Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operational Reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

DC Microgrid Reliability Enhancement with Adaptive Converter Thermal Management

Due to the different device selections, aging levels, and thermal dissipation performance, some converters may take additional thermal stress on switching devices than others in paralleled converter systems, which will reduce system reliability. To address this problem, this paper proposes a power-sharing strategy with adaptive thermal management. First, the temperature-based power loss model and electrical-thermal model are established. Based on that, a high-accuracy IGBT junction temperature estimate considering the power loss-temperature coupling can be achieved. Further, the thermal-sharing for all the switching devices in paralleled converters can be achieved with the proposed adaptive thermal management strategy. The proposed strategy can change the power-sharing ratio adaptively according to the system operation conditions, which will contribute to the system reliability enhancement. The effectiveness of the proposed strategy is verified through PLECS thermal simulation and joint real-time simulation with Dspace and RT-box.

DC microgrid↗

Co-Simulation Meets AI: MCP-Driven Power System Analysis

GridGPT, a fine-tuned Generative AI model is designed for on-premise use in grid control rooms. This presentation will demonstrate how eGridGPT can seamlessly integrate with control room solutions to offer operators, engineers, and corporate users enhanced guidance and decision support. It is to show how this innovative AI solution can improve state estimation, boost variable energy forecasting, and optimize grid operations. By leveraging eGridGPT's unique features, audience will learn to unlock new levels of automation, predictive analytics, and reliability within their power systems, ultimately leading to reduced downtime and improved operational efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Small-Signal Stability Conditions for Inverter-Based Unbalanced Microgrids

The proliferation of inverter-based generation and advanced sensing, controls, and communication infrastructure have facilitated accelerated deployment of microgrids. A coordinated network of microgrids can maintain reliable power delivery to critical facilities during extreme events. Low-inertia offered by the power-electronics–interfaced energy resources, however, can present significant challenges to ensuring stable operation of the microgrids. In this work, distributed small-signal stability conditions for inverter-based microgrids are developed that involve the droop-controller parameters and the network parameters (e.g. line impedances, loads). The distributed closed-form parametric stability conditions derived in this paper can be verified in a computationally efficient manner, facilitating reliable design and operations of networks of microgrids. Dynamic phasor models have been used to capture the effects of electromagnetic transients. Furthermore, numerical results are presented, along with PSCAD simulations, to validate the analytical stability conditions. Effects of design choices, such as the conductor types, and inverter sizes, on the small-signal stability of inverter-based microgrids are investigated to derive useful engineering insights.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Securing Small Modular Reactors in Urban Environments

Current small modular reactor (SMR) deployment use cases consider both rural and urban deployments, depending on the operational in-country needs for clean and reliable sources of energy. Many studies have been conducted analyzing security in rural and remote deployment locations, but this study looks at the physical security implications of an SMR placed in an urban environment and its uses for electricity production, district heating, and process heating. SMRs used for electricity production, district heating, and process heating may be key sources of both energy infrastructure and commercial infrastructure within a city and a State. As a result, long-term shutdowns could have a serious impact on a State’s overall energy or commercial production. Therefore, operators may consider further security applications to protect an SMR plant from physical attacks against both radiological sabotage and sabotage acts that could result in the SMR facility being offline for a significant amount of time. In this study, the team designed and analyzed a physical protection system (PPS) for securing an urban SMR facility against acts of radiological sabotage and sabotage acts that could disrupt the facility’s long-term operation. Additionally, this work analyzed the nuanced security issues related to siting an SMR near an urban environment (versus in a rural environment). The result of these analyses includes recommendations for PPSs for urban SMR facilities used for energy production, district heating, and process heating.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Networked Microgrid Operations: Supporting a Resilient Electric Power Infrastructure

Modern electric power systems operate using large generating units managed with a centralized control structure. The current systems are the result of over a hundred years of technological development and consolidation to leverage economies of scale. While the existing systems have proven cost effective and reliable, modern systems are experiencing a wide range of operational challenges that are causing a reexamination of the centralized control structure. Despite the nearly universal adoption of centralized control, electric power systems are fractal in their operational requirements. Specifically, the fundamental operational requirements are the same, regardless of the system size. While past technologies have not allowed for exploitation of this fractal behavior, emerging technologies are making it possible; these technologies include grid-forming inverters, modern telecommunications systems, and distributed control architectures. Here we show emerging technologies that allow the fractal operational requirements of electric power systems to be exploited as networked microgrids to increase the resiliency of the world’s critical electrical infrastructure.

Schneider, Kevin P.↗

Estimation of pipe failure frequencies in the absence of operational experience data: A pilot study

Probabilistic failure metrics such as leak frequency and rupture frequency are commonly used to characterize piping reliability. The methodologies for calculating the failure metrics rely on a complex set of input parameters. Operating experience data and experimental data play an important role in informing the different input parameters. The paper describes results and conclusions of a coordinated research project to benchmark three different reliability models using a four-step procedure: reference case definition of relevance to advanced reactor designs, input parameter calibration, validation of results, and application of different methodologies upon completion of the calibration and validation steps. The reference case is a weld consisting of nickel-base alloy 152/52 and located within a primary pressure boundary of an advanced reactor. This alloy is a class of structural materials known to be highly resistant to stress corrosion cracking. Synergies between the different methods are noted and the importance of a multi-disciplinary approach to input parameter development is underscored. A key conclusion is that the three methods are equally suitable for estimating failure frequencies. In any specific application, a selection of the most practical or effective computational tool can be considered. The comparison of alternative models confirms and helps to gain confidence in the computed failure frequency estimates. The study was part of a coordinated research project organized by the International Atomic Energy Agency.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Hot‐Swappable, Fault‐Tolerant, Modular Power Converter System for Solar Photovoltaic Plants

The performance metrics of the state-of-the-art commercial solar inverters, such as system cost, operation and maintenance (O&M) cost, service life, reliability, maintainability, and power density are much lower than the target metrics needed to achieve SunShot’s 2030 levelized cost of energy (LCOE) goals. To overcome the shortcomings of the existing solar inverters, this project proposed a novel Hot-Swappable, Fault-Tolerant, Modular Power Converter (HSFT-MPC) concept for solar photovoltaic (PV) plants and proved the concept through the design, fabrication, and laboratory test validation of a single-phase HSFT-MPC prototype. The HSFT-MPC has the following distinct advantages over the state-of-the-art: 1) elimination of harmonic/ electromagnetic interference (EMI) filter in the inverter stage due to the novel topology, 2) lower system cost and higher power density due to the modular design, elimination of harmonic/EMI filter, and lower cooling requirement, 3) higher efficiency due to lower switching frequencies, 4) higher reliability and longer (50 years) service life due to simpler cooling and fault tolerance capability, 5) easier installation, lower O&M cost, and improved maintainability due to the modular design and hot-swappable power electronic building blocks (PEBBs), and 6) improved manufacturability due to the modular design. This project developed a single-phase HSFT-MPC prototype with 25kW nominal output power, 2.4kV, 60Hz nominal AC output, lower than 5% AC output voltage total harmonic distortion, over 5 kW/L inverter power density, and 99.4% inverter peak efficiency, being tolerant to failure of single and multiple PEBBs, and capable of hot swapping of the failed PEBB(s). The HSFT-MPC enables uninterruptable operation of the solar PV plant when failure of single or multiple PEBBs or PV modules occurs. Compared with the existing solar inverters in the market, the HSFT-MPC is expected to reduce the inverter failure-caused downtime and energy losses of solar PV plants by more than 60% and 50%, respectively. Project findings have been presented at major conferences in the field and published in peer-reviewed papers, which added new knowledge to the field of power electronics for solar PV systems. A minicourse on Solar PV Systems was developed for outreach activities. The minicourse will help attract young individuals to the renewable energy profession which has a significant talent shortage. The HSFT-MPC is expected to overcome all of the shortcomings of the state-of-the-art solar inverters in terms of cost, efficiency, service life, reliability, maintainability, and manufacturability targets needed to achieve SunShot’s 2030 LCOE goals. Therefore, the proposed HSFT-MPC concept has the great potential to disrupt the current solar inverter market. This project created a pathway towards industry adoption of the HSFT-MPC to help achieve 50-year service life solar PV systems. Since the solar PV plants using the HSFT-MPC will feature with higher reliability, longer service life, and easier maintenance, they are particularly useful for the rural areas with underserved populations that demand reliable and affordable clean electricity. The outcomes of the project have the strong potential to address national needs in the field of renewable energy to reduce CO 2 emissions from the electricity sector, reduce imports of energy from foreign sources, and improve energy security, efficiency, and sustainability. Since electricity is used in almost all of society’s sectors, the outcomes of the project will benefit various sectors of society and economy.

14 SOLAR ENERGY↗

Modeling of tungsten filament in gas discharge in H - ion source

Sources of negative ions such as H - are essential elements of proton accelerators and tokamaks. They have limited lifetime. The replacement of an ion source is a costly process causing delays in the operation of the entire machine. The hot tungsten filament is the key element that limits the lifetime of the H - ion source at the Los Alamos Neutron Science Center (LANSCE) facility. An accurate model, which describes the filament physics and provides a reliable estimate on its lifetime, may significantly improve the operation of the facility. In this report we describe such a model, including a comprehensive list of relevant physical processes from first principles. The model can be used to describe different regimes of operation using diagnostics data as input parameters. It has been benchmarked against the data collected during the production cycle at LANSCE and shows good agreement with experimental data.

47 OTHER INSTRUMENTATION↗

Improving Cycling Performance of Anode-Free Lithium Batteries by Pressure and Voltage Control

The anode-free lithium (Li) batteries (AFLBs) have great potential to provide higher energy density than most other batteries. However, the performance of AFLBs is very sensitive to pressure and other operating parameters, especially for coin cells widely used in AFLB investigations. Therefore, optimizing cell assembly parameters and test protocol is critical to get reliable and comparable results in this field. In this work, the operating voltage range of AFLBs using a localized high concentration electrolyte has been optimized. The morphology of the deposited Li in AFLBs is much more indicting to the pressure than other type of batteries due to the absence of anode active material (i.e. Li) as a pressure cushion layer in the as prepared cells. With an optimized cycling protocol, a thin layer of uniform nucleation sites can be formed in the initial cycle which will facilitate smooth Li desposition/stripping in the subsequent cycles of AFLBs. The solid electrolyte interphase layer formed under optimized pressure and uniform pressure distribution exhibits a good mechanical stability even after long-term cycling. In conclusion, with an optimized cell configuration, the internal pressure in the coin cells has been optimized to improve the cycling performance of AFLBs (Cu||NMC811) with 72% of capacity retention in 100 cycles.

25 ENERGY STORAGE↗

Application of Orthogonal Defect Classification for Software Reliability Analysis

The modernization of existing and new nuclear power plants with digital instrumentation and control systems (DI&C) is a recent and highly trending topic. However, there lacks strong consensus on best-estimate reliability methodologies by both the United States (U.S.) Nuclear Regulatory Commission (NRC) and the industry. This has resulted in hesitation for further modernization projects until a more unified methodology is realized. In this work, we develop an approach called Orthogonal-defect Classification for Assessing Software Reliability (ORCAS) to quantify probabilities of various software failure modes in a DI&C system. The method utilizes accepted industry methodologies for software quality assurance that are also verified by experimental or mathematical formulations. In essence, the approach combines a semantic failure classification model with a reliability growth model to predict (and quantify) the potential failure modes of a DI&C software system. The semantic classification model is used to address the question: How do latent defects in software contribute to different software failure root causes? The use of reliability growth models is then used to address the question: Given the connection between latent defects and software failure root causes, how can we quantify the reliability of the software? A case study was conducted on a representative I&C platform (ChibiOS) running a smart sensor acquisition software developed by Virginia Commonwealth University (VCU). The testing and evidence collection guidance in ORCAS was applied, and defects were uncovered in the software. Qualitative evidence, such as condition coverage, was used to gauge the completeness and trustworthiness of the assessment while quantitative evidence was used to determine the software failure probabilities. The reliability of the software was then estimated and compared to existing operational data of the sensor device. It is demonstrated that by using ORCAS, a semantic reasoning framework can be developed to justify software reliability (or unreliability) while still leveraging the strength of the existing methods.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Reliability Assessment of Cooling Fans for PV Inverters: Testing, Modeling, and Case Studies

The reliability of photovoltaic (PV) inverters is critical for long-term solar system performance, with cooling fan failures frequently leading to costly downtime. While much research exists on general cooling fan reliability, little attention has been given to fans operating within PV inverters and their unique environmental challenges. Here, this article proposes a comprehensive methodology to address this gap. First, a failure mode and effects analysis is performed on fans to identify the key failure mechanisms in PV applications, their corresponding stressors, and the models necessary for lifetime prediction. Second, an accelerated life test is designed and conducted to collect valuable experimental data for PV inverter fans in a reasonable amount of time. Third, a mathematical conversion of dynamic mission profiles into effective constant stress levels is derived. Fourth, case studies are given, showcasing lifetime estimates that account for geographic variations in mission profile data. The results demonstrate that this integrated approach leads to an accurate reliability assessment for PV inverter cooling fans.

accelerated life testing (ALT)↗

Initial Assessment of Availability and Reliability for the PIP-II Superconducting Radio Frequency Linear Accelerator Facility

The Proton Improvement Plan -II (PIP-II) is a high intensity and high energy proton accelerator which will be used to support the neutrino program at Fermilab. The accelerator will deliver a 2 mA average beam current at a kinetic energy of 800 MeV. Due to the requirements from experiments, this accelerator is designed to be a highly reliable and available system. A target availability of the complete accelerator facility was prescribed to be 90%. An availability and reliability assessment of the accelerator was carried out to ascertain that the design can meet the target availability specification. The results were estimated for the nominal operational mode, when an 800 MeV beam is delivered on the target and for the critical operational mode, when a 600 MeV output beam was incident on the target. The design of a complete accel-erator system is a complex arrangement of a large number of components. To simplify the analysis, a few components were shortlisted and based on their functions, an accelerator model was created. The model is represented in the form of reliability block diagrams. Availability and reliability were estimated for each operational mode. To increase the availa-bility and reliability of the overall accelerator, redundancy of one cavity per section in the superconducting portion of the Linac was introduced.

43 PARTICLE ACCELERATORS↗

Using probabilistic solar power forecasts to inform flexible ramp product procurement for the California ISO

How can independent system operators (ISOs) take advantage of probabilistic solar forecasts to lower generation costs and improve reliability of power systems? We discuss one three-step approach for doing so, focusing on how such forecasts might help the California Independent System Operator (CAISO) prepare unexpected net load ramps, where net load equals gross demand minus wind and solar production. First, we enhance an existing solar forecasting system to provide well-calibrated hours-ahead probabilistic forecasts. We then relate the degree of uncertainty reflected in the forecasted prediction intervals (independent variables) to error distributions for net load ramp forecasts for the CAISO real-time market (dependent variable) using machine learning and quantile regression. Projected ramp forecast errors conditioned on solar uncertainty are translated into flexible ramp requirements that therefore reflect real-time meteorological and solar conditions, improving on typical ISO procedures. Detailed descriptions are provided on the quantile regression and kth-nearest neighbor categorization methods for accomplishing that translation. Finally, a multiple time-scale look-ahead market simulation model is applied to a 118-bus IEEE Reliability Test System, modified to represent the CAISO generation mix and demand distributions. The model runs quantify how solar-conditioned ramp requirements can, first, decrease operating costs by reducing requirements compared to often conservative unconditional methods and, second, decrease generation scarcity events and consequently improve reliability by increasing flexibility requirements at times when unconditional forecast-based requirements understate actual ramp uncertainty. Solar-conditioned ramp requirements are found to reduce generation operating costs by about 2% for the test system (which would be equivalent to over $\$100$ million per year for a CAISO-size system).

14 SOLAR ENERGY↗

An engineered lactate oxidase based electrochemical sensor for continuous detection of biomarker lactic acid in human sweat and serum

Lactate levels in humans reveal intensity and duration of exertion and provide a critical readout for the severity of life-threatening illnesses such as pediatric sepsis. Using the lactate oxidase enzyme (Lox) from Aerococcus viridians, we demonstrated its functionality for lactate electrochemical sensing in physiological fluids in a lab setting. The structure and dynamics of LOx were validated by crystallography, X-ray scattering, and hydroxyl radical protein footprinting. This provided a validated protein template for understanding and designing an enzyme-based electrochemical sensing elements. Using this template, LOx enzyme variants were generated and compared. Comparison of the variants demonstrates that one exhibits effective lactate sensing at significantly reduced operating voltages. Additionally, we demonstrate that the four hexahistidine-tags on each enzyme tetramer are sufficient for immobilization to create a durable, functional sensor, with no need for a covalent attachment, enabling self-immobilization and eliminating the need for additional immobilization steps. The functionality of the LOx enzyme variants was verified at physiological lactate concentrations in both human serum (0–4 mM) and artificial sweat (0–100 mM) using 3-electrode setups for analysis of the three variants in parallel. Accuracy of measurement in both artificial sweat and human serum were high. Employing a microfluidic flow cell, we successfully monitored varying lactate levels in physiological fluids continuously over a 2h period. Overall, this optimized LOx enzyme, which self-immobilizes onto gold sensing electrodes, facilitates efficient and reliable lactate detection and continuous monitoring at reduced operating voltages suitable for further development towards commercial use.

60 APPLIED LIFE SCIENCES↗

Stochastic Continuous-time Flexibility Scheduling and Pricing in Wholesale Electricity Markets

Large-scale integration of intermittent renewable energy sources (RES) is calling for additional flexibility resources as well as more advanced modeling and optimization techniques to account for the increasing uncertainty and variability in power systems operation. As the RES integration gains momentum, the magnitude and frequency of their variations increase, which may trigger ramping scarcity events in real-time power systems operation. This necessitates revisiting the present definition of power systems flexibility and reserve services to reflect their robustness and adequacy towards sub-interval variations of the load and RES, as well as adjusting the operation models to accommodate the new reserve services. This project took a fundamental approach and aimed at developing continuous-time scheduling and pricing model that accurately models the continuous-time variations of load and RES and efficiently deploys the ramping capability of flexible resources to compensate the sources of variability and uncertainty in the market. In this regard, this project pursued the following goals: Developing stochastic multi-fidelity continuous-time optimization models for scheduling of energy storage (ES) systems and flexible loads in wholesale energy markets; Developing the theory and practices of continuous-time locational marginal pricing for valuating energy storage systems and flexible loads in wholesale energy markets; Developing function space solution approach to convert the proposed stochastic multi-fidelity continuous-time optimization models into tractable mixed-integer linear optimization models; and Defining flexibility reserve as a new type of reserve in markets that would enable ultimate participation of energy storage devices in provision of services to compensate the variability and uncertainty of RES in electricity markets. This project successfully completed all five major tasks defined in the SOPO, and produced 8 high-impact journal papers, 6 conference papers, 3 published U.S. patents, and one web-based software for continuous-time operation optimization of power systems. The application of the proposed flexibility reserve and the stochastic multi-fidelity continuous-time operation scheduling models would modify the forward commitment and schedule of generating units, ES devices and flexible loads, and would line up the resources in such a way that the composition of available resources is better prepared to respond to the sub-hourly variations of the load and renewable resources in real-time operation. Therefore, this project paves the way to sustainable, reliable, and economic integration of renewable energy resources in power system, supporting the progress towards reaching the national targets on energy independence. Even if the proposed models offers a radically different point of view as compared to existing models, it does not alter fundamentally the architecture of power systems operations, nor the complexity of the scheduling problem, so the integration of this project in power systems is extremely practical.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Absorbing the Sun: Operational Practices and Balancing Reserves in Florida's Municipal Utilities

The Florida Reliability Coordinating Council (FRCC) power system is comprised of multiple balancing authorities ranging in size from Gainesville Regional Utilities (GRU) with a 2019 summer net firm demand of 429 MW to Florida Power & Light with a 2019 summer net firm demand of 22,510 MW; and including cooperative, municipal, and investor-owned utilities. As all of these balancing authorities are and have plants to continue installing significant quantities of utility-scale solar photovoltaics, one relevant question is how much operating reserves they will need to hold as solar penetrations increase. While there are estimates of how regulating and flexibility reserve requirements change with solar penetration, the literature almost exclusively focuses on large balancing authorities with sub-hourly dispatch. In this work we analyze how reserve needs change not only with solar photovoltaic penetration, but also balancing authority size and operational practices. We find that, measured as a fraction of load, smaller balancing authorities with less frequent load and solar forecasts and less frequent dispatch need more reserves. Such utilities' reserve needs also increase more with increasing solar deployment as compared to larger or more frequently dispatched balancing authorities. These impacts are most acute for GRU. We find that moving from day-ahead to hour-ahead load and solar forecasting and system dispatch could enable GRU to incorporate 32% solar generation with median reserves at 20% instead of 60% of load; and that median reserve needs could drop further to about 10% of load if Florida's municipal utilities formed a reserve sharing group and moved to sub-hourly dispatch.

14 SOLAR ENERGY↗

Absorbing the Sun: Operational Practices and Balancing Reserves in Florida's Municipal Utilities

The Florida Reliability Coordinating Council (FRCC) power system is comprised of multiple balancing authorities ranging in size from Gainesville Regional Utilities (GRU) with a 2019 summer net firm demand of 429 MW to Florida Power & Light with a 2019 summer net firm demand of 22,510 MW; and including cooperative, municipal, and investor-owned utilities. As all of these balancing authorities are and have plants to continue installing significant quantities of utility-scale solar photovoltaics, one relevant question is how much operating reserves they will need to hold as solar penetrations increase. While there are estimates of how regulating and flexibility reserve requirements change with solar penetration, the literature almost exclusively focuses on large balancing authorities with sub-hourly dispatch. In this work we analyze how reserve needs change not only with solar photovoltaic penetration, but also balancing authority size and operational practices. We find that, measured as a fraction of load, smaller balancing authorities with less frequent load and solar forecasts and less frequent dispatch need more reserves. Such utilities' reserve needs also increase more with increasing solar deployment as compared to larger or more frequently dispatched balancing authorities. These impacts are most acute for GRU. We find that moving from day-ahead to hour-ahead load and solar forecasting and system dispatch could enable GRU to incorporate 32% solar generation with median reserves at 20% instead of 60% of load; and that median reserve needs could drop further to about 10% of load if Florida's municipal utilities formed a reserve sharing group and moved to sub-hourly dispatch.

balancing authority↗

ADMS and DER Coordinated Capability Demonstrations to Assist Utilities to Increase Resilience and Reliability

The proliferation of distributed energy resources (DERs) presents opportunities and challenges to distribution grid operators. The National Renewable Energy Laboratory (NREL) and Survalent are collaborating to demonstrate advanced distribution management system (ADMS) and DER coordinated capability to assist utilities to increase resilience and reliability. ADMS and Distributed Energy Resource Management System (DERMS) Coordination for Peak Load Management (PLM). Fault Location, Isolation, and Service Restoration (FLISR) in the Presence of DERs. Grid-Edge Intelligent Distribution Automation System for Self-Healing Distribution Grids. These laboratory demonstrations use NREL's ADMS Test Bed.

ADMS↗