Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “bill”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Urban Air Mobility Noise: Current Practice, Gaps, and Recommendations

In 2018, NASA formed an Urban Air Mobility Noise Working Group to assemble noise experts from industry, universities and government agencies to identify, discuss, and address urban air mobility (UAM) noise issues. This paper presents a set of high-level goals intended to address barriers associated with UAM noise that may hamper their entry into service. It summarizes the current practice, identifies gaps in the current practice, and makes recommendations to address the gaps to achieve the high-level goals in four areas of interest: Tools and Technologies, Ground and Flight Testing, Human Response and Metrics, and Regulation and Policy.

urban air mobility↗

TriTruss Packaging and Deployment Trade Study

An architecture and feasibility study of next generation In-Space Assembled Telescopes (iSAT) concluded that robotic in-space assembly of modular components is necessary to enable large (>15-meter diameter) primary apertures. The iSAT study recommended that the foundational structure be assembled from modular TriTruss modules that are packaged for launch, deployed on-orbit and robotically assembled into the final configuration. This paper will describe and summarize the results of a trade study that investigated viable concept of operations (ConOps) for the packaging and deployment (P&D) of individual planar TriTruss modules that could be assembled to form a large aperture iSAT. The ideal TriTruss P&D concept is defined as one that: allows for efficient packaging; has sufficient geometric versatility to be launch vehicle independent; provides a stiff and lightweight structure; has low mechanical complexity; and has component modularity. The P&D concept should allow for prelaunch subsystem or utility integration if required. The concept would be kinematically simple and be robotically deployed using a minimum number of specialized tools. In this first phase of an ongoing more comprehensive trade study, concepts were proposed and then evaluated based on initial metrics representing features of an ideal P&D concept. The P&D concepts evaluated are categorized as: core collapse, face collapse, and erectable structures. Sub-scale models were constructed to help understand the kinematics and mechanical complexity required to enable P&D. Based on a weighting scale, the most promising candidate P&D concepts have selected and will undergo more rigorous structural design, analysis, and testing in the study’s next phase. The ultimate goal of the comprehensive trade study will be to recommend a single TriTruss design and associated P&D concept that will be built and evaluated at NASA Langley Research Center’s In-Space Assembly Laboratory.

in-space assembly (ISA)↗

The Breathing Plasmasphere

Explore the source record for details and available documents.

Plasmasphere, refilling, erosion, imaging↗

Tessellation and Numerical Simulation of the in-Space Assembled Telescope (iSAT) Reflector

A novel tessellation method has been developed to allow the use of uniform truss modules to form curved or doubly curved surfaces. To illustrate the method, the structural support for the doubly curved in-Space Assembled Telescope primary reflector is developed. The method intentionally leaves gaps at the nodes between identical connecting modules; the gaps are relatively small, on the order of 0.5% of the lattice characteristic cell size. Uniquely shaped nodal connectors called multi-nuts are generated to fill in the nodal gaps and connect adjacent modules. With optimization techniques, the size of these nodal gaps can be minimized to thereby minimize the incurred structural efficiency losses. Finite element analyses of the primary reflector were performed, and the structural efficiency losses amounted to a natural frequency reduction of 5%. The benefits of having uniform truss modules outweigh the structural penalties as it will greatly simplify assembly and lower manufacturing costs.

Tessellation↗

Near-term Persistent Platform Orbital Testbed: Three Candidate Architecture Options

On-orbit Servicing, Assembly, and Manufacturing (OSAM) will revolutionize the space industry by transforming the concept of operations of space systems and enabling new, radically different system implementations. These new implementations will benefit from a novel persistent asset design paradigm which focuses on evolvable designs that are tailored to the operational environment, not the launch environment. In addition, the ability to launch sub-systems independently enable future persistent assets to economically expand in capability and size, achieving cost effective and productive operations lasting for decades like terrestrial observatories. With few exceptions (International Space Station, Hubble Space Telescope, Mission Extension Vehicle customers), current space systems are not visited once they are operational. Leveraging emerging low cost commercial launch provides the ability to repeatedly and routinely revisit space systems. Thus, revolutionary new approaches for space system design are possible, creating completely new opportunities for small businesses and accelerating the growth of already established space industries. To usher in the revolutionary new operational paradigm, two things are needed. First, to build confidence in the technology and new paradigm, there must be a leading example, a bellwether persistent asset, that demonstrates the reliability and maturity of the new persistent asset paradigm (where repeated visits are common). Second, in order to rapidly advance and validate OSAM capabilities, an efficient means is required to conduct tests in the space environment. A persistent platform testbed satisfies both these needs. The space environment exhibits a plethora of characteristics that are difficult and costly to accurately simulate for a full system in a terrestrial laboratory, such as near zero gravity, a wide range of ionizing radiation types, atomic oxygen, and micro-meteoroids and space debris traveling at high velocity. In addition, since persistent assets range in mass from a few grams to several metric tons, it is difficult to accurately simulate interactions between these systems and visiting vehicles (that also exhibit a wide range of varying masses and capabilities). These interactions include the transmission of forces and/or exchanging mass (in the form of instruments, fuel, robotic assets, etc.). Thus, a rapid, versatile and cost efficient in-space testing capability that includes a persistent test platform and a surrounding in-space test zone is needed to mature technologies through experimentation. The testbed can provide common services, such as: power, thermal control, vibration isolation, data transmission between experiments and terrestrial experimenters, station-keeping, pointing, and robotic agents that can be leveraged by customer experiments. The onboard robotic agents can be used to provide payload handling services, such as: assembly, change out or upgrade, relocation, connecting/disconnecting utilities, inspection, repair or servicing, etc. Since the persistent platform cost will be amortized over many hosted payloads, its services can eventually be offered at a price much lower than if one were to design a unique and dedicated spacecraft and mission for those few experiments. The key to achieving an effective testbed is providing efficient cost effective access and infrastructure to a variety of commercial, academic and government customers coupled with extensibility, in the capability of an individual persistent platform test bed or replication of the test bed in a different operational regime. Three potential options for implementing a test bed were developed and evaluated in this study.

Persistent Platform↗

TESS Science Data Products Description Document: EXP-TESS-ARC-ICD-0014 Rev F

This document discusses data product formats that are produced primarily by the TESS Science Processing Operations Center (SPOC) at NASA Ames Research Center. Data products are sent to the TESS Science Operations Center (SOC) at MIT where they are disseminated to the Mikulski Archive for Space Telescopes (MAST) and the TESS Science Office (TSO).

TESS↗

On-orbit Servicing, Assembly and Manufacturing (OSAM) Near-Term in-Space Developmental Test Persistent Platform: ESPA-Star Based Implementation

Roundtable Session on In-Space Developmental Test: Springboard for Rapid Development. Presentation is a brief description of the On-orbit Servicing Assembly & Manufacturing (OSAM) national initiative & using standard EELV Secondary Payload Adapters (ESPAs) as the core building block to construct an ESPA-Star based implementation for an iSDT persistent platform in space.

Persistent Platform↗

An Initial Concept for Intermediate-State, Passenger-Carrying Urban Air Mobility Operations

This paper describes a general “vision” concept of operations (ConOps) for intermediate state, passenger-carrying urban air mobility (UAM) missions that has been developed jointly by NASA and Deloitte with input from stakeholders in the UAM ecosystem. This vision ConOps provides a broad overview of some of the high-level requirements for realizing the simultaneous operation of hundreds of aircraft over a single metropolitan area in a wide range of weather conditions as conceptualized by many visionaries at the time of its publication. The concepts contained in this vision ConOps are intended to provide a starting point for further discussions and investigations into how UAM operations can be best enabled. Consequently, we also describe some of the areas where additional research is required before a detailed baseline ConOps can be finalized.

urban air mobility↗

The Adaptable, Deployable, Entry and Placement Technology (ADEPT) Enabling Advanced Entry, Descent, and Landing Capabilities for SmallSat Missions

The Adaptable, Deployable Entry and Placement Technology (ADEPT) is a mechanically deployable low-ballistic coefficient aeroshell entry system which performs entry, descent, and landing (EDL) functions for a broad range of planetary destinations including Mars, Venus, Titan and Earth. The deployable system allows mission planners to develop an aeroshell design that is stowed like a folded umbrella, and yet prior to the EDL mission segment, transforms into a deployed, near-rigid low ballistic coefficient configuration. The ADEPT architecture is scalable from a sub-1m class to 6m diameter entry vehicles for Venus and and it has been studied at up to 15m – 20m scale for human exploration class missions. There has been growing interest in performing interplanetary missions with small spacecraft as secondary payloads and ADEPT offers small satellite mission designers the ability to consider Aeroassist technologies to expand mission applications. The ADEPT architecture introduces a new approach for entry vehicle design. It deploys a flexible 3D woven carbon fabric as the primary drag surface. It is capable of surviving high aerothermal heating during entry, while maintaining a robust impermeable membrane that provides high drag for vehicle deceleration. The ADEPT project team has advanced this decelerator technology via systems-level testing at the one meter diameter (nano-ADEPT) scale. A subsonic aeroloads test (May 2015) and a pathfinder arc-jet aeroheating test (Sept 2015) and a successful sounding rocket flight (SR-1) launch of a 0.7 meter deployed diameter ADEPT (September 2018). The SR-1 flight experiment demonstrated most of the primary end-to-end mission stages including: launch in a stowed configuration, separation and deployment in zero-g, exo-atmospheric conditions, and passive ballistic re-entry of a 70 degree half-angle cone geometry. The ADEPT SR-1 sounding rocket flight experiment had to address challenges such as stowing within the constrained payload envelope, fabric folding, and packaging concerns.

Paul Wercinski↗

The 2021 Meteor Shower Activity Forecast for the Lunar South Pole

The purpose of this document is to provide a forecast of major meteor shower activity at the lunar south pole. Most major showers are expected to exhibit typical activity, but the "Finlayids'' (a possible new shower originating from comet 15P/Finlay) may produce an outburst. The Andromedid and Aurigid showers may also outburst in 2021, but these showers are not visible from the lunar south pole.

Althea Moorhead↗

Updates of MERRA-2 Data and Services at NASA GES DISC

Over40 years of NASA climate reanalysis datasets from the Modern-Era Retrospective analysis for Research and Applications, Version 2 (MERRA-2) are available at the NASA Goddard Earth Sciences Data and Information Services Center (GES DISC). In addition to being used in traditional weather and climate research, MERRA-2 is also widely used in application studies of, e.g., wind and solar energy, air quality and health, food and drought, and heat waves. Two new MERRA-2 datasets were recently added at the GES DISC: (1) climate statistics derived fromMERRA-2 daily data to assist in the analysis of extreme temperature and precipitation events and of large-scale meteorological patterns from 1980 to the present and (2) gridded satellite and conventional observations processed in the MERRA-2 system, along with key statistics derived from the data assimilation, to help better understand how the quality of observations directly affect there analysis data. The GES DISC focuses its efforts on continually improving existing data services and to develop new data tools to satisfy various user communities. The newly added features include the following: Time series service: This is a new service for MERRA-2 data, which enables the easy and fast access of long-term hourly or daily time series at a location for popular parameters. The data is saved in a single le in Ascii format with a user- friendly structure. New analytic functions in the subsetter interface: Options for downloading daily minimum and maximum values have been added into the subsetter interface, in addition to the existing daily mean option, for all MERRA-2 and MERRA sub-daily products. Data format conversion to GeoTIFF has been implemented. New variables in Giovanni: Most monthly variables have been integrated into Giovanni, GESDISC’s online visualization and analysis tool. Due to the large data volume, hourly variables were selected based on user requests. More online information: New MERRA-2 documentation has been added: Data How-To, Data in Action, and FAQ. This presentation overviews two new MERRA-2 datasets and illustrates the new features of data services through a number of case studies. MERRA-2 data and services can be found at: https://disc.gsfc.gov/datasets?

Data management↗

UAM Vision Concept of Operations (ConOps) UAM Maturity Level (UML) 4

This Vision ConOps is intended as a foundation to engage members of the UAM community and provide a consensus on the future vision of UAM operations. It provides a concept for more detailed discussion and a basis for the exploration of ideas using a common framework to inform the continued development and integration of UAM as part of the broader transportation system. Advanced Air Mobility (AAM) encompasses a range of innovative aviation technologies (small drones, electric aircraft, automated air traffic management, etc.) that are transforming aviation’s role in everyday life, including the movement of goods and people. Urban Air Mobility (UAM) represents one of the most exciting and complex AAM concepts with highly automated aircraft, providing commercial services to the public over densely populated cities. This concept has generated tremendous interest and industry investment. UAM envisages a future in which advanced technologies and new operational procedures enable practical, cost-effective air travel as an integral mode of transportation in metropolitan areas. It represents one of the most exciting and complex AAM concepts with highly automated aircraft providing commercial services to the public over densely populated cities. For this reason, the National Aeronautics and Space Administration (NASA) selected UAM as the initial goal of its AAM efforts and the focus of this Vision Concept of Operations (ConOps) document. UAM Community Vision ConOps: This Vision ConOps effort was led by experts from NASA’s Aeronautics Research Mission Directorate (ARMD) in collaboration with the Federal Aviation Administration (FAA) and Deloitte’s Ecosystem Advisory Group (a cohort of advisers with aviation, aerospace, and regulatory expertise). To develop this Vision ConOps, NASA, FAA, and Deloitte built upon the current body of aeronautical research and consulted with more than 100 stakeholder organizations. This UAM community includes entities ranging from legacy aviation leaders to innovators and new market entrants. Stakeholders consulted included the federal government, state and local government, aerospace original equipment manufacturers (OEMs), local transportation organizations, prospective UAM operators, academia, industry standards-setting bodies, airports, service suppliers, and others (as described in Appendix G). This input was captured through the following methods: • A series of more than two dozen interviews with industry experts, federal regulators, state and local governments, and industry trade groups provided insight into the challenges of UAM integration into the National Airspace System (NAS), as well as technology developments and a variety of perspectives as to how UAM systems will integrate. • A series of two-day community workshops enabling active, detailed engagement of nearly 100 industry, academic, federal, and state stakeholder individuals. These workshops, hosted by NASA and Deloitte, explored UAM concepts in detail, and stakeholders were invited to collaboratively analyze and propose solutions to some of the greatest conceptual challenges behind UAM at an intermediate state. • A review of more than 160 sources of UAM literature from across government, industry, and academia, which are listed in Appendix H. • The public sharing of workshop input and document drafts for review and input across the UAM community. Feedback in the form of more than 1,000 comments and inputs on the document was received from industry groups, individual companies, academia, and government (federal, state, and local), among others. Although effort was made to incorporate inputs from across the UAM stakeholder group, not all comments could ultimately be incorporated in this version. The team resolved conflicting comments or ideas while maintaining consistency with the known direction of regulators and ensuring the document was coherent and consistent. It is recognized that this is a rapidly evolving area and that concepts will likely change over time; as such, this Vision ConOps is a living document and is expected to evolve as concepts mature. The ConOps does, however, provide a vision of UAM concepts and solutions based on the broad insights from across the UAM stakeholder community at the time of its publication and is intended to serve as a UAM North Star for continued research and development of UAM. As a broad Vision ConOps, is not a detailed engineering document; rather, it focuses primarily on outlining a broad, high-level vision across all aspects of a UAM transportation system.

Urban Air Mobility↗

Upping the Ante: The TESS Mission Shortens Full Frame Images to 10 Minutes and Introduces a Twenty-Second Data Collection Mode

The Transiting Exoplanet Survey Satellite (TESS) recently completed its initial two-year, near all-sky survey, identifying over 79 exoplanets and over 2000 exoplanet candidates. The mission is well on its way to find at least 50 small, nearby exoplanets for which masses can be ascertained and whose atmospheres can be characterized by ground- and space-based follow-on observations. TESS has unveiled a plethora of exciting non-exoplanet astrophysics results, such as asteroseismology, asteroids, and supernova. In the extended mission, TESS is collecting full frame images (FFIs) at 10-minute intervals rather than at 30-minute intervals, as was the case for the two-year primary mission. TESS is also collecting and providing photometry for up to 1000 20-sec targets in addition to the 20,000 target star postage stamps collected at 2-min intervals. The extended mission will also feature a five-month interval in which the 24°x96° field of view (FOV) will be rotated by 90°from its normal North-South orientation to observe a swath of the ecliptic plane. The FOVs for the remainder of the extended mission will be offset in latitude from those of the prime mission to help fill in the gaps in the full sky coverage. We discuss the performance and behavior of the data products generated by the TESS Science Processing Operations Center (SPOC) at NASA Ames Research Center and highlight the new 20-sec data mode and the 10-min FFIs. The TESS Mission is funded by NASA's Science Mission Directorate as an Astrophysics Explorer Mission.

TESS↗