Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TECHNICAL DETAILS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Engineering and Technology Road-map

Throughout its existence, the Environmental Management (EM) program has required a strong technology component to accomplish its mission, one that is focused on developing technologies to enhance safety, effectiveness, and efficiency. Although the Department of Energy (DOE) has made great progress toward safely disposing of the legacies of the Cold War, much remains to be done. These past accomplishments provide a guide for future success; however, the unique nature of many of the remaining challenges will require a strong and responsive applied research and engineering program. The Engineering and Technology Road-map was developed to address this need and guide the EM Engineering and Technology Program. The Road-map identifies the technical risks and uncertainties that the EM program faces over the next ten years; the strategies EM will use to reduce those risks; and the planned outcomes of implementing those strategies. Input for this Road-map was provided by EM Federal Project Directors, Stakeholders, Site Contractors, National Laboratories and the National Academy of Science. To accomplish this work, EM has designated federal Strategic Initiative Managers who will work with Federal Project Directors to develop, refine and implement a detailed scope and schedule for each initiative, as well as identify the point at which the technologies developed will be inserted into EM cleanup projects. The starting point for the Road-map was technical project risk and uncertainty. Risks are defined as known technical issues that could prevent project success. Uncertainties are indefinite or unpredictable technical aspects of a project. Risks included in the Road-map were identified in three ways: 1) By the Projects - EM's operations are performed within a culture of disciplined project management, based on DOE Order 413.3A, Program and Project Management for the Acquisition of Capital Assets. As such, technical risks and uncertainties affecting each cleanup project are identified early in the project life cycle, are captured in project risk assessments, and often lead to applied technology development activities. 2) By reviews and assessments - EM utilizes experts to review the progress of its major cleanup projects and to assess the maturity of evolving technologies. These reviews include External Technical Reviews and Technology Readiness Assessments. They transcend the project's baseline and often identify opportunities for reducing technical risk through development and deployment of innovative or enhanced technologies. 3) By the sites - EM periodically asks EM sites to identify technical risks and uncertainties in the form of technical needs. The Road-map divides EM risks into six program areas: Waste Processing, Groundwater and Soil Remediation, Deactivation and Decommissioning (D and D) and Facility Engineering, Spent Nuclear Fuel, Challenging Materials, and Integration. Tables 1-6 show those risks and uncertainties, as well as the 13 strategic initiatives established to address those risks. In conclusion, the Engineering and Technology Road-map presents an integrated approach to reducing the technical risks and uncertainties facing the EM program in a manner consistent with its disciplined approach to project management. The risks include challenges in waste processing, groundwater and soil remediation, deactivation and decommissioning, spent nuclear fuel, challenging materials, and integration. The EM Engineering and Technology Program will address these risks, and will use applied research and engineering to improve technologies and processes at sites across the country. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

10 MW, L-Band Klystron for Accelerators (Final Technical Report)

Calabazas Creek Research Inc. (CCR) completed Phase I the development of a 10 MW, 1.3 GHz, annular beam klystron (ABK) for driving advanced accelerators, such as the International Linear Collider (ILC). Through detailed simulations in Phase I, CCR produced a design that meets all of the requirements for ILC. The ABK uses an annular beam to minimize space charge depression and the impedance. This allows the relatively low voltage of 120 kV specified for the International Linear Collider (ILC). Like the sheet beam klystron, the ABK uses a thin beam located close to the drift tube walls; however, it operates with lower risk, single mode cavities. In addition, it is azimuthally symmetric, dramatically reducing design and fabrication costs. It provides the same operating characteristics as a multi-beam klystron, but is far simpler and will be easier and less expensive to fabricate.

43 PARTICLE ACCELERATORS↗

Offshore Wind Composite Siting Exclusions Scenarios

This dataset consolidates criteria that restrict the siting of offshore wind energy installations, an update from Zuckerman et al. (2023). All scenarios exclude area from wind energy development due to legal or administrative restrictions (e.g., Marine Protected Areas), existing infrastructure, and technical constraints (e.g., 1,300 m bathymetry limit). A TIF data file and a PNG cartographic map of the data are provided for three scenarios ("Open", "Reference", and "Limited"), showing areas where offshore wind energy is restricted across the contiguous United States. The "Open" scenario only excludes areas with known preclusions for offshore wind deployment. The "Reference" scenario excludes all areas from the "Open" scenario, as well as additional best management practices such as known proposed protected areas, and state waters. The "Limited" scenario excludes all area from the "Reference" scenario. Additionally, it has more stringent siting criteria such as larger setbacks from shore and infrastructure, as well as shallower depth limits on floating technology. For further details and citation, please refer to the publication linked below: Zuckerman, Gabriel R., Anthony Lopez, Travis Williams, Rebecca Green, and Grant Buster. 2023. Impacts of Siting Considerations on Offshore Wind Technical Potential in the United States. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20- 85088.

Array↗

Retrospective Study of Rapid-Exchange Monorail Versus Over-the-Wire Technique for Femoropopliteal Angioplasty

PurposeThe purpose of this study was to compare procedural outcome of rapid-exchange (RX) monorail versus conventional over-the-wire (OTW) technique for femoropopliteal angioplasty.Materials and MethodsDemographic data, procedure details, angioplasty success, and complications of 328 consecutive percutaneous transluminal angioplasties (PTAs) were collected from a prospective database and retrospectively analyzed. Procedure details included duration of fluoroscopy, area-dose product, amount of contrast agent, sheath sizes, access route, length of stenosis, presence of total occlusion, technical and anatomical success (residual stenosis <30% in the absence of complications), need for bail-out stenting, and periprocedural complications. The RX technique alone was used in 102 of 328 cases (31%); the OTW technique, in 226 of 328 of cases (68%).ResultsTechnical success was 98% for the RX versus 95.4% for the OTW technique (p = 0.2). A significantly greater number of stents had to be implanted due to angioplasty failure when the OTW technique was used (RX, 5.9%; OTW, 13.7%; p = 0.04). There were no significant differences in fluorocopy time, dose-area product, or amount of contrast medium used. The RX system facilitated the use of smaller sheath sizes (5 Fr = 38% and 6 Fr = 59% for RX versus 5 Fr = 16.8% and {>=}6 Fr = 82.5% for OTW) but showed only a tendency toward lower overall complication rates (16.6% [17/102] in the RX group versus 19.9% [45/226] in the OTW group; p = 0.09). There was no effect on length of hospitalization. RX monorail systems were not associated with higher procedural costs when compared to conventional OTW technique.ConclusionWe conclude that RX monorail systems seem to enhance the technical success of femoropopliteal angioplasty. Although smaller sheath sizes can be used due to the lower profile of the RX systems, there is only a tendency toward lower complication rates.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Computing environments for reproducibility: Capturing the “Whole Tale”

The act of sharing scientific knowledge is rapidly evolving away from traditional articles and presentations to the delivery of executable objects that integrate the data and computational details (e.g., scripts and workflows) upon which the findings rely. This envisioned coupling of data and process is essential to advancing science but faces technical and institutional barriers. The Whole Tale project aims to address these barriers by connecting computational, data-intensive research efforts with the larger research process transforming the knowledge discovery and dissemination process into one where data products are united with research articles to create "living publications" or tales. The Whole Tale focuses on the full spectrum of science, empowering users in the long tail of science, and power users with demands for access to big data and compute resources. We report here on the design, architecture, and implementation of the Whole Tale environment.

97 MATHEMATICS AND COMPUTING↗

Factors for conversion between human and automatic read-outs of CDMAM images

Purpose: According to the European protocol for the quality control of the physical and technical aspects of mammography screening (EPQCM) image quality of digital mammography devices has to be assessed using human evaluation of the CDMAM contrast-detail phantom. This is accomplished by the determination of threshold thicknesses of gold disks with different diameters (0.08-2 mm) and revealed to be very time consuming. Therefore a software solution based on a nonprewhitening matched filter (NPW) model was developed at University of Nijmegen. Factors for the conversion from automatic to human readouts have been determined by Young et al.[Proc. SPIE 614206, 1-13 (2006) and Proc. SPIE 6913, 69131C1 (2008)] using a huge amount of data of both human and automatic readouts. These factors depend on the observer groups and are purely phenomenological. The authors present an alternative approach to determine the factors by using the Rose observer model. Methods: Their method uses the Rose theory which gives a relationship between threshold contrast, diameter of the object and number of incident photons. To estimate the conversion factors for the five diameters from 0.2 to 0.5 mm they exposed with five different current-time products which resulted in 25 equations with five unknowns. Results: The theoretical conversion factors (in dependence of the diameters) amounted to be 1.61 {+-} 0.02 (0.2 mm diameter), 1.67 {+-} 0.02 (0.25 mm), 1.85 {+-} 0.02 (0.31 mm), 2.09 {+-} 0.02 (0.4 mm), and 2.28 {+-} 0.02 (0.5 mm). The corresponding phenomenological factors found in literature are 1.74 (0.2 mm), 1.78 (0.25 mm), 1.83 (0.31 mm), 1.88 (0.4 mm), and 1.93 (0.5 mm). Conclusions: They transferred the problem of determining the factors to a well known observer model which has been examined for many years and is also well established. This method reveals to be reproduceable and produces factors comparable to the phenomenological ones.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

COL Application Content Guide for HTGRs: Revision to RG 1.206, Part 1 - Status Report

A combined license (COL) application is required by the Nuclear Regulatory Commission (NRC) for all proposed nuclear plants. The information requirements for a COL application are set forth in 10 CFR 52.79, “Contents of Applications; Technical Information in Final Safety Analysis Report.” An applicant for a modular high temperature gas-cooled reactor (HTGR) must develop and submit for NRC review and approval a COL application which conforms to these requirements. The technical information necessary to allow NRC staff to evaluate a COL application and resolve all safety issues related to a proposed nuclear plant is detailed and comprehensive. To this, Regulatory Guide (RG) 1.206, “Combined License Applications for Nuclear Power Plants” (LWR Edition), was developed to assist light water reactor (LWR) applicants in incorporating and effectively formatting required information for COL application review (Ref. 1). However, the guidance prescribed in RG 1.206 presumes a LWR design proposal consistent with the systems and functions associated with large LWR power plants currently operating under NRC license.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Engineering Approaches to Dendrite free Lithium Anodes

This is the Final Technical Report of the work that was completed related to development of dendrite free anodes for Li-metal batteries. The report contains full details of all the strategies that were employed to overcome this pernicious problems of dendrite formation of lithium metal during cycling of Li-metal and Li-ion batteries. Various approaches were developed to understand the formation of dendrites and mitigation strategies were then developed to overcome this severe problem. In doing so novel multi-component alloys as well as structurally isomorphous alloys have been developed. In addition coating strategies were also developed to overcome the formation of dendrites. The novel approaches related to development of novel alloys using economic cost effective and scalable approaches. The new approaches will easily advance the science of lithium metal alloys and dendrite free anodes including current collectors. Development of this new technology will have immense benefit to providing new high energy density batteries of tremendous benefit to the public since cost effective and safe high energy density batteries will be possible with this new technology.

25 ENERGY STORAGE↗

A Community Guide to Regulatory Barriers Affecting Microgrids (Reports 1-3)

In response to growing risks of power outages from extreme weather and aging infrastructure, communities are increasingly exploring the potential of microgrids to provide reliable energy access. Microgrids offer promising solutions to meet this challenge but face a complex landscape of non-technical barriers, particularly regulations concerning the provision and distribution of energy. Most existing legal and regulatory frameworks were designed for a centralized, one-way power system, and are often poorly suited to handle systems that independently balance distributed energy resources with local load. This three-part report series provides a strategic analysis of existing regulatory and legal factors affecting microgrid deployments to help non-technical community leaders and decision-makers better understand the feasibility of a microgrid in their community. -Report No. 1: Foundational Issues Facing Microgrids details the universal policy barriers all microgrids face, including utility interconnection processes, rate structures, and local permitting. -Report No. 2: Single Property Microgrids outlines how direct asset ownership and operating behind-the-meter can bypass some regulatory oversight, using the Blue Lake Rancheria microgrid as a case study. -Report No. 3: Multi-Property Microgrids tackles the complex challenges of crossing public rights-of-way and navigating utility franchise rights, highlighting the Coventry microgrid project. The series equips decision-makers with phased frameworks to navigate financial and regulatory complexities, engage effectively with local utilities and Authorities Having Jurisdiction (AHJs), and structure successful microgrid projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating Transactive Controls of Integrated Transmission and Distribution Systems using the Framework for Network Co-Simulation

With an ever-evolving power grid, concerns regarding how to maintain system stability, efficiency, and reliability remain constant because of increasing uncertainties and decreasing rotating inertia. To alleviate some of these concerns, demand response represents a viable solution and is virtually an untapped resource in the current power grid. This work describes a hierarchical control framework that allows coordination between distributed energy resources and demand response. This control framework is composed of two control layers: a coordination layer that ensures aggregations of resources are coordinated to achieve system objectives and a device layer that controls individual resources to assure the predetermined power profile is tracked in real time. Large-scale simulations are executed to study the hierarchical control, requiring advancements in simulation capabilities. Technical advancements necessary to investigate and answer control interaction questions, including the Framework for Network Co-Simulation platform and Arion modeling capability, are detailed. Insights into the interdependencies of controls across a complex system and how they must be tuned, as well as validation of the effectiveness of the proposed control framework, are yielded using a large-scale integrated transmission system model coupled with multiple distribution systems.

demand response↗

Conceptual Model Update of Mercury Sources and Flux at Y-12 and Upper East Fork Poplar Creek, Oak Ridge,Tennessee

The interactions between the key processes that control the fate and transport of mercury (Hg) in the sediments, groundwater, and stream water within the Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee are complex, and many aspects are not well understood. In contaminated environments such as Y-12, conceptual models are frequently developed to aid in visualizing and understanding the dynamic nature of the hydrologic, geochemical, and physical environment. These conceptual models integrate data in an internally consistent manner to understand processes that control the fate and transport of contaminants. Over the past few decades of environmental investigation at Y-12, a number of conceptual models have been developed to identify and define various technical processes at various scales. The main purpose of the activities described in this report is to update the 2011 conceptual model for Upper East Fork Poplar Creek using the most recent Hg concentration and flux data and informed scientific interpretation. Emphasis was placed on improving the previous model by implementing a more detailed spatial and temporal approach to visualize transport pathways in the watershed and trends in flux and concentration over time, and to compare baseflow and stormflow system dynamics. Detailed descriptions of historical and current Hg sources and transport pathways are also provided for the east and west ends of the facility. This conceptual model will allow the US Department of Energy to evaluate past and present remedial activities and provide a strong technical basis for prioritizing and optimizing remedial responses in a cost-effective and efficient manner. Twenty years ago, Hg flux from Outfall (OF) 200 at the headwaters of East Fork Poplar Creek represented approximately 20% of the overall flux leaving Y-12. By the time of the 2011 conceptual model report, that percentage had increased to 70%–80%. Flux estimates compiled for this report using data from 2009 to 2018 show that OF200 accounted for roughly 60% of the flux leaving Y-12. The relative role of the four storm drain conduits to OF200 appeared similar to 2011, with OF163 being the greatest contributor to downstream flux. An increase in Hg concentrations and flux occurred throughout and downstream of west end storm drains in 2011 in response to a storm drain cleanout. Leading up to the 2011 storm drain cleanout, annual baseflow flux was higher at OF200A6 than at Station 17. From 2011 to 2018, the trend reversed with concentrations and flux being higher at Station 17 than at OF200A6. A spike in concentrations occurred in July 2018, potentially due to a one-time influx of Hg that occurred during COLEX decontamination and decommissioning activities at Y-12. This report includes recommendations for improving our conceptual understanding of Hg sources, transport pathways, and flux at Y-12. Important recommendations include further evaluation of transport pathways, concurrent measurement of Hg concentration and flux under baseflow and stormflow conditions at multiple sites, and research to understand the connections among periphyton and methylmercury concentration, bioavailability, and bioaccumulation. Ongoing facility decontamination and decommissioning efforts, site characterization, remedial actions, and research are facilitating the collection of new Hg data at Y-12. The conceptual model update provided herein takes advantage of the extensive recent Hg sampling to provide an updated assessment of Hg mass balance and support a refined understanding of Hg behavior at or near Y-12. This assessment should assist in future environmental management decisions and in mitigating the impacts of Hg on the surrounding environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

International Design Study for the Neutrino Factory (The IDS-NF Collaboration) Interim Design Report

The starting point for the International Design Study for the Neutrino Factory (the IDS-NF) was the output of the earlier International Scoping Study for a future Neutrino Factory and super-beam facility (the ISS). The accelerator facility described in section 2 incorporates the improvements that have been derived from the substantial amount of work carried out within the Accelerator Working Group. Highlights of these improvements include: • Initial concepts for the implementation of the proton driver at each of the three example sites, CERN, FNAL, and RAL; • Detailed studies of the energy deposition in the target area; • A reduction in the length of the muon beam phase-rotation and bunching systems; • Detailed analyses of the impact of the risk that stray magnetic field in the accelerating cavities in the ionisation cooling channel will reduce the maximum operating gradient. Several alternative ionisation-cooling lattices have been developed as fallback options to mitigate this technical risk; • Studies of particle loss in the muon front-end and the development of strategies to mitigate the deleterious effects of such losses; • The development of more complete designs for the muon linac and re-circulating linacs; • The development of a design for the muon FFAG that incorporates insertions for injection and extraction; and • Detailed studies of diagnostics in the decay ring. Other sub-systems have undergone a more “incremental” evolution; an indication that the design of the Neutrino Factory has achieved a degree of maturity. The design of the neutrino detectors described in section 3 has been optimised and the Detector Working Group has made substantial improvements to the simulation and analysis of the Magnetised Iron Neutrino Detector (MIND) resulting in an improvement in the overall neutrino-detection efficiency and a reduction in the neutrino-energy threshold. In addition, initial consideration of the engineering of the MIND has generated a design that is feasible and a finite element analysis of the toroidal magnetic field to produce a realistic field map has been carried out. Section 3 also contains, for the first time, a specification for the near-detector systems and a demonstration that the neutrino flux can be determined with a precision of 1% through measurements of inverse muon decay at the near detector. The performance of the facility, the work of the Physics and Performance Evaluation Group, is described in section 1. The effect of the improved MIND performance is to deliver a discovery reach for CP-invariance violation in the lepton sector, the determination of the mass hierarchy, and of θ 13 that extends down to values of sin 2 2θ 13 ∼ 5 × 10 −5 and is robust against systematic uncertainties. In addition, the improved neutrino-energy threshold has allowed an indicative analysis of the kind of re-optimisation of the facility that could be carried out should θ 13 be found close to the current upper bound. The results presented in section 1 demonstrate that the discovery reach as well as the precision with which the oscillation parameters can be measured at the baseline Neutrino Factory is superior to that of other proposed facilities for all possible values of sin 2 2θ 13 .

43 PARTICLE ACCELERATORS↗

CdTe Core: Final Technical Report (FTR)

CdTe is presently the cost-leading thin-film PV technology, directly competing with Si at scale, even when domestically manufactured. While an impressive technology, its efficiency remains much below the detailed balance limit with the largest cause due to its low photovoltage and fill factor. To realize gains, the carrier concentration, minority carrier lifetime, and interface recombination all need to be improved simultaneously over historic levels. Using a new defect chemistry (group V doping instead of copper) has been identified as a viable route using single crystal systems. This project focused on implementing this new defect chemistry in scalable, polycrystalline thin-film photovoltaic CdTe devices with tasks focusing improvements to the front interface, absorber, and rear interface as well as capability development & stakeholder engagement. The goal of the project was to establish a strategy using devices, test structures, detailed characterization, and modeling to quantify the sources of losses in state-of-the-art CdTe photovoltaic devices. Using this strategy and advanced synthesis, losses at the front interface, absorber, and rear interface were worked on in parallel. The final objective was to significantly improve the voltage deficit in CdTe devices to enable improvements in photovoltage and efficiency that can be implemented by industry in the near-term. Over the course of the project, the team developed new characterization techniques, analysis, and modeling which were then applied to state-of-the-art materials generated internally and collaboratively. In particular to enable rapid progress, NREL worked closely with First Solar where NREL grew complete devices as well as ones that interleaved process steps where First Solar had completed different steps such as absorber growth or absorber growth and activation using their baseline methods. Using detailed characterization and analysis including photoemission, photoluminescence, and scanning probe techniques enabled understanding of the loss pathways and area for improvements in our own and First Solar s materials. Ultimately, this contributed to the first series of new world record CdTe efficiencies since 2016, culminating in a 23.1% certified cell that was P-doped along with As-doped cells of similar performance. Internally, NREL improved the statistical variation in baseline As-doped devices and improved average photovoltage by over 100 mV. This was done through an improvement in absorber quality, changed front interface, and improved back contact. In addition to materially improving the fabrication processes at NREL, characterization, analysis, and modeling were developed and disseminated. NREL also played a pivotal role in community building over the course of this project working closely with the Cadmium Telluride Accelerator Consortium. NREL worked in a series of collaborations with academic and industry partners, leveraging knowledge and innovations from this project, as well as helped organize a series of workshops to ensure rapid progress in the field. Working closely with the academic community has led to a dissemination of knowledge; working with First Solar as increased US competitiveness First Solar expanded domestic production to ~10 GW and opened new facilities.

14 SOLAR ENERGY↗

New England Wind Energy Education Project (NEWEEP) (Final Technical Report)

Project objective is to develop and disseminate accurate, objective information on critical wind energy issues impacting market acceptance of hundreds of land-based projects and vast off-shore wind developments proposed in the 6-state New England region, thereby accelerating the pace of wind installation from today's 140 MW towards the region's 20% by 2030 goals of 12,500 MW. Methodology: This objective will be accomplished by accumulating, developing, assembling timely, accurate, objective and detailed information representing the 'state of the knowledge' on critical wind energy issues impacting market acceptance, and widely disseminating such information. The target audience includes state agencies and local governments; utilities and grid operators; wind developers; agricultural and environmental groups and other NGOs; research organizations; host communities and the general public, particularly those in communities with planned or operating wind projects. Information will be disseminated through: (a) a series of topic-specific web conference briefings; (b) a one-day NEWEEP conference, back-to-back with a Utility Wind Interest Group one-day regional conference organized for this project; (c) posting briefing and conference materials on the New England Wind Forum (NEWF) web site and featuring the content on NEWF electronic newsletters distributed to an opt-in list of currently over 5000 individuals; (d) through interaction with and participation in Wind Powering America (WPA) state Wind Working Group meetings and WPA's annual All-States Summit, and (e) through the networks of project collaborators. Sustainable Energy Advantage, LLC (lead) and the National Renewable Energy Laboratory will staff the project, directed by an independent Steering Committee composed of a collaborative regional and national network of organizations. Major Participants - the Steering Committee: In addition to the applicants, the initial collaborators committing to form a Steering Committee consists of the Massachusetts Renewable Energy Trust; Maine Public Utilities Commission; New Hampshire office of Energy & Planning, the Connecticut Clean Energy Fund;, ISO New England; Utility Wind Interest Group; University of Massachusetts Wind Energy Center; Renewable Energy New England (a new partnership between the renewable energy industry and environmental public interest groups), and Lawrence Berkeley National Laboratory (conditionally). The Steering Committee will: (1) identify and prioritize topics of greatest interest or concern where detailed, objective and accurate information will advance the dialogue in the region; (2) identify critical outreach venues, influencers and experts; (3) direct and coordinate project staff; (4) assist project staff in planning briefings and conferences described below; (5) identify topics needing additional research or technical assistance and (6) identify and recruit additional steering committee members. Impacts/Benefits/Outcomes: By cutting through the clutter of competing and conflicting information on critical issues, this project is intended to encourage the market's acceptance of appropriately-sited wind energy generation.

14 SOLAR ENERGY↗

Evaluation of Trenchless Installation Technology for Radioactive Wastewater Piping Applications

The U.S. Department of Energy (DOE) Office of Environmental Management (EM) cleanup mission at Oak Ridge National Laboratory (ORNL) includes dispositioning facilities, contaminated legacy materials/waste, and contamination sources and remediation of soil under facilities, groundwater, and surface water to support final Records of Decision (RODs). The Integrated Facilities Disposition Project (IFDP) is a roughly $15B project for completion of the EM mission at Oak Ridge, with a project duration of up to 35 years. The IFDP Mission Need Statement - Critical Decision-0 (CD-0) - was approved by DOE in July 2007, and the IFDP Alternative Selection and Cost Range - Critical Decision-1 (CD-1) - was approved in November 2008. The IFDP scope includes reconfiguration of waste collection and treatment systems as needed to complete the IFDP remediation and decontamination and decommissioning (D&D) missions in a safe and cost-effective manner while maintaining compliance with all governing regulations and bodies and preserving the support of continuing operations at ORNL. A step in the CD-1 approval process included an external technical review (ETR) of technical approaches proposed in the CD-1 document related to the facility reconfiguration for the ORNL radioactive waste and liquid low-level waste management systems. The ETR team recommended that the IFDP team consider the use of trenchless technologies for installing pipelines underground in and around contaminated sites as part of the alternatives evaluations required in support of the CD-2 process. The team specifically recommended evaluating trenchless technologies for installing new pipes in existing underground pipelines as an alternative to conventional open trench installation methods. Potential benefits could include reduction in project costs, less costly underground piping, fewer disruptions of ongoing and surface activities, and lower risk for workers. While trenchless technologies have been used extensively in the sanitary sewer and natural gas pipeline industries, they have been used far less in contaminated environments. Although trenchless technologies have been used at ORNL in limited applications to install new potable water and gas lines, the technologies have not been used in radioactive applications. This study evaluates the technical risks, benefits, and economics for installing gravity drained and pressurized piping using trenchless technologies compared to conventional installation methods for radioactive applications under ORNL geological conditions. A range of trenchless installation technologies was reviewed for this report for general applicability for replacing existing contaminated piping and/or installing new pipelines in potentially contaminated areas. Installation methods that were determined to have potential for use in typical ORNL contaminated environments were then evaluated in more detail for three specific ORNL applications. Each feasible alternative was evaluated against the baseline conventional open trench installation method using weighted criteria in the areas of environment, safety, and health (ES&H); project cost and schedule; and technical operability. The formulation of alternatives for evaluation, the development of selection criteria, and the scoring of alternatives were performed by ORNL staff with input from vendors and consultants. A description of the evaluation methodology and the evaluation results are documented in the following sections of this report.

03 NATURAL GAS↗

Interim Design Report for the International Design Study for a Neutrino Factory

The starting point for the International Design Study for the Neutrino Factory (the IDS-NF) was the output of the earlier International Scoping Study for a future Neutrino Factory and super-beam facility (the ISS). The accelerator facility described in section 2 incorporates the improvements that have been derived from the substantial amount of work carried out within the Accelerator Working Group. Highlights of these improvements include: (1) Initial concepts for the implementation of the proton driver at each of the three example sites, CERN, FNAL, and RAL; (2) Detailed studies of the energy deposition in the target area; (3) A reduction in the length of the muon beam phase-rotation and bunching systems; (4) Detailed analyses of the impact of the risk that stray magnetic field in the accelerating cavities in the ionization cooling channel will reduce the maximum operating gradient. Several alternative ionization-cooling lattices have been developed as fallback options to mitigate this technical risk; (5) Studies of particle loss in the muon front-end and the development of strategies to mitigate the deleterious effects of such losses; (6) The development of more complete designs for the muon linac and re-circulating linacs; (7) The development of a design for the muon FFAG that incorporates insertions for injection and extraction; and (8) Detailed studies of diagnostics in the decay ring. Other sub-systems have undergone a more 'incremental' evolution; an indication that the design of the Neutrino Factory has achieved a degree of maturity. The design of the neutrino detectors described in section 3 has been optimized and the Detector Working Group has made substantial improvements to the simulation and analysis of the Magnetized Iron Neutrino Detector (MIND) resulting in an improvement in the overall neutrino-detection efficiency and a reduction in the neutrino-energy threshold. In addition, initial consideration of the engineering of the MIND has generated a design that is feasible and a finite element analysis of the toroidal magnetic field to produce a realistic field map has been carried out. Section 3 also contains, for the first time, a specification for the near-detector systems and a demonstration that the neutrino flux can be determined with a precision of 1% through measurements of inverse muon decay at the near detector. The performance of the facility, the work of the Physics and Performance Evaluation Group, is described in section 1. The effect of the improved MIND performance is to deliver a discovery reach for CP-invariance violation in the lepton sector, the determination of the mass hierarchy, and of {theta}{sub 13} that extends down to values of sin{sup 2} 2{theta}{sub 13} {approx} 5 x 10{sup -5} and is robust against systematic uncertainties. In addition, the improved neutrino-energy threshold has allowed an indicative analysis of the kind of re-optimization of the facility that could be carried out should {theta}{sub 13} be found close to the current upper bound. The results presented in section 1 demonstrate that the discovery reach as well as the precision with which the oscillation parameters can be measured at the baseline Neutrino Factory is superior to that of other proposed facilities for all possible values of sin{sup 2} 2{theta}{sub 13}.

43 PARTICLE ACCELERATORS↗

Creating Jobs through Energy Efficiency Using Wisconsin's Successful Focus on Energy Program

The purpose of this project was to provide administrative and technical support for the completion of energy efficiency projects that reduce energy intensity and create or save Wisconsin industrial jobs. All projects have been completed. Details in the attached reports include project management, job development, and energy savings for each project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Hydrogen Storage Tests for Cryo-Compressed Vessels, CRADA No. TC02119.0

This was a collaborative effort between Lawrence Livermore National Security, LLC as manager and operator of Lawrence Livermore National Laboratory (LLNL) and Bayerische Motoren Werke Aktiengesellschaft (BMW), to advance the state of the art on cryogenic pressure vessel technology that would enable practical hydrogen-fueled automobiles with long driving range, high packaging density and low evaporative losses. This CRADA project was funded through the U.S. Department of Energy (DOE) Office of Hydrogen, Fuel Cells and Infrastructure Technologies. The technical objective for this project was to address the main technical challenges that stand in the way of successful cryo-compressed vessel commercialization, which would be addressed through a combination of experimental work and detailed modeling. This work has the potential of producing a practical automotive hydrogen storage technology that will accelerate the transition to an environmentally friendly hydrogen infrastructure and contribute to the reduction of global warming as well as the dependence on imported oil.

08 HYDROGEN↗