Effective number of breeders from sibship reconstruction: empirical evaluations using hatchery steelhead
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Abstract not provided.
Over the next 15 years, electricity demand from the key residential and commercial appliances is projected to be nearly 300 GW or ~65% of India’s total peak demand. The objective of this study is to characterize appliance level demand and temporal variation, and identify the overall DR potential in India. We use Bangalore Electricity Supply Company territory (peak load of 3,505 MW in 2016) as a case study, using actual one-minute resolution load data for 2,979 distribution feeders and a detailed load survey. Our results show that agricultural pumping and space cooling (residential, commercial, and industrial) are the main contributors to the peak demand – with shares of 23-27% and 14-23%, respectively. Both sectors have about 1,000 MW of DR potential – agricultural pumps offering load shifting service while space cooling offering shimmy service that is capable of dynamically adjusting to react to short-run ramps and grid disturbances. Residential electric water heaters contribute nearly 18% of the winter morning peak demand and can also offer about 500 MW in shimmy service. Overall, we find that shifting and shimmy services offer 1,199 MW and 1,511 MW total DR potential, respectively.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Grid-forming inverters rely upon an internal reference to regulate the grid’s voltage and frequency. Without a reliable reference, issues such as loss of synchronism, frequency instability, and unequal power sharing can occur. One proposed internal phase reference for grid-forming inverters is generated by the controller’s clock, but this is affected by nonidealities in the crystal oscillator leading to time drift in the phase reference. To improve the controller’s clock accuracy, the Global Positioning System (GPS) can be used to calibrate the internal clock. Previously, GPS-based clock calibration was explored theoretically and various methods were developed for mitigating frequency/phase drift at the power system level. This paper experimentally validates the direct performance of GPS time-calibration at the controller level and justifies its use in maintaining an accurate phase reference for droop-based grid-forming inverters.
Explore the source record for details and available documents.
Abstract not provided.