Digital twin advanced distribution management systems (ADMS) and methods

Advanced Distribution Management Systems not generally optimize over the entire feeder because there are few high-fidelity distribution circuit models and real-time distribution-connected sensors are rare. The limited observability at the distribution level makes it difficult to globally optimize distribution operations and issue control setpoints to power systems equipment or Distributed Energy Resources (DER) to perform grid-support services. For example, setpoints can be issued to DER based on results from an optimization module that incorporates a static or time-series feeder simulation. Feeder simulation initial conditions are populated with photovoltaic (PV) and load forecasts, state estimation results, and/or digital twin measurements or state output. The real-time (RT) digital twin runs a model of the feeder to generate state estimation pseudo-measurements since there are limited live feeder measurements.

Johnson, Jay Tillay↗

A dataset of recorded electricity outages by United States county 2014–2022

In this Data Descriptor, we present county-level electricity outage estimates at 15-minute intervals from 2014 to 2022. By 2022 92% of customers in the 50 US States, Washington DC, and Puerto Rico are represented. These data have been produced by the Environment for Analysis of Geo-Located Energy Information (EAGLE-I TM ), a geographic information system and data visualization platform created at Oak Ridge National Laboratory to map the population experiencing electricity outages every 15 minutes at the county level. Although these data do not cover every US customer, they represent the most comprehensive outage information ever compiled for the United States. The rate of coverage increases through time between 2014 and 2022. We present a quantitative Data Quality Index for these data for the years 2018–2022 to demonstrate temporal changes in customer coverage rates by FEMA region and indicators of data collection gaps or other errors.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DER's Impact on Bulk System Reliability

NREL's Power Electronic Grid Interface (PEGI) Workshop, held October 13, 2020, focused on the research challenges of operating power systems with ever-higher levels of inverter-based generation and power-electronic-based load. This presentation discusses the impact of distributed energy resources on bulk system reliability.

DER↗

Developing Synthetic Distribution Models Using Open-Source Data Sets

The deployment of distributed generation resources at scale with the distribution side of the power system network over the last two decades has spurred a lot of research interest in distribution networks. Given, the sensitive nature of power system data sets, utilities are still reluctant to open-source distribution networks. Although some open-source data sets are available, they may not cover the region of interest. In this paper, we introduce the Synthetic dIstribution Network Generator (SING), new software that allows users to develop synthetic distribution models, using open-source data sets, in any region of interest within the continental US.

data set↗

Data Management for Digital Twin Implementation: Enhancing Existing SCADA Architecture for INL's CITRC Test Distribution System

The United States power grid will continue to experience stress from aging infrastructure, extreme weather, and increasing loads. In order to strengthen resiliency, researchers need to run tests and simulations that model real-life infrastructure. Idaho National Laboratory (INL) is creating a digital twin of its Critical Infrastructure Test Range Complex (CITRC). CITRC is an at-scale grid testbed which can be configured in utility-realistic distribution scenarios for a variety of tests, such as advanced grid protection and control. A digital twin of this infrastructure would support in-depth tests/simulations without risking physical consequences, before trialing devices under test at-scale. This project focuses on the data acquisition part of constructing a digital twin. It investigates the Supervisory Data Acquisition and Control (SCADA) system of CITRC and explores ways to utilize this system for the twin. Future “ideal” at-scale implementations such as upgraded equipment, modern communication protocols, and automation applications are also explored.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Feedback Optimization of Incentives for Distribution Grid Services

Energy prices and net power injection limitations regulate the operations in distribution grids and typically ensure that operational constraints are met. Nevertheless, unexpected or prolonged abnormal events could undermine the grid's functioning. During contingencies, customers could contribute effectively to sustaining the network by providing services. Herein this paper proposes an incentive mechanism that promotes users' active participation by essentially altering the energy pricing rule. The incentives are modeled via a linear function whose parameters can be computed by the system operator (SO) by solving an optimization problem. Feedback-based optimization algorithms are then proposed to seek optimal incentives by leveraging measurements from the grid, even in the case when the SO does not have a full grid and customer information. Numerical simulations on a standard testbed validate the proposed approach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Triangle Counting with Cyclic Distributions

Triangles are the simplest non-trivial subgraphs and triangle counting is used in a number of different applications. The order in which vertices are processed in triangle counting strongly effects the amount of work that needs to be done (and thus the overall performance). Ordering vertices by degree has been shown to be one particularly effective ordering approach. However, for graphs with skewed degree distributions (such as power-law graphs), ordering by degree effects the distribution of work; parallelization must account for this distribution in order to balance work among workers. In this paper we provide an in- depth analysis of the ramifications of degree-based ordering on parallel triangle counting. We present approach for partitioning work in triangle counting, based on cyclic distribution and some surprisingly simple C++ implementations. Experimental results demonstrate the effectiveness of our approach, particularly for power-law (and social network) graphs.

Graph algorithms, parallel algorithms↗

Verification of a Modeling Toolkit for the Design of Building Electrical Distribution Systems

DC electrical distribution systems offer many potential advantages over their AC counterparts. They can facilitate easier integration with distributed energy resources, improve system energy efficiency by eliminating AC/DC converters at end-use devices (e.g., laptop chargers), and reduce installation material, time, and cost. However, DC electrical distribution systems present additional design considerations, largely resulting from potentially greater magnitude and variation in cable losses. Modeling and simulation are rarely used to design such systems. However, the greater dependency of DC system energy efficiency on design choices such as distribution voltages, architecture, and integration of PV and BESS suggests that modeling and simulation may be required. Such system performance analysis is currently not a standard practice, in part due to limited availability and validation of capable software tools. This paper characterizes the accuracy of a Modelica-based Building Electrical Efficiency Analysis Model (BEEAM) toolkit, as a precursor for validating its use to perform system performance analysis and inform design decisions. The study builds upon previous verification research by characterizing complete systems comprised of commercially available equipment, and providing a more detailed analysis of simulation results. Five lighting systems with varying electrical distribution architectures were designed using market-available equipment, installed in a laboratory environment, modeled using BEEAM, and simulated using three Modelica integrated development environments (IDEs). Simulated and measured results were compared to characterize toolkit accuracy. Initial results revealed that simulated performance was mostly within ±5% of measured system-level and device-level performance. While simulation results were not found to be dependent on the IDE, some Modelica compiler interoperability issues were identified. Although the BEEAM toolkit showed promise for the targeted use case, further work is needed to determine whether the demonstrated 5% accuracy is sufficient for making real-world design decisions, and for BEEAM to advance from an interesting research tool to one that can impact real-world building projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2021 Small Turbine Certification Awardee: Intergrid LLC

Currently, there are no U.S., fully certified inverters for wind turbines in the 10-15-kilowatt (kW) range. The federal government's Competitiveness Improvement Project (CIP) and Small Business Innovation Research programs present the most viable paths for manufacturers in the distributed wind energy industry to conduct research, develop their products, and, ultimately, commercialize them. Through CIP, Intergrid LLC is reducing the cost, size, and weight of its legacy inverter for distributed wind turbines while increasing efficiency, reliability, and serviceability. To accomplish this, Intergrid will address three areas related to power electronics for distributed wind turbines: (1) Software verification and functional safety certification; (2) Simulation for grid-interconnecting testing; (3) Component alternatives that reduce cost and improve reliability and serviceability. The first two areas relate to long-term management of inverter software, which, for grid-connected inverters, must comply with three standards - one issued by Underwriters Laboratories (UL) and two issued by the Institute of Electrical and Electronics Engineers.

CIP↗

On the Impact of High-Order Harmonic Generation in Electrical Distribution Systems

The modern power grid has seen a rise in the integration of non-linear loads, presenting a significant concern for operators. These loads introduce unwanted harmonics, leading to potential issues such as overheating and improper functioning of circuit breakers. In pursuing a more sustainable grid, the adoption of electric vehicles (EVs) and photovoltaic (PV) systems in residential networks has increased. Understanding and examining the effects of high-order harmonic frequencies beyond $1.5$ kHz is crucial to understanding their impact on the operation and planning of electrical distribution systems under varying nonlinear loading conditions. This study investigates a diverse set of critical power electronic loads within a household modeled using PSCAD/EMTdc, analyzing their unique harmonic spectra. This information is utilized to run the time-series harmonic analysis program in OpenDSS on a modified IEEE 34 bus test system model. The impact of high-order harmonics is quantified using metrics that evaluate total harmonic distortion (THD), transformer harmonic-driven eddy current loss component, and propagation of harmonics from the source to the substation transformer.

Peerzada, Aaqib A. [BATTELLE (PACIFIC NW LAB)]↗

Spatio-Temporal Deep Graph Network for Event Detection, Localization, and Classification in Cyber-Physical Electric Distribution System

This work proposes a deep graph learning framework to identify, locate, and classify power, cyber, and cyber power events at the distribution system level. The proposed algorithm jointly exploits spatial, temporal, and node-level cyber and physical data features. The developed graph neural network, together with a deep autoencoder, utilizes physical measurements from distribution level phasor measurement units and cyber data from communication network logs. The spatial structure of the synchrophasor measurements and network is incorporated through a weighted adjacency matrix. The temporal structure is incorporated by defining a spatial operation in the gated recurrent unit. This spatio-temporal learning element resides inside a power event detection, localization, and classification module that provides the degree of confidence for an event label. To accurately pinpoint the location of an event to the nearest bus equipped with a measurement unit, a combination of squared error and proximity score is utilized. Also included is a cyber event detection module that employs heteroskedasticity to analyze the significance of various cyber features during different types of attacks. Finally, a dual-bit cyber-power decision table determines the nature of the event. The proposed method is validated on two distribution systems modeled in OPAL-RT/Hypersim with limited phasor measurement units for different possible physical and cyber events. Further analyses include comparison with other state-of-the-art methods and validation in the presence of measurement noise. As a result, our method outperforms existing approaches and achieves an average detection accuracy of 97.97%, F1-score of 96.88%, precision of 96.53%, and recall of 98.57%.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Parameter Reduction of Composite Load Model Using Active Subspace Method

Over the past decades, the increasing penetration of distributed energy resources (DERs) has dramatically changed the power load composition in the distribution networks. The traditional static and dynamic load models can hardly capture the dynamic behavior of modern loads especially for fault-induced delayed voltage recovery (FIDVR) events. Thus, a more comprehensive composite load model with combination of static load, different types of induction motors, single-phase A/C motor, electronic load and DERs has been proposed by Western Electricity Coordinating Council (WECC). However, due to the large number of parameters and model complexity, the WECC composite load model (WECC CMLD) raises new challenges to power system studies. To overcome these challenges, in this paper, a cutting-edge parameter reduction (PR) approach for WECC CMLD based on active subspace method (ASM) is proposed. Firstly, the WECC CMLD is parameterized in a discrete-time manner for the application of the proposed method. Then, parameter sensitivities are calculated by discovering the active subspace, which is a lower-dimensional linear subspace of the parameter space of WECC CMLD in which the dynamic response is most sensitive. The interdependency among parameters can be taken into consideration by our approach. Finally, the numerical experiments validate the effectiveness and advantages of the proposed approach for WECC CMLD model.

active subspace↗

An Analysis of Post Attack Impacts and Effects of Learning Parameters on Vulnerability Assessment of Power Grid

Due to the increasing number of heterogeneous devices connected to electric power grid, the attack surface increases the threat actors. Game theory and machine learning are being used to study the power system failures caused by external manipulation. Most of existing works in the literature focus on one-shot process of attacks and fail to show the dynamic evolution of the defense strategy. In this paper, we focus on an adversarial multistage sequential game between the adversaries of the smart electric power transmission and distribution system. We study the impact of exploration rate and convergence of the attack strategies (sequences of action that creates large scale blackout based on the system capacity) based on the reinforcement learning approach. We also illustrate how the learned attack actions disrupt the normal operation of the grid by creating transmission line outages, bus voltage violations, and generation loss. This simulation studies are conducted on IEEE 9 and 39 bus systems. The results show the improvement of the defense strategy through the learning process. The results also prove the feasibility of the learned attack actions by replicating the disturbances created in simulated power system.

attack impacts↗

STOCHASTIC OPTIMAL POWER FLOW FOR REAL-TIME MANAGEMENT OF DISTRIBUTED RENEWABLE GENERATION AND DEMAND RESPONSE (Final Report)

To meet the grand challenge of a sustainable energy future, there has been a surge of interest in renewable energy. Today, the uncertainty associated with renewable resources is handled by using operating reserves. The high penetration of renewable resources, however, introduces difficult-to-control dynamics and challenges for power system operation. Decision support tools are necessary at the bulk system operational level to recognize and efficiently utilize renewable resources and distributed demand response products in concert with traditional grid resources. It is envisaged that responsive load can potentially have very significant cost advantages over either spinning or non-spinning ramping reserve. Critical decisions are made during hour(s)-ahead and real-time power system operation regarding the commitment and dispatch of generators to ensure power delivery is both reliable and economic. These decisions are typically made by a security constrained optimal flow, which determines future generator commitments, dispatches, and ensures adequate reserves are available in the event of a contingency (unexpected outage) or if future system conditions deviate from forecasts. However, security has been always based on a pre-specified subset of contingency constraints whose enforcement does not guarantee security under all possible future possibilities while also giving little or no weight to the likelihood of each contingent event or the severity of its consequences. Existing tools, which are based exclusively on deterministic optimization models, do not yield optimal operational decisions to address these new challenges, in terms of both reliability and cost-effectiveness. This project has focused on developing a stochastic optimal power flow (SOPF) framework, which integrates renewable resource uncertainty, load uncertainty, distributed storage (DS), demand response (DR) products, in a holistic manner to address the uncertainty associated with ever-increasing renewable resources, along with the inclusion of distributed demand response products in future power systems. A proof-of-concept problem was created using the Pennsylvania-Jersey-Maryland (PJM) power system network. Synthetic wind generation was added to the system to simulate 50% wind penetration. A 1-hour test of SOPF operation indicated more than 6% operational cost savings. The project continued by adding the Midwestern Independent System Operator (MISO) as a partner, with focus shifting from SOPF to Stochastic Look-Ahead Unit Commitment (SLAC). Unlike PJM, MISO is faced with significant renewable energy resources within its footprint and is challenged with substantial uncertainty in its operations. The SLAC distinguishes itself from existing tools that operators use. At best, today’s tools solve two to three cases independently, where one or two system parameters, such as forecasted load level (e.g., a low, base, and high forecast), are varied and the resulting scenarios are analyzed independently. The stochastic-based optimization of SLAC leverages statistical information from an ensemble of potential operational scenarios and their respective likelihood. The SLAC output can be translated into valuable information to the operator such as suggested commitments, optimal scheduling and dispatch of resources, reserve requirements at both locational and zonal resolutions, ramping availability and requirements, availability of demand response including operational guidance concerning the near-term and real-time coordination between distributed energy resources, and utilization of distributed storage resources. The developed SOPF/SLAC tool, a stand-alone tool compatible with existing EMSs, will provide system operators with unprecedented visibility, flexibility and predictability to these resources and operational guidance concerning the real-time coordination between DERs and DR/DS products. The game changing and practical impact of this disruptive technology will be dramatic and will usher in a new era in the electric power industry, wherein green energy concepts are fully embraced, and electric power costs are lowered throughout the nation.

42 ENGINEERING↗

A Distributionally Robust Optimization Framework for Stochastic Assessment of Power System Flexibility in Economic Dispatch

Given the complexity of power systems, particularly the high-dimensional variability of net loads, accurately depicting the entire operational range of net loads poses a challenge. To address this, recent methodologies have sought to gauge the maximum range of net load uncertainty across all buses. In this paper, we consider the stochastic nature of the net load and introduce a distributionally robust optimization framework that assesses system flexibility stochastically, accommodating a minimal extent of system violations. We verify the proposed method by solving the flexibility of the economic dispatch problem on four distinct IEEE standard test systems. Compared to traditional deterministic flexibility evaluations, our approach consistently yields less conservative flexibility outcomes.

distributionally robust optimization↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

5G Energy FRAME: The Design and Implementation of Data, Model, and Use Case (Year 2 Report)

This report summarizes the Year 2 work of Pacific Northwest National Laboratory’s (PNNL’s) 5G Fabricated Resource and Asset Management Encompassment for energy infrastructure (Energy FRAME) project funded by the Department of Energy Office of Science’s Advanced Scientific Computing Research (ASCR) Program. In this report, newest 5G equipment testing results are presented, along with two 5G-enabled AI/ML examples for grid applications; in addition, the work flow of grid edge, cloud, and High Performance Computing (HPC) platform is introduced, to support and interface the cross-domain simulation for power system transmission, distribution, and communication networks. Last but not least, the outlook for Year 3 work and the overarching impact of 5G Energy FRAME work to a multitude of stakeholders are provided. Additional 5G performance data now is shared through the publicly available weblink, https://www.pnnl.gov/projects/5g-energy-frame/publications

24 POWER TRANSMISSION AND DISTRIBUTION↗

DERMS-RT (Distributed Energy Resource Management Solution using Real-Time Optimization) [SWR-20-46]

DERMS-RT provides a distributed energy resource management solution using real-time optimization to control different types of distributed energy resources (DERs) — such as rooftop PVs, battery energy storage systems, HVAC loads, electric water heater loads, and EV charging loads, and use these DERs to provide distribution voltage regulation and peak demand management services. The control approach implemented by DERM-RT is developed based on the real-time optimal power flow and distributed control previously developed by NREL researchers. The software codes are designed to provide modular DER management solution that can be easily applied to control heterogeneous DERs in distribution grids in coordination with centralized utility management systems. Also, DERMS-RT provides application programming interface (API) to extract useful grid model information from an open-source power system simulation software, use the information to solve the optimization problem, and apply the optimal set-points to the controlled DERs. In this way, DERMS-RT provides a plug-and-play function for implementing the real-time DER control on different utility system models, and it can be used as a simulation testbed to demonstrate the impact of real-time DER optimization on improving grid operations.

Ding, Fei↗