Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Engineering Services in a Mission Critical Environment: Engineering Services - Science and Technology Operations’ Infrastructure Support at Los Alamos National Laboratory

As an engineering team within a facilities-driven organization, Engineering Services – Science and Technology Operations (ES-STO), supports Los Alamos National Laboratory (LANL), playing a pivotal role in the U.S. nuclear stockpile mission. This report outlines ES-STO’s contributions through the installation of crucial systems such as HVAC units, compressors, and scientific specialty equipment, as well as providing expert consultation to optimize laboratory operations. ES-STO’s goal is to ensure that LANL's infrastructure and research facilities are aligned with mission-critical needs, supporting both operational efficiency and safety in the nuclear stockpile management and maintenance. This report discusses the installation processes, ongoing consultations, and the significant impact of our efforts on national security objectives.

42 ENGINEERING↗

Congestion levels on existing infrastructure

Congestion occurs when available least-cost energy cannot be delivered to some loads because transmission facilities do not have sufficient capacity to deliver the energy. When a transmission constraint is binding (i.e., its limit is reached) it has an associated shadow price – the marginal value of relieving the constraint (i.e., of increasing the asset’s flow limit). This report contains one page dedicated to each ISO and RTO in the U.S. documenting empirical outcomes related to binding constraints during 2022 through 2024 for both the day-ahead and real-time markets. For each system operator and market timeline, the report contains two maps of infrastructure elements that are color-coded based on congestion characteristics. The first map provides information on how often each element has a binding constraint, that is, the frequency of congestion on the element. The second map reflects the intensity of congestion, measured as the sum of shadow prices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mississippi's Strategic Resilience: A multi-systems approach to secure, reliable, and adaptable electric grid infrastructure

Mississippi’s electric grid resilience challenges are linked to an intersection of complex socioeconomic, ecological, technological, historical, and political challenges, exacerbated by increasing severe weather like flooding and tornado events. The state’s legacy of underinvestment in critical energy infrastructure, particularly in rural areas and vulnerable floodplains, have stressed an aging grid, creating long-lasting disruptions in electric service during weather-related outages. Effective emergency management and preparedness is further hampered by a lack of coordination across local, county, and regional scales. Using the TASTI-GRID platform and partnership with Oak Ridge National Laboratory (ORNL), Mississippi is developing a comprehensive regional resilience strategy to overcome energy security and reliability challenges, mitigating the impacts of natural hazards, and positioning Mississippi as a resilient and premier destination for residents, businesses, and economic development.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Manufacture of Advanced Key Energy Infrastructure Technologies (MAKE IT) Prize (Final Technical Report)

This is a final technical report for the American-Made Manufacture of Advanced Key Energy Infrastructure Technologies (MAKE IT) Prize, developed by the U.S. Department of Energy (DOE) Office of Technology Commercialization (OTC) in collaboration with the Office of Clean Energy Demonstrations (OCED) and the Office of Energy Efficiency and Renewable Energy (EERE) with support from the National Laboratory of the Rockies (NLR). The MAKE IT Prize aims to catalyze domestic manufacturing of critical energy technology components, moving manufacturing facilities from planning to shovel-ready and enabling strategies for vibrant manufacturing activities in communities. This prize was launched with a prize pool of approximately $30 million spread across two tracks: Facilities and Strategies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Biofuel Infrastructure, Logistics, and Transportation (BILT) Model for Supply Chain Analysis: Documentation for BILT

The Biofuel Infrastructure, Logistics, and Transportation (BILT) model for supply chain analysis developed by Oak Ridge National Laboratory for the US Department of Energy is an accounting and optimization model that tracks the entire biomass-to-end-use supply chain (e.g., biomass production, transportation, and processing) for potential feedstocks, pathways, and end uses. This report summarizes the development, function, and operation of the BILT model.

09 BIOMASS FUELS↗

Tachyon: Intelligent Multi-Scale Modeling of Distributed Resilient Infrastructure and Workflows for Data Intensive HEP Analyses

The DOE High Energy Physics (HEP) program in Neutrino and Collider science drives data-intensive science and simulation on extreme-scale platforms. Modeling and optimizing the complex distributed components from experimental to leadership computing facilities are essential for HEP workflows to achieve required response times and resilience under various conditions. Tachyon proposes a framework for scalable modeling, simulation, and validation of key performance characteristics for the distributed infrastructure between FNAL and ALCF, along with associated HEP workflows.

Carothers, Chris [Rensselaer Poly.]↗

Tachyon: Intelligent Multi-Scale Modeling of Distributed Resilient Infrastructure and Workflows for Data Intensive HEP Analyses

The DOE High Energy Physics (HEP) program in Neutrino and Collider science drives data-intensive science and simulation on extreme-scale platforms. Modeling and optimizing the complex distributed components from experimental to leadership computing facilities are essential for HEP workflows to achieve required response times and resilience under various conditions. Tachyon proposes a framework for scalable modeling, simulation, and validation of key performance characteristics for the distributed infrastructure between FNAL and ALCF, along with associated HEP workflows.

Carothers, Chris [Rensselaer Poly.]↗

Challenges for Megawatt-Scale Artificial Intelligence Rack Infrastructure

As artificial intelligence (AI) computing densities continue to increase, industry is pursuing megawatt-scale rack architectures that require tightly coordinated advances in electrical power delivery, thermal management, operations, and infrastructure integration. This document summarizes the primary technical challenges for achieving this target.

Nawaz, Kashif [ORNL] (ORCID:0000000251612491)↗

ORNL Infrastructure: Status Update on BEA Research Reactor Cask Planning Activities Completed During FY 2025

This report documents Oak Ridge National Laboratory’s (ORNL’s) FY 2025 progress toward establishing readiness to use the Battelle Energy Alliance (BEA) Research Reactor (BRR) shipping cask in support of the Nuclear Science User Facilities (NSUF). The BRR cask will provide a new shared infrastructure capability for transporting irradiated fuels and materials between ORNL and Idaho National Laboratory (INL), thereby supporting NSUF’s mission of enabling user access to advanced nuclear research facilities. In FY 2025, ORNL advanced the regulatory, contractual, safety review, and planning activities necessary to qualify its facilities and staff for BRR cask handling. Although loaded shipments were delayed due to fabrication lead times for Orano Federal Services LLC’s internal basket hardware, the program progressed to the point where an empty cask dry run is scheduled for October 2025. This dry run represents a critical step in demonstrating ORNL’s ability to receive, handle, and return the BRR cask.

99 GENERAL AND MISCELLANEOUS↗

Critical infrastructure protection decision support system decision model : overview and quick-start user's guide.

The Critical Infrastructure Protection Decision Support System Decision Model (CIPDSS-DM) is a useful tool for comparing the effectiveness of alternative risk-mitigation strategies on the basis of CIPDSS consequence scenarios. The model is designed to assist analysts and policy makers in evaluating and selecting the most effective risk-mitigation strategies, as affected by the importance assigned to various impact measures and the likelihood of an incident. A typical CIPDSS-DM decision map plots the relative preference of alternative risk-mitigation options versus the annual probability of an undesired incident occurring once during the protective life of the investment, assumed to be 20 years. The model also enables other types of comparisons, including a decision map that isolates a selected impact variable and displays the relative preference for the options of interest--parameterized on the basis of the contribution of the isolated variable to total impact, as well as the likelihood of the incident. Satisfaction/regret analysis further assists the analyst or policy maker in evaluating the confidence with which one option can be selected over another.

97 MATHEMATICS AND COMPUTING↗

How Does Your Data Center Measure Up? Energy Efficiency Metrics and Benchmarks for Data Center Infrastructure Systems

Data centers are among the most energy intensive types of facilities, and they are growing dramatically in terms of size and intensity [EPA 2007]. As a result, in the last few years there has been increasing interest from stakeholders - ranging from data center managers to policy makers - to improve the energy efficiency of data centers, and there are several industry and government organizations that have developed tools, guidelines, and training programs. There are many opportunities to reduce energy use in data centers and benchmarking studies reveal a wide range of efficiency practices. Data center operators may not be aware of how efficient their facility may be relative to their peers, even for the same levels of service. Benchmarking is an effective way to compare one facility to another, and also to track the performance of a given facility over time. Toward that end, this article presents the key metrics that facility managers can use to assess, track, and manage the efficiency of the infrastructure systems in data centers, and thereby identify potential efficiency actions. Most of the benchmarking data presented in this article are drawn from the data center benchmarking database at Lawrence Berkeley National Laboratory (LBNL). The database was developed from studies commissioned by the California Energy Commission, Pacific Gas and Electric Co., the U.S. Department of Energy and the New York State Energy Research and Development Authority.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Uniform-Format Solid Feedstock Supply System: A Commodity-Scale Design to Produce an Infrastructure-Compatible Bulk Solid from Lignocellulosic Biomass -- Executive Summary

This report, Uniform-Format Solid Feedstock Supply System: A Commodity-Scale Design to Produce an Infrastructure-Compatible Bulk Solid from Lignocellulosic Biomass, prepared by Idaho National Laboratory (INL), acknowledges the need and provides supportive designs for an evolutionary progression from present day conventional bale-based supply systems to a uniform-format, bulk solid supply system that transitions incrementally as the industry launches and matures. These designs couple to and build from current state of technology and address science and engineering constraints that have been identified by rigorous sensitivity analyses as having the greatest impact on feedstock supply system efficiencies and costs.

09 BIOMASS FUELS↗