Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “and Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Restoring Flow Regimes after Dam Construction and Operation: Evidence from Dynamic Systems Theory

Dams provide a variety of benefits to society, including hydropower generation, flood control, recreation, and water supply for municipal, industrial, and agricultural customers. However, constructing and operating dams for these purposes can negatively impact downstream ecosystems by altering natural flow regimes and interfering with the lifecycles of aquatic and riparian species. Increased concern from environmental interests has put pressure on dam operators to quantify the flow regime changes that have resulted from dam construction and to evaluate how future modifications to dam releases may impact river systems. In this study, we present a method for analyzing the impact of dam operations by reconstructing system trajectories from hydrologic flow time series for different periods of dam operation (pre-dam, post-dam, and post-modification). We apply these methods to flow data from eight rivers in the US to determine the dimensionality of each operating period and to analyze trends based on the primary purpose of dam operation. Hydropower dams operated without flow restrictions exhibit high dimensional, stochastic behavior. However, the system dimensionality is reduced to approximately three variables when ramping restrictions are implemented, or in cases where an afterbay is present to reregulate flows. This low dimensional behavior is more similar to natural flow regimes. For dams operated primarily for flood control or water supply, the flow regimes are typically low dimensional and more deterministic.

13 HYDRO ENERGY↗

Projecting Future Colorado River Basin Water and Hydropower Operations

Drought, variable renewable energy (VRE) resources (primarily wind and photovoltaic technologies), and power markets can all impact hydropower plant operations. We analyze how these three factors collectively may potentially change the future operation and economics of federal dams and hydropower plants located in the Colorado River Basin (CRB). Federal CRB energy and capacity resources, including 4,200 MW of hydropower capacity, are marketed by Western Area Power Administration (WAPA) and sold through long-term Firm Electric Service (FES) contracts to entities located in 15 western and central States that serve millions of electricity consumers. The parameters of FES contracts allow a wide range of scheduling flexibility for FES customers. The FES customers will adjust the timing of energy delivery according to the changing water, power market, and VRE contribution level to the power grid. We simulate and project water and hydropower operations with two models: 1) reservoir operation and 2) power system operation (production cost) with various temporal granularity. We consider two sets of grid scenarios (one representing today's infrastructure, and one representing higher VRE contributions in 2036) and two sets of water scenarios (drought and normal hydrology). We modeled scenarios to understand the power market-energy price levels and patterns, FES customer scheduling, hydropower economics, WAPA finances and hydropower operation for various hydrologic conditions, and VRE contribution level to the power grid. The detailed modeling framework includes: (1) creating ensembles of CRB hydrologic and hydropower futures, (2) selecting representative futures, (3) simulation of FES customer contracts, (4) simulating western U.S. power grid economic scheduling and dispatch under two VRE contribution levels, utilizing information from modeling steps (1)-(4), (5) assessment of reservoir water and hydropower operation, and (6) comparing scenario operations and economics. Our study team comprising WAPA, and an interdisciplinary team of national labs will gain insight into how WAPA can prepare for and adapt its practices in response to an evolving U.S. power grid.

Colorado River↗

Compressing micro-operations in scheduler entries in a processor

An electronic device includes a processor having a micro-operation queue, multiple scheduler entries, and scheduler compression logic. When a pair of micro-operations in the micro-operation queue is compressible in accordance with one or more compressibility rules, the scheduler compression logic acquires the pair of micro-operations from the micro-operation queue and stores information from both micro-operations of the pair of micro-operations into different portions in a single scheduler entry. In this way, the scheduler compression logic compresses the pair of micro-operations into the single scheduler entry.

Boyer, Michael W.↗

Operational Focused Data Analytics for Optimizing Radiation Portal Monitor-Based Nuclear Smuggling Detection Systems at Global Ports of Entry

The National Nuclear Security Administration’s Office of Nuclear Smuggling Detection and Deterrence has deployed a fleet of radiation portal monitors (RPMs) across the world at global ports of entry including seaports, airports, and land border crossings. These RPMs are integrated into radiation detection systems (RDS) that also include fixed cameras, optical character recognition (OCR) systems, primary scanning systems (e.g., X-ray or gamma-ray), and secondary scanning systems (e.g., spectroscopic radiation portal monitors, portable radiation detection systems). The data from these sensing technologies is collected at the Central Alarm Station (CAS) where servers and computers reside to control and operate the system. Operators utilize the data collected by the CAS and declared cargo information to make decisions on how to respond to an alarm.This work explores the use of CAS-located data, looking at both the sensor data streams and operator inputs, to perform analysis which supports customs and border protection agencies to improve training capability and operational effectiveness. We focus on analyzing site level effectiveness and behavior by rolling up CAS-located data collected from individual occurrences. To-date, more than 15 sites (e.g., seaports, airports, border crossings) have been analyzed in this manner with the goal of understanding system operations to verify effectiveness and recommend potential improvements. This work first aims to provide background information on relevant CAS-located data sources and our current operational system analytics process including example results. After summarizing our current analytic techniques, we discuss how the future data analytics systems can provide key benefits to improving operational performance while minimizing the burden these detection systems place on operators.

Kuhn, Michael↗

Cold crucible deployment in La Hague facility: the feedback from the first four years of operation - 15119

In April 2010, a Cold Crucible Induction Melter (CCIM) started hot operation for the first time ever in an existing very high active facility (R7) at La Hague. This was the culmination of more than two decades of R and D involving progressive process and technological development. The industrial deployment included extensive cleaning of the hot cell, removal of the previous melter, exchange of several mechanical and process components in the cell, and implementation of the various additional utilities and components necessary for operation of the new CCIM. The design and implementation phases for this deployment were described in a previous paper at WM. The CCIM has now been operated for more than four years, essentially processing active effluents from D and D operations and high-level liquid waste from reprocessed U-Mo-Sn-Al spent fuel. During this period, many data have been collected to confirm the process parameters that were defined during the qualification of this innovating process. Even if some difficulties occurred, the experience of the operating teams with the support of engineering and R and D allow managing them. This paper presents the start-up methodology and history of the cold crucible deployment in La Hague facility with the feedback from the first years of operation. The production records with the different liquid solutions treated in the process are itemized. The lessons learned during the first four years of operation of the CCIM are presented with the difficulties encountered and the solutions implemented, emphasizing the benefits of a close integration between RD, engineering, and operation teams. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Toward a lean analysis for waste to support the decommissioning operation - 15321

All over the world, several nuclear facilities have been shut down few years ago and are now under dismantling or will be dismantled in the future. - Dismantling project takes place according to three major phases: - Study and definition of the dismantling scenario - Dismantling site operations - Decommissioning and final state characterization. Each step is lead in agreement with safety, security and waste management. This requires analytical tools appropriate to the radiological environment and aims. In the field of security, fissile products, explosives... will be researched and quantified while occupational safety requires quantification of radiological, carcinogenic, mutagenic and reprotoxic elements such as As, Se, Cr(IV)... or even asbestos in order to follow more and more strengthened rules. For waste management, radiological and chemical quantification are necessary but must be completed by determining physical and chemical properties such as reactivity, stability or dissolution of the waste... Required level of knowledge, analytical deadline, uncertainties, limits of detection and matrix varieties depend on the decommissioning phase. Setting up a dismantling scenario requires the most possible accurate knowledge of the initial source term present in the facility, in order to establish waste management flow-sheets, define dismantling intervention modes, and prepare the associated safety demonstrations. As history is often not sufficient, in-situ investigations and off-site laboratories are necessary to assign an initial waste and radiological inventory and propose some strategy operations. When a first scenario is chosen, more detailed samplings and analyses are required to fully prepare estimates of waste volumes and categories, and define and validate the waste recovery system that would be used during the dismantling operation. As the definition of the dismantling plan takes shape, data must be more and more accurate and reliable in order to define the waste outlet. The scaling factors for the waste must be defined in order to assure the refunding of the waste. This includes complete characterizations of various matrixes, with high precision, low detection limit in a limited time of few months, as sketchy data could lead to fix inappropriate plan Once site operations begin, it is necessary to control the safety operational conditions and waste production. Measurements requirement is under the safety threshold. Matrixes are often limited to filter. The most important factor is deadline, because operations delay is costly. Finally at the end of dismantling operations, analyses must be performed to demonstrate the successful clean-up of the work site. Analytical methods with low detection limit are required. Thus, characterization appears as a graded and iterative process and is a key issue for decommissioning and dismantling operations in term of efficiency and cost. In order to face this huge analytical demand, a strategy for sampling and characterization must be developed regarding the real needs. On site measurements are usually performed with existing hand-held instruments. A basic first level of knowledge is obtained without delay, feeding the dismantling scenario. On these bases, a sampling strategy permits to select some representative specimens to be more precise, and accurate analysis is performed on off-site laboratories introducing an additional difficulty: the sampling on the site and sub-sampling in the laboratory itself. Whatever the level of sampling, aliquots are small considering the dimension of the dismantling area. This step is crucial. Sampling strategy must be optimized according to objectives (scaling factors measurement, waste level). But in the particular case of high radioactive level waste, due to security manipulation constraints, the number and mass of samples collected are limited. At the opposite for low level waste, large number of samples is collected meaning that large analytical method capacity is necessary. Optimization of the analytical plan is critical. The analytical strategy (including control of sub-sampling, analysis sequence according to analytical capability and performances, especially for pure beta emitters) developed for real case will be detailed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Endpoint Evaluation for 200-PW-1 Operable Unit Soil Vapor Extraction, Hanford Site, Washington - 16478

On the Central Plateau of the Hanford Site in semi-arid southeast Washington State, the 216-Z-9 Trench, 216-Z-1A Tile Field, and 216-Z-18 Crib were used from 1955 to 1973 for soil column disposal of liquid wastes containing carbon tetrachloride. The geological setting underneath these disposal areas consists of an approximately 70 m thick vadose zone with a nominally 5 m thick low-permeability layer at a depth of 30 m. Infiltration of the liquid waste through the vadose zone to the groundwater was driven by the liquid volume introduced during disposal. Carbon tetrachloride readily volatilises in the vadose zone, making soil vapor extraction (SVE) the preferred remediation technology. Between 1992 and 2012, SVE recovered 80,107 kg of carbon tetrachloride from the vadose zone below the three waste sites. Of this total recovery, 93 percent was removed during the first 5 years of operations. The last 7 percent was recovered in the last 16 years of operation. In 2011, a final cleanup level of 100 ppmv for carbon tetrachloride in soil vapor was established in the record of decision for the 200-PW-1 Operable Unit, which includes the three carbon tetrachloride waste sites. The final cleanup decision specified that soil vapor concentrations and the cleanup level would be further refined and assessed in the future to ensure groundwater protection. A subsequent treatability test was conducted and the results were used to further refine the definition of vadose zone source conditions that are protective of groundwater. Based on this treatability test, predictions indicate that current and future vadose zone conditions will meet groundwater protection objectives. SVE operations were not performed in 2013, 2014, and 2015, and soil vapor concentrations in all SVE wells (and all but two monitoring probes installed using direct-push technology) remained below the 100 ppmv cleanup level during this time. SVE endpoint guidance was prepared in 2013 as a joint effort between Pacific Northwest National Laboratory, U.S. Army Corps of Engineers, and U.S. Environmental Protection Agency. This SVE guidance was used to develop a path forward for the 200-PW-1 Operable Unit SVE remedy. The guidance asks the following questions: 1. Are data collected to date adequate to support a well-defined conceptual site model? 2. Have remediation goals (cleanup levels) been defined? 3. Are environmental pathways and risk understood well enough to support site closeout? 4. Will remaining contamination in the vadose zone cause groundwater cleanup levels to be exceeded? If the answer to the first three questions is 'Yes', and the answer to the fourth question is 'No', then the site is ready for closure. At this time, the site has compiled appropriate information to answer these questions to support a remedy decision to terminate SVE operations. The U.S. Environmental Protection Agency recently provided concurrence that termination of SVE operations within the 200-PW-1 Operable Unit is appropriate. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges and Solutions in Operation and Lay-Up of the Modular Caustic- Side Solvent Extraction Unit - 20078

The Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) was designed and constructed to provide interim salt waste processing so that the Liquid Waste Disposition Program (LWDP) could continue waste removal and tank closure until start-up of the Salt Waste Processing Facility (SWPF). MCU processes Clarified Salt Solution (CSS), or salt solution (SS) that has undergone actinide removal/filtration, to produce two waste streams: the cesium laden Strip Effluent (SE), which is incorporated into glass at the Defense Waste Processing Facility (DWPF), and the cesium depleted Decontaminated SS (DSS), which is incorporated into grout at the Saltstone Production Facility (SPF). MCU completed start-up in 2008 with an initial operating life of 3 years and design life of 5 years. Prior to reaching the end of the design life, multiple critical components were upgraded and/or replaced to mitigate risks associated with any delays in SWPF start-up. During the remainder of operation (until June 2019), MCU was challenged to maximize processing with minimal additional modifications to repair/improve aging infrastructure, while maintaining low levels of risk to workers and the environment. Notable challenges during the extended operating life of the facility involved both mechanical and operational issues. Two of the most significant issues were the increased frequency of Process Vessel Ventilation (PVV) High Efficiency Particulate Air (HEPA) filter change-outs and the biofouling of the SE coalescer (SEC). The major impacts of both issues were that replacement of these components 1) resulted in high exposure to workers, and 2) required substantial downtime, thus hindering achievement of processing goals. PVV HEPA filter replacements are required based on dose rate and differential pressure (dP) limits. After introducing a higher-curie feed to MCU, the operating time between change outs was reduced by approximately half. SEC replacements are required based on dP limits. After restarting from an extended outage, the operating life of the SEC was significantly reduced by more than half due to biofouling. As a result of extensive troubleshooting and process improvements, the facility was able to recover performance and extend the operating life of the PVV HEPA filters and the SEC media. Through troubleshooting both of these issues, the facility was also able to learn from prior experience and adapt in order to minimize down time and maintain throughput. Although the facility took advantage of short periods of downtime to perform nonintrusive troubleshooting and minor corrective/preventative maintenance activities, longer outages were periodically required for corrective maintenance involving process cell entry. During these outages, remote tools and specialized shield plates were employed to minimize dose to workers. Mock-ups of non-routine maintenance activities were critical to early identification of potential issues and improvements, which shortened outage duration. Consistent with the facility's operational strategy, evolutions needed for MCU layup were identified and sequenced to ensure safe conditions within the facility, meet pre-defined criteria for lay-up configuration, and protect workers, while minimizing the impact to SWPF integration. De-inventory and flushing of process areas was prioritized so that the total residual inventory was reduced as efficiently as possible. This paper discusses lessons learned and best practices from troubleshooting unique issues, performing complex maintenance activities, and implementing a layup strategy that best supports the overall system mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fitness-for-Service Analysis of Reactor Components under Flexible Load-Following Operating Conditions

Conventional power-generation plants, including nuclear plants, have been traditionally designed to provide a steady baseload energy capacity, optimizing output efficiency while minimizing variable costs. However, the growing adoption of large-scale renewable energy-generation systems, which rely on intermittent sources such as solar and wind, has introduced more variability into the energy supply in interconnected electricity grids. As a result, the next generation of power plants needs to operate in what is known as the load-following mode, requiring flexible adjustments in electricity production to align with the energy demand on the grid. This transition from the steady baseload operation to load-following operating conditions can significantly increase the number of times various plant components are exposed to transient stresses. This increased thermo-mechanical cycling can lead to accelerated material degradation, thereby elevating the risk of premature failure of a component. It becomes imperative to conduct a comprehensive analysis of fatigue, creep-fatigue, and stress corrosion cracking life, to assess the resilience of the various engineering components under these flexible load-following operating conditions. This study aims to develop a comprehensive numerical model of a light-water reactor pressure vessel (RPV) to investigate its degradation under various operating scenarios. This coupled thermo-mechanical finite element analysis evaluated the stress response of the RPV caused by considering fluctuations in thermal and mechanical loads caused by the varying pressure and temperature occurring during the load-following operation. Critical locations on the RPV are subsequently identified based on the stress response. The stress intensity factors for the postulated flaws at those locations are then calculated, followed by an evaluation of the reactor's life in accordance with the ASME Boiler and Pressure Vessel Code Section XI. This comprehensive life assessment covers a number of transients expected during the flexible load-following operation, providing invaluable insights into the RPV's structural integrity. Moreover, the development methodology can be adapted to other reactor components, as well as components of conventional power stations that are affected by varying operating conditions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Estimation of General Area Dose Rates During Closure Weld Operations on the DOE Standard Canister Pacific Basin Nuclear Conference 2024

The Department of Energy (DOE) Spent Nuclear Fuel (SNF) Road Ready Demonstration Project is an effort to package DOE-managed SNF for road-ready dry storage. A key operation in this demonstration is performing the closure weld on the DOE Standard Canister after it has been loaded with the SNF. Planning the closure weld operations is ongoing and must consider what parts of the operations (if any) can be done manually and what parts must be done remotely. A key parameter to inform the evolving planning of these operations is the dose rate in the vicinity of the canister and the dose hazard posed to the closure weld operators and collocated workers. This study developed a Monte Carlo N-Particle (MCNP) model of the closure weld operation, which was used to estimate general area dose rates as well as dose rates to the welding location, weld operators, and collocated workers. These estimates provide some insight into the potential radiation exposure hazard for workers during the operations and are a factor to be considered in the ongoing development of designs, technology, processes, and administrative controls for packaging DOE-managed SNF for road-ready dry storage.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Construction of conformally invariant higher spin operators using transvector algebras

This paper deals with a systematic construction of higher spin operators, defined as conformally invariant differential operators acting on functions on flat space R{sup m} with values in an arbitrary half-integer irreducible representation for the spin group. To be more precise, the higher spin version of the Dirac operator and associated twistor operators will be constructed as generators of a transvector algebra, hereby generalising the well-known fact that the classical Dirac operator on R{sup m} and its symbol generate the orthosymplectic Lie superalgebra osp(1,2). To do so, we will use the extremal projection operator and its relation to transvector algebras. In the second part of the article, the conformal invariance of the constructed higher spin operators will be proven explicitly.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Enhanced Component Performance Study: Motor-Operated Valves 1998–2013

This report presents an enhanced performance evaluation of motor-operated valves (MOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from fiscal year 1998 through 2013 for the component reliability as reported in the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The MOV failure modes considered are failure to open/close, failure to operate or control, and spurious operation. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. Statistically significant increasing trends were identified in the MOV spurious operation failure rate estimate (a highly statistically significant trend), and in the MOV spurious operation failure events per reactor year (a highly statistically significant trend). Statistically significant decreasing trends were identified for failure to open/close demand rates.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Improving operations: Metrics to Results

As a result of the mission failure of the Mars Climate Orbiter (MCO) spacecraft in 1999, the Jet Propulsion Laboratory (JPL) initiated the development of a Mission Operations Assurance (MOA) program to be implemented across all flight projects managed by JPL. One of the initiatives undertaken in 2001 was the collection of data on command file errors occurring in the operational phase of the mission. This paper defines command file errors and how and where they occur in the operations process. It also describes the problem reporting system (PRS) in use for mission operations at JPL. We examine the recent modifications to the PRS that enable the collection of metrics, specifically on command file errors. This paper discusses what the data show us since metrics have been collected for the operational missions conducted by JPL. We examine the evolution of an operational working group initiative to evaluate proximate, contributing, and root causes for the errors. As part of this discussion we see what the metrics have indicated over a decade. At the macro level, we can say that the aggregate command file error rate has been cut to roughly one third of the initial 2001 level by the end of 2011. Additionally, we explore efficient and innovative means to continually integrate the findings and recommendations from the working group back into the flight operations environment.

command file errors↗

Concept of Operations for RCO SPO

Reduced crew operations (RCO) refers to the reduction of crew members flying long-haul or military operations with more than one pilot onboard. Single pilot operations (SPO) refers to flying a commercial transport aircraft with only one pilot on board the aircraft, assisted by advanced onboard automation andor ground operators providing piloting support services. Properly implemented, RCO/SPO could provide operating cost savings while maintaining a level of safety no less than conventional two-pilot commercial operations. A concept of operations (ConOps) for any paradigm describes the characteristics of its various components and their integration in a multi-dimensional design space. This paper presents key options for humanautomation function allocation being considered by NASA in its ongoing development of RCO/SPO ConOps.

ConOps↗

Design of a supervisory control system for autonomous operation of advanced reactors

Advanced reactors to be deployed in the coming decades will face deregulated energy markets, and may adopt flexible operation to boost profitability. To aid in the transition from baseload to flexible operation paradigm, autonomous operation is sought. This work focuses on the control aspect of autonomous operation. Specifically, a hierarchical control system is designed to support constraint enforcement during routine operational transients. Within the system, data-driven modeling, physics-based state observation, and classical control algorithms are integrated to provide an adaptable and robust solution. A 320 MW Fluoride-cooled High-temperature Pebble-bed Reactor is the design basis for demonstrating the proposed control system. The hierarchical control system consists of a supervisory layer and low-level layer. The supervisory layer receives requests to change the system's operating conditions (e.g., the current reactor power to meet a load -follow), and accepts or rejects them based on constraints that have been assigned. Constraints are issued to keep the plant within an optimal operating region. The low-level layer interfaces with the actuators of the system to fulfill requested changes, while maintaining tracking and regulation duties. Further, to accept requests at the supervisory layer, the Reference Governor algorithm was adopted. To model the dynamics of the reactor, a system identification algorithm, Dynamic Mode Decomposition, was utilized. To estimate the evolution of process variables that cannot be directly measured (e.g., the propagation of delayed neutron precursors), the Unscented Kalman Filter, incorporating a nonlinear model of nuclear dynamics, was adopted. The composition of these algorithms led to a numerical demonstration of constraint enforcement during a 40% power drop transient (at a rate of 5 %/min). Uncontrolled secondary-side temperatures were successfully constrained. Adaptability of the proposed system was demonstrated by modifying the constraint values, and enforcing them during the transient. Robustness was also demonstrated by enforcing constraints under noisy environments.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Peridynamic neural operators: A data-driven nonlocal constitutive model for complex material responses

Neural operators, which can act as implicit solution operators of hidden governing equations, have recently become popular tools for learning the responses of complex real-world physical systems. Nevertheless, most neural operator applications have thus far been data-driven and neglect the intrinsic preservation of fundamental physical laws in data. Here, in this work, we introduce a novel integral neural operator architecture called the Peridynamic Neural Operator (PNO) that learns a nonlocal constitutive law from data. This neural operator provides a forward model in the form of state-based peridynamics, with objectivity and momentum balance laws automatically guaranteed. As applications, we demonstrate the expressivity and efficacy of our model in learning complex material behaviors from both synthetic and experimental data sets. We also compare the performances with baseline models that use predefined constitutive laws. We show that, owing to its ability to capture complex responses, our learned neural operator achieves improved accuracy and efficiency. Moreover, by preserving the essential physical laws within the neural network architecture, the PNO is robust in treating noisy data. The method shows generalizability to different domain configurations, external loadings, and discretizations.

42 ENGINEERING↗

Impact of operating reserve rules on electricity prices with high penetrations of renewable energy

In competitive wholesale electricity markets, significant effort is devoted to designing markets that set efficient prices for maintaining supply-demand balance. One factor that can impact prices is administratively-set scarcity pricing, which sets prices to a preset level when the market is not able to meet operating reserve or energy requirements. When energy and operating reserves are co-optimized, assumptions surrounding operating reserve requirements and scarcity pricing can impact system-wide price outcomes for both operating reserves and energy. This study uses production cost modeling of an ERCOT-like system to evaluate the impact of operating reserve eligibility, scarcity pricing, and quantity rules on electricity prices, and therefore also on generator revenues. Results reveal economic and operational benefits with allowing open participation in reserve markets, as this enables greater access to the full set of capable resources at lowest cost. Furthermore, both energy and reserve prices are strongly impacted by reserve scarcity pricing events, which reveals that reserve scarcity pricing assumptions can impact price outcomes even for units not providing reserves. This study highlights the importance of operating reserve scarcity pricing rules because of the strong coupling between energy and reserve prices and because these rules serve as proxies for true price responsive demand.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Coordinated operation of pumped-storage hydropower with power and water distribution systems

Small pumped-storage hydropower (PSH) units have gained popularity as distributed energy storage options that can provide flexibility to the operation of power distribution systems. Optimal operation of small PSH units is not only dependent on the energy storage provided to power distribution system, but also on the inflow and outflow of water from and to the water distribution system. Here, in this context, this paper develops an optimization model for coordinated operation of PSH units with power and water distribution systems. The proposed model optimizes the operation of water tanks, variable-speed pumps and PSH in pumping and generating modes to minimize the operation cost of power distribution system, while respecting the power flow constraints of power distribution and hydraulic constraints of water distribution system. Appropriate electricity tariffs are implemented to avoid additional expenses in water distribution system that can be enforced by its coordinated operation in favor of power distribution system. The proposed model is implemented on a 33-bus and a 123-bus test power distribution system connected to a 16-node test water distribution system. Results demonstrate the effectiveness of proposed model in tapping PSH flexibility to reduce the operation cost of power and water distribution systems, while meeting the power and water demands.

13 HYDRO ENERGY↗