Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMAND MODULE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Technology Benefit Estimator (T/BEST): User's Manual

The Technology Benefit Estimator (T/BEST) system is a formal method to assess advanced technologies and quantify the benefit contributions for prioritization. T/BEST may be used to provide guidelines to identify and prioritize high payoff research areas, help manage research and limited resources, show the link between advanced concepts and the bottom line, i.e., accrued benefit and value, and to communicate credibly the benefits of research. The T/BEST software computer program is specifically designed to estimating benefits, and benefit sensitivities, of introducing new technologies into existing propulsion systems. Key engine cycle, structural, fluid, mission and cost analysis modules are used to provide a framework for interfacing with advanced technologies. An open-ended, modular approach is used to allow for modification and addition of both key and advanced technology modules. T/BEST has a hierarchical framework that yields varying levels of benefit estimation accuracy that are dependent on the degree of input detail available. This hierarchical feature permits rapid estimation of technology benefits even when the technology is at the conceptual stage. As knowledge of the technology details increases the accuracy of the benefit analysis increases. Included in T/BEST's framework are correlations developed from a statistical data base that is relied upon if there is insufficient information given in a particular area, e.g., fuel capacity or aircraft landing weight. Statistical predictions are not required if these data are specified in the mission requirements. The engine cycle, structural fluid, cost, noise, and emissions analyses interact with the default or user material and component libraries to yield estimates of specific global benefits: range, speed, thrust, capacity, component life, noise, emissions, specific fuel consumption, component and engine weights, pre-certification test, mission performance engine cost, direct operating cost, life cycle cost, manufacturing cost, development cost, risk, and development time. Currently, T/BEST operates on stand-alone or networked workstations, and uses a UNIX shell or script to control the operation of interfaced FORTRAN based analyses. T/BEST's interface structure works equally well with non-FORTRAN or mixed software analysis. This interface structure is designed to maintain the integrity of the expert's analyses by interfacing with expert's existing input and output files. Parameter input and output data (e.g., number of blades, hub diameters, etc.) are passed via T/BEST's neutral file, while copious data (e.g., finite element models, profiles, etc.) are passed via file pointers that point to the expert's analyses output files. In order to make the communications between the T/BEST's neutral file and attached analyses codes simple, only two software commands, PUT and GET, are required. This simplicity permits easy access to all input and output variables contained within the neutral file. Both public domain and proprietary analyses codes may be attached with a minimal amount of effort, while maintaining full data and analysis integrity, and security. T/BESt's sotware framework, status, beginner-to-expert operation, interface architecture, analysis module addition, and key analysis modules are discussed. Representative examples of T/BEST benefit analyses are shown.

Generazio, Edward R.↗

STS-106 Crew Activities Report/Flight Day 3 Highlights

On this third day of the STS-106 Atlantis mission, the flight crew, Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Daniel C. Burbank, Edward T. Lu, Richard A. Mastracchio, Yuri Ivanovich Malenchenko, and Boris V. Morukov are seen as they approach the International Space Station (ISS). Also shown are views of the rendezvous taken from both the Zarya Control Module and the Atlantis spacecraft. Final preparation for the docking includes checking of tools and equipment needed to support the rendezvous and docking, as well as equipment for the scheduled space walk. After docking over Western Kazakhstan, the Zarya and Zvezda Service Module is seen from the external cameras of Atlantis. Also shown is footage of the crew before and during the rendezvous.

Source record↗

STS-92 Crew Activity Report/Flight Day 10 Highlights

On this tenth day of the STS-92 mission, the flight crew, Commander Brian Duffy, Pilot Pamela A. Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur prepare for the undocking of Discovery from the International Space Station (ISS) as Lopez-Alegria is seen closing the hatch on the Unity Module. A slow sweep of the outside of the ISS shows the space station in detail against the backdrop of a dark Earth where the lights of a city shine. Lopez-Alegria closes the outer hatch and Discovery undocks from the ISS. As the two separate, the ISS is seen orbiting across a beautiful dark blue Earth.

Source record↗

SRMS Assisted Docking and Undocking for the Orbiter Repair Maneuver

As part of the Orbiter Repair Maneuver (ORM) planned for Return to Flight (RTF) operations, the Shuttle Remote Manipulator System (SRMS) must undock the Orbiter, maneuver it through a complex trajectory at extremely low rates, present it to an EVA crewman at the end of the Space Station Remote Manipulator System to perform the Thermal Protection System (TPS) repair, and then retrace back through the trajectory to dock the Orbiter with the Orbiter Docking System (ODS). The initial and final segments of this operation involve the interaction between the SRMS, ISS, Orbiter and ODS. Previously, a technique entitled "SRMS assisted docking" for installation of a payload to the ODS had been developed and was utilized for the Russian provided Docking Module on STS-74 during Shuttle-Mir missions and both the Node 1 and FGB elements on STS-88/Flight 2A. This procedure consisted of the SRMS grappling the respective payload, maneuvering it to a pre-install position inches above the ODS Androgynous Peripheral Attachment System (APAS) ring, commanding the SRMS into Test mode (which allows brakes-off motion of the joints), and then down-firing Primary Reaction Control System (PRCS) jets in order to effect a capture of the APAS latches. Once a successful capture had been achieved, then the AP AS was operated through its nominal retraction sequence to complete the mating sequence. While this technique can once again be used for the tail end docking portion of the ORM, the initial undocking of the orbiter and ISS vehicles with the assistance of the SRMS has yet to be attempted on orbit. The objective here is to determine the most efficient means to separate or extract the vehicles. Two techniques were analyzed in support of RTF: (1) the 'nominal' demating from the mated interface, and (2) the SRMS performing the operation (either in an active or passive fashion). In the first operation, the demating process would replicate standard undocking operations, with the exception that the SRMS is allowed to arrest the resulting motion. The second operation would be to extend the APAS ring to a ready to dock position, open the capture latches, and then detach the vehicles using the SRMS either actively or passively. In the active case, the APAS ring is extended and latched, and the SRMS is commanded to pull the two interfaces apart (assuming that the effective pull force of the SRMS can overcome the spec values of the combined latch resistance). In the passive case, the SRMS brakes are engaged and the AP AS mechanism is commanded to retract, pulling the two interfaces apart. Since the emphasis of both STS-74 and STS-88 had solely been on the installation operation, as opposed to the separation operation, two new models required development and incorporation within simulation tools designed to analyze those scenarios. These enhancements included: (1) a detailed demating dynamics model to characterize the pusher spring characteristics during undocking, and (2) contact and mechanical system modeling of the back side of the latches to represent unlatching dynamics. This paper first provides an overview of the Monte-Carlo screening analysis for the installation (both nominal and contingency), including the variation of separation distance, misalignment conditions, SRMS joint/brake parameter characteristics, and PRCS jet combinations and corresponding thrust durations. The resulting 'optimum' solution is presented based on trade studies between predicted capture success and integrated system loads. This paper then discusses the upgrades to the APAS math model associated with the new SRMS assisted undocking technique and reviews simulation results for various options investigated for either the active and passive separation of the ISS from the Orbiter.

Space Station Remote Manipulator System↗

A Modular Instrumentation System for NASA's Habitat Demonstration Unit

NASA's human spaceflight program is focused on developing technologies to expand the reaches of human exploration and science activities beyond low earth orbit. A critical aspect of living in space or on planetary surfaces is habitation, which provides a safe and comfortable space in which humans can live and work. NASA is seeking out the best option for habitation by exploring several different concepts through the Habitat Demonstration Unit (HDU) project. The purpose of this HDU is to develop a fully autonomous habitation system that enables human exploration of space. One critical feature of the HDU project that helps to accomplish its mission of autonomy is the instrumentation system that monitors key subsystems operating within a Habitat configuration. The following paper will discuss previous instrumentation systems used in analog habitat concepts and how the current instrumentation system being implemented on the HDU1-PEM, or pressurized excursion module, is building upon the lessons learned of those previous systems. Additionally, this paper will discuss the benefits and the limitations of implementing a wireless sensor network (WSN) as the basis for data transport in the instrumentation system. Finally, this paper will address the experiences and lessons learned with integration, testing prior to deployment, and field testing at the JSC rock yard. NASA is developing the HDU1-PEM as a step towards a fully autonomous habitation system that enables human exploration of space. To accomplish this purpose, the HDU project is focusing on development, integration, testing, and evaluation of habitation systems. The HDU will be used as a technology pull, testbed, and integration environment in which to advance NASA's understanding of alternative mission architectures, requirements, and operations concepts definition and validation. This project is a multi-year effort. In 2010, the HDU1-PEM will be in a pressurized excursion module configuration, and in 2011 the module will be reconfigured for a pressurized core module configuration. Each year the HDU configurations will undergo testing at NASA's Desert Research and Technology Studies (D-RaTS) in Arizona [1]. As part of this project, a modular instrumentation system is developed to meet the monitoring needs of the HDU subsystems and to integrate with the current command and data handling infrastructure that has been developed for the project. The main objective of this study is to provide for the monitoring needs of the HDU. The requirements necessary to meet this objective are developed by working with the subsystem managers of the HDU to understand their monitoring needs. Additionally, the instrumentation system design leverages knowledge and lessons learned from previous studies, such as the inflatable habitat health monitoring system that was deployed in Antarctica [2], the integrated health monitoring system developed for NASA's Microhab [3], and the JSC Lunar Habitat Wireless Testbed to demonstrate a "standardsbased" approach to a wireless instrumentation system [4]. The HDU also requires flexibility in reconfiguration options, and it is necessary to demonstrate and evaluate a modular approach to an instrumentation system. Thus, the instrumentation system is designed in two parts: the primary system employs a standard WSN configuration, and the secondary system employs a wired USB hub. The WSN design provides for reconfiguration or replacement of sensors due to malfunctions or upgrades by using a wireless node that accepts ten instrument inputs and wirelessly transmits the data to the command and data handling system. The USB hub is necessary for those instruments that operate using a wired USB connection, although the design attempts to limit the amount of sensors that need to be wired connections.

Rojdev, Kristina↗

A flexible CAMAC based data system for Space Shuttle scientific instruments

An effort has been made within NASA to produce a low-cost modular system for implementation of Shuttle payloads based on the CAMAC standards for packaging and data transfer. A key element of such a modular system is a means for controlling the data system, collecting and processing the data for transmission to the ground, and issuing commands to the instrument either from the ground or based on the data collected. A description is presented of such a means based on a network of digital processors and CAMAC crate controllers, which allows for the implementation of instruments ranging from those requiring only a single CAMAC crate of functional modules and no data processing to ones requiring multiple crates and multiple data processors.

Ehrmann, C. H.↗

Chemical release module facility

The chemical release module provides the capability to conduct: (1) thermite based metal vapor releases; (2) pressurized gas releases; (3) dispersed liquid releases; (4) shaped charge releases from ejected submodules; and (5) diagnostic measurements with pi supplied instruments. It also provides a basic R-F and electrical system for: (1) receiving and executing commands; (2) telemetering housekeeping data; (3) tracking; (4) monitoring housekeeping and control units; and (5) ultrasafe disarming and control monitoring.

Reasoner, D. L.↗

STS-93 Post Flight Presentation

An overview of Flight STS-93 is presented. The primary objective of the STS-93 mission was to deploy the Advanced X-Ray Astrophysics Facility (AXAF), also known as the Chandra X-ray Observatory. The mission flew on the Columbia Shuttle, on July 22, 1999. This facility is the most sophisticated X-ray observatory ever built. Other payloads on STS-93 were: (1) the Midcourse Space Experiment (MSX), (2) Shuttle Ionospheric Modification with Pulsed Local Exhaust (SIMPLEX), (3) Southwest Ultraviolet Imaging System (SWUIS), (4) Gelation of Sols: Applied Microgravity Research (GOSAMR), Space Tissue Loss-B (STL-B), (5) Light Weight Flexible Solar Array Hinge (LFSAH), (6) Cell Culture Module (CCM), and (7) the Shuttle Amateur Radio Experiment-II (SAREX-II), (8) EarthKam, (9) Plant Growth Investigations in Microgravity (PGIM), (10) Commercial Generic Bioprocessing Apparatus (CGBA), (11) Micro-Electrical Mechanical System (MEMS), and (12) the Biological Research in Canisters (BRIC). The crew was: Eileen M. Collins, Mission Commander, the first female shuttle commander; Jeffrey S. Ashby, Pilot; Steven A. Hawley , Mission Specialist; Catherine G. Coleman, Mission Specialist; Michel Tognini (CNES), Mission Specialist. The video contains views of life aboard the space shuttle. This mission featured both a night launching and a night landing at the Kennedy Space Center.

Source record↗

STS-106 Crew Activities Report/Flight Day 10 Highlights

On this tenth day of the STS-106 Atlantis mission, the flight crew, Commander Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Daniel C. Burbank, Edward T. Lu, Richard A. Mastracchio, Yuri Ivanovich Malenchenko, and Boris V. Morukov are shown preparing for their departure from the International Space Station (ISS). Crewmembers are shown closing the hatches of the Zarya, Unity and Zvezda modules. They are also shown packing up trash and packing materials into the Russian Progress ship.

Source record↗

Configurable Multi-Purpose Processor

Advancements in technology have allowed the miniaturization of systems used in aerospace vehicles. This technology is driven by the need for next-generation systems that provide reliable, responsive, and cost-effective range operations while providing increased capabilities such as simultaneous mission support, increased launch trajectories, improved launch, and landing opportunities, etc. Leveraging the newest technologies, the command and telemetry processor (CTP) concept provides for a compact, flexible, and integrated solution for flight command and telemetry systems and range systems. The CTP is a relatively small circuit board that serves as a processing platform for high dynamic, high vibration environments. The CTP can be reconfigured and reprogrammed, allowing it to be adapted for many different applications. The design is centered around a configurable field-programmable gate array (FPGA) device that contains numerous logic cells that can be used to implement traditional integrated circuits. The FPGA contains two PowerPC processors running the Vx-Works real-time operating system and are used to execute software programs specific to each application. The CTP was designed and developed specifically to provide telemetry functions; namely, the command processing, telemetry processing, and GPS metric tracking of a flight vehicle. However, it can be used as a general-purpose processor board to perform numerous functions implemented in either hardware or software using the FPGA s processors and/or logic cells. Functionally, the CTP was designed for range safety applications where it would ultimately become part of a vehicle s flight termination system. Consequently, the major functions of the CTP are to perform the forward link command processing, GPS metric tracking, return link telemetry data processing, error detection and correction, data encryption/ decryption, and initiate flight termination action commands. Also, the CTP had to be designed to survive and operate in a launch environment. Additionally, the CTP was designed to interface with the WFF (Wallops Flight Facility) custom-designed transceiver board which is used in the Low Cost TDRSS Transceiver (LCT2) also developed by WFF. The LCT2 s transceiver board demodulates commands received from the ground via the forward link and sends them to the CTP, where they are processed. The CTP inputs and processes data from the inertial measurement unit (IMU) and the GPS receiver board, generates status data, and then sends the data to the transceiver board where it is modulated and sent to the ground via the return link. Overall, the CTP has combined processing with the ability to interface to a GPS receiver, an IMU, and a pulse code modulation (PCM) communication link, while providing the capability to support common interfaces including Ethernet and serial interfaces boarding a relatively small-sized, lightweight package.

Valencia, J. Emilio↗

ISS GN and C - First Year Surprises

Assembly of the International Space Station (ISS) began in late 1998 with the joining of the first two US and Russ ian elements. For more than two years, the outpost was served by two Russian Guidance, Navigation, and Control (GN&C) systems. The station requires orbital translation and attitude control functions for its 100+ configurations, from the nascent two-module station to the half million kilogram completed station owned and operated by seventeen nations. With the launch of the US Laboratory module in February 2001, the integration of the US GN&C system with its Russian counterpart laid the foundation for such a robust system. In its first year of combined operation, the ISS GN&C system has performed admirably, even better than many expected, but there have been surprises. Loss of command capability, loss of communication between segments, a control system force-fight, and "non-propulsive vents" that weren't - such events have repeatedly underscored the importance of thorough program integration, testing, and operation, both across subsystem boundaries and across international borders.

Begley, Michael↗

STS-110/Atlantic/ISS 8A Pre-Launch On Orbit-Landing-Crew Egress

The crew of STS-110, which consists of Commander Michael Bloomfield, Pilot Stephen Frick, and Mission Specialists Rex Walheim, Ellen Ochoa, Lee Morin, Jerry Ross, and Steven Smith is introduced at the customary pre-flight meal. The narrator provides background information on the astronauts during suit-up. Each crew member is shown in the White Room before boarding Space Shuttle Atlantis, and some display signs to loved ones. Launch footage includes the following replays: Beach Tracker, VAB, Pad B, Tower 1, DLTR-3, Grandstand, Cocoa Beach DOAMS, Playalinda DOAMS, UCS-23, SLF Convoy, OTV-154, OTV-163, OTV-170 (mislabeled), and OTV-171 (mislabeled). After the launch, NASA administrator Sean O'Keefe gives a speech to the Launch Control Center, with political dignitaries present. While on-orbit, Atlantis docks with the International Space Station (ISS), and Canadarm 2 on the ISS lifts the S0 Truss out of the orbiter's payload bay. The video includes highlights of three extravehicular activities (EVAs). In the first, the S0 Truss is fastened to the Destiny Laboratory Module on the ISS. During the third EVA, Walheim and Smith assist in the checkout of the handcart on the S0 Truss. The Atlantis crew is shown gathered together with the Expedition 4 crew of the ISS, and again by itself after undocking. Replays of the landing include: VAB, Tower 1, Mid-field, Runway South End, Runway North End, Tower 2, Playalinda DOAMS, Cocoa Beach DOAMS, and Pilot Point of View (PPOV). After landing, Commander Bloomfield lets each of his crew members give a short speech.

Source record↗

HIL Testbed and Motion Control Strategy for the Hybrid Hydraulic-Electric Architecture (HHEA)

The Hybrid Hydraulic-Electric Architecture (HHEA) was proposed in recent years to increase system efficiency of high power mobile machines and to reap the benefits of electrification without the need for large electric machines. It uses a set of common pressure rails to provide the majority of power hydraulically and small electric motors to modulate that power for precise control. This paper presents the development of a Hardware-in-the-loop (HIL) test-bed for testing motion control strategies for the HHEA. Precise motion control is important for off-road vehicles whose utility requires the machine being dexterous and performing tasks exactly as commanded. Motion control for the HHEA is challenging due to its intrinsic use of discrete pressure rail switches to minimize system efficiency or to keep the system within the torque capabilities of the electric motor. The motion control strategy utilizes two different controllers: a nominal passivity based back-stepping controller used in between pressure rail switches and a transition controller used to handle the event of a pressure rail switch. In this paper, the performance of the nominal control under various nominal and rail switching scenarios is experimentally evaluated on the HIL testbed.

33 ADVANCED PROPULSION SYSTEMS↗

STS-88 Day 07 Highlights

On this seventh day of the STS-88 mission, the flight crew, Commander Robert D. Cabana, Pilot Frederick W. Sturckow, and Mission Specialists Nancy J. Currie, James H. Newman, Jerry L. Ross, and Sergei Krikalev are seen preparing for a 6-1/2 hour space walk. During this walk Newman and Ross install two box-like antennas on the outside of the Unity module. In addition they remove launch restraints over four hatchways, install insulating covers on the trunnion pins, and free one of two balky antennas on Zarya's backup rendezvous navigation system.

Source record↗

Crew Activity Report / Flight Day 7

The Atlantis Space Shuttle crew (Mission Commander James D. Halsell, Jr., Pilot Scott J. Horowitz, Mission Specialists Mary Ellen Weber, Jeffrey N. Williams, James S. Voss, Susan J. Helms, and Yuri Vladimirovich Usachev) completed several activities including: (1) installation of final battery in the International Space Station; (2) installation of new storage compartments behind panels in the Zarya module; (3) installation of a new Radio Telemetry System; (4) firing of Atlantis steering jets to perform the second part of three-day maneuver to raise the station's altitude; and (5) transferring more than a ton of gear to the station to await use by the first resident crew.

Source record↗

Bigelow Expandable Activity Module (BEAM) Monitoring System

What is Bigelow Expandable Activity Module (BEAM)? The Bigelow Expandable Activity Module (BEAM) is an expandable habitat technology demonstration on ISS; increase human-rated inflatable structure Technology Readiness Level (TRL) to level 9. NASA managed ISS payload project in partnership with Bigelow Aerospace. Launched to ISS on Space X 8 (April 8th, 2016). Fully expanded on May 28th, 2016. Jeff Williams/Exp. 48 Commander first entered BEAM on June 5th, 2016.

Wells, Nathan↗

Codevision 0.x

CodeVision (formerly MassAV) is a malware analysis workflow system and repository. It began as a simple tool for analyzing a large malware corpus using multiple COTS antivirus engines in parallel. It has since evolved into a unified interface for collecting, storing and analyzing malicious executable code using a variety of COTS and GOTS backends. Not only can CodeVision receive samples from users via its command-line and web interfaces, but it can also operate on continuous network data feeds (e.g., perimeter e-mail attachments, HTTP downloads). The modular analysis framework and simple API give developers the ability to integrate custom and off-the-shelf analysis tools with ease. The system manages scheduling and dependencies, allowing modules to be chained together into analysis-driven workflows. The system is designed as a distributed, load-balanced web service, an architecture that allows it to scale horizontally by adding additional nodes.

Anderson, Blake↗

STS-106 Crew Interviews: Daniel Burbank

This NASA Johnson Space Center (JSC) video production presents an STS-106 pre-launch interview with Mission Specialist Daniel C. Burbank, Lt. Commander, United States Coast Guard (USCG). Among other topics, Burbank discusses how his Coast Guard career evolved into spaceflight, his experiences flying helicopters for the Coast Guard, and his chief duties on the upcoming spaceflight. STS-106 is International Space Station assembly flight ISS-2A.2b and will utilize the SPACEHAB Double Module and the Integrated Cargo Carrier (ICC) to take supplies to the station. The mission will also include 2 spacewalks.

Source record↗