Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DAMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Humin to Human: Organic carbon, sediment, and water fluxes along river corridors in a changing world

This is a presentation with slides on What does it mean to be human? ...humin?; River flow and Hydrographs; Snake River altered hydrograph (Marston et al., 2005); Carbon dynamics are important in rivers; Rivers and streams as carbon sink; Reservoirs for organic carbon; Study sites in Colorado; River morphology; Soil sample collection; Surveys at RMNP; Soil organic carbon content at RMNP; Abandoned channels and Cutoffs; East River channel migration and erosion; Linking hydrology to floodplain sediment flux; Impact of Extreme Floods on Floodplain Sediment; Channel Geometry: RMNP; Beavers dams and multithread channels; Geomorphology and carbon in N. St. Vrain Creek; Geomorphology and carbon along the East River; Geomorphology and carbon in N. St. Vrain Creek; San Marcos River, etc.

54 ENVIRONMENTAL SCIENCES↗

Measuring Non-Market Values for Hydropower Production and Water Storage on the Colorado River: A White Paper Investigation

This study presents a conceptual framework for capturing the spatial and temporal aspects of non-market dimensions of value (DOV) and how they vary as the result of policy changes for hydropower generation and developed water uses. The foundation of this project is a literature review that reveals that focused, sector specific valuations are no longer adequate if the goal is to provide decision makers with a complete understanding of their decisions. Rather, estimates of non-market values for informing decisions regarding dam operations and/or other water management alternatives must consider the entire spectrum of market and non-market values, and the tradeoffs (both positive and negative) between those values over time and space, while considering shifting preferences in an uncertain environment. This document describes the history and reasoning for these conclusions and presents a conceptual framework for understanding non-market values as a function of changes to hydropower operations and water resources management.

13 HYDRO ENERGY↗

Experimental Pressure Measurements on Hydropower Turbine Runners

The range of hydrodynamic operating conditions to which the turbine is exposed results in significant pressure fluctuations on both the pressure and suction sides of the blades. Understanding these dynamic pressures has a range of applications. Structurally, the resulting dynamic loads are significant in understanding the design life and maintenance schedule of the bearing, shafts and runner components. The pulsing pressures have also been seen to have a detrimental effect on the surface condition of the blades. Biologically, the pressure gradients and pressure extremes are the primary driver of barotrauma for fish passing through hydroturbines. Improvements in computational fluid dynamics (CFD) can be used to simulate such unsteady pressures in the regions of concern. High frequency model scale and prototype measurements of pressures at the blade are important in the validation of these models. Experimental characterization of pressure fields over hydroturbine blades has been demonstrated by a number of studies which using multiple pressure transducers to map the pressure contours on the runner blades. These have been performed at both model and prototype scales, often to validate computational models of the pressure and flow fields over the blades. This report provides a review of existing studies in which the blade pressure was measured in situ. The report assesses the technology for both model and prototype scale testing. The details of the primary studies in this field are reported and used to inform the types of hardware required for similar experiments based on the Ice Harbor Dam owned by the US Corps of Engineers on the Snake River, WA, USA. Such a study would be used to validate the CFD performed for the BioPA.

13 HYDRO ENERGY↗

Simulation of Columbia River Floods in the Hanford Reach

Columbia River water elevations and flows in the Hanford Reach affect the environment and facilities along the shoreline, including movement of contaminants in groundwater, fish habitat, and infrastructure subject to flooding. This report describes the hydraulic simulation of hypothetical flood flows using the best available topographic and bathymetric data for the Hanford Reach and the Modular Aquatic Simulation System in 1 Dimension (MASS1) hydrodynamic model. The MASS1 model of the Hanford Reach was previously calibrated to field measurements of water surface elevations. The current model setup can be used for other studies of flow, water levels, and temperature in the Reach. The existing MASS1 channel geometry and roughness and other model configuration inputs for the Hanford Reach were used for this study, and previous calibration and validation results for the model are reprinted here for reference. The flood flows for this study were simulated by setting constant flow rates obtained from the U.S. Army Corps of Engineers (USACE) for the Columbia, Snake, and Yakima Rivers, and a constant water level at McNary Dam, and then running the model to steady state. The discharge levels simulated were all low-probability events; for example, a 100-year flood is one that would occur on average every 100 years, or put another way, in any given year there is a 1% chance that a discharge of that level or higher will occur. The simulated floods and their corresponding Columbia River discharges were 100-year (445,000 cfs), 500-year (520,000 cfs), and the USACE-defined Standard Project Flood (960,000 cfs). The resulting water levels from the steady-state floods can be viewed as “worst case” outcomes for the respective discharge levels. The MASS1 output for water surface elevations was converted to the North American Vertical Datum of 1988 and projected across the channel and land surface to enable mapping of the floodplain for each scenario. Floodplain maps show that for the 100-year and 500-year discharge levels, flooding is mainly confined to the topographic trench that is the river channel. The flooded area for the Standard Project Flood extends out of the channel area in some places, particularly in the 100-F Area. All of the output from the simulations have been archived and are available for future investigations in the Hanford Reach.

54 ENVIRONMENTAL SCIENCES↗

Catalog of Environmental Metrics for Hydropower

Evaluating the sustainability of new U.S. hydropower development will necessitate an approach that is comprehensive, transparent and consistent. The ORNL Environmental Metrics for Hydropower (EMH) project team addressed this need by conducting a literature review to extract and analyze a swath of environmental metrics related to hydropower projects. The assessed documents included peer-reviewed journal articles, U.S. Federal Energy Regulatory Commission licensing documents, and two sets of certification documents from the Low Impact Hydropower Institute and the International Hydropower Association. Review of 117 documents led to creation of a database of > 3000 current environmental metrics related to hydropower projects in 285 locations worldwide. Information recorded for each environmental metric was used to map the comprehensiveness of environmental measurement types gathered across primary categories, dam life cycle stages, spatial scales and locations. A majority of metrics were related to water quantity and water quality, a large number of metrics were related to biota and biodiversity, and relatively few metrics were related to the categories of geomorphology, land cover, connectivity and fragmentation, and infrastructure and design. Forty-five subcategories of environmental metrics emerged from our analysis, thereby suggesting an envelope of measurements that are important for understanding the environmental effects of new hydropower projects. The categories and subcategories of environmental metrics represented in each type of literature varied, however. The EMH database summarized in this Catalog will be used to inform stakeholder selection of appropriate environmental metrics for evaluating progress toward collective goals for new U.S. hydropower development.

13 HYDRO ENERGY↗

Analysis of Supply Chains and Advanced Manufacturing of Small Hydropower Systems

Clean energy manufacturing is a sector of increasing importance both in the United States and worldwide. In the United States, it has been presented as an engine for job creation in a sector of the U.S. economy that was hit hard by the 2008-2009 recession. The Clean Energy Manufacturing Analysis Center (CEMAC), sponsored by the U.S. Department of Energy (DOE), conducts credible, objective, industry-relevant, recurring, and consistent analyses of clean energy technologies. In this project, the National Renewable Energy Laboratory (NREL) and the Oak Ridge National Laboratory (ORNL) collaborated in a hydropower manufacturing and supply chain analysis primarily for U.S. small hydropower (SHP) market to provide insights on supply chain constraints, manufacturing cost, location factors, and opportunities for hydropower using advanced manufacturing technologies. The goal of the project is to improve understanding of the manufacturing opportunities in the U.S. hydropower supply chain, specific competitive advantages, and factors for manufacturing location decisions for SHP. These insights could be used to inform investment and research strategies, policy, and other decisions that could promote economic growth and strengthen U.S. manufacturing capabilities. The project scope included a design for manufacturing and assembly (DFMA) costs analysis and a levelized cost of electricity (LCOE) sensitivity analysis of modular, representative SHP turbines. A representative SHP system was chosen to be made up of two 5 megawatt (MW) turbines, as these Kaplan style turbines could be useable for many non-powered dams (NPDs) across the U.S. The sensitivity analysis used the Integrated Design and Assessment (IDEA) tool, which has helped highlight the impact of the turbine equipment cost on the potential capital expenditure (CAPEX) and LCOE of the installed, representative system. In addition, the project team analyzed international tradeflows (e.g., export and import of hydropower turbines and the parts used in hydropower systems). As part of this project, hydropower stakeholder interviews were undertaken to help identify insights related to hydropower manufacturing opportunities for U.S. players in SHP, the country-specific manufacturing advantages in the United States and threats, and key factors behind manufacturing location decisions made by the SHP industry. Key opportunities for the US SHP market and industry include: Foreign export markets such as Chile, China, Columbia, India and Japan, have an estimated 71,795 MW of technical potential that could be serviced with SHP installations. Utilization of existing manufacturing capacity and expertise, along with economies of scale benefits, could result in increased global competitiveness through lower investment requirements and component costs, which could lead to increased U.S. strength in the export of SHP systems and components. Technology advances such as modular turbine designs, standardized units for conduit systems, precast systems, and improved powertrain technologies could help reduce costs, particularly for manufacturing a small number of units. The DOE is also exploring modular hydropower designs, which would integrate standard independently-produced components, validated to meet multiple specifications. Using modules in product design simplifies manufacturing activities such as inspection, testing, assembly, and purchasing, may increase economies of scale to lower total system cost. There are significant opportunities for the use of composites and Additive Manufacturing (AM) for hydropower components, when design changes are made to hydropower systems. By taking advantage of the corrosion resistance, light-weighting and structural benefits, composites and AM could help significantly alter hydropower structures and installations.

13 HYDRO ENERGY↗

Site Classification for Standard Modular Hydropower Development: Characterizing Stream Reaches by Module Need

The objective of site classification for Standard Modular Hydropower (SMH) development is to develop a framework for classifying potential SMH sites in terms useful for informing SMH development, such as module need and module design requirements. While the current vision for SMH has focused on applications for new stream-reach development, these site classifications are equally useful for other applications, such as modular development at non-powered dams and other hydropower co-development opportunities. We used K-means clustering to classify sites (i.e., stream reaches) into clusters (i.e., groups of sites with similar attributes) based on simultaneous consideration of physical and biological attributes of those sites. Stream reaches included were confined to those with mean annual flow > 50 cfs and < 25,000 cfs (~350,000 reaches). Site Classification was conducted separately for six modules: hydroelectric generation, water quality, sediment passage, fish passage, foundation support, and recreation. About 340,000 stream reaches across the contiguous US were classified into 10 groups for each of the 6 different module categories. For each module category, clusters are visualized on US maps and described based on the defining variables that differentiate clusters from each other.

13 HYDRO ENERGY↗

Development of Intelligent Monitoring System (IMS) Modules for the Aquistore CO 2 Storage Project

The monitoring data generated at a CO 2 storage site can quickly result in large amounts of data, often requiring significant labor- and time-intensive efforts to process and analyze before being able to make operational decisions. Implementing an intelligent monitoring system (IMS) can reduce the associated data-processing and analysis costs, which can thereby improve the efficiency of the monitoring process and enable real-time operational decision-making. The Energy & Environmental Research Center (EERC) has completed a 3-year project focused on developing an IMS comprising new workflows, algorithms, and a user interface for the automation and integration of geologic carbon dioxide (CO 2 ) storage site-monitoring and simulation data. The design for the IMS was based on using injection and monitoring data acquired from Aquistore, an operating CO 2 storage project. Managed by the Petroleum Technology Research Centre, the Aquistore Project is injecting CO 2 captured from SaskPower’s coal-fired Boundary Dam Power Station into a deep saline formation for geologic storage. Using data from the Aquistore Project provided a real-world basis to develop an IMS.

47 OTHER INSTRUMENTATION↗

137 Cs Body-Burden in Wild Turkeys at the Savannah River Site

The Hunter Dose Tracking System (HDTS) [1], created by the Savannah River National Laboratory (SRNL) in support of wildlife hunts at the Savannah River Site (SRS), was used to measure 137Cs in turkeys harvested during hunts in April of 2017 and 2018 and a special hunt conducted by the Savannah River Ecology Laboratory (SREL) in late April and early May of 2018. The seventy turkeys shot during these five events were harvested from 27 of the 50 unique hunt compartments at SRS. These 27 hunt compartments cover more than 50% of the area of the site and include both clean and radiologically contaminated (such as the Pond B dam) areas.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Lake Roosevelt White Sturgeon Modeling Support

This report contains summarized progress on the construction, validation, and calibration of a hydrodynamic and water temperature model, and individual-based sturgeon model, for the Transboundary Reach of the Columbia River and Lake Roosevelt. A 1-dimensional hydrodynamic and water temperature model, the Modular Aquatic Simulation System in 1-dimension (MASS1), was constructed using existing bathymetry data from the U.S.-Canada international border to Grand Coulee Dam, and validated using velocity, temperature, and water elevation data collected by staff of the CTCR during three distinct hydrodynamic periods occurring in early spring, late spring, and summer in the study area. Parameters of MASS1 were then calibrated so that model simulations matched empirical data of water surface elevations collected in 2016. Several years of MASS1 data were archived and are available for use with the sturgeon IBM: 1975–2001, 2004, 2005, 2007–2015, and April–August 2016. An individual-based simulation model was concomitantly constructed to simulate four of the early life stages of white sturgeon: spawning, embryo incubation, free embryos, and early larvae. Submodels for each of the four life stages contain mathematical algorithms that primarily describe the growth, development, and movement of individuals based on outputs from MASS1. Sturgeon simulations were then run for two historical years where limited recruitment may have occurred (1997 and 2011) and two years in which recruitment likely did not occur (2004 and 2005).

54 ENVIRONMENTAL SCIENCES↗

Hydropower Vision A New Chapter for America's 1st Renewable Electricity Source

The U.S. Department of Energy’s (DOE’s) Wind and Water Power Technologies Office has led a first-of-its- kind comprehensive analysis to evaluate future pathways for low-carbon, renewable hydropower (hydropower generation and pumped storage) in the United States, focused on continued technical evolution, increased energy market value, and environmental sustainability. Undertaken through a broad-based collaborative effort, the Hydropower Vision initiative had four principal objectives: characterize the current state of hydropower in the United States, including trends, opportunities, and challenges; identify ways for hydropower to maintain and expand its contributions to the electricity and water management needs of the nation from the present through 2030 and 2050; examine critical environmental and social factors to assess how existing hydropower operations and potential new projects can minimize adverse effects, reduce carbon emissions from electricity generation, and contribute to stewardship of waterways and watersheds; and develop a roadmap identifying stakeholder actions that could support responsible ongoing operations and potential expansion of hydropower facilities. The Hydropower Vision analysis finds that U.S. hydropower could grow from 101 gigawatts (GW) of capacity to nearly 150 GW by 2050. Growth under this modeled scenario would result from a combination of 13 GW of new hydropower generation capacity (upgrades to existing plants, adding power at existing dams and canals, and limited development of new stream-reaches), and 36 GW of new pumped storage capacity. If this level of growth is achieved, benefits such as a savings of $209 billion from avoided greenhouse gas (GHG) emissions could be realized, of which $185 billion would be attributable to operation of the existing hydropower fleet. Transformative technical innovations able to meet the co-objectives of environmental sustainability and low-carbon energy will be critical to enabling additional hydropower growth beyond these levels. The Hydropower Vision report specifically does not evaluate or recommend new policy actions but instead analyzes the feasibility and certain benefits and costs of various credible scenarios, all of which could inform policy decisions at the federal, state, tribal, and local levels.

13 HYDRO ENERGY↗

Conventional Hydropower, Construction

This unit process quantifies the construction requirements for either a concrete or an earthen dam, used for large scale conventional hydropower. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=9197A8C2-4608-439C-9D1C-2F32333BF9F4

13 HYDRO ENERGY↗

Hydrokinetic Power, Construction

This unit process calculates the construction materials that would be required for the installation of hydrokinetic turbines within a river. Hydrokinetic turbines do not require the installation of impoundments or dams. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=0A8A1838-8F91-479E-879B-71DCA50DD35A

13 HYDRO ENERGY↗

Exploratory Research: Transport and Transformation of Particulate Organic Matter in Permeable River Sediments

The hyporheic zone (HZ) is the volume of streambed sediments where surface water and groundwater mix. The mixing of ground and surface water geochemical constituents including organic matter and the presence of large microbial populations create an important location for biogeochemical activity. Large and periodic fluctuations in river stage such as those associated with operation of hydroelectric dams, may enhance downstream hyporheic exchange by reversing the direction of flow to/from the stream on a regular basis. Solute transport in hyporheic zones is affected by river regulation; however, little is known about the transport of particulate organic matter (POM) under these conditions. We performed a laboratory experiment to simulate the transport and retention of POM under conditions simulating flow reversal in the hyporheic zone. Here, POM is created by inoculating artificial river water with algae obtained from the Hanford Reach of the Columbia River. POM transport experiments are then conducted in columns packed with sandy sediments; these data are then used to calibrate a model describing fundamental processes controlling its transport in saturated sediments. Models results reveal that filtration, sorption to sediment, and sorption to previously retained POM are important mechanisms of POM retention in sandy, saturated sediments. Additionally, upon flow direction reversal, POM is readily mobilized leading to effluents concentrations above the initial input concentrations. These findings indicate that river stage changes may change POM storage in the hyporheic zone depending on the type and magnitude of flow variation.

54 ENVIRONMENTAL SCIENCES↗

System Dynamics Modeling of the Colorado Basin for Optimizing Operations, Reducing Risk, and Increasing Resiliency

This paper is the output from SNL’s involvement in the Western Area Power Administration (WAPA), the Colorado River Energy Distributors Association (CREDA), and the Upper Colorado River Commission’s (UCRC) sponsored Phase II work to establish market and non-market values (NMV’s) of water and hydropower associated with Glen Canyon Dam (GCD) operations and the Colorado River ecosystem. It describes the purpose and need to develop a systems model for the Colorado River Basin that includes valuations in the economic, hydrologic, environmental, social, and cultural sectors. It outlines the benefits and unique features associated with such a model and provides a roadmap of how a systems model would be developed and implemented. While not meant to serve as a full development plan, the ideas and concepts herein represent what the Sandia National Laboratories (SNL) research team believes is the most impactful and effective path forward to address an ever increasing complex set of problems that occur at the basin-scale and beyond.

13 HYDRO ENERGY↗

Site Environmental Report for 2017

Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab) is a multi-program scientific facility operated by the University of California (UC) for the U.S. Department of Energy (DOE). Berkeley Lab’s research is focused on the physical, biological, environmental, and computational sciences with the objective of delivering scientific knowledge and discoveries pertinent to DOE’s mission. This annual report describes environmental protection activities and potential impacts resulting from LBNL operations conducted in 2017. The format and content of this report satisfy the requirements of both DOE Order 231.1B, Administrative Change 1 (Environment, Safety, and Health Reporting) and the operating contract between UC and DOE (DOE Contract No. DE-AC02-05CH11231, also known as Contract 31). Activities are planned and conducted with full regard to protecting employees, the public, and the environment, as well as complying with all applicable environmental, safety, and health laws and regulations. Berkeley Lab implements an Environmental Management System (EMS) to oversee these compliance activities and continually improve overall environmental performance while maintaining operational capability and sustaining its overall mission. The effectiveness of the EMS and environmental programs is reviewed annually as part of the performance evaluation process of Contract 31. For fiscal year (FY) 2017, which began October 1, 2016, and ended September 30, 2017, the EMS was given a performance rating of B plus for its management of environmental activities (on a scale from A plus as the highest grade to F as the lowest). The measurement and rating system was developed jointly by Berkeley Lab, UC, and DOE. The FY 2017 rating was based on how Berkeley Lab met the objective in DOE’s FY 2017 Performance Evaluation and Measurement Plan (Appendix B in Contract 31, Section J) of providing an efficient and effective EMS. Six significant accomplishments, which ranged from effective teaming on projects and with regulatory agencies to improved program assessment approaches, were factors in the rating. The EMS was also graded through the federal Office of Management and Budget’s annual EMS performance metrics, in which a reporting scorecard rates elements of the International Organization for Standardization (ISO) 14001 standard and the degree of integration between the EMS and Berkeley Lab’s sustainable practices. Overall scores fall into one of three categories: green (highest), yellow (middle), or red (lowest). For FY 2017, Berkeley Lab received a score of green, as described in more detail in Chapter 2. An overview of environmental protection and restoration programs is provided, including information about compliance activities, operating permits, and regulatory agency inspections that occurred during 2017. Thirteen minor violations issued during City of Berkeley inspections of above and underground storage tanks, treatment units, and hazardous waste storage areas are discussed in this chapter. This report also includes information on environmental monitoring performed in 2017. The results of these monitoring activities confirmed that groundwater cleanup actions continue to show improving conditions, and all emissions and discharges from LBNL operations were within environmental compliance release limits, with the exception of some stormwater discharges. Most stormwater discharges measured throughout the LBNL site fall within acceptable levels established by the state’s stormwater permit; however, iron and aluminum exceeded Numeric Action Levels. To reduce iron and aluminum discharge levels, Berkeley Lab is aggressively implementing controls such as construction of asphaltic berms and check dams to restrain and filter runoff to storm drains, and installation of filtration units in storm drain basins to collect sediment and absorb metal contaminants. The radiological dose assessments performed in 2017 concluded that the maximum potential dose to a hypothetical resident from Berkeley Lab’s airborne radionuclide releases was approximately 0.1% of the DOE and U.S. Environmental Protection Agency annual limit of 10 millirem per year (mrem/yr); the potential dose from all radiation sources at Berkeley Lab was approximately 0.06% of the average natural background radiation dose of 310 mrem/yr in the United States, and about 0.2% of the DOE annual limit of 100 mrem/yr from all sources.

54 ENVIRONMENTAL SCIENCES↗

Data Compilation for AGC-2 Matrix-only Compact Lot A3-H08

This document is a compilation of fabrication and characterization data for the compact lot A3-H08, which was produced for possible insertion into the second ATR Graphite Creep irradiation test capsule (AGC-2). The compacts were produced by Oak Ridge National Laboratory (ORNL) for the Advanced Gas Reactor Fuel Development and Qualification (AGR) program. This compact lot was fabricated using a graphite/resin blend formulated by INL as a candidate matrix precursor for scale-up of overcoating and compacting processes. The matrix precursor powder for compact lot A3-H08 was a jet milled blend of 64 wt% natural graphite (Asbury 3482), 16 wt% synthetic graphite (Graftech GTI-D), and 20 wt% high purity novolac resin (Hexion D_SD-1708 with 7.5% hexamethylenetetramine added). The “Matrix Compacts for AGC-2 Irradiation” Specification (INL SPC-1285, Rev. 1) provides the requirements necessary for acceptance of the compacts. Sections 2.03 and 2.04 of SPC-1285 provide the property requirements for the heat-treated compacts. There are requirements on the length, diameter, and matrix density. Section 2.02.01.01 further requests impurity analysis on representative samples from the final compact lot, but there are no specified acceptance criteria. The impurity information will be evaluated by INL as part of a final decision on whether to insert the compacts into the AGC-2 experiment. The procedures for characterizing and qualifying the compacts are outlined in ORNL product inspection plan AGR-CHAR-PIP-16. The measurement of compact length, diameter, and matrix density was performed according to data acquisition method AGR-CHAR-DAM-39. The data report forms generated by this procedure document the product acceptance for the property requirements listed in sections 2.03 and 2.04 of SPC-1285. All compacts selected for irradiation conformed to the specified requirements for length, diameter, and density. In addition to the characterization data, this report also contains other records relevant to the product acceptance. A history of the material flow and sample naming is included and the compacting process is summarized. In addition to results of the impurity analysis on representative samples from the final compact lot, impurity analysis results are also provided for samples of the graphite, resin, and the graphite/resin blend. A Certificate of Conformance to SPC-1285, Rev. 1 is attached in Appendix B.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Bridging Land-Surface Fluxes and Aerosol Concentrations to Triggering Convective Rainfall

During the period August 24-28, 2016, a delayed component the GO-Amazon Project, we launched nine altitude-controlled free balloons (CMET). Smaller than typical rawinsondes, CMET are equipped with altitude control, global communication via Iridium satellite, and aspirated sensors. The aims of our effort were to examine the interactions among convective boundary layer and dual river breeze circulations near the confluence of the Tapajos and Amazon Rivers in the eastern Basin. The week-long field campaign was timed to examine the reestablishment of the breeze circulations shortly after the passage of a strong instability line on August 22. Nine CMET were launched at the Curua-Una hydroelectric dam (2.8S; 54.3W), timed to encounter the Tapajos river breeze front by late afternoon. Soundings were made to establish the thickness of interface between the easterly trade and westerly Tapajos breeze circulation. Careful use of sounding strategies allowed these free balloons to track along the northerly channeled flow in the lowest 300 m above the River. Following the river encounter, balloons tracked to the west, sounding to describe the diurnal course of boundary layer in the forest west of the Tapajos River. The longest flight traveled more than 770 km over three days and twice rested overnight in the rain forest canopy. Ancillary data from surface climate and flux stations as well as the Santarem radiosonde, satellite images will be used to illustrate how the breeze circulations are seen near the surface and how they were disrupted by larger-scale events. Comparisons with HYSPLIT trajectories illustrate how sensitive real trajectories are to the refraction that the encounter with the breeze effects. A second effort was intensive analyses of data from the eddy flux tower at the Tapajós National Forest near Santarém Pará Brazil, with special emphasis on the role of clouds and canopy presence on light absorbance and photosynthetic activity.

54 ENVIRONMENTAL SCIENCES↗