Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power system operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Load Control System Reliability

This report summarizes the results of the Load Control System Reliability project (DOE Award DE-FC26-06NT42750). The original grant was awarded to Montana Tech April 2006. Follow-on DOE awards and expansions to the project scope occurred August 2007, January 2009, April 2011, and April 2013. In addition to the DOE monies, the project also consisted of matching funds from the states of Montana and Wyoming. Project participants included Montana Tech; the University of Wyoming; Montana State University; NorthWestern Energy, Inc., and MSE. Research focused on two areas: real-time power-system load control methodologies; and, power-system measurement-based stability-assessment operation and control tools. The majority of effort was focused on area 2. Results from the research includes: development of fundamental power-system dynamic concepts, control schemes, and signal-processing algorithms; many papers (including two prize papers) in leading journals and conferences and leadership of IEEE activities; one patent; participation in major actual-system testing in the western North American power system; prototype power-system operation and control software installed and tested at three major North American control centers; and, the incubation of a new commercial-grade operation and control software tool. Work under this grant certainly supported the DOE-OE goals in the area of “Real Time Grid Reliability Management.”

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A hierarchical framework for aggregating grid-interactive buildings with thermal and battery energy storage

The behind-the-meter (BTM) thermal and battery energy storage can help improve energy efficiency, reduce energy costs, and enhance energy resilience, particularly in rural areas and for disadvantaged communities. Aggregating numerous BTM energy storage systems can act as a price influencer with a significant source of load shifting and peak demand reduction. An integrated and scalable control mechanism is required to effectively utilize energy storage systems and flexible building loads to maximize the economic benefits, considering various distribution system constraints. Here, this paper presents an innovative hierarchical coordination framework for energy storage and flexible load in buildings, considering various factors such as electricity prices, thermal comfort, and distribution system modeling and constraints. At the upper level, a distribution system operator optimizes the power flow to minimize its power procurement costs from the electricity wholesale market, while at the lower level, aggregators determine the optimal dispatch of battery and thermal energy storage systems in multiple buildings on behalf of end-users to minimize operating costs according to the power prices. These problems are solved using a game-theoretic approach through negotiations between the distribution system operator and aggregators as a bi-level decision model. Simulation case studies have been performed for a test distribution network with a number of building end-users using energy storage systems to quantify the performance of aggregators. The results demonstrate that the proposed strategy can reduce peak load for a reliable electricity distribution network while saving electricity bills for customers.

25 ENERGY STORAGE↗

Real-time Distribution Simulation and Application Development for Power Systems Education

To help bridge the gap between traditional power system engineering instruction and emerging industry needs, a new set of classroom and research tools are needed. Real-time simulation tools emulating power system control room software present an opportunity to introduce students to the array of operational considerations, technical challenges, and decision-making associated with power system operations. The GridAPPS-D platform is proposed to support coursework and academic research as it provides an open-source platform for simulation, application development, and software integration. The GridAPPS-D platform, simulation capabilities, development environment, and interactive training are discussed in the context of lessons-learned from implementation for undergraduate and graduate students in the US and India. A series of potential GridAPPS-D supported academic capabilities are introduced.

Active distribution networks, open educational res↗

Power system

A power system includes a prime mover, a transmission, and a fluid coupler having a selectively engageable lockup clutch. The fluid coupler may be drivingly connected between the prime mover and the transmission. Additionally, the power system may include a motor/generator drivingly connected to at least one of the prime mover and the transmission. The power-system may also include power-system controls configured to execute a control method. The control method may include selecting one of a plurality of modes of operation of the power system. Additionally, the control method may include controlling the operating state of the lockup clutch dependent upon the mode of operation selected. The control method may also include controlling the operating state of the motor/generator dependent upon the mode of operation selected.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Citadels Final Report (GMLC 2.2.1: Citadels)

This is the final project report for the Grid Modernization Laboratory Consortium (GMLC) Resilient Distribution System (RDS) Citadels project. The primary goal of this GMLC project was to increase the operational flexibly of power systems by engaging microgrids distributedly, coordinated using consensus algorithms. The primary goal was successfully achieved. The primary goal was divided into three areas: Implement peer-to-peer control between microgrid controllers using the Open Field Message Bus (OpenFMB) approach; Develop and implement consensus algorithms on commercially available hardware that allows a group of microgrids to distributedly implement operational controls; Develop the architectures and controls to enable groups of microgrids to coordinate their operations to support the bulk power system during abnormal events, and end-use loads in the event the bulk power systems fail.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrating Variable Renewable Energy - Russia

To foster sustainable, low-emission development, many countries are establishing ambitious renewable energy targets for their electricity supply. Because solar and wind tend to be more variable and uncertain than conventional sources, meeting these targets will involve changes to power system planning and operations. Grid integration is the practice of developing efficient ways to deliver variable renewable energy (VRE) to the grid. Good integration methods maximize the cost-effectiveness of incorporating VRE into the power system while maintaining or increasing system stability and reliability. When considering grid integration, policy makers, regulators, and system operators consider a variety of issues, which can be organized into four broad topics: New Renewable Energy Generation, New Transmission, Increased System Flexibility, Planning for a High RE Future. This is a Russian-language translation of Integrating Variable Renewable Energy into the Grid: Key Issues, Greening the Grid, originally published in English in May 2015.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Identifying and Characterizing Non-Convexities in the Feasible Spaces of Optimal Power Flow Problems

Optimal power flow (OPF) is an important problem in the operation of electric power systems. The solution to an OPF problem provides a minimum cost operating point that satisfies constraints imposed by both the non-linear power flow equations and engineering limits. These constraints can yield non-convex feasible spaces that result in significant computational challenges. This brief proposes an algorithm that identifies and characterizes non-convexities in OPF feasible spaces. This algorithm searches for a pair of feasible points whose connecting line segment contains an infeasible point. Such points certify the existence of a non-convexity in the OPF feasible space. Moreover, the constraint violations at the infeasible point along the connecting line segment physically characterize a cause of the non-convexity. Numerical demonstrations include a small illustrative example as well as applications to various test cases.

Molzahn, Daniel K.↗

Emergency Voltage Regulation in Power Systems via Ripple-Type Control

With increasing penetrations of volatile renewable generation and cyber-physical disruptions, ensuring the safe operation of bulk power systems has become unprecedentedly challenging. Because communication and computational costs restrict centralized system dispatch to being called upon every few minutes, and because purely local schemes are shown to be insufficient, distributed controls have been advocated for handling unanticipated system conditions in real time. The applicability of distributed control schemes, however, is fundamentally limited by their need for widespread communication and model cognizance. In this context, we put forth a hybrid, low-communication, saturation-driven protocol for the coordination of control agents that are distributed over a physical system and are allowed to communicate with peers over a "hotline" communication network. Under this protocol, when agents observe a constraint violation based on local measurements, they respond locally until their control resources saturate, in which case they send a beacon for assistance to peer agents. The scheme ensures that minor violations are efficiently mitigated via fast local controls, whereas severe violations can be handled by collaboration among a relatively small set of agents. We evaluate the performance of this scheme via numerical tests on the IEEE 14-bus test feeder, where agents act upon noisy measurements under diverse scenarios of load variations and severe low-/high-voltage events.

collaboration↗

Emergency Voltage Regulation in Power Systems via Ripple-Type Control: Preprint

With increasing penetration of volatile renewable generation and cyber-physical disruptions, ensuring safe operation of bulk power systems has become unprecedentedly challenging. Since communication and computational costs restrict centralized system dispatch to be called upon every few minutes; and purely local schemes are shown to be insufficient, distributed controls have been advocated for handling unanticipated system conditions in real time. However, the applicability of distributed control schemes is fundamentally limited by their need for widespread communication and model cognizance. In this con-text, we put forth a hybrid low-communication saturation-driven protocol for the coordination of control agents that are distributed over a physical system and are allowed to communicate with peers over a ‘hotline’ communication network. Under this protocol, when agents observe a constraint violation based on local measurements, they respond locally until their control resources saturate, in which case they send a beacon for assistance to peer agents. The scheme ensures that minor violations are efficiently mitigated via fast local controls, while severe violations may be handled by a collaboration of a relatively small set of agents. We evaluate the performance of this scheme via extensive numerical tests on the IEEE 14-bus test feeder, where agents act upon noisy measurements under diverse scenarios of random load variations and severe low/high voltage events.

distributed control↗

Jettisoning system for a parachute's canister

Three-point automatically released suspension and jettisoning system operates independently of lander's power system and releases parachute on touchdown. The system is based on a ball-lock device operated by the shock of the parachute's opening and by the subsequent decay in the load on the main cord.

Lonborg, J. O.↗

A Framework to Support the Fusion of Operation and Planning

The management of the nation’s power system has progressed to the point where the boundary lines between operations and planning are becoming blurred. The dynamic behavior of smart grid technologies brings pressures of incorporating the predictive capability from planning to enhance operations. These needs are requiring a smoother, better integrated interplay between the functional roles of planning and operations. This paper presents a framework to support the fusion of operation and planning. A case study of predicting the intra-hour deficiency in generation capability and ramping capacity and presenting the outputs to operators was conducted. The study shows the benefits of the fusion and the effectiveness of the framework. All the function blocks used in the study were built upon GridOPTICS Software System (GOSS), a software system middleware platform that facilitates deployment of new applications for the future power grid.

Framework↗

Life Cycle Water Consumption and Water Resource Assessment for Utility-Scale Geothermal Systems: An In-Depth Analysis of Historical and Forthcoming EGS Projects

This report is the third in a series of reports sponsored by the U.S. Department of Energy Geothermal Technologies Program in which a range of water-related issues surrounding geothermal power production are evaluated. The first report made an initial attempt at quantifying the life cycle fresh water requirements of geothermal power-generating systems and explored operational and environmental concerns related to the geochemical composition of geothermal fluids. The initial analysis of life cycle fresh water consumption of geothermal power-generating systems identified that operational water requirements consumed the vast majority of water across the life cycle. However, it relied upon limited operational water consumption data and did not account for belowground operational losses for enhanced geothermal systems (EGSs). A second report presented an initial assessment of fresh water demand for future growth in utility-scale geothermal power generation. The current analysis builds upon this work to improve life cycle fresh water consumption estimates and incorporates regional water availability into the resource assessment to improve the identification of areas where future growth in geothermal electricity generation may encounter water challenges. This report is divided into nine chapters. Chapter 1 gives the background of the project and its purpose, which is to assess the water consumption of geothermal technologies and identify areas where water availability may present a challenge to utility-scale geothermal development. Water consumption refers to the water that is withdrawn from a resource such as a river, lake, or nongeothermal aquifer that is not returned to that resource. The geothermal electricity generation technologies evaluated in this study include conventional hydrothermal flash and binary systems, as well as EGSs that rely on engineering a productive reservoir where heat exists, but where water availability or permeability may be limited. Chapter 2 describes the approach and methods for this work and identifies the four power plant scenarios evaluated: a 20-MW EGS binary plant, a 50-MW EGS binary plant, a 10-MW hydrothermal binary plant, and a 50-MW hydrothermal flash plant. The methods focus on (1) the collection of data to improve estimation of EGS stimulation volumes, aboveground operational consumption for all geothermal technologies, and belowground operational consumption for EGS; and (2) the mapping of the geothermal and water resources of the western United States to assist in the identification of potential water challenges to geothermal growth. Chapters 3 and 4 present the water requirements for the power plant life cycle. Chapter 3 presents the results of the current data collection effort, and Chapter 4 presents the normalized volume of fresh water consumed at each life cycle stage per lifetime energy output for the power plant scenarios evaluated. Over the life cycle of a geothermal power plant, from construction through 30 years of operation, the majority of water is consumed by plant operations. For the EGS binary scenarios, where dry cooling was assumed, belowground operational water loss is the greatest contributor depending upon the physical and operational conditions of the reservoir. Total life cycle water consumption requirements for air-cooled EGS binary scenarios vary between 0.22 and 1.85 gal/kWh, depending upon the extent of belowground operational water consumption. The air-cooled hydrothermal binary and flash plants experience far less fresh water consumption over the life cycle, at 0.04 gal/kWh. Fresh water requirements associated with air- cooled binary operations are primarily from aboveground water needs, including dust control, maintenance, and domestic use. Although wet-cooled hydrothermal flash systems require water for cooling, these plants generally rely upon the geofluid, fluid from the geothermal reservoir, which typically has high salinity and total dissolved solids concentration and is much warmer than normal groundwater sources, for their cooling water needs; thus, while there is considerable geofluid loss at 2.7 gal/kWh, fresh water consumption during operations is similar to that of aircooled binary systems. Chapter 5 presents the assessment of water demand for future growth in deployment of utility-scale geothermal power generation. The approach combines the life cycle analysis of geothermal water consumption with a geothermal supply curve according to resource type, levelized cost of electricity (LCOE), and potential growth scenarios. A total of 17 growth scenarios were evaluated. In general, the scenarios that assumed lower costs for EGSs as a result of learning and technological improvements resulted in greater geothermal potential, but also significantly greater water demand due to the higher water consumption by EGSs. It was shown, however, that this effect could be largely mitigated if nonpotable water sources were used for belowground operational water demands. The geographical areas that showed the highest water demand for most growth scenarios were southern and northern California, as well as most of Nevada. In addition to water demand by geothermal power production, Chapter 5 includes data on water availability for geothermal development areas. A qualitative analysis is included that identifies some of the basins where the limited availability of water is most likely to affect the development of geothermal resources. The data indicate that water availability is fairly limited, especially under drought conditions, in most of the areas with significant near- and medium-term geothermal potential. Southern California was found to have the greatest potential for water-related challenges with its combination of high geothermal potential and limited water availability. The results of this work are summarized in Chapter 6. Overall, this work highlights the importance of utilizing dry cooling systems for binary and EGS systems and minimizing fresh water consumption throughout the life cycle of geothermal power development. The large resource base for EGSs represents a major opportunity for the geothermal industry; however, depending upon geology, these systems can require large quantities of makeup water due to belowground reservoir losses. Identifying potential sources of compatible degraded or low-quality water for use for makeup injection for EGS and flash systems represents an important opportunity to reduce the impacts of geothermal development on fresh water resources. The importance of identifying alternative water sources for geothermal systems is heightened by the fact that a large fraction of the geothermal resource is located in areas already experiencing water stress. Chapter 7 is a glossary of the technical terms used in the report, and Chapters 8 and 9 provide references and a bibliography, respectively.

15 GEOTHERMAL ENERGY↗

Experimental Investigation of a Direct-drive Hall Thruster and Solar Array System at Power Levels up to 10 kW

As NASA considers future exploration missions, high-power solar-electric propulsion (SEP) plays a prominent role in achieving many mission goals. Studies of high-power SEP systems (i.e. tens to hundreds of kilowatts) suggest that significant mass savings may be realized by implementing a direct-drive power system, so NASA recently established the National Direct-Drive Testbed to examine technical issues identified by previous investigations. The testbed includes a 12-kW solar array and power control station designed to power single and multiple Hall thrusters over a wide range of voltages and currents. In this paper, single Hall thruster operation directly from solar array output at discharge voltages of 200 to 450 V and discharge powers of 1 to 10 kW is reported. Hall thruster control and operation is shown to be simple and no different than for operation on conventional power supplies. Thruster and power system electrical oscillations were investigated over a large range of operating conditions and with different filter capacitances. Thruster oscillations were the same as for conventional power supplies, did not adversely affect solar array operation, and were independent of filter capacitance from 8 to 80 ?F. Solar array current and voltage oscillations were very small compared to their mean values and showed a modest dependence on capacitor size. No instabilities or anomalous behavior were observed in the thruster or power system at any operating condition investigated, including near and at the array peak power point. Thruster startup using the anode propellant flow as the power 'switch' was shown to be simple and reliable with system transients mitigated by the proper selection of filter capacitance size. Shutdown via cutoff of propellant flow was also demonstrated. A simple electrical circuit model was developed and is shown to have good agreement with the experimental data.

Snyder, John S.↗

Insulation Requirements of High-Voltage Power Systems in Future Spacecraft

The scope, size, and capability of the nation's space-based activities are limited by the level of electrical power available. Long-term projections show that there will be an increasing demand for electrical power in future spacecraft programs. The level of power that can be generated, conditioned, transmitted, and used will have to be considerably increased to satisfy these needs, and increased power levels will require that transmission voltages also be increased to minimize weight and resistive losses. At these projected voltages, power systems will not operate satisfactorily without the proper electrical insulation. Open or encapsulated power supplies are currently used to keep the volume and weight of space power systems low and to protect them from natural and induced environmental hazards. Circuits with open packaging are free to attain the pressure of the outer environment, whereas encapsulated circuits are imbedded in insulating materials, which are usually solids, but could be liquids or gases. Up to now, solid insulation has usually been chosen for space power systems. If the use of solid insulation is continued, when voltages increase, the amount of insulation for encapsulation also will have to increase. This increased insulation will increase weight and reduce system reliability. Therefore, non-solid insulation media must be examined to satisfy future spacecraft power and voltage demands. In this report, we assess the suitability of liquid, space vacuum, and gas insulation for space power systems.

Qureshi, A. Haq↗

The in-flight performance of the Solar Maximum Mission Electrical Power System

Circuitry, power handling, and operational characteristics and anomalies of the Electrical Power System (EPS) of the Solar Maximum Mission are discussed. The EPS is designed as a standard unit to be a candidate for use on future space missions. Blown, improperly derated fuses in the Attitude Control System and the Signal Conditioning Assembly have led to switching to magnetrons for solar angle, with a loss of accuracy, and a loss of one-half of telemetry data, respectively. In addition, reasons for an 11-14% degradation of solar array output are uncertain due to the loss of precise attitude control. Current surges to peak at 76.5 A (down from 94.5 A) at sunrise, stays for four to five minutes, then resumes nominal output for the remainder of the 61-68 daytime period. Eclipse varies between 28 and 35 minutes, with corresponding depth of discharge of 14%. The batteries charge at 20 A, and although an overcharge mode has been continuously sensed, operation has been normal and temperature sensors have not indicated overcharge; cell failure has also not been sensed. The system has a two year design life and a desired life of four years.

Broderick, R. J.↗

Hold-up power supply for flash memory

A hold-up power supply for flash memory systems is provided. The hold-up power supply provides the flash memory with the power needed to temporarily operate when a power loss exists. This allows the flash memory system to complete any erasures and writes, and thus allows it to shut down gracefully. The hold-up power supply detects when a power loss on a power supply bus is occurring and supplies the power needed for the flash memory system to temporally operate. The hold-up power supply stores power in at least one capacitor. During normal operation, power from a high voltage supply bus is used to charge the storage capacitors. When a power supply loss is detected, the power supply bus is disconnected from the flash memory system. A hold-up controller controls the power flow from the storage capacitors to the flash memory system. The hold-up controller uses feedback to assure that the proper voltage is provided from the storage capacitors to the flash memory system. This power supplied by the storage capacitors allows the flash memory system to complete any erasures and writes, and thus allows the flash memory system to shut down gracefully.

Ott, William E.↗

Integrating Solar PV in Utility System Operations

This study develops a systematic framework for estimating the increase in operating costs due to uncertainty and variability in renewable resources, uses the framework to quantify the integration costs associated with sub-hourly solar power variability and uncertainty, and shows how changes in system operations may affect these costs. Toward this end, we present a statistical method for estimating the required balancing reserves to maintain system reliability along with a model for commitment and dispatch of the portfolio of thermal and renewable resources at different stages of system operations. We estimate the costs of sub-hourly solar variability, short-term forecast errors, and day-ahead (DA) forecast errors as the difference in production costs between a case with “realistic” PV (i.e., subhourly solar variability and uncertainty are fully included in the modeling) and a case with “well behaved” PV (i.e., PV is assumed to have no sub-hourly variability and can be perfectly forecasted). In addition, we highlight current practices that allow utilities to compensate for the issues encountered at the sub-hourly time frame with increased levels of PV penetration. In this analysis we use the analytical framework to simulate utility operations with increasing deployment of PV in a case study of Arizona Public Service Company (APS), a utility in the southwestern United States. In our analysis, we focus on three processes that are important in understanding the management of PV variability and uncertainty in power system operations. First, we represent the decisions made the day before the operating day through a DA commitment model that relies on imperfect DA forecasts of load and wind as well as PV generation. Second, we represent the decisions made by schedulers in the operating day through hour-ahead (HA) scheduling. Peaking units can be committed or decommitted in the HA schedules and online units can be redispatched using forecasts that are improved relative to DA forecasts, but still imperfect. Finally, we represent decisions within the operating hour by schedulers and transmission system operators as real-time (RT) balancing. We simulate the DA and HA scheduling processes with a detailed unit-commitment (UC) and economic dispatch (ED) optimization model. This model creates a least-cost dispatch and commitment plan for the conventional generating units using forecasts and reserve requirements as inputs. We consider only the generation units and load of the utility in this analysis; we do not consider opportunities to trade power with neighboring utilities. We also do not consider provision of reserves from renewables or from demand-side options. We estimate dynamic reserve requirements in order to meet reliability requirements in the RT operations, considering the uncertainty and variability in load, solar PV, and wind resources. Balancing reserve requirements are based on the 2.5th and 97.5th percentile of 1-min deviations from the HA schedule in a previous year. We then simulate RT deployment of balancing reserves using a separate minute-by-minute simulation of deviations from the HA schedules in the operating year. In the simulations we assume that balancing reserves can be fully deployed in 10 min. The minute-by-minute deviations account for HA forecasting errors and the actual variability of the load, wind, and solar generation. Using these minute-by-minute deviations and deployment of balancing reserves, we evaluate the impact of PV on system reliability through the calculation of the standard reliability metric called Control Performance Standard 2 (CPS2). Broadly speaking, the CPS2 score measures the percentage of 10-min periods in which a balancing area is able to balance supply and demand within a specific threshold. Compliance with the North American Electric Reliability Corporation (NERC) reliability standards requires that the CPS2 score must exceed 90% (i.e., the balancing area must maintain adequate balance for 90% of the 10-min periods). The combination of representing DA forecast errors in the DA commitments, using 1-min PV data to simulate RT balancing, and estimates of reliability performance through the CPS2 metric, all factors that are important to operating systems with increasing amounts of PV, makes this study unique in its scope.

14 SOLAR ENERGY↗

DINGO: Digital assistant to grid operators for resilience management of power distribution system

With increasing adverse weather events and disasters, enabling resiliency of the power distribution system (PDS) is becoming increasingly important. Here in this work, resiliency is defined as the systems ability to keep supplying critical loads even with multiple contingencies. Resiliency may depend on: (a) advanced tools to assist operators in situational awareness and decision making with the increasing volume of data generated by the PDS, (b) visualization and ease of interaction with system resources and information, especially during extreme events and resulting human operator stress, and (c) flexible resources and autonomous control. Operators and support engineers need to interact with the system for key information and take action under stress, given the requirement for decisions in a short time. Integrated technological solutions are prevailing steps to support the most appropriate decision during critical times to serve essential loads. In order to meet the required goals, a Real-time Resiliency Monitoring and Operational Decision Support (RT-RMOD) tool have been developed. It supports various functionalities, including real-time monitoring, resilience assessment, and proactive decision support. However, this work makes advanced feature additions to the tool by developing data-enabled resilience management algorithms for (i) outage detection and localization, (ii) Resiliency-metric driven restoration and reconfiguration, and (iii) NLP based digital assistant for operators called DINGO (DIgital assistaNt to Grid Operators) to interact with Advanced Distribution Management System (ADMS) and RT-RMOD. The developed algorithm was validated for multiple cases of weather events using a real-world, off-grid microgrid system modeled in a real-time simulator, sensor data, and software tools.

24 POWER TRANSMISSION AND DISTRIBUTION↗