Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “finance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Energy I-Corps Annual Report 2025

Energy I-Corps is an initiative of the Department of Energy's Office of Technology Commercialization. The focus of this 2-month program is to train National Laboratory researchers in evaluating industry needs and potential market applications for their DOE technologies. This year's annual report details the accomplishments, activities, and finances of Energy I-Corps' 2025 fiscal year programming.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

State of Innovation 2025: Progress in Accelerating Next-Generation Cement and Concrete Technologies

The cement and concrete sectors are entering a decisive period as next-generation technologies advance from laboratory research to demonstration, early deployment, and first-of-a-kind commercial plants. Building on the 2024 State of Innovation report, the 2025 outlook highlights both the rapid acceleration of innovation and the urgent need for coordinated action across the value chain. Venture capital activity into the cement and concrete space stabilized following the record surge of 2022-2023, yet landmark financings, such as Sublime Systems' $200 million round and Terra CO2's $124 million Series B, signal continued investor confidence in companies approaching commercialization. Corporate procurement has become a powerful new catalyst, with Microsoft, Amazon, and CRH (Cement Roadstone Holdings) Ventures providing long-term commitments that underpin the first wave of next-generation cementitious products. The sector is shifting from early-stage experimentation toward the scaling of well-capitalized leaders capable of bridging the critical "capitalization gap." Early innovators continue to expand the toolkit through novel binders, electrochemical cements, biogenic limestone, and carbonate mineralization pathways. Going into 2026, cost competitiveness, durability validation, and scalability enabled by resilient supply chains remain the decisive factors for market adoption. At the 2025 Next Generation Cement and Concrete Critical Technologies Meeting, attendees emphasized dual-track funding strategies that integrate federal grants with private capital as key to enabling market breakthrough. State programs and corporate demand are sustaining momentum, while successful companies increasingly demonstrate both economic value and reduced dependence on imported materials. The National Concrete Pavement Technology Center and others underscored that broad integration of next-generation materials will hinge on standards compatibility, verified field performance, and workforce readiness. Colorado continues to serve as a proving ground through pilot programs that combine supplier training, phased implementation, and real-world data to de-risk innovation and provide replicable models for other regions. The 2025 Cement and Concrete Critical Technologies Workshop reinforced that scaling next-generation materials will require alignment among technology innovation, performance validation, and market demand. Stakeholders must move beyond siloed efforts toward collaborative frameworks that coordinate standards, funding, and infrastructure deployment. As a neutral convener and technical validator, the National Laboratory of the Rockies (NLR) plays a pivotal role in bridging innovation and market adoption through collaborative research, technology validation, and entrepreneurship programs. By uniting innovators, incumbents, policymakers, contractors, and investors, NLR and its partners are helping chart a credible pathway toward widespread commercialization in the decade ahead.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

GAIN Base Presentation Slide Deck 2/12/25

The GAIN Base Slide Deck is a compilation of topics that GAIN presents routinely to outside entities to educate them on the GAIN program, technology, demonstrations, coal to nuclear, energy systems, Financing, Supply Chain, Legislation, Regulatory, and Consent Based Citing.

99 - GENERAL AND MISCELLANEOUS↗

Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators

he exponential growth of data centers—driven by artificial intelligence and cloud computing—is reshaping the U.S. energy landscape, presenting urgent challenges and transformative opportunities for data center developers, nuclear energy providers, and utility operators. As data centers are projected to consume up to 12% of U.S. electricity by 2028, stakeholders must address rapid deployment needs, grid congestion, and the demand for reliable, high-quality power. This presentation explores the multifaceted barriers to integrating data centers with nuclear and utility infrastructure, including land use constraints, public perception, regulatory complexity, and workforce alignment. It highlights the distinct priorities and operational cultures of each sector, and the friction that arises from misaligned planning horizons and risk tolerances. We examine collaborative strategies such as co-siting, hybrid power-purchase agreements, unified community engagement, and innovative financing models.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

All Systems Go: Regional Collaborations for Scaling AEC Innovation: Preprint

The high and rising cost of preserving and delivering housing in the U.S. requires changes to existing practices of finance, design, and construction. Innovative methods such as industrialized construction could offer the means to address housing undersupply while reducing delivery costs, operational costs and material waste in the building industry, but they face challenges to success and to scale. Simultaneously, construction and cleantech innovators themselves face skepticism from the traditional entrepreneurial ecosystem such as incubators and accelerators while attempting to navigate systems level challenges. To respond to this need, various public and private sector stakeholders have launched initiatives to support innovative companies. These include nonprofits such as Terner Labs and Ivory Innovations offering curated programming to architecture, engineering, and construction (AEC) startups; housing developers in Minnesota and California "bundling" multiple projects together to reach economies of scale with a consistent project team; public and private sector entities developing "catalogues" of pre-approved home designs in the U.S. and Canada. This exploratory paper documents several of these emerging ecosystem-development efforts to support innovative housing approaches, characterizing them by leading stakeholder and intervention strategy based on publicly available information. The paper finds that these initiatives share similar high level goals but vary in implementation, reflecting different stakeholder priorities, regional market and policy dynamics, and housing typologies. The early stage of these efforts offer limited data for comparing actual outcomes, but the paper highlights common qualitative themes and identifies opportunities for further research and potential coordination among these efforts.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Funding Solar Projects at Federal Agencies: Mechanisms and Selection Criteria [Brochure]

Implementing solar energy projects at federal facilities is a process. The project planning phase of the process includes determining goals, building a team, determining site feasibility and selecting the appropriate project funding tool. This fact sheet gives practical guidance to assist decision-makers with understanding and selecting the funding tool that would best address their site goals.

14 SOLAR ENERGY↗

Geothermal FIT Design: International Experience and U.S. Considerations

Developing power plants is a risky endeavor, whether conventional or renewable generation. Feed-in tariff (FIT) policies can be designed to address some of these risks, and their design can be tailored to geothermal electric plant development. Geothermal projects face risks similar to other generation project development, including finding buyers for power, ensuring adequate transmissioncapacity, competing to supply electricity and/or renewable energy certificates (RECs), securing reliable revenue streams, navigating the legal issues related to project development, and reacting to changes in existing regulations or incentives. Although FITs have not been created specifically for geothermal in the United States to date, a variety of FIT design options could reduce geothermalpower plant development risks and are explored. This analysis focuses on the design of FIT incentive policies for geothermal electric projects and how FITs can be used to reduce risks (excluding drilling unproductive exploratory wells).

15 GEOTHERMAL ENERGY↗

Geothermal Exploration Policy Mechanisms: Lessons for the United States from International Applications

This report focuses on five of the policy types that are most relevant to the U.S. market and political context for the exploration and confirmation of conventional hydrothermal (geothermal) resources in the United States: (1) drilling failure insurance, (2) loan guarantees, (3) subsidized loans, (4) capital subsidies, and (5) government-led exploration. It describes each policy type and its application in other countries and regions. It offers policymakers a guide for drafting future geothermal support mechanisms for the exploration-drilling phase of geothermal development.

15 GEOTHERMAL ENERGY↗

Geothermal Exploration Policy Mechanisms: Lessons for the United States from International Applications

This report focuses on five of the policy types that are most relevant to the U.S. market and political context for the exploration and confirmation of conventional hydrothermal (geothermal) resources in the United States: (1) drilling failure insurance, (2) loan guarantees, (3) subsidized loans, (4) capital subsidies, and (5) government-led exploration. It describes each policy type and its application in other countries and regions. It offers policymakers a guide for drafting future geothermal support mechanisms for the exploration-drilling phase of geothermal development.

15 GEOTHERMAL ENERGY↗

Banking on Solar: New Opportunities for Lending (Fact Sheet)

The U.S. solar industry is a $13.7 billion market with roughly 450,000 systems in place. Bank and credit union lending for solar system deployment represents a valuable new opportunity for lenders to expand their consumer and commercial customer relationships, bring on new relationships and open a new asset class category.

14 SOLAR ENERGY↗

Best Practices for Selecting an ESCO: ESPC Accelerator

This document details steps and best practices for selecting an energy services company (ESCO), including how to conduct a request for proposals, to execute energy savings performance contracting (ESPC) projects.

EPSC, Energy Savings Performance Contracting, ESCO↗

Key Accomplishments & Results: ESPC Accelerator

This document provides a high-level summary of the results of DOE’s Better Buildings Energy Savings Performance Contracting Accelerator, which was a three-year partnership with states, local governments, and K-12 schools to expand access to performance contracting.

Energy Savings Performance Contracting, ESPC, Econ↗

Local Risk-Minimization for Defaultable Claims with Recovery Process

We study the local risk-minimization approach for defaultable claims with random recovery at default time, seen as payment streams on the random interval [0,{tau} Logical-And T], where T denotes the fixed time-horizon. We find the pseudo-locally risk-minimizing strategy in the case when the agent information takes into account the possibility of a default event (local risk-minimization with G-strategies) and we provide an application in the case of a corporate bond. We also discuss the problem of finding a pseudo-locally risk-minimizing strategy if we suppose the agent obtains her information only by observing the non-defaultable assets.

97 MATHEMATICS AND COMPUTING↗