Diamond Shaving of Contaminated Concrete Surfaces

Decommissioning and decontamination of existing facilities presents technological challenges. One major challenge is the removal of surface contamination from concrete floors and walls while eliminating the spread of contamination and volumetric reduction of the waste stream. Numerous methods have been tried with a varying degree of success. Recent technology has made this goal achievable and has been used successfully. This new technology is the Diamond Floor Shaver and Diamond Wall shaver. The Diamond Floor Shaver is a self-propelled, walk behind machine that literally shaves the contaminated concrete surface to specified depths. This is accomplished by using a patented system of 100 dry cutting diamond blades with offset diamond segments that interlock to provide complete shaving of the concrete surface. Grooves are eliminated which allows for a direct frisk reading to analyze results. When attached to an appropriate size vacuum, the dust produced is 100% contained. Dust is collected in drums ready for disposition and disposal. The waste produced in shaving 7,500 square feet at 1/8 inch thickness would fill a single 55 gallon drum. Production is dependent on depth of shaving but averages 100 square feet per hour. The wall shaver uses the same patented diamond drum and blades but is hydraulically driven and is deployed using a robotic arm allowing its operation to be to totally remote. It can reach ceilings as high as 20 feet. Numerous small projects were successfully completed using this technology. Large scale deployment came in 2003. Bluegrass, in conjunction with Bartlett Services, deployed this technology to support decontamination activities for closing of the Rocky Flats nuclear weapons site. Up to six floor shavers and one wall shaver were deployed in buildings B371 and B374. These buildings had up to one half-inch, fixed plutonium and beryllium contamination. Hundred-thousands of square feet of floors and walls were shaved successfully to depths of up to one half inch. Decontamination efforts were so successful the balance of the buildings could be demolished using conventional methods. The shavers helped keep the project on schedule while the vacuum system eliminated the potential for contaminants becoming airborne.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fluor Hanford ALARA Center is a D and D Resource

The mission at the Hanford Nuclear Reservation changed when the last reactor plant was shut down in 1989 and work was started to place all the facilities in a safe condition and begin decontamination, deactivation, decommissioning, and demolition (D and D). These facilities consisted of old shutdown reactor plants, spent fuel pools, processing facilities, and 177 underground tanks containing 53 million gallons of highly radioactive and toxic liquids and sludge. New skills were needed by the workforce to accomplish this mission. By 1995, workers were in the process of getting the facilities in a safe condition and it became obvious improvements were needed in their tools, equipment and work practices. The Hanford ALARA Program looked good on paper, but did little to help contractors that were working in the field. The Radiological Control Director decided that the ALARA program needed to be upgraded and a significant improvement could be made if workers had a place they could visit that had samples of the latest technology and could talk to experienced personnel who have had success doing D and D work. Two senior health physics personnel who had many years experience in doing radiological work were chosen to obtain tools and equipment from vendors and find a location centrally located on the Hanford site. Vendors were asked to loan their latest tools and equipment for display. Most vendors responded and the Hanford ALARA Center of Technology opened on October 1, 1996. Today, the ALARA Center includes a classroom for conducting training and a mockup area with gloveboxes. Two large rooms have a containment tent, several glove bags, samples of fixatives/expandable foam, coating displays, protective clothing, heat stress technology, cutting tools, HEPA filtered vacuums, ventilation units, pumps, hydraulic wrenches, communications equipment, shears, nibblers, shrouded tooling, and several examples of innovative tools developed by the Hanford facilities. See Figures I and II. The ALARA Center staff routinely researches and tests new technology, sponsor vendor demonstrations, and redistribute tools, equipment and temporary shielding that may not be needed at one facility to another facility that needs it. The ALARA Center staff learns about new technology in several ways. This includes past radiological work experience, interaction with vendors, lessons learned, networking with other DOE sites, visits to the Hanford Technical Library, attendance at off-site conferences and ALARA Workshops. Personnel that contact the ALARA Center for assistance report positive results when they implement the tools, equipment and work practices recommended by the ALARA Center staff. This has translated to reduced exposure for workers and reduced the risk of contamination spread. For example: using a hydraulic shear on one job saved 16 Rem of exposure that would have been received if workers had used saws-all tools to cut piping in twenty-nine locations. Currently, the ALARA Center staff is emphasizing D and D techniques on size-reducing materials, decontamination techniques, use of remote tools/video equipment, capture ventilation, fixatives, using containments and how to find lessons learned. The ALARA Center staff issues a weekly report that discusses their interaction with the workforce and any new work practices, tools and equipment being used by the Hanford contractors. Distribution of this weekly report is to about 130 personnel on site and 90 personnel off site. This effectively spreads the word about ALARA throughout the DOE Complex. DOE EM-23, in conjunction with the D and D and Environmental Restoration work group of the Energy Facility Contractors Organization (EFCOG) established the Hanford ALARA Center as the D and D Hotline for companies who have questions about how D and D work is accomplished. The ALARA Center has become a resource to the nuclear industry and routinely helps contractors at other DOE Sites, power reactors, DOD sites, and sites in England, Europe and Indonesia. Other ALARA Centers are located at the Savannah River Site and Los Alamos National Lab.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Savannah River Site Public and Regulatory Involvement in the Cercla Low-Level Waste (LLW) Program and Their Effect on Decisions to Dispose of LLW Generated by Cercla

The key to successful public involvement at the Savannah River Site (SRS) has been and continues to be vigorous, up-front involvement of the public, federal and state regulators with technical experts. The SRS Waste Management Program includes all forms of radioactive waste. All of the decisions associated with the management of these wastes are of interest to the public and successful program implementation would be impossible without including the public up-front in the program formulation. Serious problems can result if program decisions are made without public involvement, and if the public is informed after key decisions are made. This paper will describe the regulatory and public involvement program and their effects on the decisions concerning the disposal at the Savannah River Site (SRS) of LLW generated from CERCLA Removal and Remedial Actions. At SRS the Deactivation and Decommissioning (D and D) project has generated large amounts of LLW from the removal of buildings and processing facilities. The D and D project is expected to generate even larger amounts of LLW in the future. The most cost effective disposal alternated is to use the onsite LLW disposal facility in E-Area. The E-Area LLW Facility is owned and operated by the Department of Energy (DOE) under its authority granted by the Atomic Energy Act of 1954, as amended. Since the disposal of CERCLA generated waste is also governed by the Environmental Protection Agency (EPA) CERCLA regulations, it is important that EPA, DOE, and the South Carolina Department of Health and Environmental Control (SCDHEC) work together to resolve any conflicts in implementation of the D and D project so that all regulations are followed and the project can be continued successfully. An issue of particular significance will be described in this paper that, were it not resolved successfully, would have jeopardized the completion of one project and resulted in higher overall project costs. The EPA determined in review of the E-Area LLW Facility groundwater monitoring that a 'release' under CERCLA had occurred. As a result, EPA determined that it was necessary to issue a 'Notice of Unacceptability' to SRS revoking the CERCLA Off-Site Rule approval for the E-Area LLW Facility, thus, no longer allowing the E-Area LLW Facility Slit trenches to receive CERCLA waste for disposal. It became critical to the success of the D and D project to reestablish CERCLA Off-Site Rule approval. The discussions and negotiations Comment [HB1]: with the South Carolina regulators and EPA were conducted in full view of the public and as such, an informed decision as to resolution included the public interactions. This paper will describe the successful results of this technical, regulatory, and public involvement program, explore the challenges, how the accomplishments occurred, and describe the future challenges along with the road map for the future. In doing this, the SRS D and D project must be described to give the readers an understanding of the technical complexities that must be communicated successfully to achieve constructive stakeholder participation and regulatory approval. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development Of Strategy For The Management Of LLW In The United Kingdom

The Nuclear Decommissioning Authority (NDA) is a UK non-departmental public body with a remit to clean up the civil public sector nuclear legacy. Much work has been done to date on developing contractor competition for the management of NDA-owned sites, including the UK's principal disposal facility: the Low Level Waste Repository (LLWR) in Cumbria. The competition goals and principles are integrated with the framework for the development of a UK Low Level Waste (LLW) management plan, through which the NDA will deliver its commitments to UK Government and stakeholders. Nexia Solutions has undertaken work for the NDA in assessing strategic options and scenarios for the management and disposal of current UK LLW. The volumetric, radiological and strategic limitations of existing disposition routes have been assessed against the inventories and characteristics of LLW forecast to arise. A number of potential alternative scenarios and variants for future LLW management have been modelled and assessed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

To Sample or Not to Sample - An Investigation Into the Uncertainty from Sampling Followed by Laboratory Analysis Versus In-Toto Gamma Spectroscopy for Situations of Non-Uniform Radioactivity Distribution

During the decommissioning of structures and the remediation of soil, material that is known or suspected to be contaminated with radioactivity must be assayed. For many, if not most, of the cases, the radioactive material concentration can be determined or inferred by gamma spectroscopy. In most, if not all, of these cases, the radioactivity is not uniformly distributed. For these situations, is it better to perform in-toto measurements of the entire item, or is it better to extract a sample and analyze that sample? For the in-toto gamma spectroscopy measurement, the results will not be accurate unless the calibration method perfectly represents the measured item. And since the calibrations normally assume uniformly distributed radioactivity, any nonuniform distribution of radioactivity in the measured material will cause an error in the results. A mathematical program using probabilistic methods has been developed to estimate the uncertainty in in-toto gamma spectroscopy measurements. This program has the capability of determining the efficiency of various types of non-uniform radioactivity distributions and to compare it to the uniform distribution efficiency. Repeating this for a large number of random tries allows the estimation of the measurement uncertainty. A new feature has been added to the program to simulate the extraction of a sample from these same non-uniform distributions, to compute the average concentration in this extracted sample, and to compare it to the average concentration in the original item to be measured. Repeating this for a large number of random tries allows the estimation of the sampling uncertainty. These two computations were run on several different 'typical' contamination measurement scenarios [200 liter drums, 27 cubic meter 'truck' containers, 0.01-10 liter 'laboratory' containers, and 3600 square meter soil 'in-situ' plots]. In all cases examined, the sampling uncertainty was larger than the in-toto gamma measurement uncertainty - typically about an order of magnitude larger. This means that in-toto measurements are likely better for situations where the activity is not homogeneous, and where gamma spectroscopy is appropriate. If sampling is to be done, then the best results will be when the largest mass of sample is extracted and when it is made up from the largest number of discrete sub-samples. The more extreme the non-uniformity, the more important this is. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New initiatives in materials security

NRC Mission: To license and regulate the Nation's civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment. Scope of Responsibility: NRC's regulatory mission covers three main areas: - Reactors: commercial reactors for generating electric power and non-power reactors used for research, testing, and training; - Materials: uses of nuclear materials in medical, industrial, and academic settings and facilities that produce nuclear fuel; - Waste: transportation, storage, and disposal of nuclear materials and waste, and decommissioning of nuclear facilities from service. A Changing Environment: - National security is dominant concern; - Obtain appropriate balance between safety and Security initiatives and Operational activities; - Multiple layers of systems, infrastructures for various licensees. Effective Communication: Not easy; Sound bites galore; Nuclear 'phobia'; Acceptability of risk; Balance of cost and benefits; Responsibility of the regulator, licensees and radiation protection professionals. Prioritized Licensee Groups: - High priority: Panoramic irradiators; manufacturers/distributors; - Medium priority: medical and research facilities, radiography, well-logging, broad-scope licenses, self-shielded irradiators, open-field irradiators, and other licensees; - Low priority: Portable gauges. Increased Security Measures: Security Zone; Control Access; Monitor, Detect, Assess, and Respond; Transportation Security; Additional control to secure portable and mobile devices; Liaison with Local Law Enforcement Agencies; Background Investigations and Fingerprinting; License Verification; Document Retention; Information Protection; Orders/Legally binding requirements to more than 3000 licensees. Orders Issued: Large Panoramic Irradiators Security Measures (60 Orders issued 6/03, Inspections done); Manufacturing and Distribution Licensees Security Measures (61 Orders issued 1/04, Inspections done); Transportation of Radioactive Material Quantities of Concern (167 Orders Issued 07/05, Inspections done); Orders for Increased Control Measures for other types of sources by categories of licenses (1,098 NRC Orders and 1782 binding State requirements issued by 12/05, Implemented 06/06, Inspections done by NRC and States). Security Inspection Results: All first year Increased Control inspections completed; NRC Information Notice (IN) 2007-16 issued May 2007; Since IN 2007-16 was issued, {approx}50% of the NRC inspections performed resulted in violations; Licensees misinterpreted or incompletely implemented requirements; Common theme: failure to properly document actions or programs when implementing the Increased Controls. Energy Policy Act of 2005: Established Radiation Source Protection and Security Task Force: cooperative effort with 14 Federal agencies, 2 State organizations; Comprehensive analysis of the security of radiation sources in the U.S.; Directed NRC to contract with National Academy of Sciences to conduct a study on radiation source use and replacement; Report to the President and Congress issued 8/06 and every 4 years thereafter. Radiation Source Protection and Security Task Force: Need higher priority on international transport security; Evaluate feasibility of using new and existing technologies to detect and discourage theft during transport; Conduct a feasibility study on the possible phase out of CsCl in highly dispersible forms; Further evaluate potential alternative technologies; Expedite completion of fingerprint requirements in Act. National Source Tracking System: Joint NRC/DOE 2003 report on Radiological Dispersal Devices recommended development of a national source tracking system; IAEA Code of Conduct recommended establishment of a national registry; U.S. Energy Policy Act of 2005 placed requirements for NRC to issue regulations establishing a mandatory tracking system. New Fingerprinting Requirements: Orders were issued to NRC Increased Control licensees on Dec 5, 2007; Licensees have 60 days to notify the NRC if they are unable to comply or if compliance is unnecessary; Licensees have 90 days to fingerprint and approve a Trustworthiness and Reliability Official; Licensees will have 180 days to implement program; 34 Agreement Stated Increased Control Licensees will receive similar requirements within 180 days. 2007 GAO Investigation: Formed Bogus Company and Obtained NRC License; Altered NRC License; Two Suppliers Agreed to Sell Material; Parallel Attempt to Obtain Agreement State; License Aborted When Notified of Site Visit. Short-Term Actions Taken: Terminated the NRC License; Stopped issuance of new NRC licenses until Interim Guidance was issued; Mandatory pre-Licensing visits or meetings for new applicants; Performed consequence assessment; Coordinated with Federal and State Partners; Retrospective exam ensure licensees are legitimate. Action Plan: Independent, 120-day external review Issued 2/11/08 for comment; National Source Tracking System - Jan 2009; Web-Based Licensing; General Licenses and Outreach; Pre-Licensing and Materials Working Groups; Agreement State Partnership; Comprehensive Internal Assessment. Regulatory Issue Summary (RIS 2008-02): Issued February 1, 2008; Latest developments in materials security; Highlights Energy Policy Act 2005, GAO report and National Academy pending Feb 2008 report; New efforts with DHS, DOE/NNSA and manufacturers on additional security enhancements for Cs-137 irradiators; Low-cost, easily implemented physical security improvements. Enhanced State, Federal and International Partnerships: Federal, State and local interface; DHS' Domestic Nuclear Detection Office 'Securing the Cities' Initiative; DHS Protective Action Guides for RDDs and INDs; DOE/NNSA's Securing the Sources Initiative; International nuclear security outreach activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress and Status of the Ignalina Nuclear Power Plant's New Solid Waste Management and Storage Facilities

A considerable amount of dry radioactive waste from former NPP operation has accumulated up to date and is presently stored at the Ignalina NPP site, Lithuania. Current storage capacities are nearly exhausted and more waste is to come from future decommissioning of the two RMBKtype reactors. Additionally, the existing storage facilities does not comply to the state-of-the-art technology for handling and storage of radioactive waste. In 2005, INPP faced this situation of a need for waste processing and subsequent interim storage of these wastes by contracting NUKEM with the design, construction, installation and commissioning of new waste management and storage facilities. The subject of this paper is to describe the scope and the status of the new solid waste management and storage facilities at the Ignalina Nuclear Power Plant. In summary: The turnkey contract for the design, supply and commission of the SWMSF was awarded in December 2005. The realisation of the project was initially planned within 48 month. The basic design was finished in August 2007 and the Technical Design Documentation and Preliminary Safety Analyses Report was provided to Authorities in October 2007. The construction license is expected in July 2008. The procurement phase was started in August 2007, start of onsite activities is expected in November 2007. The start of operation of the SWMSF is scheduled for end of 2009. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparison of Candidate Sites for installation of Landfill facility at Ignalina NPP Site Using Fuzzy Logic Approach

There is only one nuclear power plant in Lithuania - Ignalina NPP (Nuclear Power Plant). Two similar units with installed capacity of 1500 MW (each) were commissioned in 1983 and 1987 respectively. But the first Unit of Ignalina NPP was finally shutdown December 31, 2004, and second Unit is planned to be shutdown before 2010. Operational radioactive waste of different activities is generated at Ignalina NPP. After closure of INPP a waste from decommissioning should be managed also. According to Lithuanian regulatory requirements (1) the waste depending on the activity must be managed in different ways. In compliance with this Regulation very low-level radioactive waste (VLLW) could be disposed of in a Landfill facility. In such case very simple engineered barriers are required. A cap on the top of the repository is necessary from long-term safety point of view. Experience has shown that the effective and safe isolation of waste depends on the performance of the overall disposal system, which is formed by three major components: the site, the disposal facility and the waste form. The basic objective of the siting process is to select a suitable site for disposal and demonstrate that this site has characteristics which provide adequate isolation of radionuclides from the biosphere for desired periods of time. The methodology and results on evaluation and comparison of two candidate sites intended for construction of Landfill facility at Ignalina NPP site are presented in the paper. Criteria for comparison are based on the IAEA (International Atomic Energy Agency) recommendations (2). Modeling of the radionuclide releases has been performed using ISAM (Improving of Safety Assessment Methodologies for Near Surface Disposal facilities) methodology (3). For generalization of the information and elaboration of the recommendations Fuzzy Logic approach was used (4). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-Term Surveillance and Maintenance at Rocky Flats: Early Experiences and Lessons Learned

The U.S. Department of Energy's (DOE's) Rocky Flats Site was established in 1951 as part of the United States' nationwide nuclear weapons complex to manufacture nuclear weapons components. In 1992 weapons production halted, and the Rocky Flats mission changed to include environmental investigations, cleanup, and site closure. In October 2005, DOE and its contractor completed an accelerated 10-year, $7 billion cleanup of chemical and radiological contamination left from nearly 50 years of production. The cleanup required the decommissioning, decontamination, demolition, and removal of more than 800 structures; removal of more than 500,000 cubic meters of low-level radioactive waste; and remediation of more than 360 potentially contaminated environmental sites. The final remedy for the site was selected in September 2006 and included institutional controls, physical controls, and continued monitoring for the former industrial portion of the site. The remainder of the site, which served as a buffer zone surrounding the former industrial area, was transferred to the U.S. Fish and Wildlife Service in July 2007 for a national wildlife refuge. DOE's Office of Legacy Management is responsible for the long-term surveillance and maintenance of Rocky Flats, which includes remedy implementation activities and general site maintenance. Several factors have complicated the transition from closure to post-closure at Rocky Flats. The early experiences associated with the two years since the physical cleanup and closure work were completed have led to several valuable lessons learned. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decontamination of the Plum Brook Reactor Facility Hot Cells

The NASA Plum Brook Reactor Facility decommissioning project recently completed a major milestone with the successful decontamination of seven hot cells. The cells included thick concrete walls and leaded glass windows, manipulator arms, inter cell dividing walls, and roof slabs. There was also a significant amount of embedded conduit and piping that had to be cleaned and surveyed. Prior to work starting evaluation studies were performed to determine whether it was more cost effective to do this work using a full up removal approach (rip and ship) or to decontaminate the cells to below required clean up levels, leaving the bulk of the material in place. This paper looks at that decision process, how it was implemented, and the results of that effort including the huge volume of material that can now be used as fill during site restoration rather than being disposed of as LLRW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Situ Characterization of Underwater Radioactive Sludge

A fundamental requirement underpinning safe clean-up technologies for legacy spent nuclear fuel (SNF) ponds, pools and wet silos is the ability to characterize the radioactive waste form prior to retrieval. The corrosion products resulting from the long term underwater storage of spent nuclear fuel, reactor components and reprocessing debris present a major hazard to facility decontamination and decommissioning in terms of their radioactive content and physical / chemical reactivity. The ability to perform in-situ underwater non-destructive characterization of sludge and debris in a safe and cost-effective manner offers significant benefits over traditional destructive sampling methods. Several techniques are available for underwater measurements including (i) Gross gamma counting, (ii) Low-, Medium- and High- Resolution Gamma Spectroscopy, (iii) Passive neutron counting and (iv) Active Neutron Interrogation. The optimum technique depends on (i) the radioactive inventory (ii) mechanical access restrictions for deployment of the detection equipment, interrogation sources etc. (iii) the integrity of plant records and (iv) the extent to which Acceptable Knowledge which may be used for 'fingerprinting' the radioactive contents to a marker nuclide. Prior deployments of underwater SNF characterization equipment around the world have been reviewed with respect to recent developments in gamma and neutron detection technologies, digital electronics advancements, data transfer techniques, remote operation capabilities and improved field ruggedization. Modeling and experimental work has been performed to determine the capabilities, performance envelope and operational limitations of the future generation of non-destructive underwater sludge characterization techniques. Recommendations are given on the optimal design of systems and procedures to provide an acceptable level of confidence in the characterization of residual sludge content of legacy wet storage facilities such that retrieval and repackaging of SNF sludges may proceed safely and efficiently with support of the regulators and the public. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applications Where Snap is BPM for Radioactive Waste Assay

Historically, the Atomic Weapons Establishment (AWE) at Aldermaston in the United Kingdom (UK), has used a variety of assay techniques to measure the radioactive content of a diverse range of waste packages from decommissioning, operational and legacy sources. The regulator, the Environment Agency in the UK, places conditions and limits on AWE through an authorisation within the Radioactive Substances Act (RSA93). The conditions and limits require Best Practical Means (BPM) measurements to be used to demonstrate compliance with the authorisation. Hence, the assay technique employed needs to achieve a balance between risk of exposure, environmental considerations, technological considerations, health and safety considerations and cost effectiveness, without being grossly disproportionate in terms of money, time or trouble. Recently published work has concluded that the Spectral Non-destructive Assay Platform (SNAP) assay system is BPM for Depleted Uranium (DU) waste assay at AWE (1) and low level plutonium in soft drummed waste, HEPA filters and soils (2-4). The purpose of this paper is to highlight other applications where SNAP represents BPM for radioactive waste assay. This has been done by intercomparison studies of SNAP with other assay techniques, such as Segmented Gamma Scanner (SGS) and Passive Neutron Coincidence Counter (PNCC). It has been concluded that, for a large range of waste packages encountered at AWE, SNAP is BPM. (author)

42 ENGINEERING↗

Polychlorinated Biphenyl Compliance Issues in the 21. Century: Poorly Recognized and Potentially Devastating

Thirty-one years have passed since the United States Congress passed the Toxic Substances Control Act (TSCA). The 1976 law essentially eliminated future production of polychlorinated biphenyls (PCBs) within the United States and greatly limited the use of previously manufactured PCBs and PCB products. The ultimate objective of the law was the complete elimination of these chemicals due to concerns about their potentially toxic effects on health and the environment. PCBs were manufactured in the United States between 1929 and 1977. They were highly valued for their fire and heat-resistance properties and for their chemical stability. As a result, PCBs were used in a variety of thermally and/or chemically stressful applications. They did not conduct electricity and therefore were particularly well-suited for use as insulating fluids in high-voltage electric equipment. PCBs were also used in various other applications, such as in hydraulic and heat transfer fluids. Strict controls on the use and disposal of PCBs were imposed by the TSCA implementing regulations at 40 CFR 761. As a result, most heavy users of PCB products worked hard to curtail their PCB use. Many organizations that once used substantial amounts of PCBs, subsequently declared themselves 'PCB free'. Unfortunately, in many cases, these 'PCB-free' declarations were premature, as PCBs were used in many more applications than insulating fluids. From the 1990's and to the present day, PCBs increasingly have been discovered in non-liquid forms. These materials were used or installed in facilities constructed before the 1979 'PCB ban'. Examples include applied paints and coatings, caulking, pre-formed joint filler, and plastic or rubber wire and cable insulation. Proper identification of these materials is necessary for appropriate and compliant waste management during deactivation and decommissioning (D and D) activities. PCBs can pose other significant waste management issues for D and D projects, particularly for nuclear facilities. Depending upon the waste form and the intended disposal path, PCBs can be regulated at thresholds in the low parts-per-billion (ppb). These low regulatory thresholds often are overlooked due to the erroneous belief by many waste management professionals that materials containing PCBs are regulated by TSCA only if their PCB concentration is at least 50 parts-per-million (ppm). Failure to recognize when and how the lower thresholds apply can lead to rejection of the waste materials by treatment, storage and disposal (TSD) facilities as well as potential regulatory non-compliance. Furthermore, re-use of 'excess' materials with PCBs is also regulated by TSCA. In the event of a characterization error, the costs required to make necessary corrections can be very high. This paper will focus on PCB characterization and waste management issues associated with D and D of DOE nuclear facilities. It will identify PCB materials that are likely to be present in such facilities, with emphasis on the nonliquid PCB forms. The paper will discuss characterization pitfalls associated with Non-Liquid PCBs (NLPCBs), including circumstances in which NLPCBs can migrate into other materials. The paper also will identify TSCA requirements for materials with very low concentrations of PCBs; certain materials are regulated at concentrations as low as 0.5 {mu}g/L PCBs (approximately 0.5 ppb). The paper will then examine the potentially extensive impacts to a facility if the materials are not managed in a TSCA-compliant manner. Examples from a recent D and D project at the DOE Savannah River Site will be used to illustrate key points and lessons learned. It is expected that this information would be useful to other DOE sites, DoD installations and commercial nuclear facilities constructed prior to 1979. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an Electrical Resistivity Imaging Program for Subsurface Characterization at Hanford

Recent successes in subsurface plume imaging over waste storage and disposal facilities using electrical resistivity geophysics has prompted the expansion of the science into a full program for environmental characterization. Characterization using direct current electrical resistivity imaging (ERI) was first tested over liquid waste disposal trenches at the BC Cribs and Trenches (BCCT) site, south of the 200 East area of Hanford. The geophysical data were compared to borehole data with favorable conclusions. Since the initial deployment at BCCT, the method has been applied at several other facilities within the Hanford Nuclear Reservation and significant achievements have been made to solve the complex nature of the industrial environment, namely metallic infrastructure such as storage tanks, pipes, wells, and other objects that interfere with plume imaging. The solution was to directly include the infrastructure into the measurement strategy. Other achievements include placement of deep subsurface electrodes during decommissioning of small-diameter characterization boreholes, permanent electrodes on the surface to allow reoccupation for time-lapsed imaging, enhancements in computer hardware and software to solve larger problems with increased resolution, and the installation of a quality assurance program to ensure instrument and data integrity. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FRJ-1 Research Reactor (Merlin) Makes Way for a 'Green Field' Milestones on the Road to Paradise Regained

This report describes the previous path of the research reactor FRJ-1 (MERLIN) from shutdown to 'green field site', whereby primary focus is placed on milestones representing distinctive phases of dismantling. However, not only the milestones, but also the stumbling blocks are worth mentioning, because even negative events are painful and therefore provide good examples of what not to do in future projects. Dismantling of FRJ-1 began in 1995 with rather unspectacular demolition of the conventional air cooling system. Nevertheless, this was a significant milestone because it marked the beginning of the nuclear decommissioning era for Research Center Juelich. From this time on the most significant milestones along the path to 'green field site' are represented by: - Demolishing the system circuits and removal of experimental equipment; - Removal of built-in equipment in the reactor tank; - Demolition of the reactor block; - Decontamination and clearance measurement of the reactor building followed by dismissal from the German Atomic Energy Act. - Conventional demolition of the reactor hall with the objective of converting to 'green field site' These steps are explained below in greater or less detail depending on their degree of controversy and interest. At the time this report is published, the reactor building will be dismissed from the German Atomic Energy Act. The last step in conventional demolition should also be completed at this time according to the original planning. However this was prevented by one of the many stumbling blocks on the way to success. Nevertheless it is assumed at the present time that this step will also be concluded before the middle of 2008. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Oak Ridge D and D Plan 3515 Project - Technology Review (2007) and GammaCam Technology Demonstration for Characterizing Building 3515 at Oak Ridge (2007)

This paper presents the results from the Characterization, Decontamination and Decommissioning (CD and D) Study performed by MSE Technology Application, Inc. (MSE) to assist the U.S. Department of Energy (DOE) and Oak Ridge National Laboratory (ORNL) in the preparation of a Project Execution Plan and Remediation Plan for Building 3515 at ORNL. Primary objectives of this study were to identify innovative CD and D technologies and methodologies and recommend alternatives applicable to the CD and D of Building 3515. Building 3515 is a small heavily shielded concrete and cement block structure centrally located in the Bethel Valley portion of the ORNL. The building's interior is extensively contaminated with Cesium 137 (Cs-137), the primary contaminant of concern. A previous attempt to characterize the building was limited to general interior area radiation exposure level measurements and a few surface smears gathered by inserting monitoring equipment into the building on long poles. Consequently, the spatial distribution of the gamma radiation source inside the building was not determined. A subsequent plan for D and D of the building presented a high risk of worker radiation dose in excess of as low as reasonably achievable (ALARA) because the source of the interior gamma radiation field is not completely understood and conventional practices required workers to be in close proximity of the building. As part of an initial literature search, MSE reviewed new generation gamma source characterization technologies and identified the GammaCam{sup TM} portable gamma ray imaging system as an innovative technology applicable to locating the dominant gamma ray sources within the building. The GammaCam{sup TM} gamma-ray imaging system is a commercially available technology marketed by the EDO Corporation. This system consists of a sensor head with a co-aligned camera and a portable computer. The system is designed to provide two-dimensional spatial mappings of gamma ray emitting nuclides in real time. The gamma radiation sensor and camera can be set up within or outside of the radiation field while the system operator and PC can be located 30 to 60 m (100 to 200 ft) from the sensor head. The system has been used successfully at numerous DOE and commercial nuclear facilities to precisely locate gamma radiation sources. However, literature attesting to the ability of this technology to detect radiation sources within heavily shielded structures was not available. Consequently, MSE was not certain if this technology would be capable of locating gamma ray sources within the heavily shielded Building 3515. To overcome this uncertainty, MSE sent two individuals to the EDO Corporation for training. At completion of the training, MSE leased the GammaCam{sup TM} portable system and brought it to ORNL to evaluate the capability of the system. An overview from this evaluation is summarized in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Disposal Of Irradiated Cadmium Control Rods From The Plumbrook Reactor Facility

Innovative mixed waste disposition from NASA's Plum Brook Reactor Facility was accomplished without costly repackaging. Irradiated characteristic hardware with contact dose rates as high as 8 Sv/hr was packaged in a HDPE overpack and stored in a Secure Environmental Container during earlier decommissioning efforts, awaiting identification of a suitable pathway. WMG obtained regulatory concurrence that the existing overpack would serve as the macro-encapsulant per 40CFR268.45 Table 1.C. The overpack vent was disabled and the overpack was placed in a stainless steel liner to satisfy overburden slumping requirements. The liner was sealed and placed in shielded shoring for transport to the disposal site in a US DOT Type A cask. Disposition via this innovative method avoided cost, risk, and dose associated with repackaging the high dose irradiated characteristic hardware. In conclusion: WMG accomplished what others said could not be done. Large D and D contractors advised NASA that the cadmium control rods could only be shipped to the proposed Yucca mountain repository. NASA management challenged MOTA to find a more realistic alternative. NASA and MOTA turned to WMG to develop a methodology to disposition the 'hot and nasty' waste that presumably had no path forward. Although WMG lead a team that accomplished the 'impossible', the project could not have been completed with out the patient, supportive management by DOE-EM, NASA, and MOTA. (authors)

42 ENGINEERING↗

Successful Demolition of Historic Cape Canaveral Air Force Station Launch Facilities: Managing the Process to Maximize Recycle Value to Fund Demolition

This paper will present the history of the Atlas 36 and Titan 40 Space Launch Complexes (SLC), the facility assessment process, demolition planning, recycle methodology, and actual facility demolition that resulted in a 40% reduction in baseline cost. These two SLC launched hundreds of payloads into space from Cape Canaveral Air Force Station (AFS), Florida. The Atlas-Centaur family of rockets could lift small- to medium-size satellites designed for communications, weather, or military use, placing them with near pinpoint accuracy into their intended orbits. The larger Titan family was relied upon for heavier lifting needs, including launching military satellites as well as interplanetary probes. But despite their efficiency and cost-effectiveness, the Titan rockets, as well as earlier generation Atlas models, were retired in 2005. Concerns about potential environmental health hazards from PCBs and lead-based paint chipping off the facilities also contributed to the Air Force's decision in 2005 to dismantle and demolish the Atlas and Titan missile-launching systems. Lockheed Martin secured the complex following the final launch, removed equipment and turned over the site to the Air Force for decommissioning and demolition (D and D). AMEC was retained by the Air Force to perform demolition planning and facility D and D in 2004. AMEC began with a review of historical information, interviews with past operations personnel, and 100% facility assessment of over 100 structures. There where numerous support buildings that due to their age contained asbestos containing material (ACM), PCB-impacted material, and universal material that had to be identified and removed prior to demolition. Environmental testing had revealed that the 36B mobile support tower (MST) exceeded the TSCA standard for polychlorinated biphenyls (PCB) paint (<50 ppm), as did the high bay sections of the Titan Vertical Integration Building (VIB). Thus, while most of the steel structures could be completely recycled, about one-third of 36B MST and the affected areas of the VIB were to be consigned to an on-site regulated waste landfill. In all, it is estimated that approximately 10,000,000 kg (11,000 tons) of PCB-coated steel will be land-filled and 23,000,000 kg (25,000 tons) will be recycled. The recycling of the steel and other materials made it possible to do additional demolition by using these funds. Therefore, finding ways to maximize the recycle value of materials became a key factor in the pre-demolition characterization and implementation strategy. This paper will present the following: - Critical elements in demolition planning working at an active launch facility; - Characterization and strategy to maximize steel recycle; - Waste disposition strategy to maximize recycle/reuse and minimize disposal; - Recycle options available at DOD installations that allow for addition funds for demolition; - Innovation in demolition methodologies for large structures - explosive demolition and large-scale dismantlement; - H and S aspects of explosive demolition and large scale dismantlement. In conclusion: The Cape Canaveral AFS Demolition Program has been a great success due to the integration of multiple operations and contractors working together to determine the most cost-effective demolition methods. It is estimated that by extensive pre-planning and working with CCAFS representatives, as well as maximizing the recycle credits of various material, primarily steel, that the government will be able to complete what was base-lined to be a $30 M demolition program for < $20 M. Other factors included a competitive subcontractor environment where they were encouraged with incentives to maximize recycle/reuse of material and creative demolition solutions. Also, by overlapping multiple demolition tasks at multiple facilities allowed for a reduction in field oversight. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗