Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RADIATION MONITORING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

RDS-SL VS Communication System

The RDS-SL VS Communication System is a component of the Radiation Detection System for Strategic, Low-Volume Seaports. Its purpose is to acquire real-time data from radiation portal monitors and cameras, record that data in a database, and make it available to system operators and administrators via a web interface. The software system contains two components: a standalone data acquisition and storage component and an ASP.NETweb application that implements the web interface.

Source record↗

List-Mode source injection algorithm for detectors with arbitrary pose and trajectory

environments, introducing actual sources is usually neither feasible nor economical. It is more practical to move the detector (whether airborne, vehicle-borne, or human-portable) through the test environment and then later artificially superimpose either measured or simulated source signatures on the recorded background data. We present a source injection (SI) algorithm that inserts source events into list-mode background data. It is designed to accommodate cases where “injection data” are available only at a limited set of locations. Stochastic methods are employed both to select source events from a measured dataset containing both source and background events, and to scale the number of selected events to match the field conditions of detector-source distance, air attenuation, acquisition duration, and the relative strength of the measured and injected sources. The algorithm is deployed as part of the Airborne Radiation Enhanced-sensor System (ARES) Advanced Technology Demonstration, and is applied to field data obtained using the ARES detector system. For this helicopter-borne detection system, we describe a practical ground-based measurement scheme for acquiring data for later injection. These data are then injected into background data acquired during flight, where arbitrary detector poses and trajectories are possible. Similar flight paths are traversed with and without actual 137Cs and 60Co sources present. SI is applied to the source-absent datasets, and the results are compared to the source-present datasets. SI output is found to be consistent with measured activity within the estimated uncertainties in GPS position and source strength.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Maximizing Operational Efficiencies in Waste Management on the Hanford Plateau Remediation Contract in a Down-turned Market - 13484

Recent changes in DOE priorities and funding have pressed DOE and its contractors to look for innovative methods to sustain critical operations at sites across the Complex. At the Hanford Site, DOE Richland Operations and its prime contractor, CH2M Hill Plateau Remediation Company (CHPRC), have completed in-depth assessments of the Plateau Remediation Contract (PRC) operations that compared available funding to mission and operational objectives in an effort to maintain requisite safety and compliance margins while realizing cost savings that meet funding profiles. These assessments included confirmation of current baseline activities, identification of potential efficiencies, barriers to implementation, and potential increased risks associated with implementation. Six operating PRC waste management facilities were evaluated against three possible end-states: complete facility closure, maintaining base operations, and performing minimum safe surveillance and maintenance activities. The costs to completely close evaluated facilities were determined to be prohibitively high and this end-state was quickly dropped from consideration. A summary of the analysis of remaining options by facility, efficiencies identified, impact to risk profiles, and expected cost savings is provided in Table I. The expected cost savings are a result of: - right-sizing and cross-training work crews to address maintenance activities across facilities; - combining and sequencing 'like-moded' operational processes; - cross-cutting emergency planning and preparedness staffing; - resource redistribution and optimization; - reducing areas requiring routine surveillance and inspection. For the efficiencies identified, there are corresponding increases in risk, including a loss of breadth and depth of available resources; lengthened response time to emergent issues; inability to invest in opportunities for improvement (OFIs); potential single-point failures or non-compliancies due to resource scarcity; limited cross-training capability; and reduced capability to respond to changes in DOE priorities. Finally, there are many challenges to achieving these cost savings. With a workforce nearing retirement effective succession planning becomes critical to success and requires establishing a balance between the cost of hiring and training and cost-saving activities. With six active waste management facilities spread across nearly 15 square miles, scheduling and deploying cross-trained surveillance and maintenance teams is a logistical challenge, particularly as the loss of funding has not diminished emphasis by regulatory agencies placed on the safe and compliant performance of DOE and its contractors. As reflected in Table I, efficiencies are currently being implemented on the Hanford Plateau Remediation Contract (PRC) that deliver cost savings that align with the current site budget while maintaining critical capabilities. It is currently estimated that these efficiencies will result in a cost savings of approximately $9 million for FY13 in base and minimum safe operations on the PRC - a cost reduction of more than 13 percent over FY12 and nearly 30 percent over FY09 levels. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pipeline Decommissioning Trial AWE Berkshire UK - 13619

This Paper details the implementation of a 'Decommissioning Trial' to assess the feasibility of decommissioning the redundant pipeline operated by AWE located in Berkshire UK. The paper also presents the tool box of decommissioning techniques that were developed during the decommissioning trial. Constructed in the 1950's and operated until 2005, AWE used a pipeline for the authorised discharge of treated effluent. Now redundant, the pipeline is under a care and surveillance regime awaiting decommissioning. The pipeline is some 18.5 km in length and extends from AWE site to the River Thames. Along its route the pipeline passes along and under several major roads, railway lines and rivers as well as travelling through woodland, agricultural land and residential areas. Currently under care and surveillance AWE is considering a number of options for decommissioning the pipeline. One option is to remove the pipeline. In order to assist option evaluation and assess the feasibility of removing the pipeline a decommissioning trial was undertaken and sections of the pipeline were removed within the AWE site. The objectives of the decommissioning trial were to: - Demonstrate to stakeholders that the pipeline can be removed safely, securely and cleanly - Develop a 'tool box' of methods that could be deployed to remove the pipeline - Replicate the conditions and environments encountered along the route of the pipeline The onsite trial was also designed to replicate the physical prevailing conditions and constraints encountered along the remainder of its route i.e. working along a narrow corridor, working in close proximity to roads, working in proximity to above ground and underground services (e.g. Gas, Water, Electricity). By undertaking the decommissioning trial AWE have successfully demonstrated the pipeline can be decommissioned in a safe, secure and clean manor and have developed a tool box of decommissioning techniques. The tool box of includes; - Hot tapping - a method of breaching the pipe while maintaining containment to remove residual liquids, - Crimp and shear - remote crimping, cutting and handling of pipe using the excavator - Pipe jacking - a way of removing pipes avoiding excavations and causing minimal disturbance and disruption. The details of the decommissioning trial design, the techniques employed, their application and effectiveness are discussed and evaluated here in. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radio-Ecological Situation in the Area of the Priargun Production Mining and Chemical Association - 13522

'The Priargun Production Mining and Chemical Association' (hereinafter referred to as PPMCA) is a diversified mining company which, in addition to underground mining of uranium ore, carries out refining of such ores in hydrometallurgical process to produce natural uranium oxide. The PPMCA facilities are sources of radiation and chemical contamination of the environment in the areas of their location. In order to establish the strategy and develop criteria for the site remediation, independent radiation hygienic monitoring is being carried out over some years. In particular, this monitoring includes determination of concentration of the main dose-forming nuclides in the environmental media. The subjects of research include: soil, grass and local foodstuff (milk and potato), as well as media of open ponds (water, bottom sediments, water vegetation). We also measured the radon activity concentration inside surface workshops and auxiliaries. We determined the specific activity of the following natural radionuclides: U-238, Th-232, K-40, Ra-226. The researches performed showed that in soil, vegetation, groundwater and local foods sampled in the vicinity of the uranium mines, there is a significant excess of {sup 226}Ra and {sup 232}Th content compared to areas outside the zone of influence of uranium mining. The ecological and hygienic situation is as follows: - at health protection zone (HPZ) gamma dose rate outdoors varies within 0.11 to 5.4 μSv/h (The mean value in the reference (background) settlement (Soktui-Molozan village) is 0.14 μSv/h); - gamma dose rate in workshops within HPZ varies over the range 0.14 - 4.3 μSv/h. - the specific activity of natural radionuclides in soil at HPZ reaches 12800 Bq/kg and 510 Bq/kg for Ra-226 and Th-232, respectively. - beyond HPZ the elevated values for {sup 226}Ra have been registered near Lantsovo Lake - 430 Bq/kg; - the radon activity concentration in workshops within HPZ varies over the range 22 - 10800 Bq/m{sup 3}. The seasonal dependence of radon activity concentration is observed in the air of workshops (radon levels are lower in winter in comparison with spring-summer period). - in drinking water, intervention levels by gross alpha activity and by some radionuclides, in particular by Rn-222, are in excess. Annual effective dose of internal exposure due to ingestion of such water will be 0.14-0.28 mSv. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

In-Situ Laboratory for nuclear characterization on D and D sites

The nuclear measurement is use in many phases of dismantling and cleanup site. Particularly the results of radiologic characterization are used to create or to optimize the deconstruction scenarios of nuclear plants and to reduce the nuclear waste volume. This type of analyses is made on samples collected in concerned installations. To realize those analyses, samples are send in laboratory what has a great impact on the planning and cost of dismantling. That's the reason why MSIS Assistance (AREVA D and S) devises Mobile Laboratory, which permits to realize nuclear measurement in situ. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Centre de la manche disposal facility after ten years of institutional control - 15255

Centre de la Manche disposal facility is the first French surface disposal facility for low and intermediate level short lived radioactive waste. It has been operated for 25 years, from 1969 to 1994. The facility was licensed for the institutional control period in 2003. As there were significant changes in the design of vaults or in waste acceptance criteria during the 25 years of operation, it was decided to implement a capping system including a bituminous membrane that would be able to sustain strains that might be caused by the settlement of waste packages in the eldest parts of the facility, where conditioning modes were different than those as presently practiced. In 2008 Andra submitted to ASN, the regulatory body in France, a file related to the safety of the facility including a study of the opportunity to modify capping system. Andra's project was to improve long term watertightness and to stabilize the sides of the cover by smoother slopes through a progressive approach. This file was completed in early 2015 by a progress report providing in particular results on studies related to the durability of the bituminous membrane. They take into account periodical measurements performed on samples of the membrane extracted from the capping system and studies performed on the phenomenology of ageing of the membrane. These data support the strategy of improvement of the capping system developed by Andra in order to achieve a more passive surveillance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

3-60B Type-B shipping cask enhanced operational features to facilitate leakage rate testing - 15585

EnergySolutions is fabricating a new 3-60B Type B Shipping Cask that will be ready for use in spring 2015, designed for shipping Type B quantities of activated and/or non-fuel-bearing reactor or accelerator components. EnergySolutions, in consult with Leak Testing Specialists, Inc., has implemented an improved design of the 3-60B cask closures to better facilitate periodic and maintenance leakage rate testing and to allow end users to more easily perform pre-shipment leakage rate testing to confirm proper assembly of the cask closures. A typical Type B cask closure lid design incorporates a double O-ring configuration, where the inner O-ring provides containment and the outer O-ring is used for leakage rate testing of the containment O-ring seal. Leakage rate testing of a double O-ring configuration is typically accomplished by filling the cask cavity with helium, pulling a vacuum on the annular space between the two O-rings and monitoring for helium leakage through the containment O-ring. One issue is the potential for helium saturation of the O-ring elastomeric material, which can result in leakage rate test failures. The cask cavity volume is typically large, and takes a significant amount of time to fill with helium. As a result, the saturation time for certain elastomeric compounds may be exceeded, leading to potential false-negative leakage rate testing results. To avoid this, that the cask cavity typically is loaded with sealed container(s) to reduce the free volume and the fill time. The improved 3-60B cask closure lid incorporates a triple O-ring seal configuration that facilitates maintenance leak rate testing of the closure lid containment O-ring seal and eliminates the issues discussed above. The triple O-ring configuration uses the middle O-ring as the containment seal, with the inner and outer test O-rings creating relatively small annular volumes for testing purposes. These small annular volumes are quick to fill, minimizing the issue of Helium saturation of the O-ring material. This seal configuration also makes it possible to detect and replace a damaged O-ring seal during loading operations, or dress a damaged sealing surface, and perform the required maintenance leakage rate testing of the replacement O-ring at the plant site without the need to unload the cask and send it to a maintenance facility. Also, a second test port has been added to each O-ring annulus to allow leakage rate testing to be accomplished using a formal system calibration that complies with the requirements and recommendations of ASME Section V, Article 10 [4], ANSI N14.5-97 [2], and ANSI N14.5-2014 [3]. This provides a simple, reliable, and accurate means to perform leakage rate testing with a test confidence level that cannot be achieved without the second test port. The improved closure and test port design simplifies and shortens the time required to perform leakage testing, resulting in reduced operating costs, greater schedule security, and dose savings for the cask users. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from FUSRAP - 16200

The US DOE Office of Legacy Management (LM) is the long-term steward for 90 sites remediated under numerous regulatory regimes including the Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. In addition, LM holds considerable historical information, gathered in the 1970's, to determine site eligibility for remediation under FUSRAP. To date, 29 FUSRAP sites are in LM's inventory of sites for long-term surveillance and maintenance (LTS and M), and 25 are with the US Army Corps of Engineers (USACE) for remediation or in the process of being transitioned to LM. It is forecasted that 13 FUSRAP sites will transfer from the USACE to LM over the next 10 years; however, the timing of the transfers is strongly dependent upon federal funding of the ongoing remedial actions. Historically, FUSRAP sites were generally cleaned up for unrestricted industrial use or remediated to the cleanup standards at that time, and their use remained unchanged. Today, these sites as well as the adjacent properties are now changing or envisioned to have changes in land use, typically from industrial to commercial or residential uses. The implication of land-use change affects DOE's LTS and M responsibility for the sites under LM stewardship as well as the planning for the additional sites scheduled to transition in time. Coinciding with land-use changes at or near FUSRAP sites is an increased community awareness of these sites. As property development increases near FUSRAP sites, the general public and interested stakeholders regularly inquire about the sufficiency of cleanups that impact their neighborhoods and communities. LM has used this experience to address a series of lessons learned to improve our program management in light of the changing conditions of our sites. We describe these lessons learned as (1) improved stakeholder relations, (2) enhanced LTS and M requirements for the sites, and (3) greater involvement in the transition process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transition and Transfer of Remediated FUSRAP Sites from USACE to US DOE for Long-Term Surveillance and Maintenance - 16209

The US Department of Energy (DOE) expects to receive the transfer of 10 FUSRAP Sites from the US Army Corps of Engineers (USACE) over the next 10 years; however, the timing of the transfers is highly dependent upon federal funding of the ongoing remedial actions. When remediation for each site is complete and the 2-year operations and maintenance period has concluded, each site will transfer from USACE to DOE for long-term surveillance and maintenance (LTS and M). US DOE's Office of Legacy Management (LM) will accept program responsibility for these sites and conduct LTS and M activities required to maintain protectiveness, preserve site-specific knowledge, and retain the cleanup and stewardship records while keeping stakeholders informed. Since the last FUSRAP site transfer occurred in 2007, LM in coordination with USACE intends to establish a transition process to promote the seamless transfer of sites from the time when the first record of decision is signed to the completion of FUSRAP activities. The approach to transfer active FUSRAP sites to completed sites status has been historically outlined in foundational documents such as the 1999 Memorandum of Understanding and supporting letters of agreement between the two agencies. As more complex FUSRAP sites are completed, this transition process will provide a model between the two agencies to communicate future long-term care liabilities. Ultimately, the FUSRAP transition process is structured to acquire and preserve site knowledge and information necessary for protecting the environment and public health. As of 2015, LM has transitioned and accepted programmatic responsibility for over 90 sites. From LM's perspective, successful transition of any site includes understanding the long-term environmental liabilities. LM uses site transition framework requirements from past transitions to develop site-specific transition plans. Site-specific transition plans are developed by LM in coordination with USACE and executed during the 2-year operations and maintenance period. An integrated project team of subject matter experts is assembled to address the conditions of the transitioning site; acquire a site records collection; evaluate site operations and final site conditions and associated risks; identify and contact stakeholders; and document the basis for site LTS and M requirements. While the majority of the transition activities are completed by LM, close coordination between US DOE LM and USACE throughout this process is essential for an effective and seamless transfer to assure that there is no lapse in site protectiveness. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges Conducting a Radiological Site Assessment at a Remote Uranium Mine - 16259

A radiological site assessment was performed as part of an environmental site assessment at a former uranium mine located in the Northwest Territories of Canada. The only access to the site was by helicopter, so the field program was a limited to only a few days. Radiological surveys were conducted to assess conditions for safety of the field crew as well as to provide overland survey of uranium at the site. Limited radiological data existed for this site and the objective was to collect as much data as possible during the short field program. ScanPlot{sup SM} gamma spectroscopy land survey system was utilized for the overland survey utilizing a backpack system. ScanPlotSM platform utilized spectroscopy grade sodium iodide detectors configured for optimal spatial coverage and radiation detection. Survey locations were recorded using an on-board global positioning system (GPS). The radiological spectral data from the radiation detectors is automatically logged and linked with the GPS coordinates to an on-board computer to create iso-contour figures using a color scale to represent radioactivity levels (ground concentration by radionuclide). The advantage of utilizing the ScanPlotSM system for this assessment is that the nature and extent of uranium is provided without having to collect and assay a large number of samples during a short period of time. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Downhole MCA for High-Resolution Spectral Gamma Logging for Characterization of Radiological Contaminants - 16321

A downhole data system for spectral gamma ray detectors has been developed and deployed in boreholes at the US DOE Hanford Site in southeastern Washington State. This system consists of a digital multichannel analyzer, power supply, and high-voltage power supply located in the borehole probe. Communication up the cable to a computer at the surface is digital, meaning that issues related to analog pulse transmission over the logging cable are eliminated. This system can support either scintillator or solid-state detectors. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance of Canberra TruckScan Waste Assay Measurement System - 16361

After the Fukushima accident, large (approximately cubic meter) super-sacks of potentially contaminated soil and vegetation were stored at various temporary locations throughout the prefecture. Canberra has developed the TruckScan system to perform rapid and accurate assay measurements for these waste sacks loaded on trucks to determine the individual and total sack activities for Cs-137 and Cs-134. The measurement system consists of eight 3x3 inch shielded and collimated NaI(Tl) gamma-ray detectors. Data collected with the eight detectors is analyzed using a maximum entropy fitting algorithm which optimizes and predicts the mean and maximum possible activity concentration present in each of the sacks. The algorithm uses SuperISOCS to generate detection efficiencies for each detector-sack combination in the measurement, which are then used to solve for the distribution of activity concentrations in each sack that yields the best agreement with the count rates observed in each detector. Throughout the summer and fall of 2015, a prototype system was developed and tested at Canberra's Meriden CT facility. In October 2015, the prototype system was installed and demonstrated in Japan. Results of the demonstration measurements are presented along with estimates of the total measurement uncertainty (TMU) budget. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Oak Ridge Site Specific Advisory Board Adapts To Engage - 16459

Environmental Management (EM) Site Specific Advisory Boards (SSABs) are representative of their communities and exist for the purpose of advising DOE EM. As such they are the conduits between the public and the DOE EM. To remain relevant to the community they cannot exist in a vacuum and the public needs to be aware of the Boards' function, purpose, and progress and have opportunities for input. Since the SSABs generally deal with fairly complex issues related to environmental cleanup, and the members of the Boards represent a diversity of background, there are many challenges associated with informing and eliciting input from Board members as well as informing and engaging the public. To that end, Oak Ridge SSAB (ORSSAB) has instituted changes to facilitate Board and public engagement. As the ORSSAB has matured and the work has become routine, it has become a challenge to keep members interested and invested. So the Board asks its members to provide input on how to make the process better. Through our annual member surveys and facilitated meetings, we query the board for ideas, and the results of these surveys and meetings are discussed at the annual planning meetings. Agreed changes are instituted in the following year. Recently the ORSSAB has instituted positive changes in the meeting structure, locations, and content. There are fewer formal meetings and these meetings are shorter. The board has also incorporated field trips to specific sites prior to presentations on those areas to further enhance membership understanding of the problems at hand, site conditions, and enormity and scope of the work to be undertaken. Changes of meeting location have occurred. Instead of the standard meeting room, the ORSSAB has met at local restaurants (in private rooms) where food service is available, and the atmosphere is more relaxed and informal. This gives members an opportunity to interact with each other rather than sitting in designated places at a formal meeting with video cameras rolling. Not only are the members more at ease, the presenters are more relaxed in their response to questions. Open discussion sessions have also been added to the meeting agendas. The ORSSAB participates in both public outreach and public engagement. Public outreach activities have included: presentations to local citizens groups; televising meetings on public access cable channels in three local communities; publishing The Advocate, a quarterly newsletter; and recently setting up and maintaining a Facebook page. Activities related to public engagement included the Board's participation at a DOE-sponsored community budget workshop. The ORSSAB strives for value and relevancy, attempting to convey a clear message to the community and to DOE. It also strives to inform its membership in a way that allows for clarity of understanding, and above all it tries to be enjoyable to its membership. The ORSSAB listens to its membership and has evolved its process to allow for effective advocacy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Protecting the Columbia River through Removal and Packaging of Radioactive Sludge in Hanford's K Area - 16572

The Columbia River once provided power and cooling water to operations on the Hanford Site; today, more than a million people downstream from Hanford rely on the river for agriculture, fishing and recreation. The Department of Energy and contractor CH2M HILL Plateau Remediation Company (CH2M) is making significant progress in protecting that vital resource. Eight of nine reactors along the river have been cocooned and soil and groundwater remediation is successfully reducing the concentration of contaminants in groundwater. The 100-K area is the last area where significant work remains to protect the river. CH2M has accomplished much in the past ten years, including demolishing the K East reactor fuel storage basin in 2009. Prior to demolition of the basin, highly radioactive sludge from that basin was transferred into containers located in the nearby K West reactor fuel storage basin. Today, the K East reactor is in interim surveillance mode, and work is underway in the K West basin to remove the sludge, which is a mixture of tiny fuel corrosion particles, fuel rod and metal fragments and soil and sand less than 1/4-inch in diameter. CH2M has designed a sludge removal system that will safely and efficiently remove the sludge from the K West basin and deposit it into specially designed containers which will be relocated to a storage facility on Hanford's Central Plateau. Procurement, fabrication and delivery of the sludge removal system is underway, with extensive testing and training planned for 2016 and 2017 ahead of the goal of removing sludge from the river by September 30, 2018. This project must account for many technical and safety considerations that render the project very challenging. Several safety measures have been incorporated as a result of safety evaluations. This paper will describe the issues facing the project team in developing the safety basis requirements and incorporating them into the design of the process equipment and construction of the facility to house the repackaging operations. This paper will allow CH2M and DOE-RL to share lessons learned and progress to date with other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulation and Optimizing Groundwater Investigations, Conceptual Design Analysis, Model Calibration and Remedial Design Using Parallel Numerical Methods: Theory and Application - 16578

Optimization of environmental restoration efforts at complex groundwater sites involves the development of a conceptual and often numerical flow and transport models. Typically, a limited number of simulations are done to assess the impact of parameter uncertainty, to evaluate remedial alternatives and develop a remedy, or to modify an existing remedy. A limited number of simulations are performed because each simulation can take upwards of several hours per simulation and until now the ability to conduct the 100's to 1000's of simulations needed to derive an optimal remedy was beyond the reach of the everyday practitioner. HGL has developed and implemented new parallel simulation and optimization methods in their software and has successfully deployed applications on high performance Cloud-based computing platforms. This advancement removes the impediment of burdensome and unpredictable runtime requirements these types of projects have typically exhibited using heuristic trial-and-error or even automated serial computation approaches. A parallel numerical solver has been added to the subsurface flow and transport simulator MODFLOW-SURFACT{sup TM} and has demonstrated reductions in solution time by as much as a factor of 9.8. This is accomplished by distributing the numerical computations of every time step over multiple processors. The integrated parallel simulation and optimization method uses the breadth and depth search approach; iteratively producing sets of tens or 100's of candidate solutions that are evaluated concurrently instead sequentially (i.e. one model evaluation at a time). Solutions within 80-100% of the globally optimal solution are regularly found expending only 5-10% of the usual computational effort using this new parallel optimization method (reducing computation effort by 10 to 20 times). Distributing optimal search runs across multiple processors additionally reduces calendar time to solutions. Practitioners evaluating multiple conceptual site models, model calibration by auto-calibration methods and remedial design by heuristics can enjoy significant reductions in model solution time by using the parallel numerical matrix solver in the physics-based simulator. Combining investigation and design analysis with breadth and depth parallel optimization methods, projects at the fringe of practical optimization, along with projects that were beyond the reach of formal optimization methods are now wholly feasible and tractable optimization problems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges of Using Indistinguishable from Background as a Release Criterion at FUSRAP Projects - 18157

The US Army Corps of Engineers (USACE) utilizes the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) approach to site release on Formerly Utilized Sites Remedial Action Program (FUSRAP) projects. Use of Indistinguishable from Background (IFB) as a release criterion is discussed in MARSSIM as Scenario B; however, the discussion is arguably limited and refers the user to other documents. USACE has utilized the IFB approach at select FUSRAP projects. USACE experience is that use of IFB as a release criterion has been difficult to implement at best. There are many challenges in using the IFB approach. These include: release criterion is required per MARSSIM; multiple reference areas need to be established; and data presentation. Potential methods to overcome these challenges are discussed. USACE has utilized alternative statistical approaches as well as the IFB approach discussed in MARSSIM for specific purposes at FUSRAP sites. Alternatives to the IFB approach discussed in this paper include other statistical tests such as the Tukey Kramer test. These alternatives may be better suited to release an area of a property prior to the development of release criteria. USACE has found using the IFB criterion useful in certain specific circumstances. These include post MARSSIM Scenario A final status survey data evaluations and for review of historical data. The challenges, alternatives, and circumstances to use the IFB approach are discussed. Other environmental remediation projects attempting to utilize IFB as a criterion may benefit from the USACE experiences as discussed herein. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗