Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FERMILAB”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Coupled Bunch Instabilities Growth in the Fermilab Booster during Acceleration Cycle

Currently, Fermilab Booster accelerates ~4.5E12 protons per pulse (ppp) in 81 bunches from 400 MeV to 8 GeV at 15 Hz to provide beam to multiple HEP experiments and is being upgraded to handle higher beam intensity >6.7E12 ppp at a repetition rate of 20 Hz. In the current mode of operation, we control longitudinal coupled bunch instabilities (LCBI) using combination of passive and active dampers. The issues with LCBI are expected to worsen at higher beam intensities. Here, we would like to investigate at what time in the beam cycle a particular mode is going to originate and how much it contributes at a different time of the acceleration cycle using the collected wall current monitor data from injection to extraction. Also, measure growth rates as a function of beam intensity for some dominant modes. Finally, this paper presents results from the observed LCBI analysis for the highest available beam intensities, unexpected findings, and future plans to mitigate the LCBI at higher beam intensities

43 PARTICLE ACCELERATORS↗

Recent Improvements in the Beam Capture at Fermilab Booster for High Intensity Operation

The Fermilab Booster uses multi-turn beam injection with all its cavities phased such that beam sees a net zero RF voltage even when each station is at the same maxi-mum voltage. During beam capture the RF voltage is increased slowly by using its paraphase system. At the end of the capture the feedback is turned on for beam acceleration. It is vital for present operations as well as during the PIP-II era that both the HLRF and LLRF systems provide the proper intended phase and RF voltage to preserve the longitudinal emittance from injection to extraction. In this paper, we describe the original architecture of the cavity phase distribution, our recent beam-based RF phase measurements, observed significant deviation in the relative phases between cavities and correction effort. Results from the improved capture for high intensity beam are also presented.

43 PARTICLE ACCELERATORS↗

Kinematic Dependence of the Dilution Factor in the SpinQuest Experiment E1039 at Fermilab

Thirty years after the "Spin Crisis" began, there is still uncertainty surrounding the spin structure of the nucleon. SpinQuest Experiment E1039 at FermiLab will attempt to probe the internal transverse dynamics of the nucleon via Drell-Yan scattering of a 120 GeV proton beam from a polarized proton target to determine if the orbital angular momentum of the sea-quarks contributes to the overall spin of the nucleon. In order to understand a leading contribution to the overall systematic uncertainty in this experiment, a study was performed to calculate and evaluate the uncertainty in the dilution factor of the experimental target. This thesis catalogs that effort, highlights where it overlaps with other sources of systematic error, and suggests future work aimed at reducing the overall systematic error of the experiment.

Conover, Arthur↗

Magnetic Measurements of HL-LHC AUP Cryo-Assemblies at Fermilab

LQXFA/B production series cryogenic assemblies are being built for the LHC upgrade by the HL-LHC Accelerator Upgrade Project (AUP). These contain a pair of MQXFA quadrupole magnets combined as a cold mass within a vacuum vessel, and are to be installed in the IR regions of the LHC. The LQXFA/B are being tested at 1.9 K to assess alignment and magnetic performance at Fermilab's horizontal test facility. The ~10 m - long assembly must meet stringent specifications for quadrupole strength and harmonic field integrals determination, magnetic axis location, and for variations in axis position and local field profile. A multi-probe, PCB-based rotating coil and Single Stretched Wire system are employed for these measurements. To accurately determine rotating coil location and angles within the cold mass, a laser tracker is utilized to record multiple targets at one end of the probe. This paper describes the measurements, probes/equipment, and techniques used to perform the necessary characterization of the cold mass.

43 PARTICLE ACCELERATORS↗

Qualifying AL-800 Garnet For The Fermilab Booster Perpendicular Biased 2nd Harmonic RF Cavity

Al-800 garnet was evaluated for the perpendicular biased 2nd harmonic cavity for the Fermilab Booster accelerator. A test apparatus was designed to evaluate the magnetic permeability and batch consistency of small witness samples of Al-800. Fully assembled AL-800 garnet rings were tested on the garnet ring test stand to measure the resonant frequency and quality factor of each ring. The garnet witness samples and assembled garnet rings showed acceptable consistency within the parameters set by the cavity design team. Based on the test results, AL-800 garnet was deemed suitable for use in the perpendicular biased 2nd harmonic cavity.

Kuharik, John C.↗

Status of the Fermilab Muon g - 2 Experiment

The muon anomalous magnetic moment, aµ = ( g - 2 )/2, is a low-energy observable which can be both measured and computed with very high precision, making it an excellent test of the Standard Model (SM) and a sensitive probe of new physics. Recent efforts improved the precision of both the theoretical prediction and the experimental measurement. On the theory side, the Muon g - 2 Theory Initiative, an international team of more than 130 physicists, reached in 2020 a consensus on the SM prediction for aµ. On the experimental side, the E989 Muon g - 2 Collaboration at Fermilab (FNAL) published in April 2021 a new measurement of aµ from the Run-1 dataset (2018) with 0.46 ppm precision, corroborating the previous Brookhaven National Laboratory (BNL) measurement and increasing the discrepancy with the SM value to 4.2 standard deviations. In this paper, I will discuss the experimental setup and report on the current status of the experiment.

Girotti, Paolo↗

Shielding Experiments Under JASMIN Collaboration at Fermilab(IV) - Measurement and Analyses of High-Energy Neutron Spectra in the Anti-Proton Target Station

Neutron spectra in high-energy region between 1 and 100-MeV in the shield configuration of the anti-proton target station and a 120-GeV proton beam at Fermi National Accelerator Laboratory (Fermilab) were determined using the reaction rate data obtained with the multi-foil activation method. Two kinds of methods were employed for the determination of neutron spectra: one is the fitting method which is newly developed in this work, another is the unfolding method with SAND-II code. The calculations were performed using the PHITS. From the comparison between the calculated and experimental neutron spectra, it concluded that the PHITS can be used for shielding design of high-energy proton accelerators.

43 PARTICLE ACCELERATORS↗

The muon g-2 experiment at FERMILAB

The muon anomaly, a µ = $\frac{g-2}{2}$, is a low energy observable that can be both measured and computed with high precision. Therefore it provides an important test of the Standard Model (SM) and it is a sensitive probe for new physics. The a µ value has been measured to a precision of 0.54 ppm by the E821 experiment at the Brookhaven National Laboratory (BNL). This result shows a difference greater than 3 σ compared to the SM prediction. In an effort to clarify this discrepancy between experimental measurement and theoretical calculation, the Muon g-2(E989) experiment at Fermilab aims to reduce the experimental error on a µ by a factor of four. E989 collected a dataset with the same statistical power of the BNL experiment during the Run 1 data taking (2018). The analysis of data is ongoing and the first result should become available in early 2020. In this paper, I will discuss the experimental setup and report on the status of the Run1 analysis.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Reduction of the beam dynamics systematic uncertainties by the phase space matching with RF electric fields in Muon g –2 experiment at Fermilab

Muon g –2 experiment at Fermilab aims to measure the magnetic anomaly of the muon in a precision of 140 parts-per-billion (ppb). It is one of the most strongly motivated precision particle physics experiments to unveil the mystery of the long-standing 3σ-4σ tension between the previous measurement of the muon g –2 experiment at BNL and the Standard Model predictions. One of the main challenges of the experiment is to keep the total systematic uncertainty within 100 ppb budget. In this dissertation, a novel way of matching the phase space in the muon g –2 storage ring to reduce the beam dynamics systematic effects with RF electric fields is presented. Systematic simulation studies and hardware development of the RF matching system are covered, followed by the promising analysis results of the commissioning runs.

Kim, On↗

A New Charged Lepton Flavor Violation Program at Fermilab

The muon has played a central role in establishing the Standard Model of particle physics, and continues to provide valuable information about the nature of new physics. A new complex at Fermilab, the Advanced Muon Facility, would provide the world's most intense positive and negative muon beams by exploiting the full potential of PIP-II and the Booster upgrade. This facility would enable a broad muon physics program, including studies of charged lepton flavor violation, muonium-antimuonium transitions, a storage ring muon EDM experiment, and muon spin rotation experiments. This document describes a staged realization of this complex, together with a series of next-generation experiments to search for charged lepton flavor violation.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The Muon g-2 Experiment at Fermilab

The muon magnetic anomaly, $a_{\mu}$, is a powerful test of the Standard Model of particle physics. A new experiment at Fermilab has recently measured $a_{\mu}$ with unprecedented precision, confirming the results of the earlier Brookhaven experiment and strengthening the tension with the prediction of the Standard Model as determined by dispersive methods. We here describe the experimental technique, recapitulate the recent result, and discuss some of the improvements made for subsequent analyses.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Muon Campus at Fermilab

The Muon Campus at Fermilab provides world class accelerator infrastructure supporting the next generation intensity frontier experiments. The anti-proton source from the Tevatron era was converted to the present day Muon Campus at the end of the collider program in 2011. Currently, the Muon Campus delivers highly polarized muon beams to the Muon g-2 experiment and in a few years, it will provide muon beams to the Mu2e experiment. The Muon g-2 experiment is a high precision test of the standard model; it is precise enough to measure QED, Weak, and QCD Standard Model contributions.The Muon g-2 experiment looks for a significant deviation from the Standard Model whereas the Mu2e experiment looks for rare processes using high intensity muon beams. The Muon g-2 experiment has measured the anomalous magnetic moment of muons to an unprecedented 460 ppb precision with Run 1 data. The experiment has completed 5 runs, accumulating 19$\times$ Brookhaven E821 data set. The Mu2e experiment has completed the construction phase and first beam to the Diagnostic Absorber was run on April 14, 2022. Installation and commissioning of the Mu2e experiment will begin in 2023 and beam commissioning and physics run is currently planned for 2026.

43 PARTICLE ACCELERATORS↗

An 8 GEV Linac As The Booster Replacement In The Fermilab Power Upgrade

Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron and linac solutions were considered for this purpose. In this paper, we consider the linac version that produces 8 GeV H- beam for injection into the Recycler Ring (RR) or MI The new linac takes ~1 GeV beam from the PIP-II linac and accelerates it to ~ 2 GeV in a 650 MHz SRF linac, and then accelerates to ~8 GeV in an SRF pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in SRF technology. This Booster Replacement linac (BRL) will increase MI beam power to DUNE to more than 2.5 MW and enable next-generation intensity frontier experiments.

Neuffer, David V.↗

Measurement of Charmonium Production in $p + p$ and $p + d$ Interactions in the Fermilab SeaQuest Experiment

The Fermilab SeaQuest experiment has measured dimuon events from the interactions of 120GeV proton beam on liquid hydrogen and deuterium targets with dimuon mass between 2 and 9GeV. These dimuon events contain both the Drell-Yan process and the charmonium ($J/\psi$ and $\psi^\prime$) production. Unlike the Drell-Yan process which probes the antiquark distributions in the nucleons, the charmonium production is sensitive to both quark and gluon distributions. SeaQuest has extracted the $\sigma^{pd}/2\sigma^{pp}$ ratio as well as the differential cross sections for charmonium production in the kinematic region of $0.4 < x_F < 0.9$. The $\sigma^{pd}/2\sigma^{pp}$ ratio for charmonium production are found to be significantly different from that of the Drell-Yan process. The measured differential cross sections for charmonium production are compared with theoretical calculations using Color Evaporation Model and Non-Relativistic QCD model.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Synchronous High-frequency Distributed Readout For Edge Processing At The Fermilab Main Injector And Recycler

The Main Injector (MI) was commissioned using data acquisition systems developed for the Fermilab Main Ring in the 1980s. New VME-based instrumentation was commissioned in 2006 for beam loss monitors (BLM)[2], which provided a more systematic study of the machine and improved displays of routine operation. However, current projects are demanding more data and at a faster rate from this aging hardware. One such project, Real-time Edge AI for Distributed Systems (READS), requires the high-frequency, low-latency collection of synchronized BLM readings from around the approximately two-mile accelerator complex. Significant work has been done to develop new hardware to monitor the VME backplane and broadcast BLM measurements over Ethernet, while not disrupting the existing operations critical functions of the BLM system. This paper will detail the design, implementation, and testing of this parallel data pathway.

43 PARTICLE ACCELERATORS↗

Electron Cloud Simulations In The Fermilab Recycler

We present a simulation study to characterize the stability region of the Fermilab (FNAL) Recycler in the context of secondary emission yield (SEY). Interactions between electrons and beam pipe material can produce electron clouds that jeopardize beam stability in certain focusing configurations. Such an instability was documented in the Recycler, and the work presented here reflects improvements to better understand that finding. We incorporated the Furman-Pivi Model into a PyECLOUD analysis, and we determined the instability threshold given various bunch lengths, intensities, SEY magnitudes, and model parameters.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Application Of The ASME Boiler And Pressure Vessel Code In The Design Of SSR Cryomodule Beamlines For PIP-II Project At Fermilab

This contribution reports the design of the main components used to interconnect SRF cavities and superconducting focusing lenses in the SSR Cryomodule beamlines, developed in the framework of the PIP-II project at Fermilab. The focus of the present contribution is on the design and testing of the edge-welded bellows according to ASME Boiler and Pressure Vessel Code. The activities performed to qualify the bellows to be assembled in cleanroom, for operation in high vacuum, cryogenic environments, and their characterization from magnetic standpoint, will also be presented.

43 PARTICLE ACCELERATORS↗

Status and Plans for a SRF Accelerator Test Faciliy at Fermilab

A superconducting RF accelerator test facility is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration secti on consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beamlines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of gene rating a 810 MeV electron beam with ILC beam intensity. Expansion plans of the facility are underway that will provide the capability to upgrade the accelerator to a total beam energy of 1.5 GeV. In addition to testing accelerator components, this facilit y will be used to test RF power equipment, instrumentation, LLRF and controls systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

43 PARTICLE ACCELERATORS↗