Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Treatment of Solar Generation in Electric Utility Resource Planning

Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. State and federal support policies, solar photovoltaic (PV) price declines, and the introduction of new business models for solar PV 'ownership' are leading to increasing interest in solar technologies (especially PV); however, solar introduces myriad new variables into the utility resource planning decision. Most, but not all, utility planners have less experience analyzing solar than conventional generation as part of capacity planning, portfolio evaluation, and resource procurement decisions. To begin to build this knowledge, utility staff expressed interest in one effort: utility exchanges regarding data, methods, challenges, and solutions for incorporating solar in the planning process. Through interviews and a questionnaire, this report aims to begin this exchange of information and capture utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

14 SOLAR ENERGY↗

Savannah River Site nuclear materials management plan FY 2017-2031

The purpose of the Nuclear Materials Management Plan (herein referred to as “this Plan”) is to integrate and document the activities required to disposition the legacy and/or surplus Enriched Uranium (EU) and Plutonium (Pu) and other nuclear materials already stored or anticipated to be received by facilities at the Department of Energy (DOE) Savannah River Site (SRS) as well as the activities to support the DOE Tritium mission. It establishes a planning basis for EU and Pu processing operations in Environmental Management Operations (EMO) facilities through the end of their program missions and for the tritium through the National Nuclear Security Administration (NNSA) Defense Programs (DP) facilities. Its development is a joint effort among the Department of Energy - Savannah River (DOE-SR), DOE – Environmental Management (EM), NNSA Office of Material Management and Minimization (M3), NNSA Savannah River Field Office (SRFO), and the Management and Operations (M&O) contractor, Savannah River Nuclear Solutions, LLC (SRNS). Life-cycle program planning for Nuclear Materials Stabilization and Disposition and the Tritium Enterprise may use this Plan as a basis for the development of the nuclear materials disposition scope and schedule. This Plan assumes full funding to accomplish the required project and operations activities. It is recognized that some aspects of this Plan are pre decisional with regard to National Environmental Policy Act (NEPA); in such cases new NEPA actions will be required.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

HBE Health Assessment & Health Action Plan Report CY 2014

Based on the Sandia employee population's "Health Risk Status" and average Wellness Score," Sandia will strive to exceed benchmarks from the University of Michigan Health Management Research Center (HMRC). The HBE Health Action Plan initiative targets the key health risks identified through the 8-15-80, model by engaging employees to change their own healthcare story. HBE identified the most prevalent of the health risks amongst our population through the University of Michigan's health assessment tool, and used that data to build Health Action Plans. Our 2014 Health Action Plans addressed tobacco use, inadequate sleep, excessive stress, weight management, physical inactivity, hypertension, dyslipidemia, managing and preventing diabetes, managing low back pain, allergies, heartburn/gatroesophageal reflux disease (GERD) and living well or maintaining low risk for those individuals who do not have a chronic condition to manage. These plans connected employees with our onsite registered dietitians, fitness professionals, health coaches, physical therapists and physicians as appropriate. In addition to addressing the physical aspects of health, the plans also emphasized pre and post-assessments to encourage building of behavioral and emotional skills that promote health and facilitate lifestyle changes over a minimum of three months. In CY2014, the average participation in a Health Action Plan was 34% with 3,840 individuals completing 5,521 Health Action Plans (a 25% increase from CY2013). Not only have the metrics revealed significant health improvements, but these improvements are evident in Sandia's health care costs as well. From 2009 - 2014, National health care costs have increased 7-8% per year (40% over 5 years). During the same time period, Sandia's health care costs have only increased 7.8% (5x lower than the national average) even though Sandia's population grew 19%.

99 GENERAL AND MISCELLANEOUS↗

G3P3 Phase 3 Project Execution Plan. Issue 1

The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Project Execution Plan (PEP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant G3P3. This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished. The plan is intended to be used by the development partners, principal investigator, and the federal project director. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. This plan is a living document and will be updated throughout the project to describe current and future processes and procedures. The scope of the PEP covers: Cost, schedule, and scope Project reporting Staffing plan Quality assurance plan Environment, safety, security, and health This document is a tailored approach for the Facilities Management and Operations Center (FMOC) to meet the project management principles of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets , and DOE G 413.3-15, DOE Guide for Project Execution Plans. This document will elaborate on content as knowledge of the project is gained or refined.

14 SOLAR ENERGY↗

EHS Health Assessment & Health Action Plan Report (CY 2020)

Sandia National Laboratories (SNL) Employee Health Services (EHS) program believes that good health is essential to getting the most out of life, which is why we offer a variety of worksite wellness programs that put employees in control of their own health. These programs are based on current research and strategies that are proven to minimize risk and decrease the impact of illness through early detection and treatment. Services includes Health Assessments, the Virgin Pulse (VP) online wellness platform, and Health Action Plans (HAP) which include one-on-one education, organizational health initiatives, a video library, an events calendar, onsite fitness facilities, and group fitness classes. Participation in these programs help employees and their spouses earn funding for their Health Reimbursement Accounts (HRAs). The EHS Health Action Plan (HAP) initiative targets the key health risks identified through the 8-15-80 model by engaging employees to change their own healthcare story. EHS identified the most prevalent of the health risks amongst our population through Health Risk Assessment (HRA) and used that data to build Health Action Plans (HAPs). The 2020 Health Action Plans addressed improving upon inadequate sleep, lack of energy, stress, weight, physical inactivity, cardiometabolic issues (hypertension, high cholesterol, diabetes), low back pain, allergies, asthma, digestive health, tobacco use, and living well to maintaining low risk for those individuals who do not have a chronic condition to manage. These plans connect employees with our onsite registered dietitians, fitness professionals, health coaches, physical therapists, and physicians as appropriate. In addition to addressing the physical aspects of health, the plans also emphasized pre/post-assessments to encourage building behavioral and emotional skills that promote health and facilitate lifestyle changes over a minimum of three months. Just one risk reduction or behavior change can make an impact on the health of the participant’s Division as well as Sandia’s overall risk levels and ultimately its healthcare costs. Sandia employees achieved an Overall Wellness Score of 69 based on the WellSource Health Assessment (the same as last year). A score of 70-100 is considered “Doing Well”, and a score of 40-69 is in the “Caution” category. Overall in CY 2019, Sandia saw a 34% participation rate in Health Action Plan (HAP) programs (up from 33% in CY 2019) with an 89% completion rate (4% lower than CY 2019). Overall, 5,039 (347 more than CY 2019) individuals participated in 8,329 HAPs, which is 1,005 more than the last calendar year (7,324).

59 BASIC BIOLOGICAL SCIENCES↗

Radiological Monitoring Plan for the Oak Ridge Y-12 National Security Complex: Surface Water

DOE Order 458.1 requires that dose estimates consider contributions from all facilities. In the Y-12 Radiological Monitoring Plan (RMP), surface water is monitored at points that reflect individual facilities, as well as at points that reflect the combined contributions of all facilities. This monitoring plan does not consider other potential routes (i.e., airborne releases and food chains). Thus, a complete determination of total effective dose (TED) cannot be made based on this plan alone. The other routes from Y-12, and all routes from other DOE facilities on the Oak Ridge Reservation (e.g., Oak Ridge National Laboratory (ORNL) and The Heritage Center), must be considered in order to satisfy DOE Order 458.1 requirements. Determination of TED from all sites and pathways is done through the use of dose-assessment models and is documented in the Annual Site Environmental Report. This monitoring plan provides adequate monitoring goals for Y-12 surface water releases to provide input of sufficient sensitivity and accuracy to reliably determine the Y-12 surface water component of the TED. The routine radiological monitoring program is designed to monitor effluents at four types of locations: (1) treatment facilities, (2) other point and area source discharges, (3) instream locations, and (4) production building roof run-off. With this sampling and analysis program, data will be obtained on primary point sources as well as on locations that represent the composite of other potential sources. This plan will be reviewed periodically to determine necessary modifications to the sampling frequencies, parameters, and locations. Modifications, if any, will be based on the analysis of the previous data and its effectiveness in satisfying the objectives of this plan. Appendix A contains graphs of the sum of the DCS fractions for locations and frequencies contained in a previous version of this plan. The data was collected from January 2009 through December 2019. Each sample was analyzed, and each result was divided by the appropriate DCS to compute a DCS fraction. These fractions were summed for all isotopes. According to DOE –STD-1196-2011, the annual average of these sums should be below 1.

54 ENVIRONMENTAL SCIENCES↗

ARM FY2024 Aerosol Operations Plan

The Atmospheric Radiation Measurement user facility (ARM) deploys a suite of aerosol and trace gas (further mentions of aerosols will assume inclusion of trace gases) instrumentation at each of ARM's observatories. ARM currently deploys five Aerosol Observing Systems, one each at: Southern Great Plains (SGP); Eastern North Atlantic (ENA); ARM Mobile Fabilities (AMFI 1, 2, and 3). Aerosol measurements at ARM’s North Slope of Alaska (NSA) observatory have historically been made by the National Oceanic and Atmospheric Administration (NOAA) and provided to ARM through a collaboration. As ARM’s support for aerosol instrumentation increases, it is important for ARM to communicate plans and priorities for aerosol measurements to the community to maximize the benefit and planning around scientific activities and to advance confidence in ARM’s aerosol measurements. ARM will develop a yearly aerosol operations plan for the upcoming fiscal year (October 1-September 30) starting with FY24. This plan will be open and available through the ARM aerosol instrument webpages and will include: Review of the previous activities since the last plan (in this case, 2018); Planned activities and their priorities for the upcoming FY; Calibration timing and efforts; Planned activities for data products and value-added products (VAP).

54 ENVIRONMENTAL SCIENCES↗

Preliminary Workforce Development and Environmental and Co-use Management Plans for a Floating Offshore Wind Platform - CRADA 609 (Final Report)

Pacific Northwest National Laboratory (PNNL) provided technical assistance to Glosten, Inc. and its affiliate, PelaStar, LLC to advance the development of their floating offshore wind (FOSW) platform. PNNL provided guidance and assessment in two areas that are important to address in the development of FOSW platforms: (1) workforce development and (2) environmental impacts and ocean co-use considerations. This work was funded by the U.S. Department of Energy’s (DOE) Wind Energy Technologies Office (WETO) through Phase 2 of the FLoating Offshore Wind ReadINess (FLOWIN) Prize. It should be noted that the Plans presented in this report are specific to the PelaStar tension-leg platform (TLP) and may not be applicable to all FOSW platforms. Workforce development and environmental/co-use impacts are highly dependent on the geographical region in which activities take place. At the request of PelaStar, PNNL focused on two regions where development may take place: the Gulf of Maine and Northern California. PNNL generated a preliminary Workforce Development Plan for PelaStar, which includes estimated job numbers and skillsets required to establish a workforce to manufacture, install, and operate their platform as part of FOSW projects. The Plan offers methods to increase diversity, equity, and inclusion practices when developing a new workforce and includes colleges and training centers for potential recruitment. Both positive and negative impacts to communities are evaluated, with potential mitigation strategies for reducing negative impacts. The structure of Community Benefit Agreements and Project Labor Agreements are discussed, noting the limitations of the role of a platform manufacturer versus the offshore wind developer. PNNL also drafted a preliminary Environmental and Co-Use Management Plan that serves as a guide to preparing an environmental assessment related to the installation and operation of PelaStar’s unique TLP design, including its potential ecological, socioeconomic, and emissions impacts. The Plan summarizes information on relevant regulatory requirements, potential impact producing factors, monitoring and mitigation measures, and physical and biological resources in the Gulf of Maine and Northern California. One of the primary perceived benefits of the PelaStar TLP is its reduced footprint due to its tensioned tendons versus catenary or taut moorings, but more research must be done as there are no studies on PelaStar’s TLP system to-date. The section also highlights ocean co-use considerations for PelaStar’s TLP system, specifically for fisheries, including existing perspectives, methods, examples, and limitations. The PNNL team established through this preliminary work and review of available literature and resources that there is not yet much research or planning around FOSW. With FOSW being a new industry, many of the findings and planning are adapted from fixed bottom offshore wind, which itself is only just taking off in the United States. More research is needed to establish best practices for workforce development and to assess environmental and ocean co-use impacts and mitigation approaches.

17 WIND ENERGY↗

ARM FY2026 Radar Plan

The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) User Facility maintains a suite of advanced atmospheric radar systems that serve as critical tools in ARM’s mission to provide continuous, high-quality observations for advancing the understanding and modeling of atmospheric processes. These radar systems enable detailed characterization of clouds, precipitation, and dynamic structures in the atmosphere, supporting a broad range of scientific applications. The number of deployed systems exceeds what current staffing levels can fully support for continuous 24/7/365 operation. As such, it is essential to have a clearly defined and community-informed plan that prioritizes radar operations and communicates ARM’s strategy for sustaining and evolving these observational assets. This FY2026 Radar Plan outlines ARM’s approach to managing its radar portfolio—balancing scientific impact, operational feasibility, and long-term sustainability. It reflects ARM’s continued commitment to delivering calibrated, well-documented radar data products that enable process-level studies and support the development and evaluation of weather and climate models. Through this plan, ARM aims to ensure transparency in decision-making, alignment with user needs, and support for innovative science across the facility’s fixed and mobile observatories. Given uncertainties around the Fiscal Year (FY) 2026 budget, this plan was developed to assume business as usual and will be updated as budgets and plans may change. It should be noted that, given the limited timeframe involved, this plan will be more succinct than previous plans.

47 OTHER INSTRUMENTATION↗

Distribution System Plan Template and Guide for Electric Utilities for Adaptation by States and Utilities [Slides]

LBNL researchers developed a template and companion guide for structuring distribution system plans. The template covers 10 key sections in utility distribution system plans and underlying topics: -Executive Summary -Planning Objectives -Current Distribution System -Planning Approach -Asst Management, Reliability and Resilience -O&M Expenses -Capacity Expansion Planning -Solution Identification -Cost-effectiveness -Implementation For each section in the template, the companion guide provides: a description of the topics covered and their importance; the type of content to include in the plan; an example utility approach; and references to other utility plans that serve as models for the topic.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Monitored execution of robot plans produced by STRIPS.

We describe PLANEX1, a plan executor for the Stanford Research Institute robot system. The problem-solving program STRIPS creates a plan consisting of a sequence of actions, and PLANEX1 program carries out the plan by executing the actions. PLANEX1 is designed so that it executes only that portion of the plan necessary for completing the task, reexecutes any portion of the plan that has failed to achieve the desired results, and initiates replanning in situations where the plan can no longer be effective in completing the task. The scenario for an example plan execution is given.

Fikes, R. E.↗

Practical applications of low, medium, and high altitude aircraft remote sensing data to land use planning

Remotely sensed data is gaining wider acceptance in land use planning activities because of several inherent advantages offered by the technology. Scope of applications have increased to meet planners broadening responsibilities and needs for more comprehensive and specific information in response to new legislative mandates. Specific data needs associated with the land use planning process are varied. To illustrate how remote sensing surveys can be designed to meet a variety of goals at several planning levels, specific examples of the use of remotely sensed data and analysis techniques in four planning oriented land use surveys are discussed. These examples illustrate the use of aerial photography at the state planning level in Maryland and county level in Jefferson Parish, Louisiana. Special applications of aerial photography are demonstrated by energy planning in San Bernardino County, California and water management planning in New Castle County, Delaware.

Drackett, K.↗

Diagnosing faults in autonomous robot plan execution

A major requirement for an autonomous robot is the capability to diagnose faults during plan execution in an uncertain environment. Many diagnostic researches concentrate only on hardware failures within an autonomous robot. Taking a different approach, the implementation of a Telerobot Diagnostic System that addresses, in addition to the hardware failures, failures caused by unexpected event changes in the environment or failures due to plan errors, is described. One feature of the system is the utilization of task-plan knowledge and context information to deduce fault symptoms. This forward deduction provides valuable information on past activities and the current expectations of a robotic event, both of which can guide the plan-execution inference process. The inference process adopts a model-based technique to recreate the plan-execution process and to confirm fault-source hypotheses. This technique allows the system to diagnose multiple faults due to either unexpected plan failures or hardware errors. This research initiates a major effort to investigate relationships between hardware faults and plan errors, relationships which were not addressed in the past. The results of this research will provide a clear understanding of how to generate a better task planner for an autonomous robot and how to recover the robot from faults in a critical environment.

Lam, Raymond K.↗

SURE (Science User Resource Expert): A science planning and scheduling assistant for a resource based environment

SURE (Science User Resource Expert) is one of three components that compose the SURPASS (Science User Resource Planning and Scheduling System). This system is a planning and scheduling tool which supports distributed planning and scheduling, based on resource allocation and optimization. Currently SURE is being used within the SURPASS by the UARS (Upper Atmospheric Research Satellite) SOLSTICE instrument to build a daily science plan and activity schedule and in a prototyping effort with NASA GSFC to demonstrate distributed planning and scheduling for the SOLSTICE II instrument on the EOS platform. For the SOLSTICE application the SURE utilizes a rule-based system. Development of a rule-based program using Ada CLIPS as opposed to using conventional programming, allows for capture of the science planning and scheduling heuristics in rules and provides flexibility in inserting or removing rules as the scientific objectives and mission constraints change. The SURE system's role as a component in the SURPASS, the purpose of the SURE planning and scheduling tool, the SURE knowledge base, and the software architecture of the SURE component are described.

Thalman, Nancy E.↗

Integrating planning and reactive control

Artificial intelligence research on planning is concerned with designing control systems that choose actions by manipulating explicit descriptions of the world state, the goal to be achieved, and the effects of elementary operations available to the system. Because planning shifts much of the burden of reasoning to the machine, it holds great appeal as a high-level programming method. Experience shows, however, that it cannot be used indiscriminately because even moderately rich languages for describing goals, states, and the elementary operators lead to computational inefficiencies that render the approach unsuitable for realistic applications. This inadequacy has spawned a recent wave of research on reactive control or situated activity in which control systems are modeled as reacting directly to the current situation rather than as reasoning about the future effects of alternative action sequences. While this research has confronted the issue of run-time tractability head on, in many cases it has done so by sacrificing the advantages of declarative planning techniques. Ways in which the two approaches can be unified are discussed. The authors begin by modeling reactive control systems as state machines that map a stream of sensory inputs to a stream of control outputs. These machines can be decomposed into two continuously active subsystems: the planner and the execution module. The planner computes a plan, which can be seen as a set of bits that control the behavior of the execution module. An important element of this work is the formulation of a precise semantic interpretation for the inputs and outputs of the planning system. They show that the distinction between planned and reactive behavior is largely in the eye of the beholder: systems that seem to compute explicit plans can be redescribed in situation-action terms and vice versa. They also discuss practical programming techniques that allow the advantages of declarative programming and guaranteed reactive response to be achieved simultaneously.

Rosenschein, Stanley J.↗

Diagnosing faults in autonomous robot plan execution

A major requirement for an autonomous robot is the capability to diagnose faults during plan execution in an uncertain environment. Many diagnostic researches concentrate only on hardware failures within an autonomous robot. Taking a different approach, the implementation of a Telerobot Diagnostic System that addresses, in addition to the hardware failures, failures caused by unexpected event changes in the environment or failures due to plan errors, is described. One feature of the system is the utilization of task-plan knowledge and context information to deduce fault symptoms. This forward deduction provides valuable information on past activities and the current expectations of a robotic event, both of which can guide the plan-execution inference process. The inference process adopts a model-based technique to recreate the plan-execution process and to confirm fault-source hypotheses. This technique allows the system to diagnose multiple faults due to either unexpected plan failures or hardware errors. This research initiates a major effort to investigate relationships between hardware faults and plan errors, relationships which were not addressed in the past. The results of this research will provide a clear understanding of how to generate a better task planner for an autonomous robot and how to recover the robot from faults in a critical environment.

Lam, Raymond K.↗

Completable scheduling: An integrated approach to planning and scheduling

The planning problem has traditionally been treated separately from the scheduling problem. However, as more realistic domains are tackled, it becomes evident that the problem of deciding on an ordered set of tasks to achieve a set of goals cannot be treated independently of the problem of actually allocating resources to the tasks. Doing so would result in losing the robustness and flexibility needed to deal with imperfectly modeled domains. Completable scheduling is an approach which integrates the two problems by allowing an a priori planning module to defer particular planning decisions, and consequently the associated scheduling decisions, until execution time. This allows a completable scheduling system to maximize plan flexibility by allowing runtime information to be taken into consideration when making planning and scheduling decision. Furthermore, through the criteria of achievability placed on deferred decision, a completable scheduling system is able to retain much of the goal-directedness and guarantees of achievement afforded by a priori planning. The completable scheduling approach is further enhanced by the use of contingent explanation-based learning, which enables a completable scheduling system to learn general completable plans from example and improve its performance through experience. Initial experimental results show that completable scheduling outperforms classical scheduling as well as pure reactive scheduling in a simple scheduling domain.

Gervasio, Melinda T.↗

Mission activities planning for a Hermes mission by means of AI-technology

Mission Activities Planning is a complex task to be performed by mission control centers. AI technology can offer attractive solutions to the planning problem. This paper presents the use of a new AI-based Mission Planning System for crew activity planning. Based on a HERMES servicing mission to the COLUMBUS Man Tended Free Flyer (MTFF) with complex time and resource constraints, approximately 2000 activities with 50 different resources have been generated, processed, and planned with parametric variation of operationally sensitive parameters. The architecture, as well as the performance of the mission planning system, is discussed. An outlook to future planning scenarios, the requirements, and how a system like MARS can fulfill those requirements is given.

Pape, U.↗