Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Upgrade”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Magnetic Measurements of Storage Ring Magnets for the APS Upgrade Project

Extensive prototyping of storage ring magnets is ongoing at the Advanced Photon Source (APS) in support of the APS Multi-Bend Achromat (MBA) upgrade project (APS-U) [1]. As part of the R&D activities four quadrupole magnets with slightly different geometries and pole tip materials, and one sextupole magnet with vanadium permendur (VP) pole tips were designed, built and tested. Magnets were measured individually using a rotating coil and a Hall probe for detailed mapping of the magnetic field. Magnets were then assembled and aligned relative to each other on a steel support plate and concrete plinth using precision machined surfaces to gain experience with the alignment method chosen for the APS-U storage ring magnets. The required alignment of magnets on a common support structure is 30 μm rms. Measurements of magnetic field quality, strength and magnet alignment after subjecting the magnets and assemblies to different tests are presented.

Doose, C.↗

Field Quality from Tolerance Stack-up In R&D Quadrupoles for the Advanced Photon Source Upgrade

The Advanced Photon Source (APS) at Argonne National Laboratory (ANL) is considering upgrading the current double-bend, 7-GeV, 3rd generation storage ring to a 6-GeV, 4th generation storage ring with a Multibend Achromat (MBA) lattice. In this study, a novel method is proposed to determine fabrication and assembly tolerances through a combination of magnetic and mechanical tolerance analyses. Mechanical tolerance stackup analyses using Teamcenter Variation Analysis are carried out to determine the part and assembly level fabrication tolerances. Finite element analyses using OPERA are conducted to estimate the effect of fabrication and assembly errors on the magnetic field of a quadrupole magnet and to determine the allowable tolerances to achieve the desired magnetic performance. Finally, results of measurements in R&D quadrupole prototypes are compared with the analysis results.

Quadrupole, Field quality, tolerance, Finite Eleme↗

Beam Loss Simulation and Collimator System Configurations for the Advanced Photon Source Upgrade

The proposed multi-bend achromat lattice for the Advanced Photon Source upgrade (APS-U) has a design emittance of less than 70 pm. The Touschek loss rate is high: compared with the current APS ring, which has an average beam lifetime ~ 10 h, the simulated beam lifetime for APS-U is only ~2 h when operated in the high flux mode (I=200 mA in 48 bunches). An additional consequence of the short lifetime is that injection must be more frequent, which provides another potential source of particle loss. In order to provide information for the radiation shielding system evaluation and to avoid particle loss in sensitive locations around the ring (for example, insertion device straight sections), simulations of the detailed beam loss distribution have been performed. Several possible collimation configurations have been simulated and compared.

43 PARTICLE ACCELERATORS↗

Design update on the transition beamline for the CEBAF Energy Upgrade

For Jefferson Lab’s 22GeV upgrade, two new permanent-magnet Fixed-Field Alternating Gradient (FFA) arcs will be integrated to serve the accelerator’s six highest-energy recirculation passes. Connecting these FFA arcs to the existing linear accelerator (linac) requires a carefully engineered transition section. The current design has two parts where the first part adiabatically matches the beam dispersion and orbit trajectories, while the second part aligns the Twiss parameters (alpha and beta functions) with those at the linac entrance. Given the tight spatial constraints and multiple matching requirements, a genetic algorithm is being explored to optimize the beam optics matching. This paper presents the current progress in developing and optimizing this transition.

Accelerator Physics↗

Status of conceptual horizontal splitter design for FFA@CEBAF energy upgrade

Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) is currently investigating the feasibility of upgrading its maximum operating energy using Fixed-Field Alternating-gradient (FFA) recirculating arcs to increase the total number of recirculations the beam through the pair of LINACs. These FFA arcs will be composed of permanent magnets, with small Panofsky-style multipole correctors. Horizontal splitters are needed to control the beam parameters through these FFA arcs. The geometrical and physical constraints, as well as the beam matching requirements are very restrictive, complicating the design. This work will show the current status of the most mature design, which includes matching solutions, as well as options for extraction of the beam.

Accelerator Physics↗

Contractor Sales Training: Providing the Skills Necessary to Sell Comprehensive Home Energy Upgrades

Many comprehensive home energy efficiency programs rely on contractors as the customer-facing ‘front line’ to sell energy improvements. Adding sales skills to contractors’ existing technical expertise is key to converting more assessments into comprehensive home energy upgrades. Leading programs recognize the need to support contractors with sales and business training to help them succeed and to support the growth of the home performance industry for the long term. A number of contractor sales training efforts are emerging, including some programs that are seeing encouraging early results.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Novel Fast Pyrolysis/Catalytic Technology for the Production of Stable Upgraded Liquids

The objective of the proposed research is the demonstration and development of a novel biomass pyrolysis technology for the production of a stable bio-oil. The approach is to carry out catalytic hydrodeoxygenation (HDO) and upgrading together with pyrolysis in a single fluidized bed reactor with a unique two-level design that permits the physical separation of the two processes. The hydrogen required for the HDO will be generated in the catalytic section by the water-gas shift reaction employing recycled CO produced from the pyrolysis reaction itself. Thus, the use of a reactive recycle stream is another innovation in this technology. The catalysts will be designed in collaboration with BASF Catalysts LLC (formerly Engelhard Corporation), a leader in the manufacture of attrition-resistant cracking catalysts. The proposed work will include reactor modeling with state-of-the-art computational fluid dynamics in a supercomputer, and advanced kinetic analysis for optimization of bio-oil production. The stability of the bio-oil will be determined by viscosity, oxygen content, and acidity determinations in real and accelerated measurements. A multi-faceted team has been assembled to handle laboratory demonstration studies and computational analysis for optimization and scaleup.

09 BIOMASS FUELS↗

Upgrade the EMPIRE code as needed for evaluation and production of covariances for actinides

Treatment of actinides in the EMPIRE code has been updated by adding capabilities necessary for effective assimilation of nuclei that undergo fission. The upgrades comprise calculations of Prompt Fission Neutron Spectra (PFNS), and the average cosine of elastically scattered neutrons ($\overline{µ}$) and include sensitivity and covariance computations for both quantities. In addition, EMPIRE outputs the average number of neutrons released per fission event ($\overline{ν}$) that is read from the existing evaluated file and scaled by a factor. Kalman filter is used to fit calculated PFNS, $\overline{µ}$, and $\overline{ν}$ to the experimental data and to produce covariances for the quantities and respective model parameters. These updates expand EMPIRE assimilation possibilities by adding PFNS, $\overline{ν}$, and $\overline{µ}$ to the physical quantities that might be perturbed along with the cross sections during the adjustment. We describe PFNS models used in the EMPIRE code, the modifications required to accommodate these models, and detail updates to the EMPIRE scripts used for fitting, and illustrate the new features applying them to specific nuclei. Finally, we report on actual assimilation of 239 Pu performed by calculating sensitivity of the JEZEBEL $k_{eff}$ to the full set of reaction model parameters (EMPIRE+MCNP) and using Kalman filter to perform adjustment of the parameters. This work was performed according to the goals set forth in milestones M3FT-12BN0210011 and M3FT-12BN0210012.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Syngas Upgrading to Hydrocarbon Fuels Technology Pathway

In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to hydrocarbon fuels to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This pathway case investigates the upgrading of biomass derived synthesis gas (‘syngas’) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and risk adverse conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas to hydrocarbon pathway to be competitive with petroleum-derived gasoline, diesel and jet range blendstocks.

Biomass↗

Syngas Upgrading to Hydrocarbon Fuels Technology Pathway

This technology pathway case investigates the upgrading of woody biomass derived synthesis gas (syngas) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and lowest risk conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas-to-hydrocarbon pathway to be competitive with petroleum-derived gasoline-, diesel- and jet-range hydrocarbon blendstocks.

09 BIOMASS FUELS↗

Properties of Alfvén Eigenmodes in the TAE range on the National Spherical Torus Experiment-Upgrade

A second Neutral Beam (NB) injection line is being installed on the NSTX Upgrade device, resulting in six NB sources with different tangency radii that will be available for heating and current drive. This work explores the properties of instabilities in the frequency range of the Toroidal Alfvén Eigenmode (TAE) for NSTX-U scenarios with various NB injection geometries, from more perpendicular to more tangential, and with increased toroidal magnetic field with respect to previous NSTX scenarios. Predictions are based on analysis through the ideal MHD code NOVA-K. For the scenarios considered in this work, modifications of the Alfvén continuum result in a frequency up-shift and a broadening of the radial mode structure. The latter effect may have consequences for fast ion transport and loss. Preliminary stability considerations indicate that TAEs are potentially unstable, with ion Landau damping representing the dominant damping mechanism.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Cement Fixation – Control System Upgrade [Slides]

Project description: Develop and deploy a new control system and necessary hardware upgrades for the cement fixation system in order to: Improve reliability of controls related hardware; Ensure drop-in, ‘like-for-like’ replacement parts are available; Create documentation and back-up software compatible with modern computers to eliminate the need to reverse-engineer documentation or software in the event of a failure.

42 ENGINEERING↗

The RHIC Polarized Source Upgrade

The basic limitations on the high-intensity H - ion beam production were experimentally studied in charge-exchange collisions of the neutral atomic hydrogen beam in the Na- vapor jet ionizer cell. These studies are the part of the polarized source upgrade (to 10 mA peak current and 85% polarization) project for RHIC. In the source the atomic hydrogen beam of a 5-10 keV energy and total (equivalent) current up to 5 A is produced by neutralization of proton beam in pulsed hydrogen gas target. Formation of the proton beam (from the surface of the plasma emitter with a low transverse ion temperature ~0.2 eV) is produced by four-electrode spherical multi-aperture ion-optical system with geometrical focusing. The hydrogen atomic beam intensity up t o 1.0 A /cm 2 (equivalent) was obtained in the Na-jet ionizer aperture of a 2.0 cm diameter. At the first stage of the experiment H- beam with 36 mA current, 5 keV energy and ~1.0 cm·mrad normalized emittance was obtained using the flat grids and magnetic focusing. The experimental results of the high-intensity neutral hydrogen beam generation and studies of the charge-exchange polarization processes of this intense beam will be presented.

43 PARTICLE ACCELERATORS↗

Nuclear Security: Upgrades Analysis

The objectives for this presentation is to discuss the important of and a process for upgrade selection; and discuss examples of effective system enhancements.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

ENERGY EFFICIENCY UPGRADES FOR SANITATION FACILITIES IN SELAWIK, AK FINAL REPORT

The Native Village of Selawik is a federally recognized Alaskan tribe, located at the mouth of the Selawik River, about 90 miles east of Kotzebue in northwest Alaska. Due to the community’s rural location and cold climate, it is common for electric rates to be four times higher than the cost urban residents pay. These high energy costs were the driving factor for Selawik pursuing funding from the Department of Energy in order to achieve significant energy cost savings. The main objective of the project was to improve the overall energy efficiency of the water treatment/distribution and sewer collection systems in Selawik by implementing the retrofit measures identified in a previously conducted utility energy audit. One purpose for the proposed improvements was to enable the community to realize significant savings associated with the cost of energy. Another purpose of the upgrades was to repair the vacuum sewer system on the west side of Selawik to prevent future freeze-up problems during winter months.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Implications of Cost Effectiveness Screening Practices in a Low Natural Gas Price Environment: Case Study of a Midwestern Residential Energy Upgrade Program

With the proliferation of statewide energy savings targets and other policies favorable to energy efficiency, savings from utility customer-funded energy efficiency programs could rise to offset much of annual load growth by 2025 (Barbose et al 2013). For these increased savings to occur, however, nearly all of these programs must pass screening for cost effectiveness. Some program administrators and state regulators are finding that conventional analyses, which only consider a narrow set of energy-savings related efficiency program benefits, are now resulting in some natural gas efficiency programs failing their cost-effectiveness criteria in the new low natural gas price environment. Regulators are considering whether to scale back or terminate gas portfolios in at least four states (WA, OR, ID, NM) because of cost-effectiveness concerns. Stakeholders in several regions of the country have asked LBNL to help assess alternatives to reducing the pursuit of energy savings in their regions. We address these requests by producing two working papers: one exploring cost-effectiveness screening policy implications of low to moderate natural gas prices, and a second assessing some of the values that policymakers may take into account in weighing the pros and cons of ending natural gas efficiency programs. In this policy brief, we lay out the challenges that low gas prices pose for cost effectiveness of an electric-gas efficiency program and portfolio. We then quantify options available to regulators and administrators who want to evaluate the tradeoffs among multiple policy objectives. A multi-measure, residential energy upgrade program in the Midwest is used as a lens to explore the implications of common and emerging cost-effectiveness policies in the context of low prices for natural gas. We illustrate the results across a range of cost-effectiveness screening options, including different discount rates, levels of test application, various benefit-cost tests, and the inclusion of non-energy resource benefits.

03 NATURAL GAS↗

Upgrades to Alabama Power Company Hydroelectric Developments

From 2010 to 2014, Alabama Power Company (“Alabama Power”) performed upgrades on four units at three of the hydropower developments it operates in east-central Alabama under licenses issued by the Federal Energy Regulatory Commission (“FERC”). These three hydropower developments are located on the Coosa River in Coosa, Chilton, and Elmore counties in east-central Alabama.

13 HYDRO ENERGY↗

Community-Scale Attic Retrofit and Home Energy Upgrade Data Mining

The U.S. Department of Energy’s Building America research team, Alliance for Residential Building Innovation (ARBI), implemented a project to increase residential retrofits in Davis, California. The project used a neighborhood-focused strategy for implementation and a low-cost retrofit program that focused on upgraded attic insulation and duct sealing. ARBI worked with a community partner, the not-for-profit Cool Davis Initiative, as well as selected area contractors to implement a strategy that sought to capitalize on the strong local expertise of partners and the unique aspects of the Davis, California, community. Working with community partners also allowed ARBI to collect and analyze data about effective messaging tactics for community-based retrofit programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗