Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch control system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Field Programmable Gate Array Failure Rate Estimation Guidelines for Launch Vehicle Fault Tree Models

Today's launch vehicles complex electronic and avionic systems heavily utilize the Field Programmable Gate Array (FPGA) integrated circuit (IC). FPGAs are prevalent ICs in communication protocols such as MIL-STD-1553B, and in control signal commands such as in solenoid/servo valves actuations. This paper will demonstrate guidelines to estimate FPGA failure rates for a launch vehicle, the guidelines will account for hardware, firmware, and radiation induced failures. The hardware contribution of the approach accounts for physical failures of the IC, FPGA memory and clock. The firmware portion will provide guidelines on the high level FPGA programming language and ways to account for software/code reliability growth. The radiation portion will provide guidelines on environment susceptibility as well as guidelines on tailoring other launch vehicle programs historical data to a specific launch vehicle.

Al Hassan, Mohammad↗

Workload characterization for the space station data communications system

NASA plans to launch a permanent manned space station in the early 1990's. The station will be used to support a wide variety of activities involving Earth and space observation, satellite maintenance, scientific experimentation, and commercial manufacturing. The control and monitoring of many of these activities will require extensive computer and communications system support. In order to identify an appropriate computer and communication system for supporting the space station, an attempt to characterize the space station's data communications subsystem workload is currently underway. Some of the special aspects of the workload characterization problem are discussed in connection with the space station, and some possible approaches are presented.

Sevcik, K. C.↗

Measurements of concentrations of chlorofluoromethanes (CFMs) carbon dioxide and carbon isotope ratio in stratospheric and tropospheric air by grab-sampling systems

Measurements of concentrations of chlorofluoromethanes (CFMs), carbon dioxide and carbon isotope ratio in stratospheric and tropospheric air by grab-sampling systems are reported. The balloon-borne grab-sampling system has been launched from Sanriku Balloon Center three times since 1981. It consists of: (1) six sampling cylinders, (2) eight motor driven values, (3) control and monitor circuits, and (4) pressurized housing. Particular consideration is paid to the problem of contamination. Strict requirements are placed on the choice of materials and components, construction methods, cleaning techniques, vacuum integrity, and sampling procedures. An aluminum pressurized housing and a 4-m long inlet line are employed to prevent the sampling air from contamination by outgassing of sampling and control devices. The sampling is performed during the descent of the system. Vertical profiles of mixing ratios of CF2Cl2, CFCl3 and CH4 are given. Mixing ratios of CF2Cl2 and CFCl3 in the stratosphere do not show the discernible effect of the increase of those in the ground level background, and decrease with altitude. Decreasing rate of CFCl3 is larger than that of CF2Cl2. CH4 mixing ratio, on the other hand, shows diffusive equilibrium, as the photodissociation cross section of CH4 is small and concentrations of OH radical and 0(sup I D) are low.

Itoh, T.↗

Computer program for prediction of capture maneuver probability for an on-off reaction controlled upper stage

A FORTRAN coded computer program which computes the capture transient of a launch vehicle upper stage at the ignition and/or separation event is presented. It is for a single degree-of-freedom on-off reaction jet attitude control system. The Monte Carlo method is used to determine the statistical value of key parameters at the outcome of the event. Aerodynamic and booster induced disturbances, vehicle and control system characteristics, and initial conditions are treated as random variables. By appropriate selection of input data pitch, yaw and roll axes can be analyzed. Transient response of a single deterministic case can be computed. The program is currently set up on a CDC CYBER 175 computer system but is compatible with ANSI FORTRAN computer language. This routine has been used over the past fifteen (15) years for the SCOUT Launch Vehicle and has been run on RECOMP III, IBM 7090, IBM 360/370, CDC6600 and CDC CYBER 175 computers with little modification.

Knauber, R. N.↗

The Disposal of Spacecraft and Launch Vehicle Stages in Low Earth Orbit

As a result of the increasing number of debris in low Earth orbit (LEO), numerous national and international orbital debris mitigation guidelines recommend the removal of spacecraft and launch vehicle stages from LEO within 25 years after mission termination. The primary purpose of this action is to enhance space safety by significantly limiting the potential of future accidental collisions resulting in the creation of large numbers of new orbital debris. Likewise, the passivation of these objects, i.e., the removal of residual stored energies, while they remain in orbit is important to prevent the generation of debris via self-induced explosions. Characteristics and trends in the growth of the derelict spacecraft and launch vehicle stage populations in LEO are examined. Depending upon the final operational altitude of the vehicle, achieving the goal of orbital lifetime reduction can influence the design and deployment philosophy of a new space system. Some spacecraft and launch vehicle stages have combined their end-of-mission passivation operations with maneuvers to vacate long-lived orbital regimes. Perhaps the most dramatic demonstration of this type occurred in 2006 when a U.S. Delta IV second stage executed an unprecedented controlled-reentry maneuver from a circular orbit at an altitude near 850 km. For space systems in orbital regimes near the upper regions of LEO (i.e., between 1400 km and 2000 km altitude), maneuvers to place the vehicle above LEO might be more attractive than attempting to ensure an atmospheric reentry within 25 years, and at least one space system operator has selected this option. In some cases, careful consideration of natural orbital perturbations can also lead to reduced orbital lifetimes, although new launch constraints might need to be imposed.

Johnson, Nicholas L.↗

The INCO Expert System Project: CLIPS in Shuttle mission control

The INCO (Integrated Communications Officer) Expert System Project (IESP) was undertaken in 1987 by the Mission Operations Directorate (MOD) at NASA's Johnson Space Center (JSC) to explore the use of advanced automation in the mission operations arena. One of MOD's primary responsibilities in the space shuttle program is the manning of the flight control positions in the Mission Control Center (MCC) at JSC. The MCC is the central hub for all ground support activities in support of Space Shuttle missions. Its responsibility extends from the moment of lift-off from the launch pad though the completion of landing. The flight controllers in the MCC are tasked with monitoring the health and status of all on-board systems and payloads, detecting and remedying errors and failures, and modifying flight activity plans accordingly.

Rasmussen, Arthur N.↗

Design and operation of the U.S. Space Station Freedom Propulsion System

The propulsion functions for the U.S. Space Station Freedom (SSF) are accomplished by two separate systems, the Primary Propulsion System and the Supplemental Reboost System (SRS). The Primary Propulsion System includes self-contained hydrazine modules for station reboost, attitude control and contingency maneuvers. These Propulsion Modules contain reboost and attitude control thrusters, propellant storage, thermal conditioning and electronic controls. The modules are serviced on the ground and launched on the Space Shuttle as replacements for the on-orbit modules which have expended their propellant. The expended modules are returned to the ground for reservicing and subsequent reuse. The Supplemental Reboost System includes a Waste Gas Assembly and Resistojet Modules which are used for reboost maneuvers only. The Waste Gas Assembly contains waste gas storage, compressors and dryers and the Resistojet Modules contain multipropellant resistojet thrusters, electronic pressure regulators and power conditioning equipment.

Morano, Joseph S.↗

GOES-8 and -9 mission launch and operations support overview

The new series of geosynchronous operational environmental satellite (GOES) missions, GOES-8 and GOES-9, provide greater instrument coverage flexibility and greater resolution than previous GOES spinners. This added flexibility and the three-axis stabilized operating mode results in control system of increased complexity: almost 5000 real-time commands are sent daily to the satellites compared to 200 commands per day for GOES-7. These advanced technologies present new challenges to the NASA operations support personnel. In order to prepare for launching, post-launch tests and in-orbit operations, a mission planning scheme was developed in order to assure the flight system command and the systems' health monitoring. The mission operations approaches are reviewed together with the associated philosophies and the operation tools developed to assist the personnel in performing complex routine and special operation tasks.

McCuistion, D.↗

Space Transportation System Availability Requirements and Its Influencing Attributes Relationships

It is essential that management and engineering understand the need for an availability requirement for the customer's space transportation system as it enables the meeting of his needs, goal, and objectives. There are three types of availability, e.g., operational availability, achieved availability, or inherent availability. The basic definition of availability is equal to the mean uptime divided by the sum of the mean uptime plus the mean downtime. The major difference is the inclusiveness of the functions within the mean downtime and the mean uptime. This paper will address tIe inherent availability which only addresses the mean downtime as that mean time to repair or the time to determine the failed article, remove it, install a replacement article and verify the functionality of the repaired system. The definitions of operational availability include the replacement hardware supply or maintenance delays and other non-design factors in the mean downtime. Also with inherent availability the mean uptime will only consider the mean time between failures (other availability definitions consider this as mean time between maintenance - preventive and corrective maintenance) that requires the repair of the system to be functional. It is also essential that management and engineering understand all influencing attributes relationships to each other and to the resultant inherent availability requirement. This visibility will provide the decision makers with the understanding necessary to place constraints on the design definition for the major drivers that will determine the inherent availability, safety, reliability, maintainability, and the life cycle cost of the fielded system provided the customer. This inherent availability requirement may be driven by the need to use a multiple launch approach to placing humans on the moon or the desire to control the number of spare parts required to support long stays in either orbit or on the surface of the moon or mars. It is the intent of this paper to provide the visibility of relationships of these major attribute drivers (variables) to each other and the resultant system inherent availability, but also provide the capability to bound the variables providing engineering the insight required to control the system's engineering solution. An example of this visibility will be the need to provide integration of similar discipline functions to allow control of the total parts count of the space transportation system. Also the relationship visibility of selecting a reliability requirement will place a constraint on parts count to achieve a given inherent availability requirement or accepting a larger parts count with the resulting higher reliability requirement. This paper will provide an understanding for the relationship of mean repair time (mean downtime) to maintainability, e.g., accessibility for repair, and both mean time between failure, e.g., reliability of hardware and the system inherent availability. Having an understanding of these relationships and resulting requirements before starting the architectural design concept definition will avoid considerable time and money required to iterate the design to meet the redesign and assessment process required to achieve the results required of the customer's space transportation system. In fact the impact to the schedule to being able to deliver the system that meets the customer's needs, goals, and objectives may cause the customer to compromise his desired operational goal and objectives resulting in considerable increased life cycle cost of the fielded space transportation system.

Rhodes, Russel E.↗

Gemini Program Mission Report for Gemini-Titan 1 (GT-1)

The Gemini-Titan 1 (GT-1) space vehicle was comprised of the Gemini spacecraft and the Gemini launch vehicle. The Gemini launch vehicle is a two-stage modified Titan II ICBM. The major modifications are the addition of a malfunction detection system and a secondary flight controls system. The Gemini spacecraft, designed to carry a crew of two men on earth orbital and rendezvous missions, was unmanned for the flight reported herein (GT-1). There were no complete Gemini flight systems on board; however, the C-band transponder and telemetry transmitters were Gemini flight subsystems. Dummy equipment, having a mass and moment of inertia equal to flight system equipment, was installed in the spacecraft. The Spacecraft was instrumented to obtain data on spacecraft heating, structural loading, vibration, sound pressure levels, and temperature and pressure during the launch phase.

Source record↗

TC-2 post Helios experiment data review

Data are presented from a systems postflight analysis of the Centaur Launch Vehicle and Helios. Also given is a comparison of data from preflight analyses. Topics examined are: (1) propellant behavior; (2) helium usage; (3) propellant tank pressurization; (4) propellant tank thermodynamics; (5) component heating; thermal control; and thermal protection system; (6) main engine system; (7) H2O2 consumption; (8) boost pump post-meco performance; and (9) an overview of other systems.

Source record↗

System Level Analysis of a Water PCM HX Integrated into Orion's Thermal Control System

In a cyclical heat load environment such as low Lunar orbit, a spacecraft's radiators are not sized to reject the full heat load requirement. Traditionally, a supplemental heat rejection device (SHReD) such as an evaporator or sublimator is used to act as a "topper" to meet the additional heat rejection demands. Utilizing a Phase Change Material (PCM) heat exchanger (HX) as a SHReD provides an attractive alternative to evaporators and sublimators as PCM HXs do not use a consumable, thereby leading to reduced launch mass and volume requirements. In continued pursuit of water PCM HX development an Orion system level analysis was performed using Thermal Desktop for a water PCM HX integrated into Orion's thermal control system in a 100km Lunar orbit. The study verified of the thermal model by using a wax PCM and analyzed 1) placing the PCM on the Internal Thermal Control System (ITCS) versus the External Thermal Control System (ETCS) 2) use of 30/70 PGW verses 50/50 PGW and 3) increasing the radiator area in order to reduce PCM freeze times. The analysis showed that for the assumed operating and boundary conditions utilizing a water PCM HX on Orion is not a viable option for any case. Additionally, it was found that the radiator area would have to be increased by at least 40% in order to support a viable water-based PCM HX.

Navarro, Moses↗

Lessons Learned During the Refurbishment and Testing of an Observatory After Long-Term Storage

Thermal Fluids Analysis Workshop (TFAWS) 2015, Silver Spring, MD NCTS 21070-15. This paper addresses the lessons learned during the refurbishment and testing of the thermal control system for a spacecraft which was placed into long-term storage. The DSCOVR (Deep Space Climate Observatory) Observatory (formerly known as Triana) was originally scheduled to launch on the Space Shuttle in 2002. With the Triana spacecraft nearly complete, the mission was canceled and the satellite was abruptly put into storage in 2001. In 2008 the observatory was removed from storage to begin refurbishment and testing. Problems arose associated with hardware that was not currently manufactured, coatings degradation, and a significant lack of documentation. Also addressed is the conversion of the thermal and geometric math models for use with updated thermal analysis software tools.

Thermal Control System↗

Retrievable Payload Carrier (RPC): Next generation Long Duration Exposure Facility

The Retrievable Payload Carrier (RPC) is described which is a multi-experiment, free-flyer spacecraft being privately developed to make in-space experimentation more accessible and economically feasible for research and development organizations. The carrier concept was derived from NASA's highly successful and flight proven Long Duration Exposure Facility (LDEF). The LDEF capabilities were enhanced to meet new customer requirements. This reusable payload carrier is planned for launch and retrieval by the space shuttle on a regular basis. The RPC's compact design facilitates flexible manifesting of the shuttle cargo bay space, thereby, permitting timely launches and retrievals. The vehicle is designed so that either the entire carrier can be retrieved from orbit, or individual experiment pallets can be removed and replaced in orbit. This gives customers even greater control over their experiment recoveries. A fully operational RPC System consists of: (1) a carrier spacecraft; (2) a ground control station for communication with customer payloads and the carrier; (3) a ground processing facility to provide refurbishment, final checkout, and integration of customer payloads and the carrier; and (4) the personnel required to support both the development and operation phases of the program. Customer payloads will fly 6 to 18 month missions, or longer, as required. Spreading launch, operations, and retrieval costs over multiple experimental payloads results in minimized customer costs. The RPC Program's initial objective is to operate a simple carrier system which meets basic customer service needs.

Perry, Arthur T.↗

A Tailored Concept of Operations for NASA LSP Integrated Operations

An integral part of the Systems Engineering process is the creation of a Concept of Operations (ConOps) for a given system, with the ConOps initially established early in the system design process and evolved as the system definition and design matures. As Integration Engineers in NASA's Launch Services Program (LSP) at Kennedy Space Center (KSC), our job is to manage the interface requirements for all the robotic space missions that come to our Program for a Launch Service. LSP procures and manages a launch service from one of our many commercial Launch Vehicle Contractors (LVCs) and these commercial companies are then responsible for developing the Interface Control Document (ICD), the verification of the requirements in that document, and all the services pertaining to integrating the spacecraft and launching it into orbit. However, one of the systems engineering tools that have not been employed within LSP to date is a Concept of Operations. The goal of this project is to research the format and content that goes into these various aerospace industry ConOps and tailor the format and content into template form, so the template may be used as an engineering tool for spacecraft integration with future LSP procured launch services.

Systems↗

Tailoring a ConOps for NASA LSP Integrated Operations

An integral part of the Systems Engineering process is the creation of a Concept of Operations (ConOps) for a given system, with the ConOps initially established early in the system design process and evolved as the system definition and design matures. As Integration Engineers in NASA's Launch Services Program (LSP) at Kennedy Space Center (KSC), our job is to manage the interface requirements for all the robotic space missions that come to our Program for a Launch Service. LSP procures and manages a launch service from one of our many commercial Launch Vehicle Contractors (LVCs) and these commercial companies are then responsible for developing the Interface Control Document (ICD), the verification of the requirements in that document, and all the services pertaining to integrating the spacecraft and launching it into orbit. However, one of the systems engineering tools that have not been employed within LSP to date is a Concept of Operations. The goal of this paper is to research the format and content that goes into these various aerospace industry ConOps and tailor the format and content into template form, so the template may be used as an engineering tool for spacecraft integration with future LSP procured launch services. This tailoring effort was performed as the authors final Masters Project in the Spring of 2016 for the Stevens Institute of Technology and modified for publication with INCOSE (Owens, 2016).

Knowledge↗

System Level Analysis of a Water PCM HX Integrated Into Orion's Thermal Control System Abstract

In a cyclical heat load environment such as low Lunar orbit, a spacecraft's radiators are not sized to reject the full heat load requirement. Traditionally, a supplemental heat rejection device (SHReD) such as an evaporator or sublimator is used to act as a "topper" to meet the additional heat rejection demands. Utilizing a Phase Change Material (PCM) heat exchanger (HX) as a SHReD provides an attractive alternative to evaporators and sublimators as PCM HXs do not use a consumable, thereby leading to reduced launch mass and volume requirements. In continued pursuit of water PCM HX development an Orion system level analysis was performed using Thermal Desktop for a water PCM HX integrated into Orion's thermal control system and in a 100km Lunar orbit. The study analyzed 1) placing the PCM on the Internal Thermal Control System (ITCS) versus the External Thermal Control System (ETCS) 2) use of 30/70 PGW verses 50/50 PGW and 3) increasing the radiator area in order to reduce PCM freeze times. The analysis showed that for the assumed operating and boundary conditions utilizing a water PCM HX on Orion is not a viable option. Additionally, it was found that the radiator area would have to be increased over 20% in order to have a viable water‐based PCM HX.

Navarro, Moses↗

Simplified Ion Thruster Xenon Feed System for NASA Science Missions

The successful implementation of ion thruster technology on the Deep Space 1 technology demonstration mission paved the way for its first use on the Dawn science mission, which launched in September 2007. Both Deep Space 1 and Dawn used a "bang-bang" xenon feed system which has proven to be highly successful. This type of feed system, however, is complex with many parts and requires a significant amount of engineering work for architecture changes. A simplified feed system, with fewer parts and less engineering work for architecture changes, is desirable to reduce the feed system cost to future missions. An attractive new path for ion thruster feed systems is based on new components developed by industry in support of commercial applications of electric propulsion systems. For example, since the launch of Deep Space 1 tens of mechanical xenon pressure regulators have successfully flown on commercial spacecraft using electric propulsion. In addition, active proportional flow controllers have flown on the Hall-thruster-equipped Tacsat-2, are flying on the ion thruster GOCE mission, and will fly next year on the Advanced EHF spacecraft. This present paper briefly reviews the Dawn xenon feed system and those implemented on other xenon electric propulsion flight missions. A simplified feed system architecture is presented that is based on assembling flight-qualified components in a manner that will reduce non-recurring engineering associated with propulsion system architecture changes, and is compared to the NASA Dawn standard. The simplified feed system includes, compared to Dawn, passive high-pressure regulation, a reduced part count, reduced complexity due to cross-strapping, and reduced non-recurring engineering work required for feed system changes. A demonstration feed system was assembled using flight-like components and used to operate a laboratory NSTAR-class ion engine. Feed system components integrated into a single-string architecture successfully operated the engine over the entire NSTAR throttle range over a series of tests. Flow rates were very stable with variations of at most 0.2%, and transition times between throttle levels were typically 90 seconds or less with a maximum of 200 seconds, both significant improvements over the Dawn bang-bang feed system.

Snyder, John Steven↗