Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “System Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Simulating Mars: Enabling Testing of the Perseverance Rover Sampling and Caching Subsystem on Earth

The development of the Sampling and Caching Subsystem (SCS) on the JPL Perseverance Rover lies at the intersection of testing, robotics, and geology. The SCS team established three primary system test campaigns and venues to aid in the development of SCS through verification and validation testing – Qualification Model Dirty Testing (QMDT) to provide a venue for testing in a Martian environment, Vehicle System Testbed (VSTB) for testing while integrated with the mobility subsystem on Martian-like terrain, and the Flight Software Testbed (FSWTB) for conducting tests using the flight motor controllers and software system on a hexapod which had the ability to simulate rover tilt. Each venue contributed a vital piece to the SCS building blocks. However, the QMDT venue operating within a 10-ft diameter Thermal Vacuum chamber to simulate Martian environment provided a sui generis opportunity to fine tune the entire sampling and caching process while building the team’s knowledge base about rock drillability, system life, and target selection. On Earth, because Martian rocks are not readily available, the development team must utilize geoanalogs to the rocks and regolith on Mars. Geologists on the team helped establish a set of standard rock types to use for Mars missions, like Basalt, Sandstone, Mudstone, Gypsum, and other related geoanalogs. These geoanalogs are characterized with a standard suite of tests for density, compressibility, and other characteristics to categorize potential drillability. This concept of drillability is what links the geoanalogs on Earth to the samples we collect on Mars. With the simulant characteristics defined, these geoanalog rocks are ready to be drilled into as we do on the Martian surface. A key aspect of interacting with the surface on Mars is rock target identification and selection. The Perseverance robotic system uses the on-board cameras, instrumentation, and software to collect enough information to identify potential scientific targets. With the targets identified, SCS can place the Corer and abrade the surface or collect a sample. For a ground test activity like QMDT, the test team did not have all of the camera and instrumentation systems that the rover does, so the team developed ground test equivalents to process a rock, build a target map, and define the target. The team constructed a Rock Scanning Station to build a 3D point cloud of the rock. This point cloud was then processed and evaluated with predefined and programmed criteria in a Target Downselect Tool. A primary output of the Target Downselect Tool is a defined target that can be uploaded directly to the robotic software system to simulate and build the robotic sequences used in tests. With these insights and programmatic definition of targets, the QMDT test team was able to make the same decisions that the Perseverance surface operations team does. In addition, valuable lessons learned from developing the target selection ground tools and using them were implemented into the tools used for surface operations.

Kim, Junggon↗

Holographic system for nondestructive testing

A description is given of a holographic system for nondestructive testing. The system is comprised of a mirror which illuminates the test object surface; the mirror is positionable to direct illumination on an object at varying angles with respect to a line normal to the surface of the object. In this manner holograms may be produced with varying degrees of sensitivity enabling optimum observation of dimensions of deformation of an object occurring between test exposures.

Kurtz, R. L.↗

Orion Capsule Parachute Assembly System (CPAS) Overload Testing Approach and Results

The qualification of the Orion Capsule Parachute Assembly System (CPAS) system includes exposure to loads and dynamic pressures above the required values as validation of the parachutes' structural integrity. As outlined in the certification plan, each of the four parachutes of the system are to be subjected to 110% of their respective maximum dynamic pressure requirements. The Main and Drogue parachutes have satisfied this overload condition in drop testing and due to cost and schedule constraints, the Forward Bay Cover Parachute (FBCP) and Pilot parachute were subjected to the overload condition in the ground testing described in this document. The test objectives and pass/fail criteria were established and require the parachutes to achieve and maintain a target riser load (associated with a minimum of 110% dynamic pressure overload) for a minimum of three seconds while sustaining no failures of any structural members (vent hoop, radials, suspension line) or any damage which propagates into catastrophic failure of the canopy. Considering the assumptions and limitations associated with the ground testing (primarily non-uniform flow field of the ground test system and variations in parachute manufacturing), a method of establishing the desired overload condition was determined by the technical community and covers the 2-sigma bounds of the drag area distribution derived from drop testing. On June 27, 2017 the testing was executed at the High Velocity Airflow System (HiVAS) facility located at the Weapon Survivability Laboratory (WSL) at the Naval Air Warfare Center, Weapons Division (NAWCWD) China Lake. Engineering Development Unit (EDU) parachutes were used as pathfinders to gain experience with achieving the test conditions. Additional runs were executed to measure the airflow at the same location as the canopy skirt, although this data is not required to satisfy the test objectives and parachute pass/fail criteria. The qualification parachutes were successfully exposed to the target conditions and sustained only minor damage.

Daum, Jared S.↗

Integrated Testing Approaches for the NASA Ares I Crew Launch Vehicle

The Ares I crew launch vehicle is being developed by the U.S. National Aeronautics and Space Administration (NASA) to provide crew and cargo access to the International Space Station (ISS) and, together with the Ares V cargo launch vehicle, serves as a critical component of NASA's future human exploration of the Moon. During the preliminary design phase, NASA defined and began implementing plans for integrated ground and flight testing necessary to achieve the first human launch of Ares I. The individual Ares I flight hardware elements - including the first stage five segment booster (FSB), upper stage, and J-2X upper stage engine - will undergo extensive development, qualification, and certification testing prior to flight. Key integrated system tests include the upper stage Main Propulsion Test Article (MPTA), acceptance tests of the integrated upper stage and upper stage engine assembly, a full-scale integrated vehicle ground vibration test (IVGVT), aerodynamic testing to characterize vehicle performance, and integrated testing of the avionics and software components. The Ares I-X development flight test will provide flight data to validate engineering models for aerodynamic performance, stage separation, structural dynamic performance, and control system functionality. The Ares I-Y flight test will validate ascent performance of the first stage, stage separation functionality, validate the ability of the upper stage to manage cryogenic propellants to achieve upper stage engine start conditions, and a high-altitude demonstration of the launch abort system (LAS) following stage separation. The Orion 1 flight test will be conducted as a full, un-crewed, operational flight test through the entire ascent flight profile prior to the first crewed launch.

Taylor, James L.↗

Monitoring System for Storm Readiness and Recovery of Test Facilities: Integrated System Health Management (ISHM) Approach

Severe weather events are likely occurrences on the Mississippi Gulf Coast. It is important to rapidly diagnose and mitigate the effects of storms on Stennis Space Center's rocket engine test complex to avoid delays to critical test article programs, reduce costs, and maintain safety. An Integrated Systems Health Management (ISHM) approach and technologies are employed to integrate environmental (weather) monitoring, structural modeling, and the suite of available facility instrumentation to provide information for readiness before storms, rapid initial damage assessment to guide mitigation planning, and then support on-going assurance as repairs are effected and finally support recertification. The system is denominated Katrina Storm Monitoring System (KStorMS). Integrated Systems Health Management (ISHM) describes a comprehensive set of capabilities that provide insight into the behavior the health of a system. Knowing the status of a system allows decision makers to effectively plan and execute their mission. For example, early insight into component degradation and impending failures provides more time to develop work around strategies and more effectively plan for maintenance. Failures of system elements generally occur over time. Information extracted from sensor data, combined with system-wide knowledge bases and methods for information extraction and fusion, inference, and decision making, can be used to detect incipient failures. If failures do occur, it is critical to detect and isolate them, and suggest an appropriate course of action. ISHM enables determining the condition (health) of every element in a complex system-of-systems or SoS (detect anomalies, diagnose causes, predict future anomalies), and provide data, information, and knowledge (DIaK) to control systems for safe and effective operation. ISHM capability is achieved by using a wide range of technologies that enable anomaly detection, diagnostics, prognostics, and advise for control: (1) anomaly detection algorithms and strategies, (2) fusion of DIaK for anomaly detection (model-based, numerical, statistical, empirical, expert-based, qualitative, etc.), (3) diagnostics/prognostics strategies and methods, (4) user interface, (5) advanced control strategies, (6) integration architectures/frameworks, (7) embedding of intelligence. Many of these technologies are mature, and they are being used in the KStorMS. The paper will describe the design, implementation, and operation of the KStorMS; and discuss further evolution to support other needs such as condition-based maintenance (CBM).

Figueroa, Fernando↗

Portable Test And Monitoring System For Wind-Tunnel Models

Portable system developed to test and monitor instrumentation used in wind-tunnel models. Self-contained and moves easily to model, either before or after model installed in wind tunnel. System is 44 1/2 in. high, 22 in. wide, and 17 in. deep and weighs 100 lb. Primary benefits realized with portable test and monitoring system associated with saving of time.

Poupard, Charles A.↗

A Tool for Requirements-Based Programming

Absent a general method for mathematically sound, automated transformation of customer requirements into a formal model of the desired system, developers must resort to either manual application of formal methods or to system testing (either manual or automated). While formal methods have afforded numerous successes, they present serious issues, e.g., costs to gear up to apply them (time, expensive staff), and scalability and reproducibility when standards in the field are not settled. The testing path cannot be walked to the ultimate goal, because exhaustive testing is infeasible for all but trivial systems. So system verification remains problematic. System or requirements validation is similarly problematic. The alternatives available today depend on either having a formal model or pursuing enough testing to enable the customer to be certain that system behavior meets requirements. The testing alternative for non-trivial systems always have some system behaviors unconfirmed and therefore is not the answer. To ensure that a formal model is equivalent to the customer s requirements necessitates that the customer somehow fully understands the formal model, which is not realistic. The predominant view that provably correct system development depends on having a formal model of the system leads to a desire for a mathematically sound method to automate the transformation of customer requirements into a formal model. Such a method, an augmentation of requirements-based programming, will be briefly described in this paper, and a prototype tool to support it will be described. The method and tool enable both requirements validation and system verification for the class of systems whose behavior can be described as scenarios. An application of the tool to a prototype automated ground control system for NASA mission is presented.

Rash, James L.↗

Forced response testing of an axi-centrifugal turboshaft engine

Dynamic data from tests of a T55-L-712 engine are presented. Engine stall/surge data were analyzed using digital signal processing techniques. In addition, forced response testing (system identification studies) was done at various engine speeds. Forced response testing was done using eight jet ejectors approximately equally circumferentially spaced about the compressor front face. This paper presents some preliminary results for the ground idle (approximately 60% of design speed) point. Brief descriptions of the jet injection system, the test matrix, and analysis techniques used are presented. Results of these analyses indicate a substantial transfer of energy across the compressor first stage at some frequencies and that the ejectors are effective in modifying the local flow conditions in front of the first compressor stage.

Owen, A. Karl↗

Forced Response Testing of an Axi-Centrifugal Turboshaft Engine

Dynamic data from tests of a T55-L,712 engine are presented. Engine stall/surge data were analyzed using digital signal processing techniques. In addition, forced response testing (system identification studies) was done at various engine speeds. Forced response testing was done using eight jet ejectors approximately equally circumferentially spaced about the compressor front face. This paper presents some preliminary results for the ground idle (approximately 60% of design speed) point. Brief descriptions of the jet injection system, the test matrix, and analysis techniques used are presented. Results of these analyses indicate a substantial transfer of energy across the compressor first stage at some frequencies and that the ejectors are effective in modifying the local flow conditions in front of the first compressor stage.

Owen, A. Karl↗

NASA Ames-Dryden integrated test facility: Presentation outline

The topics are presented in view graph form and include the following: (1) a Dryden overview; (2) the Integrated Tests Facility (ITF); (3) the ITF system architecture; (4) the computer aided system testing; and (5) the ITF system video.

Schilling, Larry↗

Studies on Stress-Strain Relationships of Polymeric Materials Used in Space Applications

A two-year research plan was undertaken in association with Polymers Branch, NASA Glenn Research Center, to carry out experimental and modeling work relating stress and strain behavior of polymeric materials, especially elastomers and vulcanized rubber. An experimental system based on MTS (Mechanical Testing and Simulation) A/T-4 test facility environment has been developed for a broader range of polymeric materials in addition to a design of laser compatible temperature control chamber for online measurements of various strains. Necessary material processing has been accomplished including rubber compounding and thermoplastic elastomer processing via injection molding. A broad suite of testing methodologies has been identified to reveal the complex non-linear mechanical behaviors of rubbery materials when subjected to complex modes of deformation. This suite of tests required the conceptualization, design and development of new specimen geometries, test fixtures, and test systems including development of a new laser based technique to measure large multi-axial deformations. Test data has been generated for some of these new fixtures and has revealed some complex coupling effects generated during multi-axial deformations. In addition, fundamental research has been conducted concerning the foundation principles of rubber thermodynamics and resulting theories of rubber elasticity. Studies have been completed on morphological properties of several thermoplastic elastomers. Finally, a series of steps have been identified to further advance the goals of NASA's ongoing effort.

Jana, Sadhan C.↗

Development of a Work Control System for Propulsion Testing at NASA Stennis

This paper will explain the requirements and steps taken to develop the current Propulsion Test Directorate electronic work control system for Test Operations. The PTD Work Control System includes work authorization and technical instruction documents, such as test preparation sheets, discrepancy reports, test requests, pre-test briefing reports, and other test operations supporting tools. The environment that existed in the E-Complex test areas in the late 1990's was one of enormous growth which brought people of diverse backgrounds together for the sole purpose of testing propulsion hardware. The problem that faced us was that these newly formed teams did not have a consistent and clearly understood method for writing, performing or verifying work. A paper system was developed that would allow the teams to use the same forms, but this still presented problems in the large amount of errors occurring, such as lost paperwork and inconsistent implementation. In a sampling of errors in August 1999, the paper work control system encountered 250 errors out of 230 documents released and completed, for an error rate of 111%.

Messer, Elizabeth A.↗

In Situ Radiography During Tensile Tests

Laboratory system for testing specimens of metal-, ceramic-, and intermetallic-matrix composite materials incorporates both electromechanical tensile-testing subsystem and either of two imaging subsystems that take x-ray photographs of specimens before, during, and after tensile tests. Used to test specimens of reaction-bonded silicon nitride reinforced with silicon carbide fibers (SiC/RBSN) considered for high-temperature service in advanced aircraft turbine engines. Provides data on effects of preexisting flaws (e.g., high-density impurities and local variations of density) on fracture behavior. Accumulated internal damage monitored during loading. X-ray source illuminates specimen in load frame while specimen is pulled. X-ray images on film correlated with stress-vs.-strain data from tensile test.

Baaklini, George Y.↗

Apparatus and Method for Thermal Performance Testing of Pipelines and Piping Systems

A test apparatus and method of its use for evaluating various performance aspects of a piping segment locates a piping segment between two cold boxes. A first cold box conditions test fluid before providing the fluid into the piping segment- The first and second cold boxes both significantly reduce, if not eliminate, any heat transfer from the ends of the piping so that accurate measurements of heat leak rates from the sides of the piping segment may be determined.

Fesmire, James E.↗

Strategies for Ground Based Testing of Manned Lunar Surface Systems

Integrated testing (such as Multi-Element Integrated Test (MEIT)) is critical to reducing risks and minimizing problems encountered during assembly, activation, and on-orbit operation of large, complex manned spacecraft. Provides the best implementation of "Test Like You Fly:. Planning for integrated testing needs to begin at the earliest stages of Program definition. Program leadership needs to fully understand and buy in to what integrated testing is and why it needs to be performed. As Program evolves and design and schedules mature, continually look for suitable opportunities to perform testing where enough components are together in one place at one time. The benefits to be gained are well worth the costs.

Beyer, Jeff↗

Thermal Protection System Aerothermal Screening Tests in HYMETS Facility

The Entry, Descent, and Landing (EDL) Technology Development Project has been tasked to develop Thermal Protection System (TPS) materials for insertion into future Mars Entry Systems. A screening arc jet test of seven rigid ablative TPS material candidates was performed in the Hypersonic Materials Environmental Test System (HYMETS) facility at NASA Langley Research Center, in both an air and carbon dioxide test environment. Recession, mass loss, surface temperature, and backface thermal response were measured for each test specimen. All material candidates survived the Mars aerocapture relevant heating condition, and some materials showed a clear increase in recession rate in the carbon dioxide test environment. These test results supported subsequent down-selection of the most promising material candidates for further development.

thermal protection systems (TPS)↗

Special environmental control and life support equipment test analyses and hardware

This final report summarizes NAS8-38250 contract events, 'Special Environmental Control and Life Support Systems Test Analysis and Hardware'. This report is technical and includes programmatic development. Key to the success of this contract was the evaluation of Environmental Control and Life Support Systems (ECLSS) test results via sophisticated laboratory analysis capabilities. The history of the contract, including all subcontracts, is followed by the support and development of each Task.

Callahan, David M.↗