Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Ground Processing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Development of high Tc (greater than 110K) Bi, Tl and Y-based materials as superconducting circuit elements

Experimental work was continued on the development and characterization of bulk and hot pressed powders and tapecast materials in the Bi-Sr-Ca-Cu-O and Tl-Ba-Ca-Cu-O systems. A process for producing warp-free, sintered, superconducting tapes of Bi composition Bi1Sr2Ca2 Cu3O(x) was established. The procedure requires a triple calcination at 830 C for 24 hours and sintering at 845 C from 20 to 200 hours. Hot pressing the triple calcined powder at 845 C for 6 hours at 5000 psi yielded a dense material, which on further heat treatment at 845 C for 24 hours, exhibited a Tc of 108.2K. The Bi compositions were found to be much less oxygen sensitive than the Y compositions. This was especially noted in the case of the hot pressed materials which were superconducting as hot pressed, a condition that could not be achieved in the Y compositions. Safire-type grounding links are in the process of being fabricated from these materials.

Haertling, Gene↗

Lightning Detection Efficiency Analysis Process: Modeling Based on Empirical Data

A ground based lightning detection system employs a grid of sensors, which record and evaluate the electromagnetic signal produced by a lightning strike. Several detectors gather information on that signal s strength, time of arrival, and behavior over time. By coordinating the information from several detectors, an event solution can be generated. That solution includes the signal s point of origin, strength and polarity. Determination of the location of the lightning strike uses algorithms based on long used techniques of triangulation. Determination of the event s original signal strength relies on the behavior of the generated magnetic field over distance and time. In general the signal from the event undergoes geometric dispersion and environmental attenuation as it progresses. Our knowledge of that radial behavior together with the strength of the signal received by detecting sites permits an extrapolation and evaluation of the original strength of the lightning strike. It also limits the detection efficiency (DE) of the network. For expansive grids and with a sparse density of detectors, the DE varies widely over the area served. This limits the utility of the network in gathering information on regional lightning strike density and applying it to meteorological studies. A network of this type is a grid of four detectors in the Rondonian region of Brazil. The service area extends over a million square kilometers. Much of that area is covered by rain forests. Thus knowledge of lightning strike characteristics over the expanse is of particular value. I have been developing a process that determines the DE over the region [3]. In turn, this provides a way to produce lightning strike density maps, corrected for DE, over the entire region of interest. This report offers a survey of that development to date and a record of present activity.

Rompala, John T.↗

Key Differences in Operating a Rover on the Moon vs. Mars

The command and control model for spacecraft operations, as well as the distribution of tasks between ground assets and in space assets, whether with a crew or solely robotic, is fundamentally constrained by the round trip light time between the space asset and the control facility (presumably on Earth, though not required). For an asset on Mars, the round trip light time varies, from roughly fourteen minutes to up to forty minutes. For a Lunar asset the round-trip light time is measured in only a few seconds, but current communications systems may more than double the latency with system overhead. For a Lunar Asset the total command latency may range from six seconds to more than forty, depending on communications overhead and data rates. Further, these variables are not always predictable, thus complicating operations. There are several differentiating factors for Lunar vs. Mars operations, Round trip light time/Atmosphere/Lighting and ShadowsTerrain type and knowledge/Round trip light time has implications for the distribution of tasks between ground and in space assets. Even at Lunar Distances, the combination of round trip light time plus communications systems overhead does not enable joy stick driving of a rover. The best that can be done, if driving from Earth, is near real time command and control. By 2030, driving from in space may be possible. Productivity on Mars requires either long operational sequences of commands, as is done for current rovers such as Curiosity, significant autonomous capability or, as may be possible by 2030, command and control support from space. Another implication of the long round trip light time from Earth to Mars, is that flight software functions must be resident on the in space asset. On the Moon, there is considerably more flexibility, enabling processing functions, to be resident on Earth or in space. This provides the opportunity to take advantage of the considerable processing power available on the ground, but may be constrained by data rates. On the Moon, for practical operational purposes, there is no atmosphere. Hence there is no scattering of light in the shadows. This has implications for image interpretation and driving near the poles. The Moon has permanently shadowed regions (PSR), unique terrain with unknown surface properties. With no scattering of light in shadows, driving on the Moon, particularly at the poles, where we have strong evidence of water, may prove to be hazardous and complex, requiring non-optical sensors, such as LIDAR.

Trimble, Jay↗

A Natural Language Understanding Approach for Digitizing Aircraft Ground Taxi Instructions

Recent Advancements in spoken language processing technologies have enabled the development of reliable automation tools to assist air traffic control (ATC) operations. These advancements present a unique opportunity to strategically implement digital taxi instructions for aircraft movement on the ground. Digital taxi instructions issue taxiing procedures to pilots as textual or graphical instructions. There are several benefits of digital instructions, including a reduction in radio congestion, elimination of communication errors, and improved aircraft monitoring capabilities. Natural language understanding (NLU) models can extract digital taxi instructions from verbal instructions issued by air traffic controllers. This capability enables the implementation of a digital taxi communication framework with minimal changes to the existing air traffic controller operational environment. We explore a novel application for NLU: automatically generating digital taxi instructions from air traffic controller speech. We describe the development of an annotation scheme to represent (aircraft) ground traffic communications in the US National Airspace System (NAS).Our annotation scheme uses intent classification and slot filling to extract taxi instructions, enabling NLU models to leverage syntactic information. Several neural network models were trained to categorize the controller’s intent and label information relevant to his or her intent.Our research demonstrates that it is feasible to use NLU to automatically generate digitaltaxi instructions, suggesting that it is a powerful tool for the implementation of digital taxi communications.

Hillel Steinmetz↗

A New Direction for the NASA Materials Science Research Using the International Space Station

In 2001 NASA created a fifth Strategic Enterprise, the Office of Biological and Physical Research (OBPR), to bring together physics, chemistry, biology, and engineering to foster interdisciplinary research. The Materials Science Program is one of five Microgravity Research disciplines within this new Enterprise's Division of Physical Sciences Research. The Materials Science Program will participate within this new enterprise structure in order to facilitate effective use of ISS facilities, target scientific and technology questions and transfer results for Earth benefits. The Materials Science research will use a low gravity environment for flight and ground-based research in crystallization, fundamental processing, properties characterization, and biomaterials in order to obtain fundamental understanding of various phenomena effects and relationships to the structures, processing, and properties of materials. Completion of the International Space Station's (ISS) first major assembly, during the past year, provides new opportunities for on-orbit research and scientific utilization. The Enterprise has recently completed an assessment of the science prioritization from which the future materials science ISS type payloads will be implemented. Science accommodations will support a variety of Materials Science payload hardware both in the US and international partner modules with emphasis on early use of Express Rack and Glovebox facilities. This paper addresses the current scope of the flight and ground investigator program. These investigators will use the various capabilities of the ISS lab facilities to achieve their research objectives. The type of research and classification of materials being studied will be addressed. This includes the recent emphasis being placed on radiation shielding, nanomaterials, propulsion materials, and biomaterials type research. The Materials Science Program will pursue a new, interdisciplinary approach, which contributes, to Human Space Flight Exploration research. The Materials Science Research Facility (MSRF) and other related American and International experiment modules will serve as the foundation for the flight research environment. A summary will explain the concept for materials science research processing capabilities aboard the ISS along with the various ground facilities necessary to support the program.

Schlagheck, Ronald A.↗

Observations of Global and Regional Ionospheric Irregularities and Scintillation Using GNSS Tracking Networks

The rate of TEC index (ROTI) is a measurement that characterizes ionospheric irregularities. It can be obtained from standard GNSS dual-frequency phase data collected using a geodetic type of GNSS receiver. By processing GPS data from ground-based networks of International GNSS Service and Continuously Operating Reference Station (CORS), ROTI maps have been produced to observe global and regional scintillation activities. A major mid-latitude scintillation event in the contiguous United States is reported here that was captured in ROTI maps produced using CORS GPS data collected during a space weather storm. The analyses conducted in this work and previously by another group indicate that ROTI is a good occurrence indicator of both amplitude and phase scintillations of GPS L-band signals, even though the magnitudes of ROTI, S4, and sigma(sub phi) can be different. For example, our analysis indicates that prominent ROTI and the L1 phase scintillation (sigma(sub phi)) are well correlated temporally in the polar region while L1 amplitude scintillation rarely occurs. The differences are partially attributed to physics processes in different latitude regions, such as high-speed plasma convection in the polar region that can suppress the amplitude scintillation. An analysis of the impact of ionospheric scintillation on precise positioning, which requires use of dual-frequency phase data, is also conducted. The results indicate that significant (more than an order of magnitude) positioning errors can occur under phase scintillation conditions.

ionospheric measurements↗

Mars Reconnaissance Orbiter Mission: Systems Engineering Challenges on the Mars Reconnaissance Orbiter Mission

MRO project is a system of systems requiring system engineering team to architect, design, integrate, test, and operate these systems at each level of the project. The challenge of system engineering mission objectives into a single mission architecture that can be integrated tested, launched, and operated. Systems engineering must translate high-level requirements into integrated mission design. Systems engineering challenges were overcome utilizing a combination by creative designs built into MRO's flight and ground systems: a) Design of sophisticated spacecraft targeting and data management capabilities b) Establishment of a strong operations team organization; c) Implementation of robust operational processes; and d) Development of strategic ground tools. The MRO system has met the challenge of its driving requirements: a) MRO began its two-year primary science phase on November 7, 2006, and by July 2007, met it minimum requirement to collect 15 Tbits of data after only eight months of operations. Currently we have collected 22 Tbits. b) Based on current performance, mission data return could return 70 Tbits of data by the end of the primary science phase in 2008.

systems engineering↗

Fusion of Test and Analysis: Artemis I Booster to Mobile Launcher Interface Validation

NASA is in the midst of bold and exciting next steps in human exploration and spaceflight. The designs of the new Space Launch System (SLS), the Orion spacecraft and the Exploration Ground Systems (EGS) for vehicle processing and launch are essentially complete and there has been significant progress in manufacturing and assembly of specific hardware for the Artemis I and Artemis II missions. Equally as important, the program level and integrated system level testing and analyses are also well underway to support integrated verification, validation, and Certificate of Flight Readiness (CoFR) for Artemis I. Testing and analysis are key to addressing technical challenges faced by the Artemis missions. Building block approaches are required that provide the right balance between component, element, and/or system level testing that satisfies verification and validation objectives where uncertainties are quantified and minimized. Artemis I is a system of systems that requires a fusion of test and analysis that adeptly characterizes critical interfaces between major program elements. An example of this fusion involves characterizing the interface between the SLS booster and the Mobile Launcher (ML) Vertical Support Post (VSP) interfaces. Proper characterization of this interface represents a number of challenges beginning with the fact that it is a mating of ground support structure in the form of a civil structure to flight hardware. Both sides of the interface are built to different construction standards, but are governed by interface requirements to ensure compatibility when mated. From past program experience, the flexibility at the booster to ML interface is critical in developing accurate prelaunch stacking and cryogenic preloads, squat loads, and pad separation release of preloads and squat loads. This same premise holds for Artemis I. To characterize the asymmetric characteristics at this interface, careful consideration of static forces due to gravity loading with the commensurate effects due to leveling during booster stacking (i.e., spacing and shimming) and nonlinear geometric forces are necessary for inclusion in pre-test assessments. This paper will look at these issues for the upcoming Booster Pull Test in which two boosters will be installed on the ML and one of these boosters will undergo static lateral loading followed afterwards with dynamic excitation into resonance and free-decay. This paper evaluates the booster to ML interface characteristics by characterizing the interface flexibility between the booster aft skirt and the ML VSP interfaces. Furthermore, this paper methodically evaluates the effect of the following on the test outcome: gravitational effects on the booster and ML, the effects of VSP leveling, spacing, and shimming under gravitational loading during booster stacking, the effect of geometric nonlinear follower force due to cg offset as booster is laterally displaced, and the system coupling between the booster under test, ML, and the second booster. Simulated results for a static load pull and dynamic excitation provide insight into the differences in measurement responses when boundary conditions and geometric conditions are included and not included.

Joel W Sills Jr.↗

Real-time onboard geometric image correction

A system to perform real time onboard geometric connection of LANDSAT D resolution satellite imagery is described. System requirements, algorithms, sensors, and other hardware components are defined. Feasibility of implementing the correction process is demonstrated using Kalman filter techniques to incorporate information from onboard ephemeris, attitude control, and ground control points. Random access sensor systems, such as charge injected devices and charge coupled devices are used to obtain pixel values at desired ground location, thus greatly reducing the data processing requirements.

Discenza, W.↗

The Potential for Health Monitoring in Expandable Space Modules: The Bigelow Expandable Activity Module on the ISS

Expandable modules for use in space and on the Moon or Mars offer a great opportunity for volume and mass savings in future space exploration missions. This type of module can be compressed into a relatively small shape on the ground, allowing them to fit into space vehicles with a smaller cargo/fairing size than a traditional solid, metallic structure based module would allow. In April 2016, the Bigelow Expandable Activity Module (BEAM) was berthed to the International Space Station (ISS). BEAM is the first human-rated expandable habitat/module to be deployed and crewed in space. BEAM is a NASA managed ISS payload project in partnership with Bigelow Aerospace. BEAM is intended to stay attached to ISS for an operational period of 2 years to help advance the technology readiness for future expandable modules. BEAM has been instrumented with a suite of space flight certified sensors systems which will help characterize the module's performance for thermal, radiation shielding and impact monitoring against potential Micro Meteoroid/Orbital Debris (MM/OD) providing fundamental information on the BEAM environment for potential health monitoring requirements and capabilities. This paper will provide an overview of how the sensors/instrumentation systems were developed, tested, installed and an overview of the current sensor system operations. It will also discuss how the MM/OD impact detection system referred to as the Distributed Impact Detection System (DIDS) data is being processed and reviewed on the ground by the principle investigators.

Wells, Nathan D.↗

A practical method of determining water current velocities and diffusion coefficients in coastal waters by remote sensing techniques

A simplified procedure is presented for determining water current velocities and diffusion coefficients. Dye drops which form dye patches in the receiving water are made from an aircraft. The changes in position and size of the patches are recorded from two flights over the area. The simplified data processing procedure requires only that the ground coordinates about the dye patches be determined at the time of each flight. With an automatic recording coordinatograph for measuring coordinates and a computer for processing the data, this technique provides a practical method of determining circulation patterns and mixing characteristics of large aquatic systems. This information is useful in assessing the environmental impact of waste water discharges and for industrial plant siting.

James, W. P.↗

Multidisciplinary Dynamic Testing Challenges in Validating the NASA Artemis Architecture

NASA is in the midst of bold and exciting next steps in human exploration and spaceflight. The designs of the new Space Launch System (SLS), the Orion spacecraft and the Exploration Ground Systems (EGS) for vehicle processing and launch are essentially complete and there has been significant progress in manufacturing and assembly of specific hardware for the Artemis I and Artemis II missions. Equally as important, the program level and integrated system level testing and analyses are also well underway to support integrated verification, validation, and certificate of flight readiness (CoFR) for the first Artemis mission. Testing and analysis are key to addressing technical challenges that the Artemis missions offer. Building block approaches are required that provide the right balance between component, system, and/or element level testing that satisfies verification and validation objectives and where, uncertainties are quantified and minimized. Artemis I is a system of systems that requires a fusion of test and analysis that adeptly characterizes critical interfaces between major program elements. NASA is implementing new in-situ testing that fuse traditional aerospace structures with civil structures, such as the Integrated Modal Test for the Artemis I vehicle where the Mobile Launcher and Crawler Transporter serve as a support structure whose dynamics couple with that of the Artemis I vehicle. This new paradigm requires a closer inspection of structural behavior of the Crawler Transporter and the Mobile Launcher as they now serve multiple purposes. This requires a paradigm shift to look beyond experimental modal techniques and incorporates operational modal analysis techniques to validate dynamic models from data collected during rollout to the launch pad. A further complicating factor is the Crawler Transporter generated ground forces have numerous harmonics making extracting dynamic responses of the Artemis I, Mobile Launcher, and Crawler Transporter coupled system challenging. This discussion explores all these challenges with and attempts to understand how we best build confidence in systems and system-of-systems performance capabilities and margins and understand uncertainties.

Joel W Sills↗

Soot Reaction Properties (Ground-Based Study)

Three major soot reaction processes are needed to predict soot properties in flame environments: soot growth, or the formation of soot on soot nuclei and soot particles; soot oxidation, or the reaction of soot with oxidizing species to yield the combustion products of soot oxidation; and soot nucleation, or the formation of soot nuclei from soot precursors having large molecular weights (generally thought to be large and particularly stable PAH molecules in flame environments, called stabilomers). These processes are addressed in the following, considering soot growth, oxidation and nucleation, in turn, by exploiting the soot and flame structure results for premixed and diffusion flames already discussed in Section 2.

Dai, Z.↗

Galileo spacecraft modeling for orbital operations

The Galileo Jupiter orbital mission using the Low Gain Antenna (LGA) requires a higher degree of spacecraft state knowledge than was originally anticipated. Key elements of the revised design include onboard buffering of science and engineering data and extensive processing of data prior to downlink. In order to prevent loss of data resulting from overflow of the buffers and to allow efficient use of the spacecraft resources, ground based models of the spacecraft processes will be implemented. These models will be integral tools in the development of satellite encounter sequences and the cruise/playback sequences where recorded data is retrieved.

Mclaughlin, Bruce A.↗

Galileo Spacecraft Modeling for Orbital Operations

The Galileo Jupiter orbital mission using the Low Gain Antenna (LGA) requires a higher degree of spacecraft state knowledge than was originally anticipated. Key elements of the revised design include onboard buffering of science and engineering data and extensive processing of data prior to downlink. In order to prevent loss of data resulting from overflow of the buffers and to allow efficient use of the spacecraft resources, ground based models of the spacecraft processes will be implemented. These models will be integral tools in the development of satellite encounter sequences and the cruise/playback sequences where recorded data is retrieved.

aerospace↗

Update - The Earth Observing System (EOS) forward and return link data processing and communications services

An overview is presented of the EOS ground support services in order to identify interfaces to and drivers of the data processing and communication systems. Generic system requirements are compared with those specifically needed for EOS, including processing requirements for forward link and return link data. Communications requirements for transporting the forward link data from the EOS Operations Center and for the transfer of level zero data to the EOS Data and Information System (EOSDIS) Distributed Active Archive Centers are specified. The forward and return link processing requirements of the EOS instruments from the international partners are also addressed. The overall context of EOSDIS in the Mission to Planet Earth Program is addressed.

Ramapriyan, H. K.↗

Permafrost on Mars: distribution, formation, and geological role

The morphology of channels, valleys, chaotic and fretted terrains and many smaller features on Mars is consistent with the hypothesis that localized deterioration of thick layers of ice-rich permafrost was a dominant geologic process on the Martian surface. Such ground ice deterioration gave rise to large-scale mass movement, including sliding, slumping and sediment gravity flowage, perhaps also catastropic floods. In contrast to Earth, such mass movement processes on Mars lack effective competition from erosion by surface runoff. Therefore, Martian features due to mass movement grew to reach immense size without being greatly modified by secondary erosional processes. The Viking Mission to Mars in 1976 provided adequate measurements of the relevant physical parameters to constrain models for Martian permafrost.

Nummedal, D.↗

Applications of Modeling and Simulation for Flight Hardware Processing at Kennedy Space Center

The Boeing Design Visualization Group (DVG) is responsible for the creation of highly-detailed representations of both on-site facilities and flight hardware using computer-aided design (CAD) software, with a focus on the ground support equipment (GSE) used to process and prepare the hardware for space. Throughout my ten weeks at this center, I have had the opportunity to work on several projects: the modification of the Multi-Payload Processing Facility (MPPF) High Bay, weekly mapping of the Space Station Processing Facility (SSPF) floor layout, kinematics applications for the Orion Command Module (CM) hatches, and the design modification of the Ares I Upper Stage hatch for maintenance purposes. The main goal of each of these projects was to generate an authentic simulation or representation using DELMIA V5 software. This allowed for evaluation of facility layouts, support equipment placement, and greater process understanding once it was used to demonstrate future processes to customers and other partners. As such, I have had the opportunity to contribute to a skilled team working on diverse projects with a central goal of providing essential planning resources for future center operations.

Marshall, Jennifer L.↗