Tracking and Data Relay Satellite System configuration and tradeoff study. Volume 4: Space shuttle launched TDRSS. Part 2: Final Report, 22 August 1972 - 1 April 1973
Configuration data and design information for the space shuttle launched configuration is presented. The overall system definition, operations and control, and telecommunication service system including link budgets are discussed. A brief description of the user transceiver and ground station is presented. A final section includes a summary description of the TDR spacecraft and all the subsystems. The data presented are largely in tabular form.