed waste removal and are filled with grout. Prior to salt dissolution, Tank 3 was a dry salt tank that contained 5.06 m (199.3 in) of salt and sludge waste. Additional salt waste was present on cooling coils above the salt layer up to approximately 5.59 m (220 in). Three mixing eductors were installed in Tank 3 to aid in dissolving salt waste in three tank riser access ports. A transfer pump was installed, and the transfer pump suction was located 25.4 cm (10 in) from the tank bottom. Well water was added to the tank through a downcomer until the dry bulk salt was covered with liquid. During the initial fill of Tank 3, approximately 242,000 L (64,000 Gal) of rain water were added from periodic F-Tank Farm (FTF) Catch Tank additions and approximately 17,000 L (4,500 Gal) of well water were added. Following liquid additions to cover the dry bulk salt, well water was added through the three mixing eductors in batches during each stage. Additionally, during the salt dissolution campaigns, the FTF Catch Tank was utilized to add rain water through a downcomer in the center tank riser access port as needed for volume relief in the FTF Catch Tank. Following liquid additions, the water was recirculated (internal to the tank) using the transfer pump, and a sample was pulled to confirm the target specific gravity (SpG) of the dissolved salt solution was achieved. The dissolved salt solution was then transferred to the receipt tank (Tank 7), and the mixing eductors were lowered as close to the new bulk salt layer as possible, to support subsequent dissolution campaigns. While the mixing jets were able to dissolve salt successfully in Tank 3, they did not do so in a completely uniform manner. Throughout dissolution, mounds were discovered under Riser 1, Riser 2, and the Center Riser. The mixing jets dissolved the salt around the edges of the tank well but were not as effective toward the center of the tank. FTF Catch Tank additions through the center tank riser access port downcomer were required to impact the mound under the center tank riser. FTF Catch Tank additions were sporadic as they were dependent on rainfall in the area. Additionally, all mixing jets were rarely able to be lowered to the same elevation, indicating some mounding in the bulk salt layer. Indexing of the mixing jets was also utilized to impact the salt mounds. Overall, Tank 3 salt dissolution was successful as approximately 1,476,000 L (390,000 Gal) of dissolved salt solution was transferred to Tank 7 over six stages. Slightly less than 852,000 L (225,000 Gal) of water were added to Tank 3. The original material balance prediction estimated that the bulk salt level in Tank 3 would be 3.88 m (152.8 in) after six salt dissolution stages. After six stages the actual bulk salt level was 3.38 m (133 in). This paper will discuss the salt removal strategy, each salt dissolution stage, and lessons learned for future salt dissolution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from the First Year of Property Remediation - 20475

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste (LLRW) in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL) on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The larger of the two PHAI scopes of work - the Port Hope Project - involves the cleanup of approximately 1.2 million cubic metres of historic LLRW from 18 major sites in Port Hope, the construction of an engineered aboveground mound where the waste will be safely contained and the long-term maintenance and monitoring of the facility. Construction of the waste water treatment plant, the first three of four cells in the mound and supporting infrastructure is complete, with construction of the fourth cell in progress. In 2017 with the movement of on-site waste at this facility began and is now complete. Waste excavation and transportation from off-site locations within the community began in 2018; the cleanup of four temporary storage sites is now complete and remediation at several other major sites is underway. The Port Hope Project also includes a survey of the interior and exterior investigation of approximately 4,800 properties, primarily residential, in the urban area of Port Hope for the presence or absence of historic LLRW. The current projection is that approximately 1,250 privately owned residential and commercial properties known as Small-Scale Sites (SSS) will be identified as having waste exceeding the PHAI clean-up criteria. This paper will outline some of the challenges and lessons learned from the first year of SSS remediation including contractual, data and design issues; interaction with and managing expectations of stakeholders; weather, site and structure conditions as well as municipal permitting, resourcing, transportation and remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from the Clean Energy to Communities (C2C) Peer-Learning Cohort on Planning and Funding for Electric Vehicle Charging Infrastructure Deployment

From June to December 2023, the U.S. Department of Energy (DOE) National Renewable Energy Laboratory (NREL) partnered with World Resources Institute (WRI) to run a peer-learning cohort for local governments on Planning and Funding for Electric Vehicle Charging Infrastructure Deployment. This cohort effort, funded by DOE's Clean Energy to Communities Program, paired 15 local and regional governments with Clean Cities and Communities coalitions to translate cohort learnings to local context and conduct activities that brought participants closer developing of public electric vehicle charging infrastructure plans. This document shares key takeaways, lessons learned, and resources from the six-month cohort.

ADVANCED PROPULSION SYSTEMS↗

Trends, Insights, and Considerations for Agrivoltaics in the Northeast: Applying National Lessons Learned to the Case of Pennsylvania

There are unique challenges and opportunities at the nexus of agriculture and energy. This presentation will feature a social science overview of agrivoltaics, which is the practice of combining solar energy and agricultural production on the same land. Centering on recent research and commercial insights, this presentation will discuss the implications of lessons learned in the Northeast and highlight key considerations for future agrivoltaic R&D in Pennsylvania.

agriculture↗

Does practice make perfect? Lessons learned from full-scale power system incident response exercise

While threats to the energy sector occur daily, few utilities get the opportunity to fully test out their detection and response mechanisms to advanced threats in the real world. With the high demand for reliability, few grid operators would allow execution of simulated cyber-attacks on their live systems. The DOE-funded Liberty Eclipse project offers a unique opportunity for small and large utilities and coops to practice their combined IT/OT responses to a live red team executing attacks against an isolated power system on an island in New York. Both cyber teams and power operations teams must work together to detect and respond to attacks, even restoring the power system against extreme impacts. Lessons learned from these exercises reveal key takeaways for understanding what a real attack against the electric sector will look like, gaps in execution of the best-laid plans when the pressure of a real event is bearing down, and how organizations can better prepare for advanced attacks by optimizing participation in exercises. This presentation will discuss successes and opportunities for improvement both in how utilities can prepare for and respond to events, as well as how full-scale IT/OT exercises can be coordinated.

24 POWER TRANSMISSION AND DISTRIBUTION↗

From IMPEL to Impact: Lessons Learned in Accelerating Innovative Building Technologies

The built environment is a complex ecosystem of social institutions and physical infrastructures. Innovation and entrepreneurship in the building industry are critical levers for market transformation toward equitable climate action. However, climate tech innovation for the built environment is not moving fast enough for global needs, and it lacks fundamental diversity, leading to inequitable outcomes. IMPEL (Incubating Market-propelled Entrepreneurial-mindset at the Labs and Beyond) - a U.S. Department of Energy incubator–addresses these critical issues. Over five years, IMPEL has enabled 250 innovators, including 55% women and diverse founders, to accelerate their buildings and clean energy technologies towards market and climate impact. IMPEL provides access to strategic mentoring and coaching, carbon tools training, testbeds, and powerful public-private pipelines, including industry demonstrations, non-dilutive grants, and venture capital networks. The IMPEL innovation ecosystem has accelerated the pace of innovation and market adoption of building decarbonization technologies. In this paper, leverage the IMPEL stakeholder ecosystem - from innovators to investors and product industry to policymakers - to analyze the critical barriers to decarbonization still encountered in the building industry. We study the IMPEL approach and highlight lessons learned that benefit young businesses pursuing innovative building and building-edge energy technologies to develop new ideas and products. Finally, we propose a ‘market forming’ framework to improve the quality and efficiency of the entrepreneurial ecosystem in the building industry. This framework could scale vetted technologies and the participation of diverse founders to de-risk the climate tech

Singh, Reshma↗

Lessons Learned from Three Agrivoltaic Installations in New Jersey

Agrivoltaics is a new technology that has the potential to positively impact commercial farming by combining agricultural practices with the generation of solar energy. While some yield reduction is to be expected, resulting from less sunlight reaching the plant canopy and ground occupied by support structures, the generated electricity provides a low-risk supplemental income to farmers. In order to combine farming with electricity generation, agrivoltaic systems use a lower ground coverage ratio compared to normal solar farms and the PV panels are often mounted higher above the ground in order to facilitate the movement of agricultural equipment and to reduce the contrast between shaded and non-shaded areas. With funding provided from the state of New Jersey and the New Jersey Agricultural Experiment Station (NJAES), we designed and installed three unique agrivoltaic research systems at Rutgers/NJAES farms. These projects were recently completed and are generating electricity that is exported to the grid. This paper discusses the lessons we have learned along the way, including all the steps necessary to see an agrivoltaic project through to completion.

14 SOLAR ENERGY↗

Lessons Learned from Three Agrivoltaic Installations in New Jersey

Agrivoltaics is a new technology that has the potential to positively impact commercial farming by combining agricultural practices with the generation of solar energy. While some yield reduction is to be expected, resulting from less sunlight reaching the plant canopy and ground occupied by support structures, the generated electricity provides a low-risk supplemental income to farmers. In order to combine farming with electricity generation, agrivoltaic systems use a lower ground coverage ratio compared to normal solar farms and the PV panels are often mounted higher above the ground in order to facilitate the movement of agricultural equipment and to reduce the contrast between shaded and non-shaded areas. With funding provided from the state of New Jersey and the New Jersey Agricultural Experiment Station (NJAES), we designed and installed three unique agrivoltaic research systems at Rutgers/NJAES farms. These projects were recently completed and are generating electricity that is exported to the grid. This paper discusses the lessons we have learned along the way, including all the steps necessary to see an agrivoltaic project through to completion.

14 SOLAR ENERGY↗

Lessons Learned from the Clean Energy to Communities (C2C) Peer-Learning Cohort Enhancing Resilience at Critical Facilities through Solar, Storage, and Microgrids

The National Renewable Energy Laboratory (NREL), with support from World Resources Institute (WRI), designed and led a six-month peer-learning cohort from January through July 2024 on "Enhancing Resilience at Critical Facilities through Solar, Storage, and Microgrids" as part of the U.S Department of Energy's Clean Energy to Communities (nrel.gov/c2c) (C2C) program. Representatives from 15 municipalities, municipal utilities, colleges, and Tribes from across the United States participated in monthly workshops covering best practices for planning and deploying local resilience projects. This document shares key takeaways, lessons learned, and resources from the cohort including considerations for planning, proposing, designing, procuring, and funding microgrid projects for resilience.

C2C↗

Lessons Learned from the Clean Energy to Communities (C2C) Peer-Learning Cohort Evaluating and Prioritizing Municipal Buildings for Energy Efficiency and Decarbonization Investment

The National Renewable Energy Laboratory (NREL), with support from World Resources Institute (WRI), designed and led a six-month peer-learning cohort from January through July 2024 on "Enhancing Resilience at Critical Facilities through Solar, Storage, and Microgrids" as part of the U.S Department of Energy's Clean Energy to Communities (nrel.gov/c2c) (C2C) program. Representatives from 15 municipalities, municipal utilities, colleges, and Tribes from across the United States participated in monthly workshops covering best practices for planning and deploying local resilience projects. This document shares key takeaways, lessons learned, and resources from the cohort.

buildings↗

Lessons Learned from the Clean Energy to Communities (C2C) Peer-Learning Cohort Incorporating Community Priorities into Electric Vehicle Plans and Projects

The National Renewable Energy Laboratory (NREL), with support from World Resources Institute (WRI), designed and led a six-month peer-learning cohort from January through July 2024 on "Enhancing Resilience at Critical Facilities through Solar, Storage, and Microgrids" as part of the U.S Department of Energy's Clean Energy to Communities (nrel.gov/c2c) (C2C) program. Representatives from 15 municipalities, municipal utilities, colleges, and Tribes from across the United States participated in monthly workshops covering best practices for planning and deploying local resilience projects. This document shares key takeaways, lessons learned, and resources from the cohort including key steps that can be taken to help entities design effective community engagement processes around clean mobility.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Updates and Lessons Learned from NuMI Beamline at Fermilab

The Neutrinos at the Main Injector (NuMI) beamline at Fermilab generates an intense muon neutrino beam for the NOvA (NuMI Off-axis $\nu_e$ Appearance) long-baseline neutrino experiment. Over the years, the NuMI beamline has been pivotal in advancing neutrino physics, providing invaluable data and insights. This proceeding paper discusses updates and the lessons learned from recent experiences during the beam operations, maintenance, and monitoring of the NuMI beamline. Key topics include the optimization of beam performance and challenges in maintaining beamline stability. The paper aims to share best practices and provide a road-map for future beamline projects, including the Long-Baseline Neutrino Facility (LBNF).

43 PARTICLE ACCELERATORS↗