Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “active integrators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Enhancing the Human Factors Engineering Role in an Austere Fiscal Environment

An austere fiscal environment in the aerospace community creates pressures to reduce program costs, often minimizing or sometimes even deleting the human interface requirements from the design process. With an assumption that the flight crew can recover real time from a poorly human factored space vehicle design, the classical crew interface requirements have been either not included in the design or not properly funded, though carried as requirements. Cost cuts have also affected quality of retained human factors engineering personnel. In response to this concern, planning is ongoing to correct the acting issues. Herein are techniques for ensuring that human interface requirements are integrated into a flight design, from proposal through verification and launch activation. This includes human factors requirements refinement and consolidation across flight programs; keyword phrases in the proposals; closer ties with systems engineering and other classical disciplines; early planning for crew-interface verification; and an Agency integrated human factors verification program, under the One NASA theme. Importance is given to communication within the aerospace human factors discipline, and utilizing the strengths of all government, industry, and academic human factors organizations in an unified research and engineering approach. A list of recommendations and concerns are provided in closing.

Stokes, Jack W.↗

Spacecraft active thermal control technology status

Four advanced space radiator concepts that were pursued in an integrated effort to develop multi-mission-use and low cost heat rejection systems which can overcome the limitations of current radiator systems are briefly discussed and described. Also, in order to establish a firm background to compare the advanced space radiator concepts, the Orbiter active thermal control system is also briefly described.

Ellis, W. E.↗

Very low luminosity active galaxies and the X-ray background

The properties of very low luminosity active galactic nuclei are not well studied, and, in particular, their possible contribution to the diffuse X-ray background is not known. In the present investigation, an X-ray luminosity function for the range from 10 to the 39th to 10 to the 42.5th ergs/s is constructed. The obtained X-ray luminosity function is integrated to estimate the contribution of these very low luminosity active galaxies to the diffuse X-ray background. The construction of the X-ray luminosity function is based on data obtained by Keel (1983) and some simple assumptions about optical and X-ray properties.

Elvis, M.↗

Evolution of Spacelab payload operations to Space Station Freedom

NASA's Office of Space Science and Applications is actively involved in the development of operational concepts and data infrastructures which will be integrated to maximize the effectiveness of Space Station Freedom (SSF) payloads. Spacelab is noted to furnish an excellent 'experience base' for SFF activities. The SSF operations/data systems will be adaptable with respect to changes in payload manifests, in facility/apparatus complexity, and in implementing technologies; they will also be capable of flexibly accommodating the expanding needs of a highly variegated community of scientific users. Flowcharts are presented for the SSF payload operations concept, its flight operational data flows, and a data-flow growth concept.

Golden, H.↗

Strategies for Ground Based Testing of Manned Lunar Surface Systems

Integrated testing (such as Multi-Element Integrated Test (MEIT)) is critical to reducing risks and minimizing problems encountered during assembly, activation, and on-orbit operation of large, complex manned spacecraft. Provides the best implementation of "Test Like You Fly:. Planning for integrated testing needs to begin at the earliest stages of Program definition. Program leadership needs to fully understand and buy in to what integrated testing is and why it needs to be performed. As Program evolves and design and schedules mature, continually look for suitable opportunities to perform testing where enough components are together in one place at one time. The benefits to be gained are well worth the costs.

Beyer, Jeff↗

Reducing the Risk of Human Missions to Mars Through Testing

During the summer of 2002 the NASA Deputy Administrator charted an internal NASA planning group to develop the rationale for exploration beyond low-Earth orbit. This team, termed the Exploration Blueprint, performed architecture analyses to develop roadmaps for how to accomplish the first steps beyond Low-Earth Orbit through the human exploration of Mars. The previous NASA Exploration Team (NEXT) activities laid the foundation and framework for development of NASA s Integrated Space Plan. The reference missions resulting from the analysis performed by the Exploration Blueprint team formed the basis for requirement definition, systems development, technology roadmapping, and risk assessments for future human exploration beyond low-Earth orbit. Emphasis was placed on developing recommendations on what could be done now to effect future exploration activities. The Exploration Blueprint team embraced the Stepping Stone approach to exploration where human and robotic activities are conducted through progressive expansion outward beyond low- Earth orbit. Results from this study produced a long-term strategy for exploration with near-term implementation plans, program recommendations, and technology investments. Specific results included the development of a common exploration crew vehicle concept, a unified space nuclear strategy, focused bioastronautics research objectives, and an integrated human and robotic exploration strategy. Recommendations from the Exploration Blueprint included the endorsement of the Nuclear Systems Initiative, augmentation of the bioastronautics research, a focused space transportation program including heavy-lift launch and a common exploration vehicle design for ISS and exploration missions, as well as an integrated human and robotic exploration strategy for Mars. Following the results of the Exploration Blueprint study, the NASA Administrator has asked for a recommendation by June, 2003 on the next steps in human and robotic exploration in order to put into context an updated Integrated Space Transportation Plan (post- Columbia) and guide Agency planning. NASA was on the verge of committing significant funding in programs that would be better served if longer term goals were better known including the Orbital Space Plane, research on the ISS, National Aerospace Initiative, Shuttle Life Extension Program, Project Prometheus, as well as a wide range of technology development throughout the Agency. Much of the focus during this period was on integrating the results from the previous studies into more concrete implementation strategies in order to understand the relationship between NASA programs, timing, and resulting budgetary implications. This resulted in an integrated approach including lunar surface operations to retire risk of human Mars missions, maximum use of common and modular systems including what was termed the exploration transfer vehicle, Earth orbit and lunar surface demonstrations of long-life systems, collaboration of human and robotic missions to vastly increase mission return, and high-efficiency transportation systems (nuclear) for deep-space transportation and power. The data provided in this summary viewgraph presentation was developed to begin to address one of the key elements of the emerging implementation strategy, namely how lunar missions help retire risk of human missions to Mars. During this process the scope of the activity broadened into the issue of how testing in general, in various venues including the Moon, can help reduce the risk for Mars missions.

Drake, Bret G.↗

Data Information for Global Change Studies: NASA's Distributed Active Archive Centers and Cooperating Data Centers

The Earth Observing System (EOS) is an integral part of the National Aeronautics and Space Administration's (NASA's) Earth Science Enterprise (ESE). ESE is a long-term global change research program designed to improve our understanding of the Earth's interrelated processes involving the atmosphere, oceans, land surfaces, and polar regions. Data from EOS instruments and other Earth science measurement systems are useful in understanding the causes and processes of global climate change and the consequences of human activities. The EOS Data and Information System (EOSDIS) provides a structure for data management and user services for products derived from EOS satellite instruments and other NASA Earth science data. Within the EOSDIS framework, the Distributed Active Archive Centers (DAACs) have been established to provide expertise in one or more Earth science disciplines. The DAACs and cooperating data centers provide data and information services to support the global change research community. Much of the development of the DAACs has been in anticipation of the enormous amount of data expected from EOS instruments to be launched within the next two decades. Terra, the EOS flagship launched in December 1999, is the first of a series of EOS satellites to carry several instruments with multispectral capabilities. Some data products from these instruments are now available from several of the DAACs. These and other data products can be ordered through the EOS Data Gateway (EDG) and DAAC-specific online ordering systems.

Source record↗

Transonic aeroelasticity of wings with active control surfaces

Transonic aeroelasticity of wings with active control surfaces is studied by using the unsteady-small disturbance transonic aerodynamic equations coupled with modal structural equations of motion. The aerodynamic and structural equations of motion are simultaneously integrated by a time-accurate numerical scheme. A procedure of synthesizing active controls with unsteady transonics is presented. Flutter suppression in the transonic regime using active controls is demonstrated for a rectangular wing. Characteristics of a selected control law in the transonic regime are studied. The results from this study are useful in the design of active control systems in the transonic regime.

Guruswamy, Guru P.↗

Gateway bi-propellant refueling development testing and model validation activities

The Gateway is an upcoming long term lunar exploration program to be completed by NASA in partnership with ESA and other US and international partners. The system design of the Gateway contains both a high performance Xenon based Solar Electric Propulsion system, as well as a bi-propellant attitude control system. Both propulsion systems are designed for on-orbit refueling to enable long life performance of the Gateway. The ESPRIT-RM is a module which will expand the pressurized volume of Gateway, while also providing refueling capability for both the Xenon and Bipropellant propulsion systems, therefore extending the Gateway life on orbit. As part of the Gateway bi-propellant refueling system development, a simplified fluidic breadboard system was created to evaluate system performance and response using simulant fluids. The test plan includes verification activities with simulant (water, HFE-7100) to verify joined subsystem behavior in the critical operations, including propellant transfer demonstration between modules, transient tests and venting tests. Integrated testing occurred at TASUK in collaboration with NASA to support joint verification activities to de-risk the major functions of the ESPRIT BTS and the overall CONOPS of the refueling of the Gateway chemical propulsion system. Initially collected test data from the system testing is presented, as well as initial model validation, and correlated to collected high frequency test data and system response is shown. Initially collected data has shown the architected system performance is closing initial design assumptions, but much forward work remains to characterize and develop the system.

Christopher Daniel Radke↗

Linear Covariance Techniques to Analyze a Multi-Vehicle, Multi-GN&C System with Applications to Rendezvous in a Near Rectilinear Halo Orbit

Typically for a rendezvous and docking scenario, only a single vehicle is considered the active vehicle. As a result, the target vehicle’s GN&C system is typically not a factor in the integrated performance analysis as it assumes a passive role. However, for upcoming NASA Artemis missions the active vehicle is both the chaser and target spacecraft. In addition, both vehicles are cooperating with one another, sharing telemetry data, and relying on data extracted from the GN&C system of the other. The process also includes a team of ground support personnel in mission control are tracking and monitoring each spacecraft uplinking state estimates and targeting solutions to support mission operations and enhance the onboard flight system performance. Being able to quickly analyze the impact of both vehicles with two different GN&C systems that also interact with the ground that does its own navigation and targeting uploads is critical. This paper outlines how to perform this rapid analysis using linear covariance techniques and applies them to a rendezvous scenario initiated in low lunar orbit and completed in a Near Rectilinear Halo Orbit (NRHO) representative of the NASA Artemis III mission.

Linear Covariance Analysis↗

Advanced Stirling Convertor Control Unit Testing at NASA Glenn Research Center in the Radioisotope Power Systems System Integration Laboratory

Future NASA missions could include long-duration flyby, orbital, lander, or rover applications where generating power from sunlight may be limited. Radioisotope power systems (RPSs) provide a dependable power source for missions where inadequate sunlight or operational requirements make other power systems impractical. Over the past 16 years, NASA Glenn Research Center has been supporting the development of RPSs. The advanced Stirling radioisotope generator (ASRG) utilized a pair of advanced Stirling convertors (ASCs). Although flight development of the ASRG has been canceled, much of the technology and hardware continued development and testing to guide future activities. Specifically, a controller for the convertor(s) is an integral part of a Stirling-based RPS. For the ASRG design, the controller maintains stable operation of the convertors, regulates the alternating current produced by the linear alternator of the convertor, provides a specified direct-current output voltage for the spacecraft, and synchronizes the piston motion of the two convertors to minimize vibration as well as manage and maintain operation with a stable piston amplitude and hot-end temperature. It not only provides power to the spacecraft but also must regulate convertor operation to avoid damage to internal components and maintain safe thermal conditions after fueling. Lockheed Martin Coherent Technologies, Inc., has designed, developed, and tested an ASC control unit engineering development unit (ACU EDU) to support this effort. GRC used the ACU EDU as part of its nonnuclear representation of a RPS that also consists of a Dual advanced Stirling convertor simulator (DASCS), and associated support equipment to perform a test in the Radioisotope Power Systems System Integration Laboratory (RSIL). The RSIL was designed and built with flexibility to evaluate hardware utilizing RPS technology. The RSIL provides insight into the electrical interactions between as many as three radioisotope power generators, associated control strategies, and typical electric system loads. The first phase of testing included a DASCS that was developed by Johns Hopkins University Applied Physics Laboratory and simulates the operation and electrical behavior of a pair of ASCs in real time via a combination of hardware and software. Testing included the following spacecraft electrical energy storage configurations: capacitor, battery, and supercapacitor. Testing of the DASCS and ACU in each energy storage configuration included simulation of a typical mission profile and transient voltage and current data during load turnon and turnoff. Testing for these devices also included the initiation of several system faults such as short circuits, electrical bus overvoltage, undervoltage, and a "dead bus" recovery to restore normal power operations. The goal of this testing was to verify operation of the ACU(s) when connected to a spacecraft electrical bus. The results of these tests are presented here.

General↗

Advanced Stirling Convertor Control Unit Testing at NASA Glenn Research Center in the Radioisotope Power Systems System Integration Laboratory

Future NASA missions could include establishing Lunar or Martian base camps, exploring Jupiters moons and travelling beyond where generating power from sunlight may be limited. Radioisotope Power Systems (RPS) provide a dependable power source for missions where inadequate sunlight or operational requirements make other power systems impractical. Over the past decade, NASA Glenn Research Center (GRC) has been supporting the development of RPSs. The Advanced Stirling Radioisotope Generator (ASRG) utilized a pair of Advanced Stirling Convertors (ASC). While flight development of the ASRG has been cancelled, much of the technology and hardware continued development and testing to guide future activities. Specifically, a controller for the convertor(s) is an integral part of a Stirling-based RPS. For the ASRG design, the controller maintains stable operation of the convertors, regulates the alternating current produced by the linear alternator of the convertor, provides a specified direct current output voltage for the spacecraft, synchronizes the piston motion of the two convertors in order to minimize vibration as well as manage and maintain operation with a stable piston amplitude and hot end temperature. It not only provides power to the spacecraft but also must regulate convertor operation to avoid damage to internal components and maintain safe thermal conditions after fueling. Lockheed Martin Coherent Technologies has designed, developed and tested an Engineering Development Unit (EDU) Advanced Stirling Convertor Control Unit (ACU) to support this effort. GRC used the ACU EDU as part of its non-nuclear representation of a RPS which also consists of a pair of Dual Advanced Stirling Convertor Simulator (DASCS), and associated support equipment to perform a test in the Radioisotope Power Systems System Integration Laboratory (RSIL). The RSIL was designed and built to evaluate hardware utilizing RPS technology. The RSIL provides insight into the electrical interactions between as many as 3 radioisotope power generators, associated control strategies, and typical electric system loads. The first phase of testing included a DASCS which was developed by Johns Hopkins UniversityApplied Physics Laboratory and simulates the operation and electrical behavior of a pair of ASCs in real time via a combination of hardware and software. Testing included the following spacecraft electrical energy storage configurations: capacitive, battery, and supercapacitor. Testing of the DASCS and ACU in each energy storage configuration included simulation of a typical mission profile, and transient voltage and current data during load turn-on/turn-off. Testing for these devices also included the initiation of several system faults such as short circuits, electrical bus over-voltage, under-voltage and a dead bus recovery to restore normal power operations. The goal of this testing was to verify operation of the ACU(s) when connected to a spacecraft electrical bus.

Dugala, Gina M.↗

Exploration Blueprint: Data Book

The material contained in this report was compiled to capture the work performed by the National Aeronautics and Space Administration's (NASA's) Exploration study team in the late 2002 timeframe. The "Exploration Blueprint Data Book" documents the analyses and findings of the 90-day Agency-wide study conducted from September - November 2002. During the summer of 2002, the NASA Deputy Administrator requested that a study be performed with the following objectives: - Develop the rationale for exploration beyond low-Earth orbit - Develop roadmaps for how to accomplish the first steps through humans to Mars - Develop design reference missions as a basis for the roadmaps - Make recommendations on what can be done now to effect this future This planning team, termed the Exploration Blueprint, performed architecture analyses to develop roadmaps for how to accomplish the first steps beyond LEO through the human exploration of Mars. The previous NASA Exploration Team activities laid the foundation and framework for development of NASA's Integrated Space Plan. The reference missions resulting from the analysis performed by the Exploration Blueprint team formed the basis for requirement definition, systems development, technology roadmapping, and risk assessments for future human exploration beyond low-Earth orbit. Emphasis was placed on developing recommendations on what could be done now to effect future exploration activities. The Exploration Blueprint team embraced the "Stepping Stone" approach to exploration where human and robotic activities are conducted through progressive expansion outward beyond low-Earth orbit. Results from this study produced a long-term strategy for exploration with near-term implementation plans, program recommendations, and technology investments. Specific results included the development of a common exploration crew vehicle concept, a unified space nuclear strategy, focused bioastronautics research objectives, and an integrated human and robotic exploration strategy. Recommendations from the Exploration Blueprint included the endorsement of the Nuclear Systems Initiative, augmentation of the bioastronautics research, a focused space transportation program including heavy-lift launch and a common exploration vehicle design for ISS and exploration missions, as well as an integrated human and robotic exploration strategy for Mars.

Bret G Drake↗

Gateway Program Safety and Mission Assurance Integration - the Future of Safe Deep Space Human Exploration

As a foundational element of the National Aeronautics and Space Administration (NASA) Artemis Campaign, the Gateway is an incrementally built cislunar spacecraft that will serve as a platform for deep space human exploration, science, and technology demonstration. The Gateway will be a unifying catalyst for international partners around the world to establish sustained deep space scientific investigations, lunar surface access, and missions to Mars. As human exploration moves farther away from Earth, spacecraft designs must prioritize and optimize mass and volume allocations, while minimizing human and spacecraft risk. To accomplish this objective, the Gateway Program Safety and Mission Assurance functions develop, implement, and ensure compliance with requirements, in concert with the accurate characterization and transparent communication of residual hazard risks, for integrated safety, reliability and maintainability and quality assurance. Safety and Mission Assurance was a key contributor during Gateway program pre-formulation and formulation activities where safety and reliability analysis was embedded in the Gateway Systems Engineering and Integration team. During these early program stages, a preliminary Gateway Integrated Hazard Analysis and Preliminary Gateway Probabilistic Risk Assessment assisted in Gateway architectural and operational definition as part of a risk-informed design process. As the deep space architecture has matured, the integrated Safety and Mission Assurance analyses have matured, new safety review processes have been developed, and requirements have been refined to ensure compliance with integrated safety and mission assurance objectives. The Gateway Program is currently concluding the preliminary design review informed milestone, where the primary objectives included: - Ensured completeness and consistency of the preliminary design, including the meeting of all requirements within appropriate margins and acceptable risk posture. - Identification of any major issues moving forward to the Critical Design phase. At this milestone, Safety and Mission Assurance provided numerous products, including Gateway Top Risks and Risk Mitigation Plans, updated integrated hazard analyses, updated probabilistic risk assessment, Crew Survival Analysis Report, and updated Safety and Mission Assurance Requirements and Plans. These products provide a many-faceted perspective on the inherent risk and available mitigations involved in flying the current proposed vehicle design and anticipated stack configurations. In addition, Safety and Mission Assurance identified top technical, process and workforce concerns to be addressed as the program progresses toward the critical design phase. This paper will detail the evolution of the Gateway Program Safety and Mission Assurance integration functions, provide its current status and lessons learned for future human spaceflight programs. Throughout this paper the key tenets of the Gateway Program Safety and Mission Assurance will be discussed: - Application of a risk-informed approach to identify and mitigate areas of highest risk. - Leverage of valuable processes and lessons learned from earlier spaceflight programs. - Development of Safety and Mission Assurance products to inform design risk trades. - Utilization of common Safety and Mission Assurance practices to identify safety risks for multiple perspectives: top-down, bottom-up, and across lines of integration. - Approval of safety hazards at the appropriate level of authority, keeping most deliberation closest to design expertise and elevating risks of greatest concern for program-level consideration. - Championing of Safety and Mission Assurance processes and forums to foster a pervasive safety culture that is transparent, inclusive, and collaborative between all partners. These tenets have allowed the Gateway Safety and Mission Assurance function to play a key role in optimized vehicle design evolution, and early identification and mitigation of Gateway program and Artemis mission risk.

Helen Vaccaro↗

Airborne Lidar for Simultaneous Measurement of Column CO2 and Water Vapor in the Atmosphere

The 2-micron wavelength region is suitable for atmospheric carbon dioxide (CO2) measurements due to the existence of distinct absorption feathers for the gas at this particular wavelength. For more than 20 years, researchers at NASA Langley Research Center (LaRC) have developed several high-energy and high repetition rate 2-micron pulsed lasers. This paper will provide status and details of an airborne 2-micron triple-pulse integrated path differential absorption (IPDA) lidar. The development of this active optical remote sensing IPDA instrument is targeted for measuring both CO2 and water vapor (H2O) in the atmosphere from an airborne platform. This presentation will focus on the advancement of the 2-micron triple-pulse IPDA lidar development. Updates on the state-of-the-art triple-pulse laser transmitter will be presented including the status of seed laser locking, wavelength control, receiver telescope, detection system and data acquisition. Future plans for the IPDA lidar system for ground integration, testing and flight validation will also be presented.

Singh, Upendra N.↗

Contact-impact analysis of deployable space systems

This paper presents simulation results of a flexible, deployable space system with multiple contact-impact events, using three different modeling approaches. In the first two approaches, the equations of motion of the system are written in terms of generalized coordinates of each component, with modal coordinates used to account for flexibility in the components. Two different methods are used to model contact-impact events in the systems. In the momentum balance method, as contact-impact occurs, momentum equations of the systems are solved for the jump discontinuity in velocity of generalized coordinates. Integration of the system is restarted with the new initial conditions from solutions of momentum equations. In the logical function method, a virtual spring connecting the two contact points is assumed. The virtual spring is active only when impact occurs. No special treatment is needed in the integration algorithm using this method. In the third approach, instead of using modal coordinates, a finite element based formulation for the transient dynamics of mechanical system is used to model flexibility of the components. The logical function method is used to model contact-impact in the third approach.

Wu, Shih-Chin↗

Benchmarking the Integration of WAVEWATCH III Results into HAZUS-MH: Preliminary Results

The report summarizes the results from the preliminary benchmarking activities associated with the use of WAVEWATCH III (WW3) results in the HAZUS-MH MR1 flood module. Project partner Applied Research Associates (ARA) is integrating the WW3 model into HAZUS. The current version of HAZUS-MH predicts loss estimates from hurricane-related coastal flooding by using values of surge only. Using WW3, wave setup can be included with surge. Loss estimates resulting from the use of surge-only and surge-plus-wave-setup were compared. This benchmarking study is preliminary because the HAZUS-MH MR1 flood module was under development at the time of the study. In addition, WW3 is not scheduled to be fully integrated with HAZUS-MH and available for public release until 2008.

Berglund, Judith↗

Integrated payload and mission planning, phase 3. Volume 1: Integrated payload and mission planning process evaluation

The integrated payload and mission planning process for STS payloads was defined, and discrete tasks which evaluate performance and support initial implementation of this process were conducted. The scope of activity was limited to NASA and NASA-related payload missions only. The integrated payload and mission planning process was defined in detail, including all related interfaces and scheduling requirements. Related to the payload mission planning process, a methodology for assessing early Spacelab mission manager assignment schedules was defined.

Sapp, T. P.↗