Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Lessons learned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Lessons Learned from Recent Rapid Imaging of Earthquake Ruptures with Satellite Geodesy

Rapid determination of the location and extent of earthquake ruptures at the surface and at depth is helpful for disaster response, as it allows prediction of the likely area of major damage from the earthquake and can help with rescue and recovery planning. The Caltech-Jet Propulsion Laboratory (JPL) Advanced Rapid Imaging and Analysis (ARIA) project has responded to many recent large earthquakes to process geodetic data and help determine the location and extent of ruptures. With the increasing availability of near real-time data from the Global Positioning System (GPS) and other global navigation satellite system receivers in active tectonic regions, and with the shorter repeat times of many recent and newly launched radar satellites, geodetic data can now be obtained quickly after earthquakes or other disasters. We have been building an ARIA data system that can ingest, catalog, and process geodetic data and combine it with seismic analysis to estimate the fault rupture locations and slip distributions for large earthquakes that are on or near land.

Simons, Mark↗

Nature of and Lessons Learned from Lunar Ice Cube and the First Deep Space Cubesat 'Cluster'

Cubesats operating in deep space face challenges Earth-orbiting cubesats do not. 15 deep space cubesat 'prototypes' will be launched over the next two years including the two MarCO cubesats, the 2018 demonstration of dual communication system at Mars, and the 13 diverse cubesats being deployed from the SLS EM1 mission within the next two years. Three of the EM1 cubesat missions, including the first deep space cubesat 'cluster', will be lunar orbiters with remote sensing instruments for lunar surface/regolith measurements. These include: Lunar Ice Cube, with its 1-4 micron broadband IR spectrometer, BIRCHES, to determine volatile distribution as a function of time of day; Lunar Flashlight, to confirm the presence of surface ice at the lunar poles, utilizing an active source (laser), and looking for absorption features in the returning signal; and LunaH-Map to characterize ice at or below the surface at the poles with a compact neutron spectrometer. In addition, the BIRCHES instrument on Lunar Ice Cube will provide the first demonstration of a microcryocooler (AIM/IRIS) in deep space. Although not originally required to do so, all will be delivering science data to the Planetary Data System, the first formal archiving effort for cubesats. 4 of the 20 recently NASA-sponsored (PSDS3) study groups for deep space cubesat/smallsat mission concepts were lunar mission concepts, most involving 12U cubesats. NASA SIMPLEX 2/SALMON 3 AO will create ongoing opportunities for low-cost missions as 'rides' on government space program or private sector vehicles as these become available.

Bujold, Emily↗

Lessons Learned in Extended-Extended Spitzer Space Telescope Operations

The Spitzer Space Telescope is executing the ninth year of extended operations beyond its 5.5-year prime mission. The project anticipated a maximum extended mission of about four years when the first mission extension was proposed. The robustness of the observatory hardware and the creativity of the project engineers and scientists in overcoming hurdles to operations has enabled a substantially longer mission lifetime. This has led to more challenges with an aging groundsystem due to resource reductions and decisions made early in the extended mission based on a shorter planned lifetime. We provide an overview of the extended mission phases, challenges met in maintaining and enhancing the science productivity, and what we would have done differently if the extended mission was planned from the start to be nearly twice as long as the prime mission.

Lowrance, Patrick↗