Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Failure risk assessment by analysis and testing

The sources of information on which to base an evaluation of reliability or failure risk of an aerospace flight system are (1) experience from tests and flights and (2) engineering analysis. It is rarely feasible to establish high reliability at high confidence by testing aerospace systems or components. Moreover, failure prediction by conventional, deterministic methods of engineering analysis can become arbitrary and subject to serious misinterpretation when uncertain or approximate information is used to establish analysis parameter values and to calibrate the accuracy of engineering models. The limitations of testing to evaluate failure risk are discussed, and a statistical approach which incorporates both engineering analysis and testing is presented.

Moore, N.↗

Non-Rhabdomyosarcoma Soft Tissue Sarcomas in Children: A Surveillance, Epidemiology, and End Results Analysis Validating COG Risk Stratifications

Purpose: Non-rhabdomyosarcoma soft tissue sarcomas (NRSTS) are a heterogeneous group of sarcomas that encompass over 35 histologies. With an incidence of ∼500 cases per year in the United States in those <20 years of age, NRSTS are rare and therefore difficult to study in pediatric populations. We used the large Surveillance, Epidemiology, and End Results (SEER) database to validate the prognostic ability of the Children's Oncology Group (COG) risk classification system and to define patient, tumor, and treatment characteristics. Methods and Materials: From SEER data from 1988 to 2007, we identified patients ≤18 years of age with NRSTS. Data for age, sex, year of diagnosis, race, registry, histology, grade, primary size, primary site, stage, radiation therapy, and survival outcomes were analyzed. Patients with nonmetastatic grossly resected low-grade tumors of any size or high-grade tumors ≤5 cm were considered low risk. Cases of nonmetastatic tumors that were high grade, >5 cm, or unresectable were considered intermediate risk. Patients with nodal or distant metastases were considered high risk. Results: A total of 941 patients met the review criteria. On univariate analysis, black race, malignant peripheral nerve sheath (MPNST) histology, tumors >5 cm, nonextremity primary, lymph node involvement, radiation therapy, and higher risk group were associated with significantly worse overall survival (OS) and cancer-specific survival (CSS). On multivariate analysis, MPNST histology, chemotherapy-resistant histology, and higher risk group were significantly poor prognostic factors for OS and CSS. Compared to low-risk patients, intermediate patients showed poorer OS (hazard ratio [HR]: 6.08, 95% confidence interval [CI]: 3.53-10.47, P<.001) and CSS (HR: 6.27; 95% CI: 3.44-11.43, P<.001), and high-risk patients had the worst OS (HR: 13.35, 95% CI: 8.18-21.76, P<.001) and CSS (HR: 14.65, 95% CI: 8.49-25.28, P<.001). Conclusions: The current COG risk group stratification for children with NRSTS has been validated with a large number of children in the SEER database.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419

This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost, and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of a Bayesian Engine for Uncertainty Analysis

In probabilistic risk assessment, it is important to have an environment where analysts have access to a shared and secured high performance computing and a statistical analysis tool package. As part of the advanced small modular reactor probabilistic risk analysis framework implementation, we have identified the need for advanced Bayesian computations. However, in order to make this technology available to non-specialists, there is also a need of a simplified tool that allows users to author models and evaluate them within this framework. As a proof-of-concept, we have implemented an advanced open source Bayesian inference tool, OpenBUGS, within the browser-based cloud risk analysis framework that is under development at the Idaho National Laboratory. This development, the “OpenBUGS Scripter” has been implemented as a client side, visual web-based and integrated development environment for creating OpenBUGS language scripts. It depends on the shared server environment to execute the generated scripts and to transmit results back to the user. The visual models are in the form of linked diagrams, from which we automatically create the applicable OpenBUGS script that matches the diagram. These diagrams can be saved locally or stored on the server environment to be shared with other users.

99 GENERAL AND MISCELLANEOUS↗

Modeling and Quantification of Team Performance in Human Reliability Analysis for Probabilistic Risk Assessment

Probabilistic Risk Assessment (PRA) and Human Reliability Assessment (HRA) are important technical contributors to the United States (U.S.) Nuclear Regulatory Commission’s (NRC) risk-informed and performance based approach to regulating U.S. commercial nuclear activities. Furthermore, all currently operating commercial NPPs in the U.S. are required by federal regulation to be staffed with crews of operators. Yet, aspects of team performance are underspecified in most HRA methods that are widely used in the nuclear industry. There are a variety of "emergent" team cognition and teamwork errors (e.g., communication errors) that are 1) distinct from individual human errors, and 2) important to understand from a PRA perspective. The lack of robust models or quantification of team performance is an issue that affects the accuracy and validity of HRA methods and models, leading to significant uncertainty in estimating HEPs. This paper describes research that has the objective to model and quantify team dynamics and teamwork within NPP control room crews for risk informed applications, thereby improving the technical basis of HRA, which improves the risk-informed approach the NRC uses to regulate the U.S. commercial nuclear industry.

99 GENERAL AND MISCELLANEOUS↗

Quantification of margins and uncertainty for risk-informed decision analysis.

QMU stands for 'Quantification of Margins and Uncertainties'. QMU is a basic framework for consistency in integrating simulation, data, and/or subject matter expertise to provide input into a risk-informed decision-making process. QMU is being applied to a wide range of NNSA stockpile issues, from performance to safety. The implementation of QMU varies with lab and application focus. The Advanced Simulation and Computing (ASC) Program develops validated computational simulation tools to be applied in the context of QMU. QMU provides input into a risk-informed decision making process. The completeness aspect of QMU can benefit from the structured methodology and discipline of quantitative risk assessment (QRA)/probabilistic risk assessment (PRA). In characterizing uncertainties it is important to pay attention to the distinction between those arising from incomplete knowledge ('epistemic' or systematic), and those arising from device-to-device variation ('aleatory' or random). The national security labs should investigate the utility of a probability of frequency (PoF) approach in presenting uncertainties in the stockpile. A QMU methodology is connected if the interactions between failure modes are included. The design labs should continue to focus attention on quantifying uncertainties that arise from epistemic uncertainties such as poorly-modeled phenomena, numerical errors, coding errors, and systematic uncertainties in experiment. The NNSA and design labs should ensure that the certification plan for any RRW is supported by strong, timely peer review and by an ongoing, transparent QMU-based documentation and analysis in order to permit a confidence level necessary for eventual certification.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Risk-Based Dynamic Contingency Analysis Applied to Puerto Rico Electric Infrastructure

The U.S. Department of Energy’s (DOE) Office of Electricity and Office of Energy Efficiency & Renewable Energy have funded DOE National Laboratories to perform modeling, analysis, and high-level design of resilience-enhancement options for the power grid of the Commonwealth of Puerto Rico. The Pacific Northwest National Laboratory (PNNL) is one of the national laboratories contributing to the DOE effort. Under this funding, PNNL completed Phase I of their analysis in 2018, which identified high-priority transmission enhancements derived from detailed dynamic cascading analysis of severe contingencies, including a hurricane scenario example. This report describes additional analysis completed under Phase II, which was performed over 2019. The PNNL team applied decades of experience making complex power systems more resilient, reliable, secure, flexible, affordable and sustainable, with partners in government and industry. In this report, PNNL presents the Phase II analysis, in which a risk-based dynamic contingency analysis approach to evaluate impact of several hurricane scenarios was developed. This approach was used to identify high-priority enhancements and test resilience mitigation actions, including the evaluation of high-solar scenarios developed as a result of the 2019 Puerto Rico Integrated Resource Plan (IRP).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Pneumothorax Complicating Coaxial and Non-coaxial CT-Guided Lung Biopsy: Comparative Analysis of Determining Risk Factors and Management of Pneumothorax in a Retrospective Review of 650 Patients

PurposeTo assess the scope and determining risk factors related to the development of pneumothorax throughout CT-guided biopsy of pulmonary lesions in coaxial and non-coaxial techniques and the outcome of its management.Materials and MethodsThe study included CT-guided percutaneous lung biopsies in 650 consecutive patients (407 males, 243 females; mean age 54.6 years, SD 5.2) from November 2008 to June 2013 in a retrospective design. Patients were classified according to lung biopsy technique into coaxial group (318 lesions) and non-coaxial group (332 lesions). Exclusion criteria for biopsy were lesions <5 mm in diameter, uncorrectable coagulopathy, positive-pressure ventilation, severe respiratory compromise, pulmonary arterial hypertension, or refusal of the procedure. Risk factors related to the occurrence of pneumothorax were classified into: (a) Technical risk factors, (b) patient-related risk factors, and (c) lesion-associated risk factors. Radiological assessments were performed by two radiologists in consensus. Mann–Whitney U test and Fisher’s exact tests were used for statistical analysis. p values <0.05 were considered statistically significant.ResultsThe incidence of pneumothorax complicating CT-guided lung biopsy was less in the non-coaxial group (23.2 %, 77 out of 332) than the coaxial group (27 %, 86 out of 318). However, the difference in incidence between both groups was statistically insignificant (p = 0.14). Significant risk factors for the development of pneumothorax in both groups were emphysema (p < 0.001 in both groups), traversing a fissure with the biopsy needle (p value 0.005 in non-coaxial group and 0.001 in coaxial group), small lesion, less than 2 cm in diameter (p value of 0.02 in both groups), location of the lesion in the basal or mid sections of the lung (p = 0.003 and <0.001 in non-coaxial and coaxial groups, respectively), and increased needle track path within the lung tissue of more than 2.5 cm (p = 0.01 in both groups). The incidence of pneumothorax in the non-coaxial group was significantly correlated to the number of specimens obtained (p = 0.006). This factor was statistically insignificant in the coaxial group (p = 0.45). The biopsy yield was more diagnostic and conclusive in the coaxial group in comparison to the non-coaxial group (p = 0.008). Simultaneous incidence of pneumothorax and pulmonary hemorrhage was 27.3 % (21/77) in non-coaxial group and in 30.2 % (26/86) in coaxial group. Conservative management was sufficient for treatment of 91 out of 101 patients of pneumothorax in both groups (90.1 %). Manual evacuation of pneumothorax was efficient in 44/51 patients (86.3 %) in both groups and intercostal chest tube was applied after failure of manual evacuation (7 patients: 13.7 %), from which one patient developed a persistent air leakage necessitating pleurodesis.ConclusionPneumothorax complicating CT-guided core biopsy of pulmonary lesions, showed the insignificant difference between coaxial and non-coaxial techniques. However, both techniques have the same significant risk factors including small and basal lesions, increased lesion’s depth from pleural surface, and increased length of aerated lung parenchyma crossed by biopsy needle and passing through pulmonary fissures in the needle tract.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

An Approach to Dynamic Human Reliability Analysis using EMRALD Dynamic Risk Assessment Tool

Research for dynamic human reliability analysis (HRA) (a.k.a., simulation-based or computation-based HRA) has been required, as many researchers have emphasized the importance of dynamic approaches to probabilistic safety assessment (PSA). This study proposes the PRocedure-based Investigation Method of EMRALD Risk Assessment – Human Reliability Analysis (PRIMERA-HRA) method, which is an approach to dynamic HRA using the Event Modeling Risk Assessment using Linked Diagram (EMRALD) software developed by Idaho National Laboratory (INL). In this study, how to model human actions using the software and evaluate the error probabilities is suggested. The applicability of this approach will be also investigated through an extended loss of AC power (ELAP) scenario. Then, major insights from this dynamic HRA approach against the static one will be discussed in the paper.

99 GENERAL AND MISCELLANEOUS↗

Analysis of blade fragment risk at a wind energy facility

An analysis was performed to determine the risk posed by wind turbine fragments on roads and buildings at the National Wind Technology Center at the National Renewable Energy Laboratory. The authors used a previously developed model of fragment trajectory and took into account the wind speed/direction distribution at the site and the probability of rotor failure. The site-specific risk was assessed by determining the likelihood of impact and related consequences. For both the roads and buildings, the risk varied from low to routine, which was considered acceptable.

17 WIND ENERGY↗

Uncertainty Quantification and Sensitivity Analysis for Quantitative Risk Assessments of Hydrogen Infrastructure

Typical QRAs provide deterministic estimates and understanding of risks posed but are constructed using significant assumptions and uncertainties due to limited data availability and historical momentum of using nominal estimates. This report presents a hydrogen QRA analysis using HyRAM+ that incorporates uncertainty with Latin hypercube sampling and sensitivity analysis using linear regression.

08 HYDROGEN↗

Solutions for Enhanced Legacy Probabilistic Risk Assessment Tools and Methodologies: Improving Efficiency of Model Development and Processing via Innovative Human Reliability Dependency Analysis

Probabilistic risk assessments (PRAs) are integral to nuclear power plant (NPP) operations, having tremendously benefitted the safety of the U.S. reactor fleet for decades. Insights obtained from the models have provided perspectives on a variety of applications, both at the plant and for the regulator. While these models are very useful, they are now being asked to represent and analyze aspects of the plant that were never envisioned by the initial PRA practitioners. Furthermore, heightened demands on the PRA models have led to increased computing power requirements. Additionally, as the complexity of the PRA models increased, the difficulty experienced by non-PRA experts in trying to understand these models, grasp the insights they provide, and effectively use that information has become problematic. The need for research to address key issues regarding PRA tools and methods has never been greater. Although the nuclear power industry has largely been well-served by these tools and methods, the underlying science is dated, remaining mostly unchanged for over two decades. Three areas were identified as most beneficial to address to maintain and improve the usefulness of the current practice legacy PRA tools: improved quantification speed, increased ability to efficiently model multi-hazard models, and improved modeling human action dependency in PRA. This report is focused on the third critical area, improvements in dependency analysis of human actions conducted as part of a typical human reliability assessment.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Dietary B group vitamin intake and the bladder cancer risk: a pooled analysis of prospective cohort studies

Abstract Purpose Diet may play an essential role in the aetiology of bladder cancer (BC). The B group complex vitamins involve diverse biological functions that could be influential in cancer prevention. The aim of the present study was to investigate the association between various components of the B group vitamin complex and BC risk. Methods Dietary data were pooled from four cohort studies. Food item intake was converted to daily intakes of B group vitamins and pooled multivariate hazard ratios (HRs), with corresponding 95% confidence intervals (CIs), were obtained using Cox-regression models. Dose–response relationships were examined using a nonparametric test for trend. Results In total, 2915 BC cases and 530,012 non-cases were included in the analyses. The present study showed an increased BC risk for moderate intake of vitamin B1 (HR B1 : 1.13, 95% CI: 1.00–1.20). In men, moderate intake of the vitamins B1, B2, energy-related vitamins and high intake of vitamin B1 were associated with an increased BC risk (HR (95% CI): 1.13 (1.02–1.26), 1.14 (1.02–1.26), 1.13 (1.02–1.26; 1.13 (1.02–1.26), respectively). In women, high intake of all vitamins and vitamin combinations, except for the entire complex, showed an inverse association (HR (95% CI): 0.80 (0.67–0.97), 0.83 (0.70–1.00); 0.77 (0.63–0.93), 0.73 (0.61–0.88), 0.82 (0.68–0.99), 0.79 (0.66–0.95), 0.80 (0.66–0.96), 0.74 (0.62–0.89), 0.76 (0.63–0.92), respectively). Dose–response analyses showed an increased BC risk for higher intake of vitamin B1 and B12. Conclusion Our findings highlight the importance of future research on the food sources of B group vitamins in the context of the overall and sex-stratified diet.

60 APPLIED LIFE SCIENCES↗

Reducing Transaction Costs for Energy Efficiency Investments and Analysis of Economic Risk Associated With Building Performance Uncertainties: Small Buildings and Small Portfolios Program

The small buildings and small portfolios (SBSP) sector face a number of barriers that inhibit SBSP owners from adopting energy efficiency solutions. This pilot project focused on overcoming two of the largest barriers to financing energy efficiency in small buildings: disproportionately high transaction costs and unknown or unacceptable risk. Solutions to these barriers can often be at odds, because inexpensive turnkey solutions are often not sufficiently tailored to the unique circumstances of each building, reducing confidence that the expected energy savings will be achieved. To address these barriers, NREL worked with two innovative, forward-thinking lead partners, Michigan Saves and Energi, to develop technical solutions that provide a quick and easy process to encourage energy efficiency investments while managing risk. The pilot project was broken into two stages: the first stage focused on reducing transaction costs, and the second stage focused on reducing performance risk. In the first stage, NREL worked with the non-profit organization, Michigan Saves, to analyze the effects of 8 energy efficiency measures (EEMs) on 81 different baseline small office building models in Holland, Michigan (climate zone 5A). The results of this analysis (totaling over 30,000 cases) are summarized in a simple spreadsheet tool that enables users to easily sort through the results and find appropriate small office EEM packages that meet a particular energy savings threshold and are likely to be cost-effective.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗