Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Trajectory Based Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Optimal management of electric hotel loads in mild hybrid heavy duty truck

Here, the problem of engine idling for heavy-duty trucks has been under study for decades with Auxiliary Power Units (APUs) and Truck Stop Electrification (TSE) as the most compelling solutions. With the electrification of trucks approaching feasibility in terms of cost-effective technology, hybridization offers another “degree of freedom” to tackle the problem. Here, this work aims at exploiting a battery pack of a 48 V mild-hybrid heavy-duty truck to store sufficient onboard energy for powering the auxiliary loads during the hoteling. This problem is not trivial, as the battery packs typically cannot recover the entire energy required through regeneration alone; hence an optimal energy management strategy needs to be employed to charge the battery through the engine during drive operation. This strategy optimizes powertrain performances among the four modes: (i) Engine of Coasting (EOC), (ii) Regeneration by braking, (iii) Regeneration by engine, and (iv) engine idling. This paper presents the development of a Dynamic Programming (DP) framework that employs a multi-objective cost function to minimize the fuel consumption and maximize the regeneration using the above-mentioned four modes. A typical heavy-duty truck drive cycle is used to represent the drive phase, with mandatory hoteling stops as per regulations. A comprehensive powertrain model is developed using validated components’ model. The DP employs two state variables: battery State-of-Charge (SOC) and engine mode, and three control inputs: (i) the engine ON–OFF state, (ii) clutch engagement state, and (iii) power request at the Electric Machine (EM) for calculating optimal SOC trajectory. The framework also tackles rapid engine ON–OFF scenarios to avoid the challenges associated with DP and the compromises in fuel cost with those approaches. Finally, the effectiveness of the proposed framework is tested for potential fuel savings on two different battery packs by performing the full cycle simulations. The results show 6.47% of fuel consumption reduction as compared to traditional APU-based heavy-duty truck.

33 ADVANCED PROPULSION SYSTEMS↗

Aerial Vehicle Routing and Scheduling for UAS Traffic Management: A Monte Carlo Tree Search Approach

Numerous unmanned aircraft systems operating at low altitudes to deliver goods and services may one day become ubiquitous in our cities. In the Unmanned Aircraft Systems (UAS) Traffic Management (UTM) framework, such a concept is envisioned, where aerial vehicles operate beyond visual line of sight (BVLOS) within specifically reserved and time stamped “corridors” in the airspace. For example, these corridors or operational intent volumes can connect an aerial vehicle’s origin site to its destination site for package delivery operations. There may also be more than one corridor available for an aerial vehicle to choose from and often different corridors may intersect with one another. Thus, it is imperative to ensure flight trajectories belonging to different aerial vehicles are not in conflict. Per the UTM CONOPs, we assume that a vehicle almost always stays inside its corridor or operational volume. This work provides a framework for strategic deconfliction of UTM or package delivery drones, where we schedule the departure time of all vehicles subject to various temporal constraints (including the corridor deconfliction at the intersections). We present the “multi-route weighted package delivery problem” which serves as an exemplifying model for strategic deconfliction in UTM. In the multi-route weighted package delivery problem, a graph network is given which consists of a set of depots (source) and drop-off (destination) nodes, with multiple routes (defined as a sequence of waypoints) connecting the depots to drop-off nodes. In addition, routes are weighted by the associated ground risk and total travel distance for package delivery. The goal is for a known set of aerial vehicles to depart from the depots, choose a route and take off time, while avoiding conflicts with other aerial vehicles, and minimizing both risk and distance traveled. We provide a mixed integer linear programming (MILP) formulation of the problem, as well as a heuristic solution based on Monte Carlo Tree Search (MCTS) – a method used in game theory and artificial intelligence – to overcome limitations inherent to optimal solvers. Computational results show the advantages of using MCTS over the MILP formulation; the former can provide a sub-optimal solution quickly, and may sometimes even reach an optimal solution, whereas the latter may not even produce a solution in reasonable time. Furthermore, results from both the MILP formulation and MCTS methods were validated using a preliminary agent-based simulator implementing the UTM concept of operations. Thus, the MCTS method can be seen as a scalable solution to the complex multi-route weighted package delivery problem and may possibly be extended to similar complex optimization problems.

Kenny Chour↗

Fusion-Enabled Pluto Orbiter and Lander

Direct Fusion Drive (DFD) is a unique fusion engine concept based on the Princeton Field-Reversed Configuration (PFRC) fusion reactor conceived by Dr. Sam Cohen of the Princeton Plasma Physics Laboratory. DFD would enable the Pluto orbiter and lander context mission and more broadly enable true "rapid transit" to outer-planet and near interstellar space. The truly game-changing levels of thrust and power in a modestly sized package could integrate with our current launch infrastructure while radically expanding the science capability of these missions. Our Phase I was our first funded work on the DFD, with previous work at PSS occurring only under internal R&D. We established the feasibility of our Pluto mission trajectories using straight-line and planar models, including a departure spiral from Earth and insertion at Pluto. We developed our first thrust and specific impulse model using the results of the UEDGE multi-fluid code. Our specific power model was improved. During this Phase II effort, we continued our efforts to increase the fidelity of the designs for the RF, magnet, and shielding subsystems. Dedicated thrust augmentation experiments were run on the PFRC experiment, using a supersonic gas puffing valve. For the first time, we analyzed the design of a closed-loop operation mode and estimated the hardware that would be required for a dual-mode engine. In an exciting new development, we have invented a new thermophotovoltaic thermal conversion method that has the potential to have efficiencies of a Brayton or Stirling system. Our report presents details of these analyses. Our roadmap to bringing DFD to flight predicts that with sufficient support, a first flight unit could be built by 2040. We anticipate that three machine generations are required before this point: a ~1 T PFRC-3 machine hitting new plasma temperature and density levels, a ~5 T PFRC-4 machine with first demonstration of D-3He fusion, and a flight. (The current experiment, PFRC-2, is limited to about 0.1 T). In order to achieve a flight in 2035-2040, the TRL of the supporting systems must be increased in parallel, including low mass radiators, cryogenic propellant storage, and large (>100 kW) thermal conversion systems. Fortunately, many of these systems are dual-use and are required for other technologies including fission systems, so DFD would contribute to and benefit from those programs. This NIAC support and the results of our work have led to multiple follow-on contracts. We won two NASA STTRs focused on DFD subsystems, one on the RF system and one on the superconducting magnets, and our magnet STTR is now midway through a Phase II. We will be receiving a superconducting test magnet for experiments at PPPL this summer. In addition, we won an ARPA-E OPEN grant; this is the first time that OPEN has included fusion technologies, and we are part of a cohort of three alternative fusion companies now supported directly by DOE. We are very optimistic that if we are able to meet our experimental milestones in the next 12-18 months, we will be competitive for additional DOE grants to build PFRC-3.

Propulsion↗

Making the Traffic Operations Case for Congestion Pricing: Operational Impacts of Congestion Pricing

Congestion begins when an excess of vehicles on a segment of roadway at a given time, resulting in speeds that are significantly slower than normal or 'free flow' speeds. Congestion often means stop-and-go traffic. The transition occurs when vehicle density (the number of vehicles per mile in a lane) exceeds a critical level. Once traffic enters a state of congestion, recovery or time to return to a free-flow state is lengthy; and during the recovery process, delay continues to accumulate. The breakdown in speed and flow greatly impedes the efficient operation of the freeway system, resulting in economic, mobility, environmental and safety problems. Freeways are designed to function as access-controlled highways characterized by uninterrupted traffic flow so references to freeway performance relate primarily to the quality of traffic flow or traffic conditions as experienced by users of the freeway. The maximum flow or capacity of a freeway segment is reached while traffic is moving freely. As a result, freeways are most productive when they carry capacity flows at 60 mph, whereas lower speeds impose freeway delay, resulting in bottlenecks. Bottlenecks may be caused by physical disruptions, such as a reduced number of lanes, a change in grade, or an on-ramp with a short merge lane. This type of bottleneck occurs on a predictable or 'recurrent' basis at the same time of day and same day of week. Recurrent congestion totals 45% of congestion and is primarily from bottlenecks (40%) as well as inadequate signal timing (5%). Nonrecurring bottlenecks result from crashes, work zone disruptions, adverse weather conditions, and special events that create surges in demand and that account for over 55% of experienced congestion. Figure 1.1 shows that nonrecurring congestion is composed of traffic incidents (25%), severe weather (15%), work zones, (10%), and special events (5%). Between 1995 and 2005, the average percentage change in increased peak traveler delay, based on hours spent in traffic in a year, grew by 22% as the national average of hours spent in delay grew from 36 hours to 44 hours. Peak delay per traveler grew one-third in medium-size urban areas over the 10 year period. The traffic engineering community has developed an arsenal of integrated tools to mitigate the impacts of congestion on freeway throughput and performance, including pricing of capacity to manage demand for travel. Congestion pricing is a strategy which dynamically matches demand with available capacity. A congestion price is a user fee equal to the added cost imposed on other travelers as a result of the last traveler's entry into the highway network. The concept is based on the idea that motorists should pay for the additional congestion they create when entering a congested road. The concept calls for fees to vary according to the level of congestion with the price mechanism applied to make travelers more fully aware of the congestion externality they impose on other travelers and the system itself. The operational rationales for the institution of pricing strategies are to improve the efficiency of operations in a corridor and/or to better manage congestion. To this end, the objectives of this project were to: (1) Better understand and quantify the impacts of congestion pricing strategies on traffic operations through the study of actual projects, and (2) Better understand and quantify the impacts of congestion pricing strategies on traffic operations through the use of modeling and other analytical methods. Specifically, the project was to identify credible analytical procedures that FHWA can use to quantify the impacts of various congestion pricing strategies on traffic flow (throughput) and congestion.

99 GENERAL AND MISCELLANEOUS↗

Foundations for the Future Power System: Inverter-Based Resource Interconnection Standards

As power systems evolve to become reliant on solar, wind, batteries, and other inverter-based resources (IBRs), it is essential that those resources meet certain minimum performance and capability criteria designed to ensure the power system operates stably and reliably. Because those criteria, as enshrined in interconnection standards, take years to develop and are very long lived, they need to account for not only the present state of the power system but also its expected future state over the lifetime of the power plants to which they will apply. In addition, they need to be specific enough to ensure reliability without over specifying and, thereby, impeding innovation. Because power systems are shifting rapidly from a state where IBRs make up a small to medium portion of generation to one where the generation will, at times, come predominantly from IBRs, interconnection standards are especially challenging to develop today. Good interconnection standards can make the power system more reliable and less costly to operate, whereas poorly designed standards can lead to major problems, like the famous German 50.2-Hz problem, which introduced a risk of losing many gigawatts of solar on a frequency excursion and resulted in many IBRs being retrofitted at great cost to mitigate a major system reliability risk. Readying the power system by specifying forward-looking technical minimum functional capabilities for IBRs can be an effective approach to avoid future retrofits.

data models↗

Deploying a Route Optimization EFB Application for Commercial Airline Operational Trials

The Traffic Aware Planner (TAP), developed for NASA Langley Research Center to support the Traffic Aware Strategic Aircrew Requests (TASAR) project, is a flight-efficiency software application developed for an Electronic Flight Bag (EFB). Tested in two flight trials and planned for operational testing by two commercial airlines, TAP is a real-time trajectory optimization application that leverages connectivity with onboard avionics and broadband Internet sources to compute and recommend route modifications to flight crews to improve fuel and time performance. The application utilizes a wide range of data, including Automatic Dependent Surveillance Broadcast (ADS-B) traffic, Flight Management System (FMS) guidance and intent, on-board sensors, published winds and weather, and Special Use Airspace (SUA) schedules. This paper discusses the challenges of developing and deploying TAP to various EFB platforms, our solutions to some of these challenges, and lessons learned, to assist commercial software developers and hardware manufacturers in their efforts to implement and extend TAP functionality in their environments. EFB applications (such as TAP) typically access avionics data via an ARINC 834 Simple Text Avionics Protocol (STAP) server hosted by an Aircraft Interface Device (AID) or other installed hardware. While the protocol is standardized, the data sources, content, and transmission rates can vary from aircraft to aircraft. Additionally, the method of communicating with the AID may vary depending on EFB hardware and/or the availability of onboard networking services, such as Ethernet, WIFI, Bluetooth, or other mechanisms. EFBs with portable and installed components can be implemented using a variety of operating systems, and cockpits are increasingly incorporating tablet-based technologies, further expanding the number of platforms the application may need to support. Supporting multiple EFB platforms, AIDs, avionics datasets, and user interfaces presents a challenge for software developers and the management of their code baselines. Maintaining multiple baselines to support all deployment targets can be extremely cumbersome and expensive. Certification also needs to be considered when developing the application. Regardless of whether the software is itself destined to be certified, data requirements in support of the application and user interface elements may introduce certification requirements for EFB manufacturers and the airlines. The example of TAP, the challenges faced, solutions implemented, and lessons learned will give EFB application and hardware developers insight into future potential requirements in deploying TAP or similar flight-deck EFB applications.

Roscoe, David A.↗

NAIRAS Ionizing Radiation Model: Extension from Atmosphere to Space

The Nowcast of Aerospace Ionizing RAdiation System (NAIRAS) model is a real-time, global, physics-based model originally developed to predict exposure from cosmic radiation to air travelers from both galactic and solar sources. A prototype operational NAIRAS model has provided tabular and graphical data products via its public web site for about ten years. A new version of the NAIRAS model has been developed that incorporates an extension of the model domain from the atmospheric ionizing radiation environment to the space radiation environment, with the addition of the trapped inner belt proton source and altitude-dependent and rigidity-dependent geomagnetic shielding of the galactic cosmic rays (GCR) and solar energetic particle (SEP) protons. New output products of differential and integral particle flux have been developed for the characterization of single-event effects (SEE), expanding the application of NAIRAS from human radiation exposure assessment to allowing end-users to quantify radiation environment risks to aviation and spacecraft microelectronic systems. The NAIRAS model has transitioned to prototype operations at the Community Coordinated Modeling Center (CCMC) where the model now operates in two modes: (1) real-time global predictions of the atmospheric radiation environment and (2) a run-on-request (RoR) service allowing the user to select a specific time period for the global dosimetric calculations, or to upload an aircraft, balloon, or spaceflight trajectory file to provide predictions of the dosimetric and particle flux quantities along the flight path. The new features of NAIRAS version 3.0 are described in this paper and example results of the new output products for low-Earth orbit (LEO), medium-Earth orbit (MEO), and free-space radiation environments are presented

Christopher J. Mertens↗

Post-Transcriptional Mechanisms Respond Rapidly to Ecologically Relevant Thermal Fluctuations During Temperature-Dependent Sex Determination

An organism’s ability to integrate transient environmental cues experienced during development into molecular and physiological responses forms the basis for adaptive shifts in phenotypic trajectories. During temperature-dependent sex determination (TSD), thermal cues during discrete periods in development coordinate molecular changes that ultimately dictate sexual fate and contribute to patterns of inter- and intra-sexual variation. How these mechanisms interface with dynamic thermal environments in nature remain largely unknown. By deploying thermal loggers in wild nests of the American alligator (Alligator mississippiensis) over two consecutive breeding seasons, we observed that 80% of nests exhibit both male- and female-promoting thermal cues during the thermosensitive period, and of these nests, all exhibited both male- and female-promoting temperatures within the span of a single day. These observations raise a critical question—how are opposing environmental cues integrated into sexually dimorphic transcriptional programs across short temporal scales? To address this question, alligator embryos were exposed to fluctuating temperatures based on nest thermal profiles and sampled over the course of a daily thermal fluctuation. We examined the expression dynamics of upstream genes in the temperature-sensing pathway and find that post-transcriptional alternative splicing and transcript abundance of epigenetic modifier genes JARID2 and KDM6B respond rapidly to thermal fluctuations while transcriptional changes of downstream effector genes, SOX9 and DMRT1, occur on a delayed timescale. Our findings reveal how the basic mechanisms of TSD operate in an ecologically relevant context. We present a hypothetical hierarchical model based on our findings as well as previous studies, in which temperature-sensitive alternative splicing incrementally influences the epigenetic landscape to affect the transcriptional activity of key sex-determining genes.

59 BASIC BIOLOGICAL SCIENCES↗

Multi-Sensor Testing for Automated Rendezvous and Docking Sensor Testing at the Flight Robotics Laboratory

The Exploration Systems Architecture defines missions that require rendezvous, proximity operations, and docking (RPOD) of two spacecraft both in Low Earth Orbit (LEO) and in Low Lunar Orbit (LLO). Uncrewed spacecraft must perform automated and/or autonomous rendezvous, proximity operations and docking operations (commonly known as AR&D). The crewed missions may also perform rendezvous and docking operations and may require different levels of automation and/or autonomy, and must provide the crew with relative navigation information for manual piloting. The capabilities of the RPOD sensors are critical to the success of the Exploration Program. NASA has the responsibility to determine whether the Crew Exploration Vehicle (CEV) contractor proposed relative navigation sensor suite will meet the requirements. The relatively low technology readiness level of AR&D relative navigation sensors has been carried as one of the CEV Project's top risks. The AR&D Sensor Technology Project seeks to reduce the risk by the testing and analysis of selected relative navigation sensor technologies through hardware-in-the-loop testing and simulation. These activities will provide the CEV Project information to assess the relative navigation sensors maturity as well as demonstrate test methods and capabilities. The first year of this project focused on a series of"pathfinder" testing tasks to develop the test plans, test facility requirements, trajectories, math model architecture, simulation platform, and processes that will be used to evaluate the Contractor-proposed sensors. Four candidate sensors were used in the first phase of the testing. The second phase of testing used four sensors simultaneously: two Marshall Space Flight Center (MSFC) Advanced Video Guidance Sensors (AVGS), a laser-based video sensor that uses retroreflectors attached to the target vehicle, and two commercial laser range finders. The multi-sensor testing was conducted at MSFC's Flight Robotics Laboratory (FRL) using the FRL's 6-DOF gantry system, called the Dynamic Overhead Target System (DOTS). The target vehicle for "docking" in the laboratory was a mockup that was representative of the proposed CEV docking system, with added retroreflectors for the AVGS. The multi-sensor test configuration used 35 open-loop test trajectories covering three major objectives: (1) sensor characterization trajectories designed to test a wide range of performance parameters; (2) CEV-specific trajectories designed to test performance during CEV-like approach and departure profiles; and (3) sensor characterization tests designed for evaluating sensor performance under more extreme conditions as might be induced during a spacecraft failure or during contingency situations. This paper describes the test development, test facility, test preparations, test execution, and test results of the multi-sensor series of trajectories.

Brewster, L.↗

Multi-Sensor Testing for Automated Rendezvous and Docking Sensor Testing at the Flight Robotics Lab

The Exploration Systems Architecture defines missions that require rendezvous, proximity operations, and docking (RPOD) of two spacecraft both in Low Earth Orbit (LEO) and in Low Lunar Orbit (LLO). Uncrewed spacecraft must perform automated and/or autonomous rendezvous, proximity operations and docking operations (commonly known as AR&D). The crewed missions may also perform rendezvous and docking operations and may require different levels of automation and/or autonomy, and must provide the crew with relative navigation information for manual piloting. The capabilities of the RPOD sensors are critical to the success ofthe Exploration Program. NASA has the responsibility to determine whether the Crew Exploration Vehicle (CEV) contractor-proposed relative navigation sensor suite will meet the requirements. The relatively low technology readiness level of AR&D relative navigation sensors has been carried as one of the CEV Project's top risks. The AR&D Sensor Technology Project seeks to reduce the risk by the testing and analysis of selected relative navigation sensor technologies through hardware-in-the-Ioop testing and simulation. These activities will provide the CEV Project information to assess the relative navigation sensors maturity as well as demonstrate test methods and capabilities. The first year of this project focused on a series of "pathfinder" testing tasks to develop the test plans, test facility requirements, trajectories, math model architecture, simulation platform, and processes that will be used to evaluate the Contractor-proposed sensors. Four candidate sensors were used in the first phase of the testing. The second phase of testing used four sensors simultaneously: two Marshall Space Flight Center (MSFC) Advanced Video Guidance Sensors (AVGS), a laser-based video sensor that uses retroreflectors attached to the target vehicle, and two commercial laser range finders. The multi-sensor testing was conducted at MSFC's Flight Robotics Laboratory (FRL) using the FRL's 6-DOF gantry system, called the Dynamic Overhead Target System (DOTS). The target vehicle for "docking" in the laboratory was a mockup that was representative of the proposed CEV docking system, with added retroreflectors for the AVGS.' The multi-sensor test configuration used 35 open-loop test trajectories covering three major objectives: (l) sensor characterization trajectories designed to test a wide range of performance parameters; (2) CEV-specific trajectories designed to test performance during CEV-like approach and departure profiles; and (3) sensor characterization tests designed for evaluating sensor performance under more extreme conditions as might be induced during a spacecraft failure or during contingency situations. This paper describes the test development, test facility, test preparations, test execution, and test results of the multisensor series oftrajectories

Brewster, Linda L.↗

SPOT Program

A Spacecraft Position Optimal Tracking (SPOT) program was developed to process Global Positioning System (GPS) data, sent via telemetry from a spacecraft, to generate accurate navigation estimates of the vehicle position and velocity (state vector) using a Kalman filter. This program uses the GPS onboard receiver measurements to sequentially calculate the vehicle state vectors and provide this information to ground flight controllers. It is the first real-time ground-based shuttle navigation application using onboard sensors. The program is compact, portable, self-contained, and can run on a variety of UNIX or Linux computers. The program has a modular objec-toriented design that supports application-specific plugins such as data corruption remediation pre-processing and remote graphics display. The Kalman filter is extensible to additional sensor types or force models. The Kalman filter design is also strong against data dropouts because it uses physical models from state and covariance propagation in the absence of data. The design of this program separates the functionalities of SPOT into six different executable processes. This allows for the individual processes to be connected in an a la carte manner, making the feature set and executable complexity of SPOT adaptable to the needs of the user. Also, these processes need not be executed on the same workstation. This allows for communications between SPOT processes executing on the same Local Area Network (LAN). Thus, SPOT can be executed in a distributed sense with the capability for a team of flight controllers to efficiently share the same trajectory information currently being computed by the program. SPOT is used in the Mission Control Center (MCC) for Space Shuttle Program (SSP) and International Space Station Program (ISSP) operations, and can also be used as a post -flight analysis tool. It is primarily used for situational awareness, and for contingency situations.

Smith, Jason T.↗

Strategy for Developing Technologies for Megawatt-class Nuclear Electric Propulsion Systems

In late fiscal year 2020, the Space Nuclear Propulsion (SNP) project began the process of formulating an investment strategy to support development of the technologies required for a high-power (megawatt-class) nuclear electric propulsion (NEP) system capable of performing human-scale missions. This activity was initiated concurrent with several high-level studies and assessments were either under way or had just concluded. Studies of human-scale Mars missions have been performed several times over the past two decades. One of the most recent studies examined opposition-class human Mars missions to occur in the late 2030s timeframe [1,2]. The mission architecture assumed a hybrid NEP/chem-propelled vehicle that used a high specific impulse (Isp) NEP-system and a liquid oxygen (LOx)-liquid methane high thrust chemical stage (two 110 kN (25 klbf) thrust, 365 s Isp engines) for maneuvers performed to enter and exit gravity wells. Trajectory analyses performed in this study showed that such a mission could be performed with 2-4 MWe directed into the electric propulsion system (operating for 20,000+ hours), with the large range representing different opposition-class Mars mission opportunities and permutations on the trajectory design, concept of operations, and technology choices. In 2020, the NASA Engineering and Safety Center (NESC) performed a study to evaluate the maturity of the different technologies required for nuclear propulsion systems [3]. The executive summary of this report provided the following top-level conclusions: • “The majority of critical technologies for… NEP/Chem… systems are relatively immature” • “TRLs [technology readiness levels] in the literature are often overestimated” • “The majority of critical technologies… for NEP/Chem… systems are at a relatively high level of advancement degree of difficulty (AD2 > 4) for maturation, requiring a dual development approach” • “The proper assessment of baseline TRL and AD2 values and the estimation of requirements and resources required for advancement have been consistent issues for NEP,” • “Non-advocate reviews should occur at the start of a technology program and at all key milestones.” In 2021, the National Academies of Science, Engineering, and Medicine (NASEM) issued a separate report [4] identifying the “primary technical and programmatic challenges, merits, and risks for maturing space nuclear propulsion technologies of interest to a future human Mars exploration mission.” That work contained several important findings, including: • “Developing a MWe-class NEP system for the baseline mission would require increasing power by orders of magnitude relative to NEP system flight- or ground-based technology demonstrations completed to date.” • “Subscale in-space flight testing of NEP systems cannot address many of the risks and potential failure modes associated with the baseline mission NEP system. With sufficient M&S [modeling & simulation] and ground testing, including modular subsystem tests at full scale and power, flight qualification requirements can be met by the cargo missions that will precede the first crewed mission to Mars. Fully integrated ground testing may not be required.” • “As a result of low and intermittent investment over the past several decades, it is unclear if even an aggressive program would be able to develop an NEP system capable of executing the baseline mission in 2039.” These efforts motivated the SNP project to investigate the technologies available for a megawatt-class high power nuclear electric propulsion system. That system is illustrated schematically in Figure 1 and is comprised of five separate top-level critical technology elements (CTEs). 1. Nuclear Reactor – Thermal power source for the system, utilizing high-assay low enriched uranium (HALEU) as the nuclear fuel. Reactor radiation shielding is also included in this CTE. 2. Power Conversion – Operates as a thermodynamic cycle, accepting nuclear reactor thermal power as an input and converting it to mechanical power. 3. Power Management and Distribution (PMAD) – Accepts as an input mechanical power from the power conversion system, which is used to generate electrical power. The PMAD system also distributes the generated electrical power to all other parts of the spacecraft, including the high-power EP system. The PMAD system may also perform duties such as isolation, fault detection, and power transformation/rectification for different spacecraft systems, including the thrusters. 4. Electric Propulsion (EP) – Accepts as an input electrical power, which is used to accelerate a propellant to high speeds to produce thrust. This system includes the power processing unit (PPU), which converts the power it receives to the correct current and voltage required by the thrusters, and the propellant storage and feed systems, which contain and meter the flow of propellant to the thrusters. 5. Thermal Management (Radiators/Heat Rejection) – The cold side of the thermodynamic power conversion cycle, accepts thermal power from the power conversion system and radiatively rejects that heat to space. In this paper, we describe the SNP project formulation and investment strategy that aims to accomplish the research and development required to advance the technology readiness for each CTE. The strategy relies heavily upon experimental testing supported by modeling and simulation to yield realistic assessments of the technologies, which in turn will be used to inform future NEP system-level design decisions and any potential technology downselects.

Kurt A Polzin↗

A Numerical Approach to Estimate the Ballistic Coefficient of Space Debris from TLE Orbital Data

Low Earth Orbit (LEO) is full of space debris, which consist of spent rocket stages, old satellites and fragments from explosions and collisions. As of 2009, more than 21,000 orbital debris larger than 10 cm are known to exist], and while it is hard to track anything smaller than that, the estimated population of particles between 1 and 10 cm in diameter is approximately 500,000, whereas small as 1 cm exceeds 100 million. These objects orbit Earth with huge kinetic energies speeds usually exceed 7 kms. The shape of their orbit varies from almost circular to highly elliptical and covers all LEO, a region in space between 160 and 2,000 km above sea level. Unfortunately, LEO is also the place where most of our active satellites are situated, as well as, International Space Station (ISS) and Hubble Space Telescope, whose orbits are around 400 and 550 km above sea level, respectively.This poses a real threat as debris can collide with satellites and deal substantial damage or even destroy them.Collisions between two or more debris create clouds of smaller debris, which are harder to track and increase overall object density and collision probability. At some point, the debris density couldthen reach a critical value, which would start a chain reaction and the number of space debris would grow exponentially. This phenomenon was first described by Kessler in 1978 and he concluded that it would lead to creation of debris belt, which would vastly complicate satellite operations in LEO. The debris density is already relatively high, as seen from several necessary debris avoidance maneuvers done by Shuttle, before it was discontinued, and ISS. But not all satellites have a propulsion system to avoid collision, hence different methods need to be applied. One of the proposed collision avoidance concepts is called LightForce and it suggests using photon pressure to induce small orbital corrections to deflect debris from colliding. This method is very efficient as seen from theoretical simulations, even few continuous mode 10 kW ground-based lasers, focused by 1.5 m telescopes with adaptive optics, were enough to prevent significant amount of the debris collisions. Simulations were done by propagating all space objects in LEO by 1 year into the future and checking whether the probability of collision was high. For those space objects different ground-based lasers were used to divert them, afterwards collision probabilities were reevaluated. However, the actual accuracy of the LightForce software, which has been developed at NASA AmesResearch Center, depends on the veracity of the input parameters, one of which is the objects ballistic coefficient. It is a measure of bodys ability to overcome air resistance, which has a significant impact on the debris in LEO, and thus it is responsible for the shape of the trajectory of the debris. Having the exact values of the ballistic coefficient would make significantly better collision predictions, unfortunately, we do not know what are the values for most of the objects.In this research, we were working with part of LightForce code, which estimates the ballistic coefficient from ephemerides. Previously used method gave highly inaccurate values, when compared to known objects, and it needed to be changed. The goal of this work was to try out a different method of estimating the ballistic coefficient and to check whether or not it gives noticeable improvements.

Collisions↗

Blast-Wave Characteristics Near Site 300

We have developed a procedure for calculating the maximum high-explosive weight limit for use at Site 300 based on the analysis of the blast-wave propagation behavior in the atmosphere. Both analytical and experimental efforts have been involved in the present work, including a literature search, evaluation of other data, measurements of local weather conditions, and implementation of relevant computational programs. Major results of the present effort are • Comparison of the LLNL data with other data reveals discrepancies, suggesting that local effects, such as weather conditions in the downrange regions, may play a role in affecting the wave-propagation behavior. Our measurements of the local weather conditions indeed show that they differ from those at Site 300. • Analyses of other, newer models and data have resulted in the implementation of relevant computer codes, such as the BLASTO code, to be used at Site 300. • A new procedure for predicting the weight limit at Site 300 has been recommended. This new procedure consists of - Site 300 and local valley weather measurements. - The LAP code. - The BLASTO code. The LAP code is a modified SIPS code and computes the acoustic ray trajectories, including the focus ("caustic") locations, under varying local weather conditions. The BLASTO code calculates the peak overpressure vs distance relationship for a given charge weight and weather condition. Both the LAP code and the BLASTO code have been implemented and are operational at Site 300. Future plans include conducting selective tests to verify the validity of the predictive procedure recommended for Site 300.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Wind Prediction Accuracy for Air Traffic Management Decision Support Tools

The performance of Air Traffic Management and flight deck decision support tools depends in large part on the accuracy of the supporting 4D trajectory predictions. This is particularly relevant to conflict prediction and active advisories for the resolution of conflicts and the conformance with of traffic-flow management flow-rate constraints (e.g., arrival metering / required time of arrival). Flight test results have indicated that wind prediction errors may represent the largest source of trajectory prediction error. The tests also discovered relatively large errors (e.g., greater than 20 knots), existing in pockets of space and time critical to ATM DST performance (one or more sectors, greater than 20 minutes), are inadequately represented by the classic RMS aggregate prediction-accuracy studies of the past. To facilitate the identification and reduction of DST-critical wind-prediction errors, NASA has lead a collaborative research and development activity with MIT Lincoln Laboratories and the Forecast Systems Lab of the National Oceanographic and Atmospheric Administration (NOAA). This activity, begun in 1996, has focussed on the development of key metrics for ATM DST performance, assessment of wind-prediction skill for state of the art systems, and development/validation of system enhancements to improve skill. A 13 month study was conducted for the Denver Center airspace in 1997. Two complementary wind-prediction systems were analyzed and compared to the forecast performance of the then standard 60 km Rapid Update Cycle - version 1 (RUC-1). One system, developed by NOAA, was the prototype 40-km RUC-2 that became operational at NCEP in 1999. RUC-2 introduced a faster cycle (1 hr vs. 3 hr) and improved mesoscale physics. The second system, Augmented Winds (AW), is a prototype en route wind application developed by MITLL based on the Integrated Terminal Wind System (ITWS). AW is run at a local facility (Center) level, and updates RUC predictions based on an optimal interpolation of the latest ACARS reports since the RUC run. This paper presents an overview of the study's results including the identification and use of new large mor wind-prediction accuracy metrics that are key to ATM DST performance.

Cole, Rod↗

Ion Propulsion: An Enabling Technology for the Dawn Mission

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, 4 Vesta, and the dwarf planet 1 Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 rocket that placed the 1218-kg spacecraft into an Earth-escape (heliocentic) trajectory with an escape velocity of 11 km/s. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide an additional delta-V of approximately 11 km/s for the heliocentric transfers to each body and for all orbit transfers including orbit capture/escape and transition to the various science orbits. Deterministic thrusting to Vesta began in December 2007 and concluded with orbit capture at Vesta in July 2011. The transfer to Vesta included a Mars gravity assist flyby in February 2009 that provided an additional delta-V of 2.6 km/s and was the only post-launch mission delta-V not provided by IPS. The IPS was used during the 14 months at Vesta for all science orbit transfers and then for Vesta escape. Deterministic thrusting for Ceres began in late August 2012 with a planned arrival date at Ceres in early 2015, whereupon IPS will be used for all science orbit transfers. As of January 2013 the IPS has been operated for approximately 28,000 hours, consumed approximately 280 kg of xenon, and provided a delta-V of approximately 7.5 km/s, the most post-launch delta-V of any spacecraft yet flown. IPS performance characteristics are very close to the expected performance based on analysis and testing performed pre-launch. Use of the IPS together with a medium-priced launch vehicle enabled this high delta-V mission to be performed within the Discovery Program cost cap. This paper provides an overview of the Dawn IPS and its mission operations through departure for Ceres.

Dawn mission overview↗

Understanding the Uncertainty in the Technical Performance Level Assessment for Wave Energy

In recent years, the design and development of wave energy converters (WECs) has been explored with intense interest, with highly varying design concepts emerging globally across both research enterprises and industry. The design space for WECs is vast - many concepts ranging in functionality, control systems, power development systems, materials, and scale have been ideated and prototyped, but WEC technology has yet to converge. One critical element of the technology trajectory that governs the speed of adoption is the performance of a WEC concept. In analogous but more-established industries (such as aerospace, and environmentally sustainable electronics design), performance assessment is a quantitative method, based on historical data, that is used as an iterative tool to improve the design of these systems early on in the design process. Though more nascent than these approaches, in wave energy R&D, WEC performance has been assessed using the Technology Performance Level (TPL) assessment, which provides designers with a quantitative score, situating a grid-scale WEC concept on a scale from 1-9 (1 being the lowest performance, and 9 being the highest, trending with the oft-used Technology Readiness Level, or TRL). The TPL assessment is designed to be used during design iteration, when a WEC concept is fully ideated, to enable designers to consider potential means of improving the downstream performance of the concept. One concern that may be slowing the adoption of TPL among WEC developers is the inherent uncertainty in the assessment, and how uncertainty in the individual questions asked as part of the assessment may contribute to perceived inaccuracies in the final score. In this work, we explore the uncertainty present in the assessment and quantify this uncertainty using both traditional mathematical operations and a Monte Carlo simulation. Results imply areas of improvement of the TPL assessment, where reducing uncertainty will be most helpful to end users, enabling both TPL practitioners and users to understand with more accuracy those design elements that can be improved to impact device performance most substantively.

techno-economic analysis↗

Trajectory Reconstruction of the Low-Earth Orbit Flight Test of an Inflatable Decelerator

The Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) project conducted a flight test of a 6m inflatable aeroshell. The LOFTID test article was a secondary payload on an Atlas V launcher that carried the Joint Polar Satellite System-2 (JPSS-2) as its primary payload. The vehicle launched on November 10th, 2022. After reaching orbit, the LOFTID test article inflated the aeroshell, separated from the upper stage on an entry trajectory, and entered the atmosphere to splash down in the Pacific Ocean under parachutes. The test concept of operations is shown in Figure 1. The test article was instrumented with a variety of sensors to be used for post-flight evaluation of vehicle performance. Data from one of the key sensors for trajectory reconstruction, the Inertial Measurement Unit (IMU), was not captured in the data recorder due to a malfunction. Data from the nose cone mounted Flush Air Data Sensing (FADS) system were successfully acquired. The layout of the FADS sensors and the measured pressures during atmospheric entry are shown in Figure 2. The FADS data were combined with a Newtonian flow pressure model [1, 2] to produce estimates of the atmospheric relative trajectory. A Mach number anchoring technique given in [2] was used to stabilize estimates in high speed flight conditions. Since no IMU data were available, a trajectory simulation was used to provide the Mach number time history. The resulting estimates of the atmospheric-relative trajectory are shown in Figures 3. Given the loss of the IMU data, alternate methods for trajectory reconstruction are being explored. One approach under investigation is the use of the on-board video recorder data to be analyzed to reconstruct attitude motion. This approach is currently under investigation and will be reported on in the final paper. The Newtonian flow pressure model for the FADS analysis will also be updated with a CFD-based pressure model.

Christopher D Karlgaard↗