Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic Risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Development of Concentration Ratios and Transfer Factors for Human and Ecological Probabilistic Performance Assessments - 19781

Human and ecological risk assessments utilize concentration ratios and transfer factors to calculate contaminant concentrations in plant and animal tissues in equilibrium with soil or water (concentration ratios) or based on an animal's contaminant intake from various media (transfer factors). These ratios and factors are used to evaluate human dose via food ingestion pathways and to evaluate ecological dose to an organism. In a probabilistic performance assessment, concentration ratio and transfer factor distributions are developed for every element, and these distributions are applied across the spatial and temporal domain of the assessment. As a result, it is necessary to scale the underlying data distributions by applying the central limit theorem to develop appropriate distributions of the mean for the temporal and spatial scale of the model. Herein we discuss the methodologies for identifying and ranking references, and how to develop statistical distributions of concentration ratios and transfer factors for probabilistic performance assessment models. We also discuss factors that could be pertinent to differences when selecting references and developing distributions for human versus ecological risk assessment scenarios. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operating Dynamic Reserve Dimensioning Using Probabilistic Forecasts

The rapid integration of variable energy sources (VRES) into power grids increases variability and uncertainty of the net demand, making the power system operation challenging. Operating reserve is used by system operators to manage and hedge against such variability and uncertainty. Traditionally, reserve requirements are determined by rules-of-thumb (static reserve requirements, e.g., NERC Reliability Standards), and more recently, dynamic reserve requirements from tools and methods which are in the adoption process (e.g., DynADOR, DRD, and RESERVE, among others). While these methods/tools significantly improve the static rule-of-thumb approaches, they rely exclusively on deterministic data (i.e., best guess only). Consequently, these methods disregard the probabilistic uncertainty thresholds associated with specific days and their weather conditions (i.e., best guess plus probabilistic uncertainty). This work presents practical approaches to determine the operating reserve requirements leveraging the wealth information from probabilistic forecasts. Proposed approaches are validated and tested using actual data from the CAISO system. Furthermore, results show the benefits in terms of risk reduction of considering the probabilistic forecast information into the dimensioning process of operating reserve requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development of Graphical User Interface for ARRBOD (Acute Radiation Risk and BRYNTRN Organ Dose Projection)

The space radiation environment, particularly solar particle events (SPEs), poses the risk of acute radiation sickness (ARS) to humans; and organ doses from SPE exposure may reach critical levels during extra vehicular activities (EVAs) or within lightly shielded spacecraft. NASA has developed an organ dose projection model using the BRYNTRN with SUMDOSE computer codes, and a probabilistic model of Acute Radiation Risk (ARR). The codes BRYNTRN and SUMDOSE, written in FORTRAN, are a Baryon transport code and an output data processing code, respectively. The ARR code is written in C. The risk projection models of organ doses and ARR take the output from BRYNTRN as an input to their calculations. BRYNTRN code operation requires extensive input preparation. With a graphical user interface (GUI) to handle input and output for BRYNTRN, the response models can be connected easily and correctly to BRYNTRN in friendly way. A GUI for the Acute Radiation Risk and BRYNTRN Organ Dose (ARRBOD) projection code provides seamless integration of input and output manipulations, which are required for operations of the ARRBOD modules: BRYNTRN, SUMDOSE, and the ARR probabilistic response model. The ARRBOD GUI is intended for mission planners, radiation shield designers, space operations in the mission operations directorate (MOD), and space biophysics researchers. The ARRBOD GUI will serve as a proof-of-concept example for future integration of other human space applications risk projection models. The current version of the ARRBOD GUI is a new self-contained product and will have follow-on versions, as options are added: 1) human geometries of MAX/FAX in addition to CAM/CAF; 2) shielding distributions for spacecraft, Mars surface and atmosphere; 3) various space environmental and biophysical models; and 4) other response models to be connected to the BRYNTRN. The major components of the overall system, the subsystem interconnections, and external interfaces are described in this report; and the ARRBOD GUI product is explained step by step in order to serve as a tutorial.

Kim, Myung-Hee↗

Regulatory Review of Micro-Reactors: Initial Considerations

The U.S. Nuclear Regulatory Commission (NRC) is working to have an effective and efficient mission readiness for reactors that differ considerably from those currently licensed. Micro-reactors, that is, reactors that have a power of roughly no more than 10 MW, are one class of these advanced reactors. This report is one of the first steps taken to articulate the many technical and regulatory issues that will need to be addressed for NRC to have the ability to review license applications for micro-reactors. Many of the issues center around the fact that a) these reactors may be operated remotely or semi-autonomously and b) it will be difficult to analyze risk from new, unique, technologies. Initial thoughts are given on how probabilistic methods could be used to determine risk and how the current approach for reviewing non-power reactors could be useful for micro-reactors.

42 ENGINEERING↗

Low-Probability High-Consequence (LPHC) Failure Events in Geologic Carbon Sequestration Pipelines and Wells: Framework for LPHC Risk Assessment Incorporating Spatial Variability of Risk

If Carbon dioxide Capture and Storage (CCS) is to be effective in mitigating climate change, it will need to be carried out on a very large scale. This will involve many thousands of miles of dedicated high-pressure pipelines in order to transport many millions of tonnes of CO 2 annually, with the CO 2 delivered to many thousands of wells that will inject the CO 2 underground. The new CCS infrastructure could rival in size the current U.S. upstream natural gas pipeline and well infrastructure. This new infrastructure entails hazards for life, health, animals, the environment, and natural resources. Pipelines are known to rupture due to corrosion, from external forces such as impacts by vehicles or digging equipment, by defects in construction, or from the failure of valves and seals. Similarly, wells are vulnerable to catastrophic failure due to corrosion, cement degradation, or operational mistakes. While most accidents involving pipelines and wells will be minor, there is the inevitable possibility of accidents with very high consequences, especially to public health. The most important consequence of concern is CO 2 release to the environment in concentrations sufficient to cause death by asphyxiation to nearby populations. Such accidents are thought to be very unlikely, but of course they cannot be excluded, even if major engineering effort is devoted (as it will be) to keeping their probability low and their consequences minimized. This project has developed a methodology for analyzing the risks of these rare but high-consequence accidents, using a step-by-step probabilistic methodology. A key difference between risks for pipelines and wells is that the former are spatially distributed along the pipe whereas the latter are confined to the vicinity of the well. Otherwise, the methodology we develop for risk assessment of pipeline and well failures is similar and provides an analysis both of the annual probabilities of accident sequences of concern and of their consequences, and crucially the methodology provides insights into what measures might be taken to mitigate those accident sequences identified as of concern. Mitigating strategies could address reducing the likelihood of an accident sequence of concern, or reducing the consequences, or some combination. The methodology elucidates both local and integrated risks along the pipeline or at the well providing information useful to decision makers at various levels including local (e.g., property owners and town councils), regional (e.g., county and state representatives), and national levels (federal regulators and corporate proponents).

54 ENVIRONMENTAL SCIENCES↗

Estimating the Likelihood of GHG Concentration Scenarios From Probabilistic Integrated Assessment Model Simulations

The climate scenarios that form the basis for current climate risk assessments have no assigned probabilities, and this impedes the analysis of future climate risks. This paper proposes an approach to estimate the probability of carbon dioxide (CO 2 ) concentration scenarios used in key climate change modeling experiments. It computes the CO 2 emissions compatible with the concentrations prescribed by Coupled Model Intercomparison Project Phase 5 (CMIP5) and CMIP6 experiments. The distribution of these compatible cumulative emissions is interpreted as the likelihood of future emissions given a concentration pathway. Using Bayesian analysis, the probability of each pathway can be estimated from a probabilistic sample of future emissions. The approach is demonstrated with five probabilistic CO 2 emission simulation ensembles from four Integrated Assessment Models (IAM), leading to independent estimates of the likelihood of the CO 2 concentration of Representative Concentration Pathways (RCP) and Shared Socioeconomic Pathways (SSP). Results suggest that SSP5-8.5 is unlikely for the second half of the 21st century, but offer no clear consensus on which of the remaining scenarios is most likely. Estimates of likelihoods of CO 2 concentrations associated with RCP and SSP scenarios are affected by sampling errors, differences in emission sources simulated by the IAMs, and a lack of a common experimental framework for IAM simulations. These shortcomings, along with a small IAM ensemble size, limit the applicability of the results presented here. Novel joint IAM and the Earth System Model experiments are needed to deliver actionable probabilistic climate risk assessments.

54 ENVIRONMENTAL SCIENCES↗

Overview of Graphical User Interface for ARRBOD (Acute Radiation Risk and BRYNTRN Organ Dose Projection)

Solar particle events (SPEs) pose the risk of acute radiation sickness (ARS) to astronauts, because organ doses from large SPEs may reach critical levels during extra vehicular activities (EVAs) or lightly shielded spacecraft. NASA has developed an organ dose projection model of Baryon transport code (BRYNTRN) with an output data processing module of SUMDOSE, and a probabilistic model of acute radiation risk (ARR). BRYNTRN code operation requires extensive input preparation, and the risk projection models of organ doses and ARR take the output from BRYNTRN as an input to their calculations. With a graphical user interface (GUI) to handle input and output for BRYNTRN, these response models can be connected easily and correctly to BRYNTRN in a user friendly way. The GUI for the Acute Radiation Risk and BRYNTRN Organ Dose (ARRBOD) projection code provides seamless integration of input and output manipulations required for operations of the ARRBOD modules: BRYNTRN, SUMDOSE, and the ARR probabilistic response model. The ARRBOD GUI is intended for mission planners, radiation shield designers, space operations in the mission operations directorate (MOD), and space biophysics researchers. Assessment of astronauts organ doses and ARS from the exposure to historically large SPEs is in support of mission design and operation planning to avoid ARS and stay within the current NASA short-term dose limits. The ARRBOD GUI will serve as a proof-of-concept for future integration of other risk projection models for human space applications. We present an overview of the ARRBOD GUI product, which is a new self-contained product, for the major components of the overall system, subsystem interconnections, and external interfaces.

Kim, Myung-Hee Y.↗

Probabilistic Vulnerability Assessment Based on Power Flow and Voltage Distribution

Risk assessment of large scale power systems has been an important problem in power system reliability study. Probabilistic technique provides a powerful tool to solve the task. In this paper, we present the results of a study on probabilistic vulnerability assessment on WECC system. Cumulant based expansion method is applied to obtain the probabilistic distribution function (PDF) and cumulative distribution function (CDF) of power flows on transmission lines and voltage. Overall risk index based on the system vulnerability analysis is calculated using the WECC system. The simulation results based on WECC system is used to demonstrate the effectiveness of the method. The methodology can be applied to the risk analysis on large scale power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Integrated Physics-Based Risk Model for Assessing the Asteroid Threat

Although most asteroids and other near-Earth objects (NEOs) do not pose a threat to Earth’s inhabitants, impacts from objects that are just tens of meters in diameter can cause significant damage if they occur over a populated area. This paper forms the foundation of an effort at NASA Ames Research Center to quantify these risks and identify the greatest risk-driving parameters and uncertainties. An integrated risk model that couples dynamic probabilistic simulations of strike occurrences with physics-based models of NEO impact damage factors has been developed to generate casualty estimates for a range of NEO impact properties. Currently, the model focuses on the risk due to blast overpressure damage from airbursts and impacts on land. The model is first used to reproduce results from established sources, and then is extended to perform sensitivity studies that yield greater insights into risk driving parameters. Results show that meteor strength and entry angle play a role for small to mid-size NEOs, and that accounting for the specific target location significantly affects casualty estimates and dominates the risk. Future work will continue to refine and expand the models to better characterize key impact risk factors, include additional types of threats such as tsunamis and climate effects, and ultimately support assessments of potential asteroid mitigation strategies.

Asteroid Threat↗

Risk-Informed Condition Evaluation of Solar-centered Energy Generation and Distribution Networks through Bayesian Learning and Inference

We develop a methodology based on Bayesian inference over Probabilistic Graphical Models (PGMs) to understand and quantify risk in solar-centered grids using targeted measurements and learned system behavior. Being non-prescriptive but, rather, able to infer system behavior and, ultimately, address risk queries from data, our machine learning-type paradigm is tailored for diverse topologies and threat scenarios often associated with distributed energy generation and photovoltaic distributed energy resources (PV-DERs) in particular. We describe algorithmic processes for: (i) learning the structure of PGMs that result from attack-prone PV-DER-proliferated distribution systems, (ii) quantifying cause-effect relationships, and (iii) evaluating risk queries based on diverse evidence. The contributions are illustrated on a residential grid subject to output impairment attacks on its PV-DER infrastructure.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of criticality risk evaluation method for fuel debris in Fukushima Dai-ichi NPS - 14373

After the accident of Fukushima Dai-ichi Nuclear Power Station, there has been still damaged nuclear fuel in the reactor buildings, which is called 'fuel debris' and contains an amount of fissile materials show that it is currently subcritical, which must be kept until finishing retrieval work. In the latest plan, retrieving fuel debris is to start in 2025. The International Research Institute for Nuclear Decommissioning, IRID, has been developing the technology for decontamination in reactor building. A developed method will be reviewed and granted by the Nuclear Regulatory Authority in Japan, NRA, before the start of the retrieving. Criticality risk information will be needed for decision making on following two subcriticality issues, -Criticality control of fuel debris to keep is subcritical until the end of retrieval work. -Safe operation for retrieving fuel debris to keep it subcritical. Because fuel debris has been out of criticality control and the key condition for its current subcriticality is unknown, it is important to obtain criticality risk information as soon as possible. Applying conventional Probabilistic Safety Assessment, PSA, to fuel debris is difficult, because it is based on the probability of becoming out of criticality control due to troubles such as equipment failure, operation mistake and so on. A new method, which has been developed by Japan Atomic Energy Agency to technically support the NRA, is designed to estimate criticality risk based on a probability distribution of k{sub eff} due to uncertainty of composition and geometry of fuel debris, which method will provide risk information for the two subcriticality issues as well as for the tolerance level of criticality risk if it is unavoidable. Developed method contains four steps: two steps of analysis of criticality risk and two steps of quantification of the risk. A procedure of risk quantification has been defined, in which systematic analysis of criticality risk can be done by making 'status matrix'. A trial analysis by using the procedure shows that some events which can initiate criticality are able to be supposed to happen during maintenance period until the beginning of retrieving fuel debris, and that analysis also indicates countermeasures should be considered as soon as possible in order to reduce criticality risk for public and workers. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

An improved approach for flight readiness certification: Probabilistic models for flaw propagation and turbine blade failure. Volume 2: Software documentation

An improved methodology for quantitatively evaluating failure risk of spaceflights systems to assess flight readiness and identify risk control measures is presented. This methodology, called Probabilistic Failure Assessment (PFA), combines operating experience from tests and flights with analytical modeling of failure phenomena to estimate failure risk. The PFA methodology is of particular value when information on which to base an assessment of failure risk, including test experience and knowledge of parameters used in analytical modeling, is expensive or difficult to acquire. The PFA methodology is a prescribed statistical structure in which analytical models that characterize failure phenomena are used conjointly with uncertainties about analysis parameters and/or modeling accuracy to estimate failure probability distributions for specific failure modes. These distributions can then be modified, by means of statistical procedures of the PFA methodology, to reflect any test or flight experience. State-of-the-art analytical models currently employed for design, failure prediction, or performance analysis are used in this methodology. The rationale for the statistical approach taken in the PFA methodology is discussed, the PFA methodology is described, and examples of its application to structural failure modes are presented. The engineering models and computer software used in fatigue crack growth and fatigue crack initiation applications are thoroughly documented.

Moore, N. R.↗

Hydrogen Plus Other Alternative Fuels Risk Assessment Models (HyRAM+) Version 5.0 Technical Reference Manual

The HyRAM+ software toolkit provides a basis for conducting quantitative risk assessment and consequence modeling for hydrogen, natural gas, and autogas systems. HyRAM+ is designed to facilitate the use of state-of-the-art models to conduct robust, repeatable assessments of safety, hazards, and risk. HyRAM+ integrates deterministic and probabilistic models for quantifying leak sizes and rates, predicting physical effects, characterizing hazards (thermal effects from jet fires, overpressure effects from delayed ignition), and assessing impacts on people. HyRAM+ is developed at Sandia National Laboratories to support the development and revision of national and international codes and standards, and to provide developed models in a publicly-accessible toolkit usable by all stakeholders. This document provides a description of the methodology and models contained in HyRAM+ version 5.0. The most significant change for HyRAM+ version 5.0 from HyRAM+ version 4.1 is the ability to model blends of different fuels. HyRAM+ was previously only suitable for use with hydrogen, methane, or propane, with users having the ability to use methane as a proxy for natural gas and propane as a proxy for autogas/liquefied petroleum gas. In version 5.0, real natural gas or autogas compositions can be modeled as the fuel, or even blends of natural gas with hydrogen. These blends can be used in the standalone physics models, but not yet in the quantitative risk assessment mode of HyRAM+.

03 NATURAL GAS↗

An improved approach for flight readiness certification: Probabilistic models for flaw propagation and turbine blade failure. Volume 1: Methodology and applications

An improved methodology for quantitatively evaluating failure risk of spaceflight systems to assess flight readiness and identify risk control measures is presented. This methodology, called Probabilistic Failure Assessment (PFA), combines operating experience from tests and flights with analytical modeling of failure phenomena to estimate failure risk. The PFA methodology is of particular value when information on which to base an assessment of failure risk, including test experience and knowledge of parameters used in analytical modeling, is expensive or difficult to acquire. The PFA methodology is a prescribed statistical structure in which analytical models that characterize failure phenomena are used conjointly with uncertainties about analysis parameters and/or modeling accuracy to estimate failure probability distributions for specific failure modes. These distributions can then be modified, by means of statistical procedures of the PFA methodology, to reflect any test or flight experience. State-of-the-art analytical models currently employed for designs failure prediction, or performance analysis are used in this methodology. The rationale for the statistical approach taken in the PFA methodology is discussed, the PFA methodology is described, and examples of its application to structural failure modes are presented. The engineering models and computer software used in fatigue crack growth and fatigue crack initiation applications are thoroughly documented.

Moore, N. R.↗

Probabilistic failure assessment with application to solid rocket motors

A quantitative methodology is being developed for assessment of risk of failure of solid rocket motors. This probabilistic methodology employs best available engineering models and available information in a stochastic framework. The framework accounts for incomplete knowledge of governing parameters, intrinsic variability, and failure model specification error. Earlier case studies have been conducted on several failure modes of the Space Shuttle Main Engine. Work in progress on application of this probabilistic approach to large solid rocket boosters such as the Advanced Solid Rocket Motor for the Space Shuttle is described. Failure due to debonding has been selected as the first case study for large solid rocket motors (SRMs) since it accounts for a significant number of historical SRM failures. Impact of incomplete knowledge of governing parameters and failure model specification errors is expected to be important.

Jan, Darrell L.↗

Integrated Medical Model Verification, Validation, and Credibility

The Integrated Medical Model (IMM) was designed to forecast relative changes for a specified set of crew health and mission success risk metrics by using a probabilistic (stochastic process) model based on historical data, cohort data, and subject matter expert opinion. A probabilistic approach is taken since exact (deterministic) results would not appropriately reflect the uncertainty in the IMM inputs. Once the IMM was conceptualized, a plan was needed to rigorously assess input information, framework and code, and output results of the IMM, and ensure that end user requests and requirements were considered during all stages of model development and implementation. METHODS: In 2008, the IMM team developed a comprehensive verification and validation (VV) plan, which specified internal and external review criteria encompassing 1) verification of data and IMM structure to ensure proper implementation of the IMM, 2) several validation techniques to confirm that the simulation capability of the IMM appropriately represents occurrences and consequences of medical conditions during space missions, and 3) credibility processes to develop user confidence in the information derived from the IMM. When the NASA-STD-7009 (7009) was published, the IMM team updated their verification, validation, and credibility (VVC) project plan to meet 7009 requirements and include 7009 tools in reporting VVC status of the IMM. RESULTS: IMM VVC updates are compiled recurrently and include 7009 Compliance and Credibility matrices, IMM VV Plan status, and a synopsis of any changes or updates to the IMM during the reporting period. Reporting tools have evolved over the lifetime of the IMM project to better communicate VVC status. This has included refining original 7009 methodology with augmentation from the NASA-STD-7009 Guidance Document. End user requests and requirements are being satisfied as evidenced by ISS Program acceptance of IMM risk forecasts, transition to an operational model and simulation tool, and completion of service requests from a broad end user consortium including Operations, Science and Technology Planning, and Exploration Planning. CONCLUSIONS: The VVC approach established by the IMM project of combining the IMM VV Plan with 7009 requirements is comprehensive and includes the involvement of end users at every stage in IMM evolution. Methods and techniques used to quantify the VVC status of the IMM have not only received approval from the local NASA community but have also garnered recognition by other federal agencies seeking to develop similar guidelines in the medical modeling community.

Validation↗

Integrated Medical Model (IMM) Project Verification, Validation, and Credibility (VVandC)

The Integrated Medical Model (IMM) Project supports end user requests by employing the Integrated Medical Evidence Database (iMED) and IMM tools as well as subject matter expertise within the Project. The iMED houses data used by the IMM. The IMM is designed to forecast relative changes for a specified set of crew health and mission success risk metrics by using a probabilistic model based on historical data, cohort data, and subject matter expert opinion. A stochastic approach is taken because deterministic results would not appropriately reflect the uncertainty in the IMM inputs. Once the IMM was conceptualized, a plan was needed to rigorously assess input information, framework and code, and output results of the IMM, and ensure that end user requests and requirements were considered during all stages of model development and implementation, as well as lay the foundation for external review and application. METHODS: In 2008, the Project team developed a comprehensive verification and validation (VV) plan, which specified internal and external review criteria encompassing 1) verification of data and IMM structure to ensure proper implementation of the IMM, 2) several validation techniques to confirm that the simulation capability of the IMM appropriately represents occurrences and consequences of medical conditions during space missions, and 3) credibility processes to develop user confidence in the information derived from the IMM. When the NASA-STD-7009 (7009) [1] was published, the Project team updated their verification, validation, and credibility (VVC) project plan to meet 7009 requirements and include 7009 tools in reporting VVC status of the IMM. Construction of these tools included meeting documentation and evidence requirements sufficient to meet external review success criteria. RESULTS: IMM Project VVC updates are compiled recurrently and include updates to the 7009 Compliance and Credibility matrices. Reporting tools have evolved over the lifetime of the IMM Project to better communicate VVC status. This has included refining original 7009 methodology with augmentation from the HRP NASA-STD-7009 Guidance Document working group and the NASA-HDBK-7009 [2]. End user requests and requirements are being satisfied as evidenced by ISS Program acceptance of IMM risk forecasts, transition to an operational model and simulation tool, and completion of service requests from a broad end user consortium including operations, science and technology planning, and exploration planning. IMM v4.0 is slated for operational release in the FY015 and current VVC assessments illustrate the expected VVC status prior to the completion of customer lead external review efforts. CONCLUSIONS: The VVC approach established by the IMM Project of incorporating Project-specific recommended practices and guidelines for implementing the 7009 requirements is comprehensive and includes the involvement of end users at every stage in IMM evolution. Methods and techniques used to quantify the VVC status of the IMM Project represented a critical communication tool in providing clear and concise suitability assessments to IMM customers. These processes have not only received approval from the local NASA community but have also garnered recognition by other federal agencies seeking to develop similar guidelines in the medical modeling community.

Walton, M.↗

RAVEN, a New Software for Dynamic Risk Analysis

RAVEN is a generic software driver to perform parametric and probabilistic analysis of code simulating complex systems. Initially developed to provide dynamic risk analysis capabilities to the RELAP-7 code [1] is currently being generalized with the addition of Application Programming Interfaces (APIs). These interfaces are used to extend RAVEN capabilities to any software as long as all the parameters that need to be perturbed are accessible by inputs files or directly via python interfaces. RAVEN is capable to investigate the system response probing the input space using Monte Carlo, grid strategies, or Latin Hyper Cube schemes, but its strength is its focus toward system feature discovery like limit surfaces separating regions of the input space leading to system failure using dynamic supervised learning techniques. The paper will present an overview of the software capabilities and their implementation schemes followed by same application examples.

97 MATHEMATICS AND COMPUTING↗