Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LAUNCHING FACILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

ABSOLUTE RADIOMETRIC CALIBRATION OF THE EUNIS-06 170-205 A CHANNEL AND CALIBRATION UPDATE FOR CORONAL DIAGNOSTIC SPECTROMETER/NORMAL-INCIDENCE SPECTROMETER

The Extreme-Ultraviolet Normal-Incidence Spectrograph sounding-rocket payload was flown on 2006 April 12 (EUNIS-06), carrying two independent imaging spectrographs covering wavebands of 300-370 A in first order and 170-205 A in second order, respectively. The absolute radiometric response of the EUNIS-06 long-wavelength (LW) channel was directly measured in the same facility used to calibrate Coronal Diagnostic Spectrometer (CDS) prior to the Solar and Heliospheric Observatory (SOHO) launch. Because the absolute calibration of the short-wavelength (SW) channel could not be obtained from the same lab configuration, we here present a technique to derive it using a combination of solar LW spectra and density- and temperature-insensitive line intensity ratios. The first step in this procedure is to use the coordinated, cospatial EUNIS and SOHO/CDS spectra to carry out an intensity calibration update for the CDS NIS-1 waveband, which shows that its efficiency has decreased by a factor about 1.7 compared to that of the previously implemented calibration. Then, theoretical insensitive line ratios obtained from CHIANTI allow us to determine absolute intensities of emission lines within the EUNIS SW bandpass from those of cospatial CDS/NIS-1 spectra after the EUNIS LW calibration correction. A total of 12 ratios derived from intensities of 5 CDS and 12 SW emission lines from Fe X to Fe XIII yield an instrumental response curve for the EUNIS-06 SW channel that matches well to a relative calibration which relied on combining measurements of individual optical components. Taking into account all potential sources of error, we estimate that the EUNIS-06 SW absolute calibration is accurate to {+-}20%.

79 ASTRONOMY AND ASTROPHYSICS↗

Tracking and data system support for the Mariner Mars 1971 mission. Prelaunch phase through first trajectory correction maneuver, volume 1

The DSN command system provided the capability to enter commands in a computer at the deep space stations for transmission to the spacecraft. The high-rate telemetry system operated at 16,200 bits/sec. This system will permit return to DSS 14 of full-resolution television pictures from the spacecraft tape recorder, plus the other science experiment data, during the two playback periods of each Goldstone pass planned for each corresponding orbit. Other features included 4800 bits/sec modem high-speed data lines from all deep space stations to Space Flight Operations Facility (SFOF) and the Goddard Space Flight Center, as well as 50,000 bits/sec wideband data lines from DSS 14 to the SFOF, thus providing the capability for data flow of two 16,200 bits/sec high-rate telemetry data streams in real time. The TDS performed prelaunch training and testing and provided support for the Mariner Mars 1971/Mission Operations System training and testing. The facilities of the ETR, DSS 71, and stations of the MSFN provided flight support coverage at launch and during the near-earth phase. The DSSs 12, 14, 41, and 51 of the DSN provided the deep space phase support from 30 May 1971 through 4 June 1971.

Laeser, R. P.↗

The earth resources experiment package on Skylab and proposed resource investigations.

In late 1973, NASA plans to launch a three-man experimental space station, the Skylab Workshop. Technical specifications regarding the instrumental facilities of the space station are presented, giving attention to the multispectral photographic facility, the IR spectrometer, the multispectral scanner, the L-band radiometer, and the S-193 sensor. The S-193 sensor will provide data applicable to studying varying ocean surfaces, wave conditions, sea and lake ice, ocean clouds, weather prediction, and soil types. All data from the sensors will be recorded on film and analog magnetic tape for return at the end of each manned period of Skylab.

Park, A. B.↗

Mission Control Center (MCC) system specification for the shuttle Orbital Flight Test (OFT) timeframe

The Mission Control Center Shuttle (MCC) Shuttle Orbital Flight Test (OFT) Data System (OFTDS) provides facilities for flight control and data systems personnel to monitor and control the Shuttle flights from launch (tower clear) to rollout (wheels stopped on runway). It also supports the preparation for flight (flight planning, flight controller and crew training, and integrated vehicle and network testing activities). The MCC Shuttle OFTDS is described in detail. Three major support systems of the OFTDS and the data types and sources of data entering or exiting the MCC were illustrated. These systems are the communication interface system, the data computation complex, and the display and control system.

Source record↗

SPS program review transportation perspective

The delivery of cargo and space workers to the SPS construction site requires the development of two different systems, one to handle large cargo deliveries and a smaller system to accommodate crew. The overall scenario of the transportation system is shown. Eight major elements comprise the transportation system: personnel launch vehicle (PLV) or shuttle; personnel orbital transfer vehicle (POTV); the heavy lift launch vehicle (HLLV); the electric orbital transfer vehicle (EOTV); intra orbit transfer vehicle (IOTV); LEO support facility; GEO support facility and a shuttle derived HLLV (SDHLLV) for supporting the early SPS Demonstration Program. The HLLV and EOTV represent the cargo carriers while the PLV and POTV represent the people carriers. The IOTV is utilized to ferry people and cargo modules over short distances in the vicinity of its station.

Wales, W. W., Jr.↗

Space Transportation System Meteorological Expert

The STS Meteorological Expert (STSMET) is a long-term project to acquire general Shuttle operational weather forecasting expertise specific to the launch locale, to apply it to Shuttle operational weather forecasting tasks at the Cape Canaveral Forecast Facility, and ultimately to provide an on-line real-time operational aid to the duty forecasters in performing their tasks. Particular attention is given to the development of an approach called scenario-based reasoning, with specific application to summer thunderstorms; this type of reasoning can also be applied to frontal weather phenomena, visibility including fog, and wind shear.

Beller, Arthur E.↗

Aluminum-fueled rockets for the space transportation system

Aluminum-fueled engines, used to propel orbital transfer vehicles (OTV's), offer benefits to the Space Transportation System (STS) if scrap aluminum can be scavenged at a reasonable cost. Aluminum scavenged from Space Shuttle external tanks could replace propellants hauled from Earth, thus allowing more payloads to be sent to their final destinations at the same Shuttle launch rate. To allow OTV use of aluminum fuel, two new items would be required: a facility to reprocess aluminum from external tanks and an engine for the OTV which could burn aluminum. Design of the orbital transfer vehicle would have to differ substantially from current concepts for it to carry and use the aluminum fuel. The aluminum reprocessing facility would probably have a mass of under 15 metric tons and would probably cost less that $200,000,000. Development of an aluminum-burning engine would no doubt be extremely expensive (1 to 2 billion dollars), but this amount would be adequately repaid by increased STS throughput. Engine production cost is difficult to estimate, but even an extremely high cost (e.g., $250,000,000 per engine) would not significantly increase orbit-raising expenses.

Cutler, Andrew Hall↗

Solar extreme ultraviolet sensor and advanced langmuir probe

For more than two decades, the staff of the Space Physics Research Laboratory (SPRL) has collaborated with the Goddard Space Flight Center (GSFC) in the design and implementation of Langmuir probes (LP). This program of probe development under the direction of Larry Brace of GSFC has evolved methodically with innovations to: improve measurement precision, increase the speed of measurement, and reduce the weight, size, power consumption and data rate of the instrument. Under contract NAG5-419 these improvements were implemented and are what characterize the Advanced Langmuir Probe (ALP). Using data from the Langmuir Probe on the Pioneer Venus Orbiter, Brace and Walter Hoegy of GSFC demonstrated a novel method of monitoring the solar extreme ultraviolet (EUV) flux. This led to the idea of developing a sensor similar to a Langmuir probe specifically designed to measure solar EUV (SEUV) that uses a similar electronics package. Under this contract, a combined instrument package of the ALP and SEUV sensor was to be designed, constructed, and laboratory tested. Finally the instrument was to be flight tested as part of sounding rocket experiment to acquire the necessary data to validate this method for possible use in future earth and planetary aeronomy missions. The primary purpose of this contract was to develop the electronics hardware and software for this instrument, since the actual sensors were suppied by GSFC. Due to budget constraints, only a flight model was constructed. These electronics were tested and calibrated in the laboratory, and then the instrument was integrated into the rocket payload at Wallops Flight Facility where it underwent environmental testing. After instrument recalibration at SPRL, the payload was reintegrated and launched from the Poker Flat Research Range near Fairbanks Alaska. The payload was successfully recovered and after refurbishment underwent further testing and developing to improve its performance for future use.

Voronka, N. R.↗

HL-20 operations and support requirements for the Personnel Launch System mission

The processing, mission planning, and support requirements were defined for the HL-20 lifting-body configuration that can serve as a Personnel Launch System. These requirements were based on the assumption of an operating environment that incorporates aircraft and airline support methods and techniques that are applicable to operations. The study covered the complete turnaround process for the HL-20, including landing through launch, and mission operations, but did not address the support requirements of the launch vehicle except for the integrated activities. Support is defined in terms of manpower, staffing levels, facilities, ground support equipment, maintenance/sparing requirements, and turnaround processing time. Support results were drawn from two contracted studies, plus an in-house analysis used to define the maintenance manpower. The results of the contracted studies were used as the basis for a stochastic simulation of the support environment to determine the sufficiency of support and the effect of variance on vehicle processing. Results indicate the levels of support defined for the HL-20 through this process to be sufficient to achieve the desired flight rate of eight flights per year.

Morris, W. D.↗

A Free-flight Wind Tunnel for Aerodynamic Testing at Hypersonic Speeds

The supersonic free-flight wind tunnel is a facility at the Ames Laboratory of the NACA in which aerodynamic test models are gun-launched at high speed and directed upstream through the test section of a supersonic wind tunnel. In this way, test Mach numbers up to 10 have been attained and indications are that still higher speeds will be realized. An advantage of this technique is that the air and model temperatures simulate those of flight through the atmosphere. Also the Reynolds numbers are high. Aerodynamic measurements are made from photographic observation of the model flight. Instruments and techniques have been developed for measuring the following aerodynamic properties: drag, initial lift-curve slope, initial pitching-moment-curve slope, center of pressure, skin friction, boundary-layer transition, damping in roll, and aileron effectiveness. (author)

Seiff, Alvin↗

Education and Public Outreach to Support the HESSI Mission: Raising Public Awareness

The current upswing in solar activity bodies well for accomplishing the goals of the upcoming HESSI mission. The solar community is making good use of the increased activity through coordinated observations, both in space and on the ground. Ground-based measurements will provide crucial context observations and complementary measurements of the high-energy p,,ocesses which HESSI will observe; vector magnetographs will provide information on the morphology and strength of active region magnetic fields. At the time of the launch of HESSI, we will provide scientific data to the community with the MSFC vector magnetograph and will use the facilities to enhance the educational experience of the local community. In the meantime, to raise public consciousness about the solar cycle and to prepare for HESSI observations, we have prepared lesson plans and activities which are currently being distributed via the internet. Further, to inform the educational community about our activities, our teacher partners disseminate the information by attending teacher conferences. This poster will review what we have already accomplished and what we plan for the next, few pre-launch months.

Adams, M. L.↗

Plans for a STRV-2 to AMOS High Data Rate Bi-Directional Optical Communications Link

The Ballistic Missile Defense Organization has developed a high-data rate (155 Mbps - 1 Gbps) optical communications terminal that will be flown on the STRV-2 satellite. The satellite is scheduled for launch in November 1999, and NASA/JPL has been asked to investigate the use of the AMOS facility as a backup ground terminal to a small transportable terminal constructed by Astroterra Corporation of San Diego. The ground terminal built by Astroterra is designed to support a links out to 2000 km, and will be located at the Table Mountain Facility in Wrightwood, California. Subject to BMDO approval, the demonstration from AMOS will begin in early 2000. For the demonstration, the beam-director tracker will serve as the uplink transmitter, and the 1.6-m telescope as the downlink receiver. It will support bi-directional links out to the 3500-km maximum slant range of the satellite's pass.

Wilson, K. E.↗

He II Liquid/Vapor Phase Separator for Large Dynamic Range Operation

A phase separator, which separates helium vapor from liquid superfluid helium (He II), is an indispensable device for space cryogenics. The most recent approach to the Space Infrared Telescope Facility (SIRTF) uses a new design concept in which only the detector package is cold at launch, the remainder of the telescope being subsequently cooled to operating temperature on orbit. Therefore, a large dynamic operational range is required of the cryogen system. This is a report of initial laboratory test results with candidate porous plugs as phase separators. Mass flow rates and pressure and temperature differences across a porous plug were measured in this experiment. Relatively large mass flow rates were observed even at small pressure differences. In the high mass flow rate region, a hysteresis was observed with increases and decreases of the pressure difference. A linear theory is proposed and compared with experimental data to explain several phenomena observed in this system.

Phase Separator, Space Cryogenics↗

NASA's Software Safety Standard

NASA (National Aeronautics and Space Administration) relies more and more on software to control, monitor, and verify its safety critical systems, facilities and operations. Since the 1960's there has hardly been a spacecraft (manned or unmanned) launched that did not have a computer on board that provided vital command and control services. Despite this growing dependence on software control and monitoring, there has been no consistent application of software safety practices and methodology to NASA's projects with safety critical software. Led by the NASA Headquarters Office of Safety and Mission Assurance, the NASA Software Safety Standard (STD-18l9.13B) has recently undergone a significant update in an attempt to provide that consistency. This paper will discuss the key features of the new NASA Software Safety Standard. It will start with a brief history of the use and development of software in safety critical applications at NASA. It will then give a brief overview of the NASA Software Working Group and the approach it took to revise the software engineering process across the Agency.

Ramsay, Christopher M.↗

Return to Mercury: A Comparison of Solar Simulation and Flight Data for the MESSENGER Spacecraft

The MErcury, Surface, Space, ENvironment GEochemistry and Ranging (MESSENGER) spacecraft is a NASA Discovery Mission spacecraft developed and operated by the Johns Hopkins University Applied Physics Laboratory. It was launched on August 3, 2004 and is currently on a course for Mercury orbit insertion in March 2011. To date the mission trajectory has taken the spacecraft to minimum solar distances of 0.332 and 0.313 AU and on January 14, 2008 the first flyby of Mercury in 33 years. From launch through the latest perihelion passage temperature performance data has been collected for the sun facing Digital Sun Sensors (DSS), the sun facing phased array and low gain (omni) antennas, the solar arrays, the sunshade and the two sun facing attitude control 4.4 N thrusters. Prior to launch, extensive solar simulation testing was conducted at the Glenn Research Center, Tank 6 solar simulation facility in Cleveland Ohio. Flight hardware qualification units representing these Sun exposed components were tested in solar environments that represented near mission minimum solar distance as to verify the thermal designs and the material used in fabrication. The paper will review the thermal designs of these components and their thermal performance to date as compared to the solar simulation testing.

Ercol, Carl J.↗

Exploration Supply Chain Simulation

The Exploration Supply Chain Simulation project was chartered by the NASA Exploration Systems Mission Directorate to develop a software tool, with proper data, to quantitatively analyze supply chains for future program planning. This tool is a discrete-event simulation that uses the basic supply chain concepts of planning, sourcing, making, delivering, and returning. This supply chain perspective is combined with other discrete or continuous simulation factors. Discrete resource events (such as launch or delivery reviews) are represented as organizational functional units. Continuous resources (such as civil service or contractor program functions) are defined as enabling functional units. Concepts of fixed and variable costs are included in the model to allow the discrete events to interact with cost calculations. The definition file is intrinsic to the model, but a blank start can be initiated at any time. The current definition file is an Orion Ares I crew launch vehicle. Parameters stretch from Kennedy Space Center across and into other program entities (Michaud Assembly Facility, Aliant Techsystems, Stennis Space Center, Johnson Space Center, etc.) though these will only gain detail as the file continues to evolve. The Orion Ares I file definition in the tool continues to evolve, and analysis from this tool is expected in 2008. This is the first application of such business-driven modeling to a NASA/government-- aerospace contractor endeavor.

Source record↗

Synergistic Development, Test, and Qualification Approaches for the Ares I and V Launch Vehicles

The U.S. National Aeronautics and Space Administration (NASA) initiated plans to develop the Ares I and Ares V launch vehicles in 2005 to meet the mission objectives for future human exploration of space. Ares I is designed to provide the capability to deliver the Orion crew exploration vehicle (CEV) to low-Earth orbit (LEO), either for docking to the International Space Station (ISS) or docking with an Earth departure stage (EDS) and lunar lander for transit to the Moon. Ares V provides the heavy-lift capability to deliver the EDS and lunar lander to orbit. An integrated test plan was developed for Ares I that includes un-crewed flight validation testing and ground testing to qualify structural components and propulsion systems prior to operational deployment. The overall test program also includes a single development test flight conducted prior to the Ares I critical design review (CDR). Since the Ares V concept was formulated to maximize hardware commonality between the Ares V and Ares I launch vehicles, initial test planning for Ares V has considered the extensibility of test approaches and facilities from Ares I. The Ares V test plan was part of a successful mission concept review (MCR) in 2008.

Cockrell, Charles E.↗