Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Onboard processing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

X-Ray Detection and Processing Models for Spacecraft Navigation and Timing

The current primary method of deepspace navigation is the NASA Deep Space Network (DSN). High-performance navigation is achieved using Delta Differential One-Way Range techniques that utilize simultaneous observations from multiple DSN sites, and incorporate observations of quasars near the line-of-sight to a spacecraft in order to improve the range and angle measurement accuracies. Over the past four decades, x-ray astronomers have identified a number of xray pulsars with pulsed emissions having stabilities comparable to atomic clocks. The x-ray pulsar-based navigation and time determination (XNAV) system uses phase measurements from these sources to establish autonomously the position of the detector, and thus the spacecraft, relative to a known reference frame, much as the Global Positioning System (GPS) uses phase measurements from radio signals from several satellites to establish the position of the user relative to an Earth-centered fixed frame of reference. While a GPS receiver uses an antenna to detect the radio signals, XNAV uses a detector array to capture the individual xray photons from the x-ray pulsars. The navigation solution relies on detailed xray source models, signal processing, navigation and timing algorithms, and analytical tools that form the basis of an autonomous XNAV system. Through previous XNAV development efforts, some techniques have been established to utilize a pulsar pulse time-of-arrival (TOA) measurement to correct a position estimate. One well-studied approach, based upon Kalman filter methods, optimally adjusts a dynamic orbit propagation solution based upon the offset in measured and predicted pulse TOA. In this delta position estimator scheme, previously estimated values of spacecraft position and velocity are utilized from an onboard orbit propagator. Using these estimated values, the detected arrival times at the spacecraft of pulses from a pulsar are compared to the predicted arrival times defined by the pulsar s pulse timing model. A discrepancy provides an estimate of the spacecraft position offset, since an error in position will relate to the measured time offset of a pulse along the line of sight to the pulsar. XNAV researchers have been developing additional enhanced approaches to process the photon TOAs to arrive at an estimate of spacecraft position, including those using maximum-likelihood estimation, digital phase locked loops, and "single photon processing" schemes that utilize all available time data associated with each photon. Using pulsars from separate, non-coplanar locations provides range and range-rate measurements in each pulsar s direction. Combining these different pulsar measurements solves for offsets in position and velocity in three dimensions, and provides accurate overall navigation for deep space vehicles.

Sheikh, Suneel↗

NWB Sensors Infrared Cloud Imager Data Products from SGP

NWB Sensors is a company which has developed a commercially available Infrared Cloud Imager (ICI). For more information, consult the company's webpage, https://www.nwbsensors.com/infrared-cloud-imager. To validate the radiometric accuracy of the ICI, NWB Sensors deployed it to the ARM SGP User Facility in 2023. The primary motivation of this deployment was to perform an intercomparison between the ICI and the Atmospheric Emitted Radiance Interferometer (AERI). The AERI spectral radiance data product can be integrated across the response function of the ICI and directly compared to the zenith radiance observed by the ICI. In addition, the ICI uses proprietary models of the downwelling clear-sky radiance in its cloud processing algorithms. They are based on surface meteorology and precipitable water vapor (PWV). These models were validated by comparing their predicted radiances to those derived from radiative transfer models of the ARM radiosondes. Finally, PWV observations derived from the ICI's onboard GNSS-based PWV retrieval system were compared against those from the microwave radiometer. This dataset contains the ICI radiance and cloud data products.

Atmosphere↗

Command and control of the Voyager spacecraft

The Voyager Mission was designed to be conducted using reprogrammable onboard computers. This decision was based on the need for highly reliable semi-autonomous operations of the spacecraft and the lengthy two-way communication times envisioned during the mission. Command and control of the spacecraft is effected by the process through which the programs for these computers are developed. While this results in a relatively passive real-time command and control function, provisions exist for intervention to occur in order to modify or augment the programs or respond to spacecraft anomalies.

Adamski, Terrence P.↗

Real-time piloted simulation of fully automatic guidance and control for rotorcraft nap-of-the-earth (NOE) flight following planned profiles

Developing a single-pilot all-weather NOE capability requires fully automatic NOE navigation and flight control. Innovative guidance and control concepts are being investigated to (1) organize the onboard computer-based storage and real-time updating of NOE terrain profiles and obstacles; (2) define a class of automatic anticipative pursuit guidance algorithms to follow the vertical, lateral, and longitudinal guidance commands; (3) automate a decision-making process for unexpected obstacle avoidance; and (4) provide several rapid response maneuvers. Acquired knowledge from the sensed environment is correlated with the recorded environment which is then used to determine an appropriate evasive maneuver if a nonconformity is observed. This research effort has been evaluated in both fixed-base and moving-base real-time piloted simulations thereby evaluating pilot acceptance of the automated concepts, supervisory override, manual operation, and reengagement of the automatic system.

Clement, Warren F.↗

Loss of Water from Saturn's E-Ring Through Ion Pick-Up

One of the possible loss processes for Saturn s E-ring is ionization followed by acceleration by the electric field associated with the corotating magnetized plasma. It is possible to determine if this process is occurring by detecting electromagnetic waves at the gyrofrequency of water group ions. If the energy the particle gains in this pick-up process is sufficiently great, the picked up ions will generate ion cyclotron waves. Pioneer 11 and Voyager 1 both observed intervals of such waves associated with water group ions during their passes through Saturn s E-ring. Presently the magnetometer onboard the Cassini spacecraft is also seeing water group ion cyclotron oscillations. The Cassini data allow the spatial and temporal behavior of the waves to be mapped in ways not possible during the previous flybys. Analyses of these waves allow us to study the rate of mass loading and its latitudinal and local time variation. In conjunction with previous data, we can then determine the variation as the inclination of the ring to the Sun changes, in accordance with Saturn's seasons. These waves may be the clue to how Saturn powers its magnetosphere as the newly born ions could be the driver for the radial motion of the plasma and to how the E-ring may play the equivalent role to that of Io in the jovian magnetosphere.

Leisner, J. S.↗

From Blood Platelets Classification to Earth System Digital Twins: A Career in Computer Vision

IEEE SIgnal Processing Society (SPS) and Women in Signal Processing (WiSP) Webinar (https://signalprocessingsociety.org/blog/webinar-wisp-blood-platelets-classification-earth-system-digital-twins-career-computer-vision): Join us for an interactive session with Dr. Jacqueline Le Moigne, Manager of the NASA Science Mission Directorate Earth Science Technology Office’s Advanced Information Systems Technology Program. In this webinar, Dr. Le Moigne will share her journey through academia, the private sector, and her pivotal roles at NASA, emphasizing her work in signal processing, computer vision, and related technologies. The webinar will conclude with an interactive Q&A session, providing attendees the opportunity to engage directly with Dr. Le Moigne about her experiences and insights. Dr. Jacqueline Le Moigne manages NASA's Advanced Information Systems Technology Program, focusing on novel technologies that support Earth Science missions. She previously held roles at NASA Goddard, including Assistant Chief for Technology, and has worked on NASA's Space Technology Research Grants Program and Technology Roadmaps. Before NASA, she was a Research Scientist at the University of Maryland's Computer Vision Laboratory and also gained experience in the private sector. Jacqueline earned her Ph.D. in Computer Science from the University Pierre and Marie Curie in Paris. Her research interests include Image Registration, Computer Vision, Artificial Intelligence, Autonomous Systems, Distributed Spacecraft Missions (DSM), and Earth System Digital Twins (ESDT), as well as high-performance and onboard computing. She has authored over 180 publications, including books and patents, and has received multiple awards, including the NASA Exceptional Service Medal and the Goddard Information Science and Technology Award in 2012.

Computer Vision; Image Processing; Earth Science R↗

The Concept Verification Testing of a materials science payload

The Concept Verification Testing (CVT) project at the Marshall Space Flight Center, Alabama is a developmental activity that supports Shuttle Payload projects such as Spacelab. It provides an operational one-g environment for testing NASA and other agency experiment and support systems concepts that may be used in Shuttle. A dedicated Materials Science Payload was tested in the General Purpose Laboratory (GPL) in December 1974 in order to assess the requirements of a Space Processing payload on a Spacelab type facility. Physical and functional integration of the experiments into the facility was studied, and the impact of the experiments on the facility (and vice versa) was evaluated. The Principal Investigators (PI) who had proposed experiments were onboard and in a consulting status on the ground. The significant results of the week-long simulation will be discussed.

Griner, C. S.↗

Intelligent diagnostics systems

Intelligent systems have been applied to today's problems and could also be applied to space operations integrity. One of these systems is the XMAN tool designed for 'troubleshooting' jet engines. XMAN is the eXpert MAiNtenance tool developed to be an expert information analysis tool which stores trending and diagnostic data on Air Force engines. XMAN operates with a 'network topology' which follows a flow chart containing engine management information reports required by the governments technical order procedures. With XMAN technology, the user is able to identify engine problems by presenting the assertions of the fault isolation logic and attempting to satisfy individual assertions by referring to the databases created by an engine monitoring system. The troubleshooting process requires interaction between the technician and the computer to acquire new evidence form auxiliary maintenance tests corroboration of analytical results to accurately diagnose equipment malfunctions. This same technology will be required for systems which are functioning in space either with an onboard crew, or with an unmanned system. The technology and lessons learned developing this technology while suggesting definite applications for its use with developing space systems are addressed.

Mcquiston, Barbara M.↗

NASA/Mir Phase 1: A Lesson Learned in Long Duration Mission Planning and Operations

The NASA/Mir Phase I Program is a precursor to the assembly and operations of the International Space Station (ISS). The Phase I Program covers a four-year period and encompasses over ten shuttle flights to the Mir, culminating with the flight of STS-91 in June 1998. The Mir-Orbiting Station (Mir-OS) provides an excellent environment, both onboard and on the ground, for learning and studying the characteristics associated with crew-tended operations on long duration missions. By the end of the Phase I program, NASA astronauts will have accumulated over two years of continuous operations experience working and living onboard the Mir-OS. Ground controllers, working in Russia and at remote sites in the United States, will have gained valuable experience in the generation, maintenance, and coordination of the information and products required to support the long duration crew members onboard the Mir-OS. The experience gained by the crew and ground support personnel in the area of long duration mission operations has resulted in a number of factors that need to be considered in the definition and implementation of the processes and products for the ISS. While there are many areas in which experience has been gained, this paper focuses on the lessons learned regarding the level of detail and flexibility of crew timelines. Provided in this paper is an overview of the characteristics associated with long duration mission timeline development and execution, a summary of applicable lessons learned identified and documented through participation in the NASA/Mir Phase I Program, a detailed discussion of "Gross Timelines" as implementation which addresses the lessons learned. Also discussed are the challenges that must be overcome in getting the ISS program to recognize, evaluate, and learn from the crew and ground controller experience gained through participation in the NASA/Mir Phase I Program.

Hagopian, Jeff↗

Increasing Efficiency at the NTF by Optimizing Model AoA Positioning

The National Transonic Facility (NTF) at NASA Langley Research Center (LaRC) is a national resource for aeronautical research and development. The government, military and private industries rely on the capability of this facility for realistic flight data. Reducing the operation costs and keeping the NTF affordable is essential for aeronautics research. The NTF is undertaking an effort to reduce the time between data points during a pitch polar. This reduction is being driven by the operating costs of a cryogenic facility. If the time per data point can be reduced, a substantial cost savings can be realized from a reduction in liquid nitrogen (LN2) consumption. It is known that angle-of-attack (AoA) positioning is the longest lead-time item between points. In January 2005 a test was conducted at the NTF to determine the cause of the long lead-time so that an effort could be made to improve efficiency. The AoA signal at the NTF originates from onboard instrumentation then travels through a number of different systems including the signal conditioner, digital voltmeter, and the data system where the AoA angle is calculated. It is then fed into a closed loop control system that sets the model position. Each process along this path adds to the time per data point affecting the efficiency of the data taking process. Due to the nature of the closed loop feed back AoA control and the signal path, it takes approximately 18 seconds to take one pitch pause point with a typical AoA increment. Options are being investigated to reduce the time delay between points by modifying the signal path. These options include: reduced signal filtering, using analog channels instead of a digital volt meter (DVM), re-routing the signal directly to the AoA control computer and implementing new control algorithms. Each of these has potential to reduce the positioning time and together the savings could be significant. These timesaving efforts are essential but must be weighed against possible loss of data quality. For example, a reduction in filtering can introduce noise into the signal and using analog channels could result in some loss of accuracy. Data quality assessments need to be performed concurrently with timesaving techniques since data quality parameters are essential in maintaining facility integrity. This paper will highlight time saving efforts being undertaken or studied at the NTF. It will outline the instrumentation and computer systems involved in setting of the model pitch attitude then suggest changes to the process and discuss how these system changes would effect the time between data points. It also discusses the issue of data quality and how the potential efficiency changes in the system could affect it. Lastly, it will discuss the possibility of using an open loop control system and give some pros and cons of this method.

Crawford, Bradley L.↗

Detection and Characterization of Boundary-Layer Transition in Flight at Supersonic Conditions Using Infrared Thermography

Infrared thermography is a powerful tool for investigating fluid mechanics on flight vehicles. (Can be used to visualize and characterize transition, shock impingement, separation etc.). Updated onboard F-15 based system was used to visualize supersonic boundary layer transition test article. (Tollmien-Schlichting and cross-flow dominant flow fields). Digital Recording improves image quality and analysis capability. (Allows accurate quantitative (temperature) measurements, Greater enhancement through image processing allows analysis of smaller scale phenomena).

Banks, Daniel W.↗

Toward a Framework for Systematic Error Modeling of NASA Spaceborne Radar with NOAA/NSSL Ground Radar-Based National Mosaic QPE

Characterization of the error associated to satellite rainfall estimates is a necessary component of deterministic and probabilistic frameworks involving space-born passive and active microwave measurement") for applications ranging from water budget studies to forecasting natural hazards related to extreme rainfall events. We focus here on the error structure of NASA's Tropical Rainfall Measurement Mission (TRMM) Precipitation Radar (PR) quantitative precipitation estimation (QPE) at ground. The problem is addressed by comparison of PR QPEs with reference values derived from ground-based measurements using NOAA/NSSL ground radar-based National Mosaic and QPE system (NMQ/Q2). A preliminary investigation of this subject has been carried out at the PR estimation scale (instantaneous and 5 km) using a three-month data sample in the southern part of US. The primary contribution of this study is the presentation of the detailed steps required to derive trustworthy reference rainfall dataset from Q2 at the PR pixel resolution. It relics on a bias correction and a radar quality index, both of which provide a basis to filter out the less trustworthy Q2 values. Several aspects of PR errors arc revealed and quantified including sensitivity to the processing steps with the reference rainfall, comparisons of rainfall detectability and rainfall rate distributions, spatial representativeness of error, and separation of systematic biases and random errors. The methodology and framework developed herein applies more generally to rainfall rate estimates from other sensors onboard low-earth orbiting satellites such as microwave imagers and dual-wavelength radars such as with the Global Precipitation Measurement (GPM) mission.

Kirstettier, Pierre-Emmanual↗

Ionospheric Specifications for SAR Interferometry (ISSI)

The ISSI software package is designed to image the ionosphere from space by calibrating and processing polarimetric synthetic aperture radar (PolSAR) data collected from low Earth orbit satellites. Signals transmitted and received by a PolSAR are subject to the Faraday rotation effect as they traverse the magnetized ionosphere. The ISSI algorithms combine the horizontally and vertically polarized (with respect to the radar system) SAR signals to estimate Faraday rotation and ionospheric total electron content (TEC) with spatial resolutions of sub-kilometers to kilometers, and to derive radar system calibration parameters. The ISSI software package has been designed and developed to integrate the algorithms, process PolSAR data, and image as well as visualize the ionospheric measurements. A number of tests have been conducted using ISSI with PolSAR data collected from various latitude regions using the phase array-type L-band synthetic aperture radar (PALSAR) onboard Japan Aerospace Exploration Agency's Advanced Land Observing Satellite mission, and also with Global Positioning System data. These tests have demonstrated and validated SAR-derived ionospheric images and data correction algorithms.

Pi, Xiaoqing↗

Imagery Integration Team

The Human Exploration Science Office (KX) provides leadership for NASA's Imagery Integration (Integration 2) Team, an affiliation of experts in the use of engineering-class imagery intended to monitor the performance of launch vehicles and crewed spacecraft in flight. Typical engineering imagery assessments include studying and characterizing the liftoff and ascent debris environments; launch vehicle and propulsion element performance; in-flight activities; and entry, landing, and recovery operations. Integration 2 support has been provided not only for U.S. Government spaceflight (e.g., Space Shuttle, Ares I-X) but also for commercial launch providers, such as Space Exploration Technologies Corporation (SpaceX) and Orbital Sciences Corporation, servicing the International Space Station. The NASA Integration 2 Team is composed of imagery integration specialists from JSC, the Marshall Space Flight Center (MSFC), and the Kennedy Space Center (KSC), who have access to a vast pool of experience and capabilities related to program integration, deployment and management of imagery assets, imagery data management, and photogrammetric analysis. The Integration 2 team is currently providing integration services to commercial demonstration flights, Exploration Flight Test-1 (EFT-1), and the Space Launch System (SLS)-based Exploration Missions (EM)-1 and EM-2. EM-2 will be the first attempt to fly a piloted mission with the Orion spacecraft. The Integration 2 Team provides the customer (both commercial and Government) with access to a wide array of imagery options - ground-based, airborne, seaborne, or vehicle-based - that are available through the Government and commercial vendors. The team guides the customer in assembling the appropriate complement of imagery acquisition assets at the customer's facilities, minimizing costs associated with market research and the risk of purchasing inadequate assets. The NASA Integration 2 capability simplifies the process of securing one-of-a-kind imagery assets and skill sets, such as ground-based fixed and tracking cameras, crew-in the-loop imaging applications, and the integration of custom or commercial-off-the-shelf sensors onboard spacecraft. For spaceflight applications, the Integration 2 Team leverages modeling, analytical, and scientific resources along with decades of experience and lessons learned to assist the customer in optimizing engineering imagery acquisition and management schemes for any phase of flight - launch, ascent, on-orbit, descent, and landing. The Integration 2 Team guides the customer in using NASA's world-class imagery analysis teams, which specialize in overcoming inherent challenges associated with spaceflight imagery sets. Precision motion tracking, two-dimensional (2D) and three-dimensional (3D) photogrammetry, image stabilization, 3D modeling of imagery data, lighting assessment, and vehicle fiducial marking assessments are available. During a mission or test, the Integration 2 Team provides oversight of imagery operations to verify fulfillment of imagery requirements. The team oversees the collection, screening, and analysis of imagery to build a set of imagery findings. It integrates and corroborates the imagery findings with other mission data sets, generating executive summaries to support time-critical mission decisions.

Calhoun, Tracy↗

Guidance, Navigation, and Control for Laser-Based Non-Cooperative Target Detumbling

Orbital debris is a well known and growing problem presenting risks to the future of spaceflight. Many pieces of debris are defunct satellites or rocket upper stages. These large objects could generate an exponentially growing cloud of debris should they be involved in a collision, i.e., Kessler Syndrome. Future orbital debris remediation efforts often propose perturbing the orbit of these large targets to mitigate risk. These plans often involve non-cooperative rendezvous. In the absence of active control, the targets are expected to be tumbling which makes rendezvous a dangerous prospect. In this work we describe a guidance, navigation, and control system for a contactless non-cooperative target detumbling methodology which will significantly increase the safety of non-cooperative rendezvous. An onboard laser generates thrust on the target by ablating its surface material. This thrust is used to control target attitude. Our guidance, navigation, and control system is able to estimate relative pose, target the laser, and maintain formation flight during the detumbling process. The system is validated with Monte Carlo simulation in a variety of scenarios.

Guidance↗

Lessons Learned In Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

Lessons Learned in Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

Accuracy of estimating the masses of Phobos and Deimos from multiple Viking orbiter encounters

The problem was investigated of estimating the masses of Phobos and Deimos from Doppler and onboard optical measurements during the Viking extended mission. A Kalman filter was used to analyze the effects of gravitational uncertainties and nongravitational accelerations. These accelerations destroy the dynamical integrity of the orbit, and multibatch or limited memory filtering is preferred to single batch processing. Optical tracking is essential to improve the relative orbit geometry. The masses can be determined to about 10% and 25% respectively for Phobos and Deimos, assuming satellite densities of about 3 gr/cu cm.

Tolson, R. H.↗