Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Novel Thermal Storage Technologies for Concentrating Solar Power Generation

The technologies that are to be developed in this work will enable storage of thermal energy in 100 MW e solar energy plants for 6-24 hours at temperatures around 300°C and 850°C using encapsulated phase change materials (EPCM). Several encapsulated phase change materials have been identified, fabricated and proven with calorimetry. Two of these materials have been tested in an airflow experiment. A cost analysis for these thermal energy storage systems has also been conducted that met the targets established at the initiation of the project.

14 SOLAR ENERGY↗

Low Cost Polymer heat Exchangers for Condensing Boilers

Work in this project sought to develop a suitable design for a low cost, corrosion resistant heat exchanger as part of a high efficiency condensing boiler. Based upon the design parameters and cost analysis several geometries and material options were explored. The project also quantified and demonstrated the durability of the selected polymer/filler composite under expected operating conditions. The core material idea included a polymer matrix with fillers for thermal conductivity improvement. While the work focused on conventional heating oil, this concept could also be applicable to natural gas, low sulfur heating oil, and biodiesel- although these are considered to be less challenging environments. An extruded polymer composite heat exchanger was designed, built, and tested during this project, demonstrating technical feasibility of this corrosion-resistant material approach. In such flue gas-to-air heat exchangers, the controlling resistance to heat transfer is in the gas-side convective layer and not in the tube material. For this reason, the lower thermal conductivity polymer composite heat exchanger can achieve overall heat transfer performance comparable to a metal heat exchanger. However, with the polymer composite, the surface temperature on the gas side will be higher, leading to a lower water vapor condensation rate.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Prototype Systems for Measuring Outdoor Air Intake Rates in Rooftop Air Handlers

The widespread absence of systems for real-time measurement and feedback control, of minimum outdoor air intake rates in HVAC systems contributes to the poor control of ventilation rates in commercial buildings. Ventilation rates affect building energy consumption and influence occupant health. The project designed fabricated and tested four prototypes of systems for measuring rates of outdoor air intake into roof top air handlers. All prototypes met the ±20% accuracy target at low wind speeds, with all prototypes accurate within approximately ±10% after application of calibration equations. One prototype met the accuracy target without a calibration. With two of four prototype measurement systems, there was no evidence that wind speed or direction affected accuracy; however, winds speeds were generally below usually 3.5 m s -1 (12.6 km h -1 ) and further testing is desirable. The airflow resistance of the prototypes was generally less than 35 Pa at maximum RTU air flow rates. A pressure drop of this magnitude will increase fan energy consumption by approximately 4%. The project did not have resources necessary to estimate costs of mass produced systems. The retail cost of components and materials used to construct prototypes ranged from approximately $1,200 to $1,700. The test data indicate that the basic designs developed in this project, particularly the designs of two of the prototypes, have considerable merit. Further design refinement, testing, and cost analysis would be necessary to fully assess commercial potential. The designs and test results will be communicated to the HVAC manufacturing community.

42 ENGINEERING↗

Cornerstone Third Party Alternative Cost Study

The attached cost analyses sheets have been developed for use in planning during the Third Party Alternative study currently underway for the Sandia CREATE project. This cost analysis builds upon the previously submitted base estimate dated June 14, 2013 and includes comparison information collected during a Market Validation exercise conducted in August/September 2013.

99 GENERAL AND MISCELLANEOUS↗

Task Order 22 – Engineering and Technical Support, Deep Borehole Field Test. AREVA Summary Review Report

Under Task Order 22 of the industry Advisory and Assistance Services (A&AS) Contract to the Department of Energy (DOE) DE-NE0000291, AREVA has been tasked with providing assistance with engineering, analysis, cost estimating, and design support of a system for disposal of radioactive wastes in deep boreholes (without the use of radioactive waste). As part of this task order, AREVA was requested, through a letter of technical direction, to evaluate Sandia National Laboratory’s (SNL’s) waste package borehole emplacement system concept recommendation using input from DOE and SNL. This summary review report (SRR) documents this evaluation, with its focus on the primary input document titled: “Deep Borehole Field Test Specifications/M2FT-15SN0817091” Rev. 1 [1], hereafter referred to as the “M2 report.” The M2 report focuses on the conceptual design development for the Deep Borehole Field Test (DBFT), mainly the test waste packages (WPs) and the system for demonstrating emplacement and retrieval of those packages in the Field Test Borehole (FTB). This SRR follows the same outline as the M2 report, which allows for easy correlation between AREVA’s review comments, discussion, potential proposed alternatives, and path forward with information established in the M2 report. AREVA’s assessment focused on three primary elements of the M2 report: the conceptual design of the WPs proposed for deep borehole disposal (DBD), the mode of emplacement of the WP into DBD, and the conceptual design of the DBFT. AREVA concurs with the M2 report’s selection of the wireline emplacement mode specifically over the drill-string emplacement mode and generically over alternative emplacement modes. Table 5-1 of this SRR compares the pros and cons of each emplacement mode considered viable for DBD. The primary positive characteristics of the wireline emplacement mode include: (1) considered a mature technology; (2) operations are relatively simple; (3) probability of a radiological release due to off-normal events are relatively low; (4) costs are relatively low; and (5) maintenance activities are relatively simple. The primary drawback associated with the wireline emplacement mode for DBD is the number of emplacement trips-in to the borehole, which results in a relatively higher probability for a drop event. Fortunately, the WPs can be engineered with impact limiters that will minimize the likelihood of a breach of the WP due to a drop. The WP designs presented in the M2 report appear to be focused on compatibility with the drill-string emplacement mode (e.g., the threaded connections). With the recommendation that the wireline emplacement mode be utilized for the DBFT, some changes may be warranted to these WPs. For example, the development of a WP release connection that is more reliable than the currently credited connection, which is considered to have a high failure probability, and the integration of an impact limiter into its design. The M2 report states the engineering demonstration of the DBFT will occur in the FTB over a 4-year period. AREVA recommends development and testing of the WP emplacement handling equipment occur separately (but concurrently, if not earlier) from the FTB at a mock-up facility. The separation of this activity would prevent schedule interference between the science and engineering thrusts of the project. Performing tests in a mock-up facility would allow additional control and observation compared to the FTB. The mock-up facility could also be utilized as a training facility for future operations. Terminal velocity and impact limiter testing would require the FTB for testing, since these areas would be difficult to reproduce in a limited depth mock-up. Although only at the end of the conceptual stage of design development, DBD appears to be a viable solution for some waste forms produced by the nuclear industry. However, regulatory requirements have yet to be established for pre- and post-closure performance of DBD and should be established as soon as possible. Some of the main areas of focus from a regulatory perspective include: (1) establishing acceptable performance requirements for the long-term behavior of DBD; (2) determining acceptable borehole abandonment criteria; (3) establishing retrievability requirements; (4) developing a consensus on the factor of safety (FoS) for the emplacement mode and WP; and (5) establishing safety and safeguards performance requirements for DBD. Although conservative requirements have been utilized to provide the foundation for the conceptual design of DBD, regulatory requirements and feedback are necessary to confirm recommendations made herein and to ensure the long-term performance of DBD is acceptable. The combination of the M2 report and this SRR is intended to facilitate the completion of the conceptual design for DBD for the Cs and Sr capsules and calcined waste forms. Using the conceptual design, preliminary design activities (the second stage of a three-stage process described in the M2 report) can proceed and the DBFT utilized to support, demonstrate, and confirm engineering elements of this design.

42 ENGINEERING↗

An Alternative Low-Cost Process for Deposition of MCrAlY Bond Coats for Advanced Syngas/Hydrogen Turbine Applications

The objective of this project was to develop and optimize MCrAlY bond coats for syngas/hydrogen turbine applications using a low-cost electrolytic codeposition process. Prealloyed CrAlY-based powders were codeposited into a metal matrix of Ni, Co or Ni-Co during the electroplating process, and a subsequent post-deposition heat treatment converted it to the MCrAlY coating. Our research efforts focused on: (1) investigation of the effects of electro-codeposition configuration and parameters on the CrAlY particle incorporation in the NiCo-CrAlY composite coatings; (2) development of the post-deposition heat treating procedure; (3) characterization of coating properties and evaluation of coating oxidation performance; (4) exploration of a sulfurfree electroplating solution; (5) cost analysis of the present electrolytic codeposition process. Different electro-codeposition configurations were investigated, and the rotating barrel system demonstrated the capability of depositing NiCo-CrAlY composite coatings uniformly on the entire specimen surface, with the CrAlY particle incorporation in the range 37-42 vol.%. Post-deposition heat treatment at 1000-1200 °C promoted interdiffusion between the CrAlY particles and the Ni-Co metal matrix, resulting in β/γ’/γ or β/γ’ phases in the heat-treated coatings. The results also indicate that the post-deposition heat treatment should be conducted at temperatures ≤1100 °C to minimize Cr evaporation and outward diffusion of Ti. The electro-codeposited NiCrAlY coatings in general showed lower hardness and surface roughness than thermal spray MCrAlY coatings. Coating oxidation performance was evaluated at 1000-1100 °C in dry and wet air environments. The initial electro-codeposited NiCoCrAlY coatings containing relatively high sulfur did not show good oxidation resistance. After modifications of the coating process, the cleaner NiCoCrAlY coating exhibited good oxidation performance at 1000 °C during the 2,000 1-h cyclic oxidation test. A sulfur-free fluoboratebased plating solution was explored in order to reduce the sulfur level in the electro-codeposited MCrAlY coatings. However, chemical reactions occurred between the CrAlY powder and the fluoborate plating solution, resulting in dark powdery coatings. The fluoborate-based plating bath can thus only be used to codeposit more inert particles (e.g., oxides or carbides) instead of the present Al-containing metallic particles.

36 MATERIALS SCIENCE↗

Baseline System Costs for 50.0 MW Enhanced Geothermal System -- A Function of: Working Fluid, Technology, and Location, Location, Location

Substantial unexploited opportunity exists for the US, and the world, in Enhanced Geothermal Systems (EGS). As a result of US DOE investment, new drilling technology, new power generation equipment and cycles enable meaningful power production, in a compact and modular fashion; at lower and lower top side EGS working fluid temperatures and in a broader range of geologies and geographies. This cost analysis effort supports the expansion of Enhanced Geothermal Systems (EGS), furthering DOE strategic themes of energy security and sub goal of energy diversity; reducing the Nation's dependence on foreign oil while improving the environment.

15 GEOTHERMAL ENERGY↗

Case Study for the ARRA-funded Ground Source Heat Pump Demonstration at Denver Museum of Nature & Science

High initial costs and lack of public awareness of ground-source heat pump (GSHP) technology are the two major barriers preventing rapid deployment of this energy-saving technology in the United States. Under the American Recovery and Reinvestment Act (ARRA), 26 GSHP projects were competitively selected and carried out to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. This report highlights the findings of a case study of one such GSHP demonstration projects that uses a recycled water heat pump (RWHP) system installed at the Denver Museum of Nature & Science in Denver, Colorado. The RWHP system uses recycled water from the city’s water system as the heat sink and source for a modular water-to-water heat pump (WWHP). This case study was conducted based on the available measured performance data from December 2014 through August 2015, utility bills of the building in 2014 and 2015, construction drawings, maintenance records, personal communications, and construction costs. The annual energy consumption of the RWHP system was calculated based on the available measured data and other related information. It was compared with the performance of a baseline scenario— a conventional VAV system using a water-cooled chiller and a natural gas fired boiler, both of which have the minimum energy efficiencies allowed by ASHRAE 90.1-2010. The comparison was made to determine energy savings, operating cost savings, and CO2 emission reductions achieved by the RWHP system. A cost analysis was performed to evaluate the simple payback of the RWHP system. Summarized below are the results of the performance analysis, the learned lessons, and recommended improvement in the operation of the RWHP system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Case Study for the ARRA-Funded Ground Source Heat Pump Demonstration at Ball State University

With funding provided by the American Recovery and Reinvestment Act (ARRA), 26 ground-source heat pump (GSHP) projects were competitively selected in 2009 to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. One of the selected demonstration projects is a district central GSHP system installed at Ball State University (BSU) in Muncie, IN. Prior to implementing the district GSHP system, 47 major buildings in BSU were served by a central steam plant with four coal-fired and three natural-gas-fired steam boilers. Cooling was provided by five water-cooled centrifugal chillers at the District Energy Station South (DESS). The new district GSHP system replaced the existing coal-fired steam boilers and conventional water-cooled chillers. It uses ground-coupled heat recovery (HR) chillers to meet the simultaneous heating and cooling demands of the campus. The actual performance of the GSHP system was analyzed based on available measured data from August 2015 through July 2016, construction drawings, maintenance records, personal communications, and construction costs. Since Phase 1 was funded in part by the ARRA grant, it is the focus of this case study. The annual energy consumption of the GSHP system was calculated based on the available measured data and other related information. It was compared with the performance of a baseline scenario— a conventional water-cooled chiller and natural-gas-fired boiler system, both of which meet the minimum energy efficiencies allowed by the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE 90.1-2013). The comparison was made to determine source energy savings, energy cost savings, and CO2 emission reductions achieved by the GSHP system. A cost analysis was performed to evaluate the simple payback of the GSHP system. The following sections summarize the results of the analysis, the lessons learned, and recommendations for improvement in the operation of this district GSHP system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Retrospective Benefit-Cost Evaluation of U.S. DOE Wind Energy R&D Program: Impact of Selected Energy Technology Investments

This benefit-cost analysis focuses on the DOE Wind Energy Program's public sector R&D investments and returns. The analysis accounts for the program's additionality – that is, comparing what has happened as a result of the program to what would have happened without it. The analysis does not address the return on the investments of private companies ("private returns"). Public returns on the program's investments from 1976 to 2008 are identified and analyzed using retrospective analysis.

17 WIND ENERGY↗

Development of Intelligent Monitoring System (IMS) Modules for the Aquistore CO 2 Storage Project

The monitoring data generated at a CO 2 storage site can quickly result in large amounts of data, often requiring significant labor- and time-intensive efforts to process and analyze before being able to make operational decisions. Implementing an intelligent monitoring system (IMS) can reduce the associated data-processing and analysis costs, which can thereby improve the efficiency of the monitoring process and enable real-time operational decision-making. The Energy & Environmental Research Center (EERC) has completed a 3-year project focused on developing an IMS comprising new workflows, algorithms, and a user interface for the automation and integration of geologic carbon dioxide (CO 2 ) storage site-monitoring and simulation data. The design for the IMS was based on using injection and monitoring data acquired from Aquistore, an operating CO 2 storage project. Managed by the Petroleum Technology Research Centre, the Aquistore Project is injecting CO 2 captured from SaskPower’s coal-fired Boundary Dam Power Station into a deep saline formation for geologic storage. Using data from the Aquistore Project provided a real-world basis to develop an IMS.

47 OTHER INSTRUMENTATION↗

Transactive System Program Communication System Cost Model

Transactive energy is an economics and controls technique that aims to dynamically manage the generation and consumption of electricity within the power system. Much research has been done in the area of demonstrating the capability and performance of transactive systems, as well as valuing the benefits a transactive system can provide. Significantly less research has been done in the area of estimating the costs of a transactive system. This work aimed to build a model that would estimate the costs of the communications system that would be necessary to support a transactive system and be realized by a local utility. Dynamic pricing, and a customer’s response to this pricing, is a key aspect of a transactive system; this would require a two-way communication system between utilities and customers. Since the system will vary based on many factors, the cost model was consequently designed for use in a wide variety of applications. The cost model requires some basic user inputs regarding the system being analyzed, such as location and size. The user also identifies one or more generic circuit models that best represent the system. Additionally, a user can, but is not required to, change assumed equipment and installation costs and equipment lifetime within the model. These inputs will result in 20 year cost estimates for three different communication technologies that are capable of supporting the bandwidth needs of a transactive energy system. The three communication systems included in the model are cellular, fiber optic and wireless mesh. Each vary significantly from one another and offer unique advantages and barriers. A cellular network avoids high upfront costs, but is limited to areas where there is coverage by the service provider and subject to the ongoing rate established with the service provider. A fiber optic system requires a large up-front cost, but it will provide a reliable system to areas where cellular and mesh may be unable to do so. Additionally, fiber provides more bandwidth than necessary for transactive systems and can offer additional business opportunities. A mesh system can be installed for less upfront costs than fiber and offers enough bandwidth to support a transactive system, but the ability to model this technology is done with less certainty than the other two options. The estimated costs include the communication system that connects the customers to their nearest substation, in addition to the smart meter and radio that would be required for each customer. The communications from the substation to the utility are not included in estimates, as the need for upgrading that system would be assessed on a case-by-case basis. Although the cost of the smart meter and radio is included, no other appliance specific cost is included in the estimate provided by the model. The communication system is a key aspect of the development of a transactive system. This work resulted in easily being able to estimate the costs of a communication system specific to the system being studied. This cost model will aid ongoing valuation and simulation work in the field of transactive energy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Continuous Water Quality Sensing for FGD Wastewater

The coal fired plant power industry requires new solutions for on-line monitoring of flue gas desulfurization (FGD) wastewaters for regulated trace metals to reduce recurring operating and off-site laboratory analysis costs and provide a high level of confidence of compliance with state and federal discharge guidelines. The University of Alabama at Birmingham (UAB) developed an integrated water sensor package for continuous water quality monitoring of flue gas desulfurization (FGD) wastewaters for concentration measurements of Selenium (Se). UAB utilized a diverse team of University Professors/Staff Members/Student(s) (Engineering and Innovative Technology Development Group), a University Affiliated Research Institution from the local area (Southern Research), and a cost sharing Industry Partner (Metrohm). The team developed and validated a proprietary wet chemistry batch process for water sample preparation; and implemented this process as a fully automated on-line monitor prototype system. This prototype system’s performance was evaluated in both the laboratory and during in-field deployment to a coal fired power plant. In both environments it was found that the prototype system was unable to recreate the batch process’s success at preparing FGD water samples for total Se measurements with a commercial-off-the-shelf (COTS) cyclic anodic stripping voltammetry (CSV) system. Through this experience, UAB has provided insight into a number of specific areas where improvements can be made with respect to the COTS systems used in this project to yield a more complete and competitive industry solution for on-line monitoring of total Se in industrial wastewater.

20 FOSSIL-FUELED POWER PLANTS↗

ALDCP Student Team 7/25/19 Briefing [Slides]

This set of slides documents the activities of the Associate Laboratory Directorate for Capital Projects (ALDCP) student team during the week of July 25, 2019. It summarizes the involvement of the group in the Smart Lab project, and the individual progress of separate projects, including the Life-Cycle Cost Analysis (LCCA) Calculator and Tests, the HVAC Renovation, and the Renovation Feasibility Study, with accomplishments and barriers for each.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Continuous Water Quality Sensing for FGD Wastewater

The coal fired plant power industry requires new solutions for on-line monitoring of flue gas desulfurization (FGD) wastewaters for regulated trace metals to reduce recurring operating and off-site laboratory analysis costs and provide a high level of confidence of compliance with state and federal discharge guidelines. The University of Alabama at Birmingham (UAB) developed an integrated water sensor package for continuous water quality monitoring of flue gas desulfurization (FGD) wastewaters for concentration measurements of Selenium (Se). UAB utilized a diverse team of University Professors/Staff Members/Student(s) (Engineering and Innovative Technology Development Group), a University Affiliated Research Institution from the local area (Southern Research), and a cost sharing Industry Partner (Metrohm). The team developed and validated a proprietary wet chemistry batch process for water sample preparation; and implemented this process as a fully automated on-line monitor prototype system. This prototype system’s performance was evaluated in both the laboratory and during in-field deployment to a coal fired power plant. In both environments it was found that the prototype system was unable to recreate the batch process’s success at preparing FGD water samples for total Se measurements with a commercial-off-the-shelf (COTS) cyclic anodic stripping voltammetry (CSV) system. Through this experience, UAB has provided insight into a number of specific areas where improvements can be made with respect to the COTS systems used in this project to yield a more complete and competitive industry solution for on-line monitoring of total Se in industrial wastewater.

01 COAL, LIGNITE, AND PEAT↗

Enhancement of Optical Efficiency of CSP Mirrors for Reducing O&M Cost via Near-Continuous Operation of Self-Cleaning Electrodynamic Screens (EDS). Final Report

Over the past decade, techno-economical advancements in solar energy systems, particularly the improvement in the conversion efficiency of PV modules made with mono-crystalline silicon solar cells from 12% to 20%, as well as the cost reduction in manufacturing by a factor of about 10%, have made it possible to achieve a levelized cost of electricity (LCOE) in PV plants that is comparable to, or less than, the cost of deriving electricity from fossil fuels. Operating PV plants in mid-latitude sun-belt regions, where the solar irradiance level is highest, provides a high annual energy-yield (kWh/kWp) due to two factors: (1) the availability of predictable high solar irradiance throughout the year with the fewest interruptions in solar flux from clouds and rain, and (2) the increased conversion efficiency of crystalline solar cells, as recombination loss has decreased with increased intensity of the sunlight that illuminates the silicon solar cells. Semi-arid and desert regions, however, are plagued by high atmospheric dust concentrations and frequent sand storms. The deposition of a layer of dust on the optical surfaces of solar collectors such as PV modules and concentrating mirrors reduces the transmission efficiency of sunlight that actually reaches the solar cells or receivers, resulting in high energy-yield soiling loss. There are two major cost components to operating a solar plant: (1) installation costs, and (2) operation-and-maintenance (O&M) costs. There is no fuel cost; hence operating a solar plant in a semi-arid or desert region provides high returns on investment if soiling losses are mitigated via efficient cleaning methods and optimized cleaning frequency. If solar collectors are not cleaned, the accumulation of dust layers on solar collectors may cause the operation of such plants in arid regions to become economically unviable. Washing solar collectors with water and detergent, as is most commonly done now, is an efficient method for cleaning. The conventional approach in utility-scale solar plants is to use a large truck with a water tank and pump system for spraying deionized water on the surface of the solar collectors. Robotic cleaning with brushes, used for many solar plants, requires lesser water for cleaning. The water consumed using semi-automated cleaning of PV modules in utility-scale solar plants is approximately 2 liters/m 2 per cleaning cycle. The total optical surface area of the solar collectors in 1 TW-scale solar installation will be more than 3 × 109 m 2 ; hence an enormous amount of water be needed for cleaning. There simply is not enough fresh water in the sun-belt areas of the world for predicted cleaning needs. In solar power plants, the estimated cost of cleaning solar collectors includes expenses related to the equipment used, labor, cost of transportation of water, the energy required for cleaning, plus ancillary costs whereas the cost of water is not considered. The water used is obtained from sources located close to plant sites, unmindful of the environmental and societal impact as the power plants are oftentimes located in regions that face severe drought. This practice is very similar to the cost calculations in deriving the levelized cost of electricity (LCOE) in conventional power plants based on burning fossil fuel such as coal and gas, while disregarding the cost of climate change and health effects. Unless a water-free or low-water cleaning method is established, the expansion of solar plants may lose public support in areas suffering long intervals of drought. The goal of this research project has been the development and application of the Electrodynamic Screen (EDS) as a means for a water-free, scalable cleaning process applicable to solar-power installations, including rooftop applications. We describe here the development of an EDS film-based cleaning process as an emerging method for use on PV modules, parabolic troughs, and heliostats. This report aims to show the feasibility of integrating or retrofitting EDS films onto the optical surfaces of solar collectors (both PV and CSP) while maintaining high transmission or reflection efficiency. The cleaning action provided by the EDS film is an active method to remove dust deposits by electrodynamic force. Current lab-scale prototype EDS films, retrofitted onto solar panels and mirrors, have shown to be capable of maintaining optical transmission or specular-reflection efficiencies higher than 90% of initial values under clean conditions. The optical surfaces of solar collectors laminated with EDS films can remove more than 90% of deposited dust when the EDS is activated for less than two minutes. As an electrodynamic dust removal process, the EDS film-based method is designed primarily for the removal of dust in solar installations located in semi-arid and desert areas, where the atmosphere is often dry and dusty and rainfall is infrequent. While EDS film application minimizes water consumption and facilitates cleaning as frequently as needed, it has limitations in removing contaminants such as soot, organic pollutants deposited as fine films on the surface, and bird droppings. The dust removal efficiency of the EDS is maximum at relative humidity RH is 40 to 50% and decreases at when RH > 65%. Many solar plant sites undergo diurnal and seasonal cycles of high ambient, early afternoon temperatures and an RH that reaches the dew point early in the morning. These variations in atmospheric conditions do not limit the operation of the EDS film. This report presents a brief review of the progress and the potential of EDS film technology for mitigating the impact of dust on solar collectors via water-free cleaning, as well as current technical challenges regarding efficiency and durability. Our experimental data on the performance of EDS films show that: (1) the dust-removal efficiency (DRE) can reach levels higher than 90%, (2) the specular reflectivity (SR) of EDS film-laminated second-surface mirrors reach levels in excess of 90%, (3) the specular reflectivity restoration (SRR) can exceed 90%, (4) the output-power restoration (OPR) of PV modules can exceed 95%, and (5) the optical transmission efficiency (TE) of the EDS films can be greater than 90%. Working with Sandia National Laboratories (NM), Corning Research and Development Corporation (NY), Eastman Kodak (NY), Tomark-Worthen Industries (NH), and EDS Chile SPA (Chile), we have produced EDS film-laminated PV modules and demonstrated their self-cleaning functions without requiring water. We have demonstrated that the operational range of EDS films will cover the expected ambient temperature of solar fields at RH cycling varying from 20 to 95% as long as the EDS films are activated in the RH range 20 to 50%. (Typical solar-field climates in deserts and semi-arid lands often reach near dew point in coastal areas.) Our experiments on the application of hydrophobic-fluorinated nanoparticle coatings on EDS film surfaces show that the EDS operational range can be extended to higher RH levels that approach the dew point. At Eastman Kodak, as one of our industrial partners, we were able to establish a process for manufacturing EDS films using flexographic printing of the electrodes onto transparent polymer films. This process utilizes an existing manufacturing line at Eastman Kodak that allows fabrication of medium-scale EDS films (26 cm × 30 cm). The manufacturing process has the capacity to produce EDS films at high production speeds. The medium-scale EDS films that have been printed at Kodak were evaluated in the lab at Boston University. The EDS films produced at Kodak were laminated at Tomark-Worthen using an industrial scale vacuum laminator to produce EDS film stacks, which can be affixed onto the optical surfaces of PV modules or concentrating mirrors. The EDS film stack consists of the EDS films that have Willow® Glass (WG) which has a thickness of 100 μm as the front surface. The WG sheets obtained from Corning Research and Development Corporation are customized in size and shape to cover the active area of the EDS films. The back surface of the EDS film stack is integrated onto the optical surface of the solar panel or mirror using optically clear adhesive (OCA) films or silicone adhesives. The OCA films (thickness 25 μm) are produced by 3M. The EDS film stacks have the architecture: WG/OCA/EDS Film/OCA/ over PV module or solar mirror. The power-supply units needed for activating the electrodes of the EDS film were designed and produced at Boston University. These power supply units provide three-phase, 1.2 kV voltage pulses at a very low current (micro-ampere) level and at a low frequency (≈ 5 Hz). The voltage pulses are applied to the electrodes in a sequence such that the train of pulses resembles a unidirectional traveling wave of electrical field on the surface of the EDS film. The dust particles on the surface become charged electrostatically and are levitated by the Coulomb force. The lateral sweeping action of the traveling electric field created by the three-phase voltages pulses then sweeps the dust off the surface. The energy consumed by the EDS electrodes is less than 0.2 Wh/m 2 /cleaning cycle, enabling energy-efficient restoration of output power (OPR) of PV module or specular reflectivity restoration (SRR) for solar mirrors. The EDS system consists of (1) an EDS film stack laminated onto the solar collectors, (2) connection of the EDS film to its power supply unit and (3) Interconnection of the power supply to PV modules or solar mirrors. Design, construction and assessment of field-testing units that have EDS stack laminated PV modules for evaluating the performance of the EDS films in solar fields is being carried out at BU. Our progress under this project, aimed at the advancement of EDS film technology, has reached DOE Technology Readiness Level (TRL) 6. Based on the extensive laboratory evaluations and limited field trials, as well as contacts with potential users, we believe that the technology has reached its commercial stage. We are conducting a cost analysis using the National Renewable Energy Laboratory (NREL) System Advisory Model (SAM) and are preparing for field trials of EDS films in different solar fields in the US, Chile, India and in the Middle East. A brief description of EDS film performance, construction and testing of the field-test unit, autonomous operation of the field-test unit for evaluating EDS performance in increasing energy yield, associated revenue savings, and water conservation is presented.

14 SOLAR ENERGY↗

Cooperative Research and Development Agreement between National Energy Technology Laboratory and Birla Carbon U.S.A., Inc. [Abstract]

NETL researchers will be collaborating with Birla Carbon, U.S.A., Inc. (Birla Carbon) to leverage NETL's patented catalyst work on methane decomposition to commercialize an efficient and a cost-effective process for production of hydrogen and valuable carbon from natural gas. This catalytic methane decomposition is a promising technology, however, finding an appropriate catalyst to perform all the functions has been a challenge. NETL has developed a suitable catalyst for the process which has shown promising results. The heat required for this endothermic catalytic decomposition process is provided by combustion of a portion of the hydrogen. This process is cost effective, energy efficient, and environmentally friendly with minimal CO 2 mitigation costs. The objectives of the project include evaluation of the effect of feed gas composition on the performance, reduction of the catalyst production cost, and conduction of an in-depth large-scale cost analysis for a process suitable for applications at Birla Carbon.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗