Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Pilot”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

100-OL-1 Operable Unit Field Portable X-Ray Fluorescence (XRF) Analyzer Pilot Study Plans

A pilot study is being conducted to support the approval of the Remedial Investigation/Feasibility Study (RI/FS) Work Plan to evaluate the 100-OL-1 Operable Unit (OU) pre-Hanford orchard lands. Based on comments received by the U.S. Environmental Protection Agency (EPA) and Washington State Department of Ecology, the pilot study will evaluate the use of field portable X-ray fluorescence (XRF) spectrometry measurements for evaluating lead and arsenic concentrations on the soil surface as an indicator of past use of lead arsenate pesticide residue in the OU. The work will be performed in the field during the summer of 2014, and assist in the planning for the characterization activities in the RI/FS.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Field-Metered Data from Portable Unit Dehumidifiers in the U.S. Residential Sector: Initial Results of a Pilot Study

The work described herein is intended to enrich the body of literature regarding dehumidifiers in residential settings—in particular the hours of use and energy consumption of various types of dehumidifiers. In the United States, portable unit dehumidifiers most commonly are used in basements during humid summer days in northern climates. Dehumidifier energy consumption differs among households depending on settings selected by the user, frequency of use, and conditions of operation. Although some estimates of dehumidifier use have been developed, and a few metering studies performed, there remains a paucity of metered data collected from individual households that use dehumidifiers. For this study we obtained field data on the energy consumption of dehumidifiers to supplement currently available analyses. Our goal was to obtain data from a pilot study that we could use to develop initial distributions describing the capacities and applications of dehumidifiers used in individual homes. More precisely characterizing the use of dehumidifiers in real-world applications will enable a more accurate estimate of the range of energy use in various operational modes. Our pilot field-metering exercise was aimed at compiling real-time data on the energy consumption of portable dehumidifiers in residential households in the New England and Mid-Atlantic areas. Our analysis furthers the process of developing a more precise estimate of dehumidifier energy use, which will support the evaluation of the potential energy savings and attendant costs associated with more energy efficient dehumidifiers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Pilot Scale Advanced Fogging Demonstration

Radiological contamination control is crucial during decommissioning and demolition (D&D) activities, as well as during modifications to existing radiological systems. It is well known that contamination, in some cases substantial contamination, is present throughout the exhaust ductwork in several older processing facilities within the Department of Energy (DOE) complex, due to years of processing radioactive materials in areas served by closed ventilation systems. Accumulations of radioactive dust and lint – commonly found in laundry facilities, exhaust ventilation ducting, and exhaust stacks – present a specific contamination control issue. Particle suspension is more likely to occur during cleaning, modification, or demolition of these systems and during disposal site exhumation. In a recent demolition of large ventilation ducting (~10’ × 10’ cross section, ~100’ long) at Brookhaven National Laboratory, a spray coating was manually applied to the inside of the duct – requiring painters, dressed in anti-contamination clothing and an airline respirator system, to enter the duct.1 The advanced fogging technique offers an alternative method to mitigate these airborne contamination hazards with minimal personnel entry. Experiments in 2006 developed a useful fog solution using three different chemical constituents. Optimization of the fog recipe and use of commercially available equipment were identified as needs that had not been addressed. During 2012 development work it was noted that low concentrations of the components hampered coverage and drying in the United Kingdom’s National Nuclear Laboratory’s testing much more so than was evident in the 2006 tests. In fiscal year 2014 the Idaho National Laboratory undertook a systematic optimization of the fogging formulation and conducted a non-radioactive, pilot scale demonstration using commercially available fogging equipment. While not as sophisticated as the equipment used in earlier testing, the new approach is much less expensive and readily available for smaller scale operations. Pilot scale testing was important to validate new equipment of an appropriate scale, optimize the chemistry of the fogging solution, and to realize the conceptual approach.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Greenbelt Homes Pilot Energy Efficiency Program Phase 1 Summary: Existing Conditions and Baseline Energy Use

A multi-year pilot energy efficiency retrofit project has been undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 co-operative of circa 1930 and '40 homes. The three predominate construction methods of the townhomes in the community are materials common to the area and climate zone including 8” CMU block, wood frame with brick veneer and wood frame with vinyl siding. GHI has established a pilot project that will serve as a basis for decision making for the roll out of a decade-long community upgrade program that will incorporate energy efficiency to the building envelope and equipment with the modernization of other systems like plumbing, mechanical equipment, and cladding.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reinvestigation into Closure Predictions of Room D at the Waste Isolation Pilot Plant

Room D was an in-situ, isothermal, underground experiment conducted at theWaste Isolation Pilot Plant between 1984 and 1991. The room was carefully instrumented to measure the horizontal and vertical closure immediately upon excavation and for several years thereafter. Early finite element simulations of salt creep around Room D under predicted the vertical closure by 4.5×, causing investigators to explore a series of changes to the way Room D was modeled. Discrepancies between simulations and measurements were resolved through a series of adjustments to model parameters, which were openly acknowledged in published reports. Interest in Room D has been rekindled recently by the U.S./German Joint Project III and Project WEIMOS, which seek to improve the predictions of rock salt constitutive models. Joint Project participants calibrate their models solely against laboratory tests, and benchmark the models against underground experiments, such as room D. This report describes updating legacy Room D simulations to today’s computational standards by rectifying several numerical issues. Subsequently, the constitutive model used in previous modeling is recalibrated two different ways against a suite of new laboratory creep experiments on salt extracted from the repository horizon of the Waste Isolation Pilot Plant. Simulations with the new, laboratory-based, calibrations under predict Room D vertical closure by 3.1×. A list of potential improvements is discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiological Operations Support Specialist (ROSS) Pilot Course Summary and Recommendations

In support of the Department of Homeland Security / Science and Technology Directorate’s (DHS/S&T) creation of a new position called the Radiological Operations Support Specialist (ROSS), Lawrence Livermore National Laboratory (LLNL) in Sub-task 1.1 and 1.2 has assisted in the development of the ROSS skills, knowledge, and abilities (SKAs); identified potentially relevant training; cross-mapped the training to the SKAs; and identified gaps in the training related to the SKAs, as well as their respective level of training knowledge - current versus desired. In the follow on task, Sub-task 1.3, a 5 day ROSS Pilot Training course was developed to fill the priority gaps identified in Sub-Task 1.2. Additionally, in Sub-Task 1.5, LLNL has performed a gap analysis of electronic tools, handbooks, and job-aides currently available to the ROSS and developed recommendations for additional and next generation tools to ensure the operational effectiveness of the ROSS position. This document summarizes the feedback received from the instructors and pilot course observers on what worked in the course and what could be improved as well as an assessment of the Pre- and Post-Test administered to the students.

61 RADIATION PROTECTION AND DOSIMETRY↗

FY2017 Pilot Project Plan for the Nuclear Energy Knowledge and Validation Center Initiative

To prepare for technical development of computational code validation under the Nuclear Energy Knowledge and Validation Center (NEKVAC) initiative, several meetings were held by a group of experts of the Idaho National Laboratory (INL) and the Oak Ridge National Laboratory (ORNL) to develop requirements of, and formulate a structure for, a transient fuel database through leveraging existing resources. It was concluded in discussions of these meetings that a pilot project is needed to address the most fundamental issues that can generate immediate stimulus to near-future validation developments as well as long-lasting benefits to NEKVAC operation. The present project is proposed based on the consensus of these discussions. Analysis of common scenarios in code validation indicates that the incapability of acquiring satisfactory validation data is often a showstopper that must first be tackled before any confident validation developments can be carried out. Validation data are usually found scattered in different places most likely with interrelationships among the data not well documented, incomplete with information for some parameters missing, nonexistent, or unrealistic to experimentally generate. Furthermore, with very different technical backgrounds, the modeler, the experimentalist, and the knowledgebase developer that must be involved in validation data development often cannot communicate effectively without a data package template that is representative of the data structure for the information domain of interest to the desired code validation. This pilot project is proposed to use the legendary TREAT Experiments Database to provide core elements for creating an ideal validation data package. Data gaps and missing data interrelationships will be identified from these core elements. All the identified missing elements will then be filled in with experimental data if available from other existing sources or with dummy data if nonexistent. The resulting hybrid validation data package (composed of experimental and dummy data) will provide a clear and complete instance delineating the structure of the desired validation data and enabling effective communication among the modeler, the experimentalist, and the knowledgebase developer. With a good common understanding of the desired data structure by the three parties of subject matter experts, further existing data hunting will be effectively conducted, new experimental data generation will be realistically pursued, knowledgebase schema will be practically designed; and code validation will be confidently planned.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Reinvestigation into Closure Predictions of Room D at the Waste Isolation Pilot Plant

Room D was an in-situ, isothermal, underground experiment conducted at the Waste Isolation Pilot Plant between 1984 and 1991. The room was carefully instrumented to measure the horizontal and vertical closure immediately upon excavation and for several years thereafter. Early finite element simulations of salt creep around Room D under-predicted the vertical closure by 4.5×, causing investigators to explore a series of changes to the way Room D was modeled. Discrepancies between simulations and measurements were resolved through a series of adjustments to model parameters, which were openly acknowledged in published reports. Interest in Room D has been rekindled recently by the U.S./German Joint Project III and Project WEIMOS, which seek to improve the predictions of rock salt constitutive models. Joint Project participants calibrate their models solely against laboratory tests, and benchmark the models against underground experiments, such as room D. This report describes updating legacy Room D simulations to today’s computational standards by rectifying several numerical issues. Subsequently, the constitutive model used in previous modeling is recalibrated two different ways against a suite of new laboratory creep experiments on salt extracted from the repository horizon of the Waste Isolation Pilot Plant. Simulations with the new, laboratory-based, calibrations under-predict Room D vertical closure by 3.1×. A list of potential improvements is discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Los Alamos National Security, LLC Request for Interest (RFI) for Investment Mentors to participate in the Laboratory’s Entrepreneurial Postdoctoral Pilot.

Los Alamos National Laboratory (LANL) is committed to understanding how the role of venture funding, new investment mechanisms, and fostering the development of a culture of entrepreneurship may enhance the Laboratory and bring strength and creativity to its people. LANL, in partnership with the University of California (UC), has created the Entrepreneurial Postdoctoral Fellowship Pilot (Pilot) to provide an immersion-based learning opportunity to post-doctoral researchers to develop and practice skills in entrepreneurship and comercialization.

99 GENERAL AND MISCELLANEOUS↗

UC/Los Alamos Entrepreneurial Postdoctoral Fellowship Pilot Program

The UC/Los Alamos Entrepreneurial Postdoctoral Fellowship Pilot Program (Pilot) for existing postdoctoral researchers at Los Alamos National Laboratory (Los Alamos) to gain skills in entrepreneurship and commercializing technology as part of their postdoctoral experience. This program will incorporate training and mentoring during the first 6-month period, culminating in a focused 6-month Fellowship aimed at creating a new business in Northern New Mexico.

99 GENERAL AND MISCELLANEOUS↗

Technical Details on Beyond Design Basis Event Pilot Evaluations

The primary focus of the BDBE pilot project was the review of BDBE analysis and mitigation features at four DOE nuclear facilities representing a range of DOE sites, nuclear facility types/activities, and responsible program offices. The pilots looked at (1) how beyond design basis accidents were evaluated and documented in the facility Documented Safety Analysis, (2) potential BDBE vulnerabilities and margins to failure of facility safety features as obtained from general area and specific system walkdowns and design documents reviews, and (3) preparations made in facility and site emergency management programs to respond to severe accidents. It also evaluated whether draft BDBE guidance on safety analysis and emergency management could be used to improve the analysis of and preparations for mitigating severe and beyond design basis accidents. The details of these activities are organized in this report as described below.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Large Pilot-Scale Carbon Dioxide (CO2) Capture Project Using Aminosilicone Solvent.Final Scientific/Technical Report

GE Global Research has developed, over the last 8 years, a platform of cost effective CO2 capture technologies based on a non-aqueous aminosilicone solvent (GAP-1m). As demonstrated in previous funded DOE projects (DE-FE0007502 and DEFE0013755), the GAP-1m solvent has increased CO2 working capacity, lower volatility and corrosivity than the benchmark aqueous amine technology. Performance of the GAP-1m solvent was recently demonstrated in a 0.5 MWe pilot at National Carbon Capture Center, AL with real flue gas for over 500 hours of operation using a Steam Stripper Column (SSC). The pilot-scale PSTU engineering data were used to (i) update the techno-economic analysis, and EH&S assessment, (ii) perform technology gap analysis, and (iii) conduct the solvent manufacturability and scale-up study.

01 COAL, LIGNITE, AND PEAT↗

Department of Energy Operational Readiness Review for the Waste Isolation Pilot Plant

The U.S. Department of Energy (DOE) has completed an Operational Readiness Review (ORR) for the restart of Contact Handled (CH) waste emplacement at the Waste Isolation Pilot Plant (WIPP) located near Carlsbad, New Mexico. The ORR team assessed the readiness of Nuclear Waste Partnership, LLC (NWP) to manage and perform receipt through CH waste emplacement, and associated waste handling and management activities, including the ability of the National TRU Program (NTP) to evaluate the waste currently stored at the WIPP site against the revised and enhanced Waste Acceptance Criteria (WAC). Field work for this review began on November 14, 2015 and was completed on November 30, 2016. The DOE ORR was conducted in accordance with the Department of Energy Operational Readiness Review Implementation Plan for the Waste Isolation Pilot Plant, dated November 8, 2016, and DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities. The review activities included personnel interviews, record reviews, direct observation of operations and maintenance demonstrations, and observation of multiple operational and emergency drills/exercises. The DOE ORR also evaluated the adequacy of the contractor’s ORR (CORR) and the readiness of the DOE Carlsbad field Office (CBFO) to oversee the startup and execution of CH waste emplacement activities at the WIPP facility. The WIPP facility is categorized as a Hazard Category 2 DOE Nonreactor Nuclear Facility for all surface and Underground (UG) operations per DOE-STD-1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports. In addition, the WIPP experienced two events in February, 2014 that resulted in Accident Investigations being performed in accordance with the requirements of DOE Order 225.1B, Accident Investigations. Based upon the results of the accident investigations and hazard categorization of the facility, the team placed significant emphasis on the following areas: fire protection, emergency preparedness, radiological protection, nuclear safety, and operations. The identification of specific focus areas was not intended to diminish the importance of other areas of the review, but to ensure that these areas received a particularly thorough and in-depth evaluation due to their significance with respect to the safe operation of the facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Q and A with the grandson of the Little Boy’s pilot: Brigadier General (retired) Paul Tibbets IV reflects on his family’s legacy military service

Paul Tibbets Jr., the pilot of the Enola Gay who released the Little Boy atomic bomb above Hiroshima, is part of a family with a legacy of military service. He was father to Paul Tibbets III, who served in the military as an Army reservist pharmacist and hospital administrator and eventually retired as a colonel. His son— grandson of Tibbets Jr.—is also Paul Tibbets. Paul Tibbets IV is a retired Air Force brigadier general and decorated bomber pilot. This legacy is not lost on his fellow airmen. They gave Tibbets IV the callsign “Nuke” early in his flying career. Tibbets IV flew the B-1 bomber and then the B-2 stealth bomber, a nuclear-capable, longrange strike aircraft. His 29 years of military service include combat missions in the Middle East, Afghanistan, and the Balkans—and a flight in a restored B-29 with his grandfather. In commemoration of the 75th anniversary of the atomic bombs and his grandfather’s historic role, Tibbets IV spoke with Los Alamos National Laboratory.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Nuclear Criticality Safety Assessment of Criticality Control Containers without Moderation Control at the Waste Isolation Pilot Plant

The Waste Isolation Pilot Plant (WIPP) provides for safe, permanent disposal of government-owned transuranic (TRU) and TRU mixed wastes. Receipt and disposal of waste at the WIPP site began in March 1999. The Sandia report, Consideration of Nuclear Criticality When Disposing of Transuranic Waste at the Waste Isolation Pilot Plant, addressed potential nuclear criticality safety issues based on the projected inventory characteristics known at the time [1]. As designs for inventory, waste forms, and disposal packages have changed, new analyses have been performed, and updates have been made to address any potential effects to the WIPP safety basis. New analyses performed include Saylor 2017 [2] and Brickner 2019 [3], which address certain waste containers with specified loadings under post-closure conditions. Both examined several hypothetical scenarios and included analyses to bound (from a criticality potential standpoint) credible configurations that could occur at WIPP during the repository regulatory post-closure disposal time period for feature, event, and process (FEP) considerations—10,000 years. During this post-closure period at WIPP, the screening of FEPs is governed by the risk-based standards and implementing regulations of the US Environmental Protection Agency (EPA) (i.e., 40 CFR 191 and 40 CFR 194, respectively) [4,5]. An FEP screening can be based on either a low-consequence or low-probability rationale. A low-probability rationale includes either (a) a qualitative rationale that the FEP is not credible or (b) a quantitative demonstration that the probability is less than 10-4 in 104 years. In this evaluation, a qualitative lowprobability rationale of not credible is used by demonstrating that bounding configurations of the waste are not critical. The demonstration of subcriticality is through quantitative calculations, but a probability of criticality is not evaluated. Rather, the rationale for this evaluation is that bounding configurations with an effective neutron multiplication factor (keff) well below the upper subcriticality limit (USL) make criticality incredible. Reference [2] documented a nuclear criticality assessment of the WIPP repository for disposal of dilute surplus plutonium materials using the Dilute and Dispose Approach and packaging in criticality control overpacks (CCOs). The CCO is the waste disposal container recently designed to allow for up to 380 fissile gram equivalent (FGE) 239 Pu per drum, which is a higher fissile loading than typical waste containers. The CCO consists of a criticality control container (CCC) positioned by upper and lower plywood spacers within a standard 55 gal drum. The CCC is used to establish a geometry control for fissile materials during transportation and WIPP emplacement operations. The current WIPP waste acceptance criteria for CCO payloads limit beryllium to less than or equal to 1% by weight of the waste contents and require the waste form to be non-machine compacted. Reference [2] considered two scenario progressions—room closure from salt creep, hereafter referred to as the reconfigured dry scenario, and flooding with brine, hereafter referred to as the reconfigured wet scenario. The subsequent drying out of the reconfigured wet scenarios was also considered. For all scenarios, subcriticality was maintained when 50 g of B 4 C (acting as a neutron absorber) per CCC was intermixed within the plutonium disposition waste form. The analysis used a waste form description that limits the amount of moderation that could be present within the waste form (i.e., it limits the amount of water and polyethylene that could be present based on planned processing conditions). This analysis to evaluate increased limits on the amount of moderation that could be present was performed as a companion to Reference [2] to address concerns associated with verifying moisture and/or plastic contents of waste materials following packaging of dilute surplus plutonium in the CCO. To that end, this analysis used the models and methods from Reference [2] to evaluate a more generic base waste form consisting of water and polyethylene that is more similar (and nearly identical) to the generic waste forms utilized in other models/analyses supporting the TRU Package Transporter Model II (TRUPACTII) safety analysis [6] (all are without moderation controls). The waste form in this analysis uses a base mixture of 75% water and 25% polyethylene, the total amount of which is varied to determine the optimum moderation to fissile material (H/Pu) ratio. The fissile loading is maintained at up to 380 FGE 239 Pu (modeled as PuO 2 ) per CCO with an additional 545 g of beryllium (to bound the 1% by weight contents restriction) and 50 g of B 4 C intermixed per CCO. The beryllium content (1% by weight) is based on the total allowed waste weight (this does not include packaging and container weights). Figures ES-1 and ES-2 display summary results, showing that with this model including 50 g of B 4 C per CCO, the system keff remains under 0.85 for all moderator amounts and provides a significant margin against post-closure criticality under postulated bounding conditions for compaction. Figure ES-1 compares an infinite model with a room model at the initial emplacement spacing and under full radial compaction. Full radial compaction places each CCC in direct contact and does not credit any anticipated spacing associated with current post-closure geomechanical modeling of the repository [7]. The effects of variations in the H/Pu ratio were evaluated by varying the amount of the water/polyethylene component of the waste model, with fissile loading maintained at 380 239 Pu FGE. Similarly, Figure ES-2 illustrates how various amounts of B 4 C per CCO influence k eff at different radial compactions, all at the H/Pu ratio of 200 (in the room array model). Therefore, while the results from Saylor 2017 [2] modeled more realistic process limits associated with packaging of dilute surplus plutonium, this analysis demonstrates that limits on moderation (plastic and water content) are not necessary to ensure subcriticality in the WIPP repository, provided the requisite B 4 C absorber is present.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GT Flex: A Coordinated Multi-Building Pilot Study

Buildings are a significant and untapped resource for providing utility electric grid services. Recent studies have estimated that buildings could reduce the peak demand on the electric grid in the U.S. by almost 25% through effective combinations of energy efficiency (EE) measures and load flexibility strategies (Langevin et al. 2021). The U.S. Department of Energy (DOE) has established a goal to triple energy efficiency and demand flexibility in both residential and commercial sections by 2030 compared to 2020 levels (Satchwell et al. 2021). Such findings place buildings alongside electric vehicles, photovoltaics, electric batteries, and other distributed energy resources (DERs) as primary technologies needed for supporting high renewable energy generation grids. Coordinating and optimizing multiple buildings and other DERs is more beneficial and valuable when compared with individual buildings and DERs operating as siloed resources, uncoordinated with others (Olgyay et al. 2020). A pilot study at the Georgia Institute of Technology (GIT) was conducted to evaluate value propositions of a multi-building scale project seeking carbon reduction, energy efficiency and grid-interactive capabilities, by demonstrating the means by which stakeholders can determine the technical and financial merits of grid-interactivity and energy efficiency technologies coordinated across multiple assets. The study focused on analyzing technical feasibility of deploying thermal load flexibility strategies at the multi-building scale, coordinated to not exceed existing infrastructure constraints at the pilot site. Results show that campus can provide 3-3.5 MW of potential load shed over a 4-hour event window through coordinated dispatch of thermal cooling load flexibility without exceeding existing infrastructure capacities. Under future high renewable scenarios, this thermal flexibility resource is also valuable when coordinated to reduce curtailment of intermittent renewables. Economic analyses were performed to effectively communicate various value propositions of grid-interactive and efficient building (GEB) thermal flexibility strategies. Load flexibility presents a financial value proposition to the campus today. By conducting rationalized, coordinated dispatch in response to real time price (RTP) fluctuations, the campus can benefit materially from daily price arbitrage. The RTP signal acts as an aggregating mechanism between the utility and customer to call on demand flexibility resources, with a large portion of the benefit deriving from a relatively small number of days. Realizing and maximizing this benefit with thermal load flexibility requires careful attention to the timing of pricing signals and parameterization of dispatch to overcome efficiency penalties. Grid value and signals are expected to evolve over time, and thermal load flexibility shows potential to adapt dispatch logic to support intermittent renewable generation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Using Pilot Jobs and CernVM File System for Simplified Use of Containers and Software Distribution

High Energy Physics (HEP) experiments entail an abundance of computing resources, i.e. sites, to run simulations and analyses by processing data. This requirement is fulfilled by local batch farms, grid sites, private/commercial clouds, and supercomputing centers via High Throughput Computing (HTC). The growing needs of such experiments and resources being prone to trends of heterogeneity make it difficult for physicists to handle these resources directly. Additionally, HEP collaborations heavily rely on data and software releases, typically in the order of tens of gigabytes, while conducting simulations and analyses. Hence, aspects of scalability, reliability, and maintenance become crucial with regards to the distribution of the necessary data and software stack. The GlideinWMS [4] framework helps with the resource management problem by using pilot jobs, aka Glideins, to provision reliable elastic virtual clusters. Glideins are submitted to unreliable heterogeneous resources which are validated and customized by the Glideins to make the worker nodes available for end-user job execution. On the other hand, the CernVM File System (CernVM-FS or CVMFS) [1] helps with data distribution. It is a write-once, read-everywhere filesystem used to deploy scientific software to thousands of nodes on a worldwide distributed computing infrastructure. CVMFS is based on the Hyper Text Transfer Protocol and has been widely used within the particle physics community for (1) distributing experiment software and data such as calibrations, and (2) facilitating containerization by efficiently hosting container images along with providing containerization software, especially Singularity [3] GlideinWMS relies on CVMFS installed locally on the computing resources to satisfy the experiments' software needs. This requires system administrators' effort to install and maintain CVMFS at the sites and limits the use of sites, especially HPC resources, that do not have CVMFS installed. This poster presents a solution, taking advantage of Glideins to provide CVMFS at most sites without the need for a local installation. Doing so expands the pool of resources available for HEP experiments and reduces the effort of system administrators for current resources. Additionally, the proposed solution allows GlideinWMS to also start Singularity [3], a containerization software that can run unprivileged, on sites where neither CVMFS nor Singularity are available, including HPC sites. The benefits provided by this solution are: (1) lower overhead for site administrators in that they have less software to install, (2) an expanded pool of resources that run user jobs with easy access to software and data provided by CVMFS, thus making life easier for the scientists, and (3) improved flexibility to use HPC resources by enabling GlideinWMS pilot jobs to support HPC sites.

Urs, Namratha↗

Gen 3 Particle Pilot Plant (G3P3) -- High-Temperature Particle System for Concentrating Solar Power (Phases 1 and 2)

The U.S. Department of Energy Solar Energy Technologies Office initiated the Generation 3 Concentrating Solar Power (CSP) program to achieve higher operating temperatures (>700 °C) to enable next-generation CSP high-temperature power cycles such as the supercritical CO 2 (sCO2) Brayton Cycle. Three teams were selected to pursue high-temperature gas, liquid, and solid pathways for the heat-transfer media. Phases 1 and 2, which lasted from 2018 – 2020, consisted of design, modeling, and testing activities to further de-risk each of the technologies and develop a design for construction, commissioning, and operation of a pilot-scale facility in Phase 3 (2021 – 2024). This report summarizes the activities in Phases 1 and 2 for the solid-particle pathway led by Sandia National Laboratories. In Phases 1 and 2, Sandia successfully de-risked key elements of the proposed Gen 3 Particle Pilot Plant (G3P3) by improving the design, operation, and performance of key particle component technologies including the receiver, storage bins, particle-to-sCO2 heat exchanger, particle lift, and data acquisition and controls. Modeling and testing of critical components have led to optimized designs that meet desired performance metrics. Detailed drawings, piping and instrumentation diagrams, and process flow diagrams were generated for the integrated system, and structural analyses of the assembled tower structure were performed to demonstrate compliance with relevant codes and standards. Instrumentation and control systems of key subsystems were also demonstrated. Together with Bridgers & Paxton, Bohannan Huston, and Sandia Facilities, we have completed a 100% G3P3 tower design package with stamped engineering drawings suitable for construction bid in Phase 3.

14 SOLAR ENERGY↗