Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Synchronization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Loran-C time management

As of 1 Oct. 1993, the US Coast Guard (USCG) supports and operates fifteen Loran-C chains. With the introduction of the Global Positioning Systems (GPS) and the termination of the Department of Defense (DOD) overseas need for Loran-C, the USCG will cease operating the three remaining overseas chains by 31 Dec. 1994. Following this date, the USCG Loran-C system will consist of twelve chains. Since 1971, management of time synchronization of the Loran-C system has been conducted under a Memorandum of Agreement between the US Naval Observatory (USNO) and the USCG. The requirement to maintain synchronization with Coordinated Universal Time (UTC) was initially specified as +/- 25 microseconds. This tolerance was rapidly lowered to +/- 2.5 microseconds in 1974. To manage this synchronization requirement, the USCG incorporated administrative practices which kept the USNO appraised of all aspects of the master timing path. This included procedures for responding to timing path failures, timing adjustments, and time steps. Conducting these aspects of time synchronization depended on message traffic between the various master stations and the USNO. To determine clock adjustment the USCG relied upon the USNO's Series 4 and 100 updates so that the characteristics of the master clock could be plotted and controls appropriately applied. In 1987, Public Law 100-223, under the Airport and Airway Improvement Act Amendment, reduced the synchronization tolerance to approximately 100 nanoseconds for chains serving the National Airspace System (NAS). This action caused changes in the previous administrative procedures and techniques. The actions taken by the USCG to meet the requirements of this law are presented.

Justice, Charles↗

Cascaded clocks measurement and simulation findings

This paper will examine aspects related to network synchronization distribution and the cascading of timing elements. Methods of timing distribution have become a much debated topic in standards forums and among network service providers (both domestically and internationally). Essentially these concerns focus on the need to migrate their existing network synchronization plans (and capabilities) to those required for the next generation of transport technologies (namely, the Synchronous Digital Hierarchy (SDH), Synchronous Optical Networks (SONET), and Asynchronous Transfer Mode (ATM). The particular choices for synchronization distribution network architectures are now being evaluated and are demonstrating that they can indeed have a profound effect on the overall service performance levels that will be delivered to the customer. The salient aspects of these concerns reduce to the following: (1) identifying that the devil is in the details of the timing element specifications and the distribution of timing information (i.e., small design choices can have a large performance impact); (2) developing a standardized method of performance verification that will yield unambiguous results; and (3) presentation of those results. Specifically, this will be done for two general cases: an ideal input, and a noisy input to a cascaded chain of slave clocks.

Chislow, Don↗

Experiment K-7-28: Lung Morphology Study

There are no previous studies investigating the effect of microgravity exposure during spaceflight on lung tissue. We examined the ultrastructure of the left lungs of 5 Czechoslovakian Wistar rats flown on the 13 day, 19+ hr. Cosmos 2044 mission, and compared them to 5 vivarium and 5 synchronous controls at 1-g conditions, and 5 rats exposed to 14 days of tail-suspension. Within 10 minutes of sacrifice by decapitation, the lungs were removed and immersed in 3% glutaraldehyde in 0.1M phosphate buffer (total osmolarity of the fixative: 560 mOsm; pH = 7.4). The tissue stored at 5 C was transported to our laboratory where it was processed for light and electron microscopy. No significant perivascular cuffing caused by interstitial edema was present in the tissue samples. Some of the flight, tail-suspended, and synchronous control rats showed alveolar edema, while vivarium controls did not. The pulmonary capillaries appeared to be more congested in the flight animals than in the other groups. This could be related to the increased hematocrit due to the microgravity exposure. In all 5 flight, 4 tail-suspended, and 3 synchronous rats, red blood cells (RBC) were present in the alveolar spaces. The RBC were either suspended free in the alveoli or observed lining the alveolar wall. The frequency of RBC lining the alveolar walls appeared greater in the dorsal (gravity non-dependent) than in ventral (gravity dependent) regions of the lung in these three animal groups. In 3 of the vivarium controls, a few RBC were found in the alveolar spaces. Intra-capillary fluid-filled vesicles were observed in the flight, tail-suspended and synchronous animals, but not in the vivarium controls. The formation of intra-capillary fluid-filled vesicles has been previously associated with pulmonary hypertension induced by high altitude exposure and mitral stenosis. In conclusion, pulmonary hemorrhage and alveolar edema of unknown origin occurred to a greater extent in the flight, tail-suspended, and synchronous control animals, and in the dorsal regions of the lung when compared to the vivarium controls. The etiology of these changes, which are possibly due to an increase in pulmonary vascular pressure, requires further investigation.

West, J. B.↗

Synchrony in human, mouse and bacterial cell cultures--a comparison

Growth characteristics of synchronous human MOLT-4, human U-937 and mouse L1210 cultures produced with a new minimally-disturbing technology were compared to each other and to synchronous Escherichia coli B/r. Based on measurements of cell concentrations during synchronous growth, synchrony persisted in similar fashion for all cells. Cell size and DNA distributions in the mammalian cultures also progressed synchronously and reproducibly for multiple cell cycles. The results demonstrate that unambiguous multi-cycle synchrony, critical for verifying the absence of significant growth imbalances induced by the synchronization procedure, is feasible with these cell lines, and possibly others.

Non-NASA Center↗

Nonphotic entrainment of the human circadian pacemaker

In organisms as diverse as single-celled algae and humans, light is the primary stimulus mediating entrainment of the circadian biological clock. Reports that some totally blind individuals appear entrained to the 24-h day have suggested that nonphotic stimuli may also be effective circadian synchronizers in humans, although the nonphotic stimuli are probably comparatively weak synchronizers, because the circadian rhythms of many totally blind individuals "free run" even when they maintain a 24-h activity-rest schedule. To investigate entrainment by nonphotic synchronizers, we studied the endogenous circadian melatonin and core body temperature rhythms of 15 totally blind subjects who lacked conscious light perception and exhibited no suppression of plasma melatonin in response to ocular bright-light exposure. Nine of these fifteen blind individuals were able to maintain synchronization to the 24-h day, albeit often at an atypical phase angle of entrainment. Nonphotic stimuli also synchronized the endogenous circadian rhythms of a totally blind individual to a non-24-h schedule while living in constant near darkness. We conclude that nonphotic stimuli can entrain the human circadian pacemaker in some individuals lacking ocular circadian photoreception.

NASA Discipline Regulatory Physiology↗

Spaceflight effects on biomechanical and biochemical properties of rat vertebrae

The biomechanical and biochemical responses of lumbar vertebral bodies during a 12.5-day spaceflight (Cosmos 1887 biosatellite) were determined for rapidly growing rats (90-day-old, Czechoslovakian-Wistar). By use of age-matched vivarium controls (normal cage environment) and synchronous controls (simulated flight conditions), as well as a basal control group (killed before lift-off on the 1st day of flight), the combined influences of growth and space-flight could be examined. Centra of the sixth lumbar vertebrae (L6) were compressed to 50% strain at a fast strain rate while immersed in physiological buffer (37 degrees C). The body masses of vivarium and synchronous controls were significantly heavier than either the flight or basal controls. The flight group had an L6 vertebral body compressional stiffness that was 39% less than the vivarium controls, 47% less than the synchronous control, and 16% less than the basal controls. In addition, the average initial maximum load of the flight L6 was 22% less than vivarium controls and 18% less than the synchronous controls, whereas the linear compressional load of the flight group averaged 34% less than the vivarium and 25% less than the synchronous groups. The structural properties of the vertebrae from the 12.5-day-younger basal group closely resembled the flight vertebrae. Calcium, phosphorous, and hydroxyproline concentrations were not significantly different among the groups. Nevertheless, the lack of strength and stiffness development in spaceflight, coupled with a smaller proportion of mature hydroxypyridinoline cross-links, suggested that the 12.5 days of spaceflight slowed the maturation of trabecular bone in the vertebral bodies of rapidly growing rats.

Non-NASA Center↗

Control of Rate-Bounded Hybrid Systems with Liveness Specifications

In the present paper we examine the control problem for a class of composite hybrid machines (CHMs) that consist of concurrent operation (employing synchronous composition) of elementary hybrid machines (EHMs), that allows both signal sharing and event synchronization. A controller can then be coupled with the plant by means of synchronous composition. We confine our attention to controllers that interact with the system only through event synchronization. We present an initial investigation of synthesis of liveness controllers for hybrid machines. To this end we define open hybrid machines as systems that can interact with the environment through event synchronization and can be therefor be "driven" to their marked configuration by user (controller). Liveness specifications must be associated with timing constraints. We may require that for a specified time limit, every run reach a marked configuration within that time limit. Alternatively, a more relaxed specification may be that, for some (unspecified) global time bound, every run of the system reach a marked configuration within that time bound. Finally, the least restrictive liveness requirement is that every run reach a marked configuration within a finite time limit (but we do not insist on the existence of a global time bound for all runs).

Heymann, Michael↗

PPM Receiver Implemented in Software

A computer program has been written as a tool for developing optical pulse-position- modulation (PPM) receivers in which photodetector outputs are fed to analog-to-digital converters (ADCs) and all subsequent signal processing is performed digitally. The program can be used, for example, to simulate an all-digital version of the PPM receiver described in Parallel Processing of Broad-Band PPM Signals (NPO-40711), which appears elsewhere in this issue of NASA Tech Briefs. The program can also be translated into a design for digital PPM receiver hardware. The most notable innovation embodied in the software and the underlying PPM-reception concept is a digital processing subsystem that performs synchronization of PPM time slots, even though the digital processing is, itself, asynchronous in the sense that no attempt is made to synchronize it with the incoming optical signal a priori and there is no feedback to analog signal processing subsystems or ADCs. Functions performed by the software receiver include time-slot synchronization, symbol synchronization, coding preprocessing, and diagnostic functions. The program is written in the MATLAB and Simulink software system. The software receiver is highly parameterized and, hence, programmable: for example, slot- and symbol-synchronization filters have programmable bandwidths.

Gray, Andrew↗

Using Integer Clocks to Verify the Timing-Sync Sensor Network Protocol

We use the UPPAAL model checker for Timed Automata to verify the Timing-Sync time-synchronization protocol for sensor networks (TPSN). The TPSN protocol seeks to provide network-wide synchronization of the distributed clocks in a sensor network. Clock-synchronization algorithms for sensor networks such as TPSN must be able to perform arithmetic on clock values to calculate clock drift and network propagation delays. They must be able to read the value of a local clock and assign it to another local clock. Such operations are not directly supported by the theory of Timed Automata. To overcome this formal-modeling obstacle, we augment the UPPAAL specification language with the integer clock derived type. Integer clocks, which are essentially integer variables that are periodically incremented by a global pulse generator, greatly facilitate the encoding of the operations required to synchronize clocks as in the TPSN protocol. With this integer-clock-based model of TPSN in hand, we use UPPAAL to verify that the protocol achieves network-wide time synchronization and is devoid of deadlock. We also use the UPPAAL Tracer tool to illustrate how integer clocks can be used to capture clock drift and resynchronization during protocol execution

Huang, Xiaowan↗

Video Guidance Sensors Using Remotely Activated Targets

Four updated video guidance sensor (VGS) systems have been proposed. As described in a previous NASA Tech Briefs article, a VGS system is an optoelectronic system that provides guidance for automated docking of two vehicles. The VGS provides relative position and attitude (6-DOF) information between the VGS and its target. In the original intended application, the two vehicles would be spacecraft, but the basic principles of design and operation of the system are applicable to aircraft, robots, objects maneuvered by cranes, or other objects that may be required to be aligned and brought together automatically or under remote control. In the first two of the four VGS systems as now proposed, the tracked vehicle would include active targets that would light up on command from the tracking vehicle, and a video camera on the tracking vehicle would be synchronized with, and would acquire images of, the active targets. The video camera would also acquire background images during the periods between target illuminations. The images would be digitized and the background images would be subtracted from the illuminated-target images. Then the position and orientation of the tracked vehicle relative to the tracking vehicle would be computed from the known geometric relationships among the positions of the targets in the image, the positions of the targets relative to each other and to the rest of the tracked vehicle, and the position and orientation of the video camera relative to the rest of the tracking vehicle. The major difference between the first two proposed systems and prior active-target VGS systems lies in the techniques for synchronizing the flashing of the active targets with the digitization and processing of image data. In the prior active-target VGS systems, synchronization was effected, variously, by use of either a wire connection or the Global Positioning System (GPS). In three of the proposed VGS systems, the synchronizing signal would be generated on, and transmitted from, the tracking vehicle. In the first proposed VGS system, the tracking vehicle would transmit a pulse of light. Upon reception of the pulse, circuitry on the tracked vehicle would activate the target lights. During the pulse, the target image acquired by the camera would be digitized. When the pulse was turned off, the target lights would be turned off and the background video image would be digitized. The second proposed system would function similarly to the first proposed system, except that the transmitted synchronizing signal would be a radio pulse instead of a light pulse. In this system, the signal receptor would be a rectifying antenna. If the signal contained sufficient power, the output of the rectifying antenna could be used to activate the target lights, making it unnecessary to include a battery or other power supply for the targets on the tracked vehicle.

Bryan, Thomas C.↗

Powder Bed Fusion Laser Beam Metals Additive Manufacturing: Process Monitoring Approaches for Qualification and Certification

The use of in-situ process monitoring is of interest to lower the cost of inspection for the qualification of powder bed fusion laser beam metal (PBF-LB/M) additively manufactured (AM) parts. Precise monitoring of the PBF-LB/M AM build process constitutes a multi-scale and multi-discipline task. There are several significant challenges to the in-situ approach: the synchronization of sensor signals to process steps; the physical interpretation and classification of sensor signals; managing very large datasets; and comparing the inputs with the observed monitoring signals. At NASA Langley Research Center, a configurable architecture additive testbed has been developed to monitor the build process with synchronized sensors. The philosophy and method adopted for the synchronization of the cameras with laser power and position throughout a complex PBF-LB/M AM build will be described. The synchronized in-situ monitoring signals are compared with ex-situ nondestructive inspection, x-ray computed tomography (XCT). Such comparisons permit a better understanding of how the sequential process actions of LPBF-AM can affect build quality. The multi-scale and complex process of printing additively manufactured (AM) parts can have unexpected, but predictable, build conditions that result in material microstructure variability. This presentation will describe an additive manufacturing model-based process metric (AM-PM) computational method that is a fully parallel reduced order modeling approach developed to evaluate the evolution of AM processes. This method couples the known sequence of the AM process with a physically informed nearest neighbors’ calculation to map the conditions of a part-scale build. The result is a map of the build that is derived directly from build files or in-situ process monitoring sensors. The methodology of the approach will be described and mapped to the porosity observed from XCT for a complex PBF-LB/M build. Such comparative results develop understanding of how the sequential process actions can affect the PBF-LB/M AM build quality and microstructure variability.

Laser Powder Bed Fusion↗

Parallel operation of two Brayton-cycle alternators with parasitic speed controllers

The experimental paralleling characteristics of two 1200 Hz Brayton-cycle alternators are presented. Since the Brayton power conversion system uses electric speed controllers, the paralleling requirements are somewhat different from those for conventional ground-based systems. Results include the transient effects of synchronizing the two alternators with various phase-angle, voltage, and frequency differences. Based on these results, the effects of synchronizing differences can be defined, and adjustment requirements of the parasitic speed controllers during synchronizing can be established. Data indicate that parasitically loaded alternators are able to parallel over a wide range of synchronizing differences. However, equilibrium could not be reached in extreme cases where alternator load differences were great and, at the same time, the phase-angle error was large (150 deg or more).

Perz, D. A.↗

Parallel operation of two Brayton-cycle alternators with parasitic speed controllers.

The experimental paralleling characteristics of two 1200-Hz Brayton-cycle alternators are presented. Since the Brayton power conversion system uses electric speed controllers, the paralleling requirements are somewhat different from those for conventional ground-based power systems. Results include the transient effects of synchronizing the two alternators with various phase-angle, voltage, and frequency differences. Based on these results, the effects of synchronizing differences can be defined, and adjustment requirements of the parasitic speed controllers during synchronizing can be established. Data indicate that parasitically loaded alternators are able to parallel over a wide range of synchronizing differences.

Perz, D. A.↗

Precision time distribution within a deep space communications complex

The Precision Time Distribution System (PTDS) at the Golstone Deep Space Communications Complex is a practical application of existing technology to the solution of a local problem. The problem was to synchronize four station timing systems to a master source with a relative accuracy consistently and significantly better than 10 microseconds. The solution involved combining a precision timing source, an automatic error detection assembly and a microwave distribution network into an operational system. Upon activation of the completed PTDS two years ago, synchronization accuracy at Goldstone (two station relative) was improved by an order of magnitude. It is felt that the validation of the PTDS mechanization is now completed. Other facilities which have site dispersion and synchronization accuracy requirements similar to Goldstone may find the PTDS mechanization useful in solving their problem. At present, the two station relative synchronization accuracy at Goldstone is better than one microsecond.

Curtright, J. B.↗

Motor run-up system

A starting system is described for bringing a large synchronous motor up to speed to prevent large power line disturbances at the moment the motor is connected to the power line. The system includes (1) a digital counter which generates a count determined by the difference in frequency between the power line and a small current generated by the synchronous motor; (2) a latch which stores the count; and (3) a comparator which compares the stored count with a newly generated count to determine whether the synchronous motor is accelerating or decelerating. Signals generated by the counter and comparator control the current to a clutch that couples a starting motor to the large synchronous motor.

Daeges, J. J.↗

Comparison between variable and fixed dwell-time PN acquisition algorithms

Pseudo noise (PN) spread spectrum systems require a very accurate alignment between the PN code epochs at the transmitter and receiver. This synchronism is typically established through a two-step algorithm, including a coarse synchronization procedure and a fine synchronization procedure. A standard approach for the coarse synchronization is a sequential search over all code phases. The measurement of the power in the filtered signal is used to either accept or reject the code phase under test as the phase of the received PN code. This acquisition strategy, called a single dwell-time system, has been analyzed by Holmes and Chen (1977). A synopsis of the field of sequential analysis as it applies to the PN acquisition problem is provided. From this, the implementation of the variable dwell time algorithm as a sequential probability ratio test is developed. The performance of this algorithm is compared to the optimum detection algorithm and to the fixed dwell-time system.

Braun, W. R.↗

Ensuring fault tolerance of phase-locked clocks

Processors within a real-time multiprocessor system must be synchronized with as little overhead as possible. Although synchronization can be achieved via both software (e.g., interactive convergence and interactive consistency algorithms) and hardware (e.g., multistage synchronizers and phase-locked clocks), phase-locked clocks are most attractive due to their small overheads. Despite the fact that synchronization of the multiprocessor system with phase-locked clocks is totally different in nature from the interactive consistency algorithm, it is presently proven that it must satisfy the same condition, N equal to or greater than 3m + 1, where N is the total number of clocks in the multiprocessor system and m is the maximum number of faults tolerable. Also presented are results showing how to design phase-locked clocks so as to be impervious up to a given arbitrary number of malicious failures.

Krishna, C. M.↗

Fairness of channel access for non-time-critical traffic using the FDDI token ring protocol

The Fiber Distributed Data Interface (FDDI) is an ANSI draft proposed standard for a 100 megabit per second fiber optic token ring. FDDI supports two types of traffic, synchronous and asynchronous. Synchronous traffic is time critical traffic; stations are assigned guaranteed bandwidth to support their synchronous needs. Asynchronous traffic is lower priority and is sent only if time permits. It is proved analytically that the FDDI access protocol provides all stations on the ring with equal access to the channel to transmit asynchronous frames, regardless of the relative sizes of synchronous bandwidth allocations for individual stations. Analytic results are supported with data from simulation runs.

Johnson, M. J.↗