Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operational adaptability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Space Tug thermal control

Future development of full capability of the Space Tug will impose strict requirements upon the thermal design. Space Tug must be capable of steady-state and transient thermal operation during any given mission for durations of up to seven days and potentially longer periods of time. Maximum flexibility and adaptability of Space Tug to the mission model requires that the vehicle operate without attitude constraints throughout any specific mission. These requirements were translated into a preliminary design study for a geostationary deploy and retrieve mission definition for Space Tug to determine the thermal control design requirements. Results of the study are discussed with emphasis on some of the unique avenues pursued during the study, as well as the recommended thermal design configuration.

Ward, T. L.↗

Automation of Hubble Space Telescope Mission Operations

On June 13, 2011, after more than 21 years, 115 thousand orbits, and nearly 1 million exposures taken, the operation of the Hubble Space Telescope successfully transitioned from 24x7x365 staffing to 815 staffing. This required the automation of routine mission operations including telemetry and forward link acquisition, data dumping and solid-state recorder management, stored command loading, and health and safety monitoring of both the observatory and the HST Ground System. These changes were driven by budget reductions, and required ground system and onboard spacecraft enhancements across the entire operations spectrum, from planning and scheduling systems to payload flight software. Changes in personnel and staffing were required in order to adapt to the new roles and responsibilities required in the new automated operations era. This paper will provide a high level overview of the obstacles to automating nominal HST mission operations, both technical and cultural, and how those obstacles were overcome.

Burley, Richard↗

Lessons Learned from Astrobee Operations on the International Space Station

Since its launch in 2019, NASA has been operating three Astrobee free-flying robots providing an autonomous and adaptable research platform aboard the International Space Station (ISS). These robots have not only facilitated a myriad of national and international research endeavors in microgravity but have also served as a STEM outreach platform for student competitions aboard the ISS. Amidst its extensive operational tenure, spanning over five years and exceeding 1200 hours of cumulative free-flyer operation as of April 2024, the Astrobee robots have encountered software and hardware anomalies. Despite its inherent design for on-orbit repair or replacement, certain anomalies have proven to be complex, necessitating remote resolution via software and firmware updates or, in extreme cases, hardware replacements or the return of faulty units to NASA's ground facilities for repair. Such challenges underscore the delicate balance between the autonomous functionality of Astrobee and the occasional need for human intervention to maintain optimal performance. One recurring point of failure identified during Astrobee's operational lifespan has been the SD card, a critical component utilized by the different Astrobee processors and the Dock Station. The occurrence of SD card anomalies, both on orbit and within ground units, has provided invaluable insights into the improvement of Astrobee's systems and mitigation to future faults. This presentation will focus on four key areas: 1. Overview of Faults and Anomalies: A comprehensive examination of the diverse array of faults and anomalies encountered by Astrobee and its associated systems both in orbit and on the ground. From software glitches to hardware malfunctions, this section provides insights into the challenges faced during Astrobee's operational tenure. 2. Resolution Processes and Procedures: An in-depth discussion of the methodologies and procedures implemented to resolve the encountered anomalies. This includes remote troubleshooting, software patches, firmware updates, and, when necessary, the logistics involved in hardware replacements or down-massing for repair. 3. Implementation of Software Updates and Hardware Upgrades: A detailed exploration of the strategies employed to mitigate the risk of recurring anomalies through the implementation of software updates and hardware upgrades. This section highlights the iterative nature of Astrobee's development, emphasizing the continuous pursuit of robustness and reliability. 4. Lessons Learned and Future Directions: Reflecting on the insights gained from addressing anomalies, this section examines the lessons learned and outlines future directions for enhancing Astrobee's robustness and resilience. It underscores the iterative nature of space exploration and the importance of adaptability and continuous improvement in the pursuit of scientific discovery. Through a nuanced examination of Astrobee's operational challenges and the strategies employed to overcome them, this presentation sheds light on the complexities of operating autonomous robotic systems in the ISS environment. It underscores NASA's commitment to pushing the boundaries of exploration and innovation while navigating the inherent challenges of space exploration.

Astrobee↗

Lessons Learned from Astrobee Operations on the International Space Station

Since its launch in 2019, NASA has been operating three Astrobee free-flying robots providing an autonomous and adaptable research platform aboard the International Space Station (ISS). These robots have not only facilitated a myriad of national and international research endeavors in microgravity but have also served as a STEM outreach platform for student competitions aboard the ISS. Amidst its extensive operational tenure, spanning over five years and exceeding 1200 hours of cumulative free-flyer operation as of April 2024, the Astrobee robots have encountered software and hardware anomalies. Despite its inherent design for on-orbit repair or replacement, certain anomalies have proven to be complex, necessitating remote resolution via software and firmware updates or, in extreme cases, hardware replacements or the return of faulty units to NASA's ground facilities for repair. Such challenges underscore the delicate balance between the autonomous functionality of Astrobee and the occasional need for human intervention to maintain optimal performance. One recurring point of failure identified during Astrobee's operational lifespan has been the SD card, a critical component utilized by the different Astrobee processors and the Dock Station. The occurrence of SD card anomalies, both on orbit and within ground units, has provided invaluable insights into the improvement of Astrobee's systems and mitigation to future faults. This presentation will focus on four key areas: 1. Overview of Faults and Anomalies: A comprehensive examination of the diverse array of faults and anomalies encountered by Astrobee and its associated systems both in orbit and on the ground. From software glitches to hardware malfunctions, this section provides insights into the challenges faced during Astrobee's operational tenure. 2. Resolution Processes and Procedures: An in-depth discussion of the methodologies and procedures implemented to resolve the encountered anomalies. This includes remote troubleshooting, software patches, firmware updates, and, when necessary, the logistics involved in hardware replacements or down-massing for repair. 3. Implementation of Software Updates and Hardware Upgrades: A detailed exploration of the strategies employed to mitigate the risk of recurring anomalies through the implementation of software updates and hardware upgrades. This section highlights the iterative nature of Astrobee's development, emphasizing the continuous pursuit of robustness and reliability. 4. Lessons Learned and Future Directions: Reflecting on the insights gained from addressing anomalies, this section examines the lessons learned and outlines future directions for enhancing Astrobee's robustness and resilience. It underscores the iterative nature of space exploration and the importance of adaptability and continuous improvement in the pursuit of scientific discovery. Through a nuanced examination of Astrobee's operational challenges and the strategies employed to overcome them, this presentation sheds light on the complexities of operating autonomous robotic systems in the ISS environment. It underscores NASA's commitment to pushing the boundaries of exploration and innovation while navigating the inherent challenges of space exploration.

Astrobee↗

Adaptive Aerostructures for Revolutionary Civil Supersonic Transportation

To enable commercially viable civil supersonic transport (SST) aircraft, innovative solutions must be developed to meet noise and efficiency requirements for overland flight. This research effort consists of a multidisciplinary team of academic and industrial experts exploring for the first time the potential of small real-time geometric outer mold line (OML) reconfigurations to minimize sonic boom signatures and aircraft drag in response to changing ambient conditions, thereby enabling noise-compliant overland supersonic flight. The team utilizes recent advances in supersonic computational fluid dynamic (CFD) methods, new noise prediction tools, and new design approaches to consider embedded highly energy-dense shape memory alloy (SMA) actuators for local shape modifications to an SST aircraft leading to optimal low boom signature and low drag in different environments. This university-led program will provide strategic leadership toward technology convergence that advances NASA's Aerospace Research Mission Directorate's (ARMD) research objectives with regard to Thrust 2: “Innovation in Commercial Supersonic Aircraft” by exploring for the first time enabling low-boom operation across a range of flight conditions via structural adaptivity, and will promote education of the next generation of engineers. The overall research strategy is to pursue three critical areas: the design of configurations for reducing boom, SMA material development and modeling, and technology feasibility demonstration in a relevant environment. Initially, the team will identify potential applications where structure or geometry adaptivity provides a benefit in noise or drag across the entire flight envelope. For selected applications/structural locations, required OML geometry changes will be determined based on analysis of sonic boom ground signature and drag reduction using new design tools, trade studies, and atmospheric sensing techniques. Designs will be developed and evaluated against requirements on loading, stroke length, and operational temperature. New alloy formulations will be developed tailored for both autonomous and controlled actuation modes. As the SMA material development matures, integrated system-level factors will be investigated. Optimized designs for small-scale distributed adaptivity applications of maximum benefit will then be matured and tested, moving toward demonstration of the innovative technology approaches at a TRL 4-5 and showing that sonic booms can be reduced by reconfiguration on demand.

Koushik Datta↗

Deep Learning-Based Adaptive Remedial Action Scheme with Security Margin for Renewable-Dominated Power Grids

The Remedial Action Scheme (RAS) is designed to take corrective actions after detecting predetermined conditions to maintain system transient stability in large interconnected power grids. However, since RAS is usually designed based on a few selected typical operating conditions, it is not optimal in operating conditions that are not considered in the offline design, especially under frequently and dramatically varying operating conditions due to the increasing integration of intermittent renewables. The deep learning-based RAS is proposed to enhance the adaptivity of RAS to varying operating conditions. During the training, a customized loss function is developed to penalize the negative loss and suggest corrective actions with a security margin to avoid triggering under-frequency and over-frequency relays. Simulation results of the reduced United States Western Interconnection system model demonstrate that the proposed deep learning–based RAS can provide optimal corrective actions for unseen operating conditions while maintaining a sufficient security margin.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Elastic-wave sensitivity-guided adaptive seismic survey design for cost-effective monitoring of geological carbon storage

Effective seismic monitoring is essential for verifying CO₂ containment, detecting potential leakage, and optimizing operational decisions in geologic carbon storage. Here, this study presents a time-adaptive, elastic-wave sensitivity-guided framework for designing cost-effective seismic monitoring layouts for tracking CO₂ plume migration. The method is based on elastic-wave sensitivity analysis, which quantifies how variations in subsurface properties impact seismic wavefields. Two complementary design strategies are developed: one based on selecting a fixed number of seismic sources (Method A), and the other based on selecting source–receiver pairs contributing to a fixed fraction of cumulative elastic-wave sensitivity energy (Method B). The optimization workflow to identify source–receiver configurations with the highest detection potential is demonstrated using a hypothetical GCS scenario at the Kimberlina site in California using simulations of elastic-wave sensitivity data at multiple post-injection timesteps. Results show that both strategies adapt to evolving plume geometries and wavefield sensitivities, with Method B offering broader spatial coverage and Method A ensuring simpler deployment. This framework enables site-specific, cost-effective, and risk-informed seismic survey designs, enhancing the ability to monitor CO₂ migration over time in evolving geological environments

58 GEOSCIENCES↗

Adaptive Modeling of the International Space Station Electrical Power System

Software simulations provide NASA engineers the ability to experiment with spacecraft systems in a computer-imitated environment. Engineers currently develop software models that encapsulate spacecraft system behavior. These models can be inaccurate due to invalid assumptions, erroneous operation, or system evolution. Increasing accuracy requires manual calibration and domain-specific knowledge. This thesis presents a method for automatically learning system models without any assumptions regarding system behavior. Data stream mining techniques are applied to learn models for critical portions of the International Space Station (ISS) Electrical Power System (EPS). We also explore a knowledge fusion approach that uses traditional engineered EPS models to supplement the learned models. We observed that these engineered EPS models provide useful background knowledge to reduce predictive error spikes when confronted with making predictions in situations that are quite different from the training scenarios used when learning the model. Evaluations using ISS sensor data and existing EPS models demonstrate the success of the adaptive approach. Our experimental results show that adaptive modeling provides reductions in model error anywhere from 80% to 96% over these existing models. Final discussions include impending use of adaptive modeling technology for ISS mission operations and the need for adaptive modeling in future NASA lunar and Martian exploration.

Thomas, Justin Ray↗

Advanced Mixed Waste Treatment Project Overcomes Challenges to Complete Treatment of Debris Waste - 20616

The Advanced Mixed Waste Treatment Project (AMWTP), operated by Fluor Idaho for the Department of Energy Idaho Operations Office, completed the last of its debris waste treatment in the fall of 2019. Concluding that work-scope was certainly not without its challenges. Fluor Idaho and its employees had to adapt to treating extremely challenging waste types, such as high-fissile gram materials and potentially pyrophoric and reactive wastes coming down the stretch. It also had to complete the sizing of large waste boxes from Mound Laboratories in inner-contamination enclosures designed to capture the extremely fine, 'flighty' plutonium-238 in its high-efficiency particulate air filters. Very few waste treatment facilities in the DOE Complex have completed their missions. In fact, most large-scale waste treatment facilities are still under construction with many months or years remaining before 'hot operations' begin. AMWTP is unique because it functioned as a 'one-stop shop.' Transuranic and low-level waste characterization, treatment, certification, and shipping all occurred there. AMWTP concluded the most challenging part of its mission and will continue to ship material out of the state of Idaho for the next decade. This paper will provide a background of the AMWTP mission, and the adaptations to its operating permit, equipment, or treatment processes to address challenging waste types. AMWTP will leave behind a legacy of being one of the most successful waste treatment facilities in the history of the DOE Complex. The facility was well-conceived, well-constructed, and well-executed; it was done right from start to finish. During the course of its waste treatment mission, the facility was required to adapt to changing conditions by treating extremely challenging waste types. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Real-Time Visualization of Spacecraft Telemetry for the GLAST and LRO Missions

GlastCam and LROCam are closely-related tools developed at NASA Goddard Space Flight Center for real-time visualization of spacecraft telemetry, developed for the Gamma-Ray Large Area Space Telescope (GLAST) and Lunar Reconnaissance Orbiter (LRO) missions, respectively. Derived from a common simulation tool, they use related but different architectures to ingest real-time spacecraft telemetry and ground predicted ephemerides, and to compute and display features of special interest to each mission in its operational environment. We describe the architectures of GlastCam and LROCam, the customizations required to fit into the mission operations environment, and the features that were found to be especially useful in early operations for their respective missions. Both tools have a primary window depicting a three-dimensional Cam view of the spacecraft that may be freely manipulated by the user. The scene is augmented with fields of view, pointing constraints, and other features which enhance situational awareness. Each tool also has another "Map" window showing the spacecraft's groundtrack projected onto a map of the Earth or Moon, along with useful features such as the Sun, eclipse regions, and TDRS satellite locations. Additional windows support specialized checkout tasks. One such window shows the star tracker fields of view, with tracking window locations and the mission star catalog. This view was instrumental for GLAST in quickly resolving a star tracker mounting polarity issue; visualization made the 180-deg mismatch immediately obvious. Full access to GlastCam's source code also made possible a rapid coarse star tracker mounting calibration with some on the fly code adjustments; adding a fine grid to measure alignment offsets, and introducing a calibration quaternion which could be adjusted within GlastCam without perturbing the flight parameters. This calibration, from concept to completion, took less than half an hour. Both GlastCam and LROCam were developed in the C language, with non-proprietary support libraries, for ease of customization and portability. This no-blackboxes aspect enables engineers to adapt quickly to unforeseen circumstances in the intense operations environment. GlastCam and LROCam were installed on multiple workstations in the operations support rooms, allowing independent use by multiple subsystems, systems engineers and managers, with negligible draw on telemetry system resources.

Stoneking, Eric T.↗

An architecture for intelligent interfaces - Outline of an approach to supporting operators of complex systems

The conceptual design of a comprehensive support system for operators of complex systems is presented. Key functions within the support system architecture include information management, error monitoring, and adaptive aiding. One of the central knowledge bases underlying this functionality is an operator model that involves a 'matrix' of algorithmic and symbolic models for assessing and predicting an operator's activities, awareness resources, intentions, and performance. Functional block diagrams are presented for the overall architecture as well as the key elements within this architecture. A variety of difficult design issues are discussed and ongoing efforts aimed at resolving these issues are noted.

Rouse, W. B.↗

Future space transportation system architecture avionics requirements

NASA began a multi-center study in January 1993 to examine options for providing the most cost effective space transportation system in the future. The key advanced avionics requirements for these vehicle concepts are envisioned to provide significantly improved operational efficiency and effectiveness. It is very desirable to have adaptive guidance, navigation, and control approaches that will allow launch and return in almost any weather condition. The vehicles must be able to accommodate atmospheric density variations and winds without software changes. The flight operations must become much more autonomous in all flight regimes like an aircraft, and preflight checkout should make use of the onboard systems. When the vehicle returns to the launch site, subsystem health must be known and maintenance tasks scheduled accordingly. Ground testing of most subsystems must be eliminated. Also, the health monitoring system must be designed to enhance the ability to abort the mission significantly and save the crew and the vehicle. The displays and controls must be much less complex than current systems and must significantly reduce pilot work load. It is important to have low power, light weight displays and controls. Rendezvous and docking and all flight phases must have autopilot capability to reduce pilot work load for routine operations and in abort situations. The vehicles must have the demonstrated ability to return to the launch site. Abort from all mission phases can put additional demands on the communications system.

Stone, Howard↗

Advanced Multimodal Solutions for Information Presentation

High-workload, fast-paced, and degraded sensory environments are the likeliest candidates to benefit from multimodal information presentation. For example, during extra-vehicular activity (EVA) and telerobotic operations, the sensory restrictions associated with such a hostile environment provide a major challenge to maintaining the situation awareness (SA) required for safe operations. In particular, orientation, navigation, and collision avoidance are critical aspects of EVA tasks that need to be addressed to ensure the safety of the crew and the success of the mission. Multimodal displays hold promise to enhance situation awareness and task performance by utilizing different sensory modalities and maximizing their effectiveness based on appropriate interaction between modalities. Multimodal displays will also play an important role for long-duration information systems and will likely begin to be developed in the early phases of cislunar Gateway, and later lunar or Mars transit missions. Information systems are envisioned for LDEMs that require spacecraft with greater crew autonomy and increased dependence on computer-provided information needed to perform routine tasks, as well as time- and safety critical tasks. Such a system will require a single, common interface that is easy to learn and use and accesses key information from all relevant vehicle/habitat systems to enable task performance in both nominal and emergency conditions. Understanding of multimodal display technologies and their interactions will help to inform interface guidelines for LDEMs. The scope of the current report is an analysis of potential multimodal display technologies for long duration missions and, in particular, will focus on their potential role in EVA activities. The review will address multimodal (combined visual, auditory and/or tactile) displays investigated by the National Aeronautics and Space Administration (NASA), industry, and Department of Defense (DoD). It also considers the need for adaptive information systems to accommodate a variety of operational contexts such as crew status (e.g., fatigue, workload level) and task environment (e.g., EVA, habitat, rover, spacecraft). Current approaches to guidelines and best practices for combining modalities for the most effective information displays are also reviewed. Potential issues in developing interface guidelines for LDEMs are briefly considered.

multimodal displays↗

Space tug thermal control

The future development of full capability Space Tug will impose strict requirements upon the thermal design. While requiring a reliable and reusable design, Space Tug must be capable of steady-state and transient thermal operation during any given mission for mission durations of up to seven days and potentially longer periods of time. Maximum flexibility and adaptability of Space Tug to the mission model requires that the vehicle operate within attitude constraints throughout any specific mission. These requirements were translated into a preliminary design study for a geostationary deploy and retrieve mission definition for Space Tug to determine the thermal control design requirements. Results of the study are discussed with emphasis given to some of the unique avenues pursued during the study, as well as the recommended thermal design configuration.

Ward, T. L.↗

Geosynchronous platform definition study. Volume 7: Geosynchronous transporation requirements

The analyses and trade studies are presented which were conducted to define the interfaces between geosynchronous platforms and the space transportation system. Mission timelines are synthesized for both manned and unmanned placement and servicing operations. Physical, operational, and functional interfaces between platforms and the space shuttle and tug are derived from the timelines. Where interface incompatibilities exist, alternate approaches are evaluated and a preferred approach is defined. An evaluation of the adaptation of the solar electric propulsion (SEP) stage for geosynchronous operations is presented. A comparison of geosynchronous platform programs with and without the SEP stage in the transportation system is developed.

Myers, H. L.↗

AI and Autonomy Initiatives for NASA’s Deep Space Network (DSN)

NASA’s Deep Space Network (DSN) consists of thirteen large (34- and 70-meter) antennas that are used to communicate with approximately 40 NASA and partner spacecraft, all at great distance from the earth (generally at Lunar distances and beyond). The DSN has a long history — over 50 years — and has evolved with cutting edge, often custom, telecommunications equipment and associated software systems. In recent years, and in preparation for an increasing future demand, there has been an effort to invest in initiatives that will result in significant cost savings in the future. These efforts are building on, or augmenting, the recent deployment of “Follow-the-Sun” operations (day shift remote operational control of the entire network from each of the three antenna complexes in turn) — which is being deployed in 2017. This paper focuses on Adaptive Demand Access: in a paradigm shift from completely pre-planned operations, this concept calls for spacecraft to signal their intent (or not) for near-future contacts, in case they have science results of interest, or have experienced an anomaly. This would take advantage of a beacon tone transmission, which can be detected using smaller antennas. When a connection request is received, the DSN ground systems would adaptively accommodate the request, inserting the contact into the plan as soon as possible, subject to constraints and priorities. The demand access concept incorporates onboard data analysis and science data processing, so that beacon tones can be generated with maximum information. This area is representative of several where infusing AI technologies can lead to improved effectiveness of the DSN as the network readies for support of expanded Mars exploration efforts in the 2020’s and beyond.

Wyatt, E. Jay↗

Power Burst Facility: U(18)O2-CaO-ZrO2 Fuel Rods in Water

The Power Burst Facility (PBF) reactor operated from 1972 to 1985 on the SPERT Area I of the Idaho National Laboratory, then known as Nuclear Reactor Test Station. PBF was designed to provide experimental data to aid in defining thresholds for and modes of failure under postulated accident conditions. PBF reactor startup testing began in 1972. This evaluation focuses on two operational loading tests, chronologically numbered 1 and 2, published in a startup-test report in 1974 [1]. Data for these tests was used by one of the authors to validate a MCNP model for criticality safety purposes [2]. Although specific references to original documents are kept in the text, all the reactor parameters and test specific data presented here was adapted from that report. The tests were performed with operational fuel loadings, a stainless steel in-pile tube (IPT) mockup, a neutron source, four pulse chambers, two fission chambers, and one ion chamber. The reactor's four transition rods (TRs) and control rods (CRs) were present but TR boron was completely withdrawn below the core and CR boron was partially withdrawn above the core. Test configurations differ primarily in the number of shim rods, and consequently the number of fuel rods included in the core. The critical condition was approached by incrementally and uniformly withdrawing CR boron from the core. Based on the analysis of the experimental data and numerical calculations, both experiments are considered acceptable as criticality safety benchmarks.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Deep-learning-based domain adaptation for cavity fault prediction at Jefferson Laboratory

Superconducting radio-frequency (SRF) cavities are the core components of the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab, providing high-power electron beams for nuclear physics experiments. The facility comprises 418 SRF cavities, and any fault in these cavities can lead to interruptions in the electron beam supply. Cavity faults are the leading cause of beam trips in CEBAF. Predicting and mitigating those faults before onset can help maintain normal operation. Existing models face challenges in distinguishing between normal and fault signals when changes occur in the underlying time-series data, from changes in control software, operational parameters, or the environment. This work proposes a deep learning domain adaptation model that leverages transfer learning to address fault prediction challenges by improving accuracy. The model is trained and fine-tuned using a dataset collected for faulty and normal operation using a data acquisition system in CEBAF. Our deep learning-based domain adaptation model achieves a prediction accuracy of 89.61% of the fault and normal signals. The developed model effectively predicts normal running signals compared to the baseline approach without domain adaptation. This capacity is essential for the fault prediction task in the CEBAF because of heavily imbalanced data containing vast amounts of normal signals. The model performs well for predicting faults several hundred milliseconds before the fault onset compared to other models where no adaptation is applied. Incorporating deep learning-based domain adaptation techniques will significantly improve the fault prediction performance.

Rahman, Md Monibor [Old Dominion Univ., Norfolk, V↗