Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Space shuttle orbital flight testing

The current plan for a flight test program to support the Skylab revisit and to accommodate changes in the schedule is presented. The stability and control aspects of the entry flight phase are discussed. The orbiter flight control effectors and their characteristics are described. The approach chosen for orbital flight testing was examined.

Hartsfield, H. W., Jr.↗

Testing of Two Mars Powered Descent Vehicle Concepts in the Langley Unitary Plan Wind Tunnel

Testing was conducted in the NASA Langley Unitary Plan Wind Tunnel in order to investigate the aerodynamic interference of sub-scale versions of two Mars powered descent vehicle concepts at supersonic Mach numbers (2.4 and 3.5): a model based on a blunt hypersonic inflatable aerodynamic decelerator (HIAD) and the second representing a more slender rigid vehicle with body flaps (CobraMRV). Each model was designed to accommodate up to eight nozzles, with the HIAD model having five different nozzle configurations to investigate the effects of nozzle location, cant angle, and area ratio. The models were tested with high pressure air as the nozzle plume gas, and included the following instrumentation: high-speed video, discrete steady state and high-frequency pressure, pressure sensitive paint, and a new flow-through force and moment balance for the HIAD model. The high-speed imagery showed the overall expected growth of the shock layer to increasing thrust levels. The discrete stagnation pressure data on the HIAD model with four and eight blowing nozzles was sensitive to thrust coefficient with the nozzles canted at 0 degrees, whereas having nozzles canted outward 20 degrees and/or being located closer to the heatshield shoulder largely removed that sensitivity. The CobraMRV model stagnation pressure was more sensitive to tunnel Mach number and sideslip angle, due to the nozzle arrangement and plume interference. Pressure sensitive paint data quality was compromised by paint damage from frequent model changes, especially for the HIAD model. However, pressure coefficient data on the CobraMRV model showed the same trends as the discrete pressure measurements, as well as a sensitivity to non-zero sideslip angles. The aerodynamic force coefficients were derived from the pressure sensitive paint data. On the HIAD models, the primary force coefficient decreased with increasing thrust due to the nozzle plumes blocking flow to the heatshield area surrounding the nozzle exist. On the CobraMRV model, the force coefficient was relatively insensitive to thrust coefficient at the lower Mach number when sideslip angle was 0 degrees The force coefficient decreases with increasing thrust coefficient when the sideslip angle is 10 degrees. Balance data quality was negatively impacted by thermal drift issues that were not apparent in pre-test calibration measurements, thus preventing usable test data. Results and lessons learned will be used to take further technology development steps, including more advanced ground test techniques and flight testing.

Supersonic Retropropulsion↗

Testing of Two Mars Powered Descent Vehicle Concepts in the Langley Unitary Plan Wind Tunnel

Testing was conducted in the NASA Langley Unitary Plan Wind Tunnel in order to investigate the aerodynamic interference of sub-scale versions of two Mars powered descent vehicle concepts at supersonic Mach numbers (2.4 and 3.5): a model based on a blunt hypersonic inflatable aerodynamic decelerator (HIAD) and the second representing a more slender rigid vehicle with body flaps (CobraMRV). Each model was designed to accommodate up to eight nozzles, with the HIAD model having five different nozzle configurations to investigate the effects of nozzle location, cant angle, and area ratio. The models were tested with high pressure air as the nozzle plume gas, and included the following instrumentation: high-speed video, discrete steady state and high-frequency pressure, pressure sensitive paint, and a new flow-through force and moment balance for the HIAD model. The high-speed imagery showed the overall expected growth of the shock layer to increasing thrust levels. The discrete stagnation pressure data on the HIAD model with four and eight blowing nozzles was sensitive to thrust coefficient with the nozzles canted at 0 degrees, whereas having nozzles canted outward 20 degrees and/or being located closer to the heatshield shoulder largely removed that sensitivity. The CobraMRV model stagnation pressure was more sensitive to tunnel Mach number and sideslip angle, due to the nozzle arrangement and plume interference. Pressure sensitive paint data quality was compromised by paint damage from frequent model changes, especially for the HIAD model. However, pressure coefficient data on the CobraMRV model showed the same trends as the discrete pressure measurements, as well as a sensitivity to non-zero sideslip angles. The aerodynamic force coefficients were derived from the pressure sensitive paint data. On the HIAD models, the primary force coefficient decreased with increasing thrust due to the nozzle plumes blocking flow to the heatshield area surrounding the nozzle exist. On the CobraMRV model, the force coefficient was relatively insensitive to thrust coefficient at the lower Mach number when sideslip angle was 0 degrees The force coefficient decreases with increasing thrust coefficient when the sideslip angle is 10 degrees. Balance data quality was negatively impacted by thermal drift issues that were not apparent in pre-test calibration measurements, thus preventing usable test data. Results and lessons learned will be used to take further technology development steps, including more advanced ground test techniques and flight testing.

Karl T Edquist↗

Integrated Tests and Evaluations

NASA has developed a project plan to address issues related to UAS access to the NAS The plan is being formulated with inputs from our stakeholders. NASA will work with our stakeholders to develop ConOps and a national roadmap to determine key research technologies and policy issues to enable UAS access to the NAS. NASA will use ConOps and roadmap to either validate current NASA research investment areas and make any necessary changes to proposed UAS research portfolio. NASA will conduct integration and testing of key research areas to enable UAS access to the NAS. Use phase I to do detailed test planning for phase II Assist subelements with test planning Assist with documenting test objectives, data and facilities/infrastructure requirements, and detailed test planning Provide facilities/infrastructure to meet test requirements Provide interfaces between tools Develop, document, and execute data handling and dissemination plans Provide a test engineer to facilitate scheduling of facilities, support specific equipment and software needs, track schedule progress, and monitor changes to schedule Provide guidance for alternative facilities or equipment to mitigate risk associated with loss of availability Provide opportunities for subelements to gather data in relevant and increasingly complex environments

Bixby, C. J.↗

Schlieren Movies of the 8-Inch Diameter Rigid Parachute Model of the Cook Research Laboratory Taken During the Fourth Phase of Testing in the Langley Unitary Plan Wind Tunnel

Canopy Model IV was tested in four different configuration series. Shroud lines were used in the first three series of tests; none were used in the fourth series. Other variables were Mach number (1.77, 2.17, 2.76), dynamic pressure (290, 250, 155 lb per sq ft), camera speed, and attitude.

[Tunnel] Unitary Plan Wind Tunnel↗

Test, Control and Monitor System maintenance plan

The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.

Buehler, David P.↗

Optical Testing and Verification Methods for the James Webb Space Telescope Integrated Science Instrument Module Element

NASA's James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy (~40K). The JWST Observatory includes the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM) that contains four science instruments (SI) and the fine guider. The SIs are mounted to a composite metering structure. The SI and guider units were integrated to the ISIM structure and optically tested at the NASA Goddard Space Flight Center as a suite using the Optical Telescope Element SIMulator (OSIM). OSIM is a full field, cryogenic JWST telescope simulator. SI performance, including alignment and wave front error, were evaluated using OSIM. We describe test and analysis methods for optical performance verification of the ISIM Element, with an emphasis on the processes used to plan and execute the test. The complexity of ISIM and OSIM drove us to develop a software tool for test planning that allows for configuration control of observations, associated scripts, and management of hardware and software limits and constraints, as well as tools for rapid data evaluation, and flexible re-planning in response to the unexpected. As examples of our test and analysis approach, we discuss how factors such as the ground test thermal environment are compensated in alignment. We describe how these innovative methods for test planning and execution and post-test analysis were instrumental in the verification program for the ISIM element, with enough information to allow the reader to consider these innovations and lessons learned in this successful effort in their future testing for other programs.

spaceborne telescopes↗

First Crewed Flight: Rationale, Considerations and Challenges from the Constellation Experience

NASA's Constellation Program has made the most progress in a generation towards building an integrated human-rated spacecraft and launch vehicle. During that development, it became clear that NASA's human-rating requirements lacked the specificity necessary to defend a program plan, particularly human-rating test flight plans, from severe budget challenges. This paper addresses the progress Constellation achieved, problems encountered in clarifying and defending a human-rating certification plan, and discusses key considerations for those who find themselves in similar straits with future human-rated spacecraft and vehicles. We assert, and support with space flight data, that NASA's current human-rating requirements do not adequately address "unknown-unknowns", or the unexpected things the hardware can reveal to the designer during test.

Noriega, Carlos↗

Supersonic control effectiveness for full and partial span elevon configurations on a 0.0165 scale model space shuttle orbiter tested in the LaRC unitary plan wind tunnel (LA49)

A wind tunnel test is reported on an early version of the space shuttle orbiter (designated 089B-139) 0.0165 scale model to systematically determine both longitudinal and lateral control effectiveness associated with various combinations of inboard, outboard, and full span wing trailing edge controls. The test Mach umbers were 2.5 and 4.63 over an angle of attack range from -4 deg to 42 deg at 0 deg sideslip.

Source record↗

Summary of Recent Inducer Testing at MSFC and Future Plans

This viewgraph presentation covers water flow tests on the RS-83 Main LOX Inducer for the Space Shuttle Main Engine (SSME). The presentation lists recent water tests on the SSME liquid oxygen (LOX) pump inducer, includes images and diagrams of the water test facility at Marshall Space Flight Center (MSFC), profiles inducer hydrodynamic forces, and diagrams the performance of the RS-83 inducer.

Skelley, Stephen↗

CERES and the S'COOL Project

The first Clouds and the Earth's Radiant Energy System (CERES) instrument will be launched on the Tropical Rainfall Measuring Mission (TRMM) spacecraft from a Japanese launch site in November 1997. This instrument is a follow-on to the Earth Radiation Budget Experiment (ERBE) begun in the 1980's. The instrument will measure the radiation budget - incoming and outgoing radiant energy - of the Earth. It will establish a baseline and look for climatic trends. The major feature of interest is clouds, which play a very strong role in regulating our climate. CERES will identify clear and cloudy regions and determine cloud physical and microphysical properties using imager data from a companion instrument. Validation efforts for the remote sensing algorithms will be intensive. As one component of the validation, the S'COOL (Students' Cloud Observations On-Line) project will involve school children from around the globe in making ground truth measurements at the time of a CERES overpass. Their observations will be collected at the NASA Langley Distributed Active Archive Center (DAAC) and made available over the Internet for educational purposes as well as for use by the CERES Science Team in validation efforts. Pilot testing of the S'COOL project began in January 1997 with two local schools in Southeastern Virginia and one remote site in Montana. This experience is helping guide the development of the S'COOL project. National testing is planned for April 1997, international testing for July 1997, and global testing for October 1997. In 1998, when the CERES instrument is operational, a global observer network should be in place providing useful information to the scientists and learning opportunities to the students.

Chambers, Lin H.↗

Modeling in the State Flow Environment to Support Launch Vehicle Verification Testing for Mission and Fault Management Algorithms in the NASA Space Launch System

Analysis methods and testing processes are essential activities in the engineering development and verification of the National Aeronautics and Space Administration's (NASA) new Space Launch System (SLS). Central to mission success is reliable verification of the Mission and Fault Management (M&FM) algorithms for the SLS launch vehicle (LV) flight software. This is particularly difficult because M&FM algorithms integrate and operate LV subsystems, which consist of diverse forms of hardware and software themselves, with equally diverse integration from the engineering disciplines of LV subsystems. M&FM operation of SLS requires a changing mix of LV automation. During pre-launch the LV is primarily operated by the Kennedy Space Center (KSC) Ground Systems Development and Operations (GSDO) organization with some LV automation of time-critical functions, and much more autonomous LV operations during ascent that have crucial interactions with the Orion crew capsule, its astronauts, and with mission controllers at the Johnson Space Center. M&FM algorithms must perform all nominal mission commanding via the flight computer to control LV states from pre-launch through disposal and also address failure conditions by initiating autonomous or commanded aborts (crew capsule escape from the failing LV), redundancy management of failing subsystems and components, and safing actions to reduce or prevent threats to ground systems and crew. To address the criticality of the verification testing of these algorithms, the NASA M&FM team has utilized the State Flow environment6 (SFE) with its existing Vehicle Management End-to-End Testbed (VMET) platform which also hosts vendor-supplied physics-based LV subsystem models. The human-derived M&FM algorithms are designed and vetted in Integrated Development Teams composed of design and development disciplines such as Systems Engineering, Flight Software (FSW), Safety and Mission Assurance (S&MA) and major subsystems and vehicle elements such as Main Propulsion Systems (MPS), boosters, avionics, Guidance, Navigation, and Control (GN&C), Thrust Vector Control (TVC), liquid engines, and the astronaut crew office. Since the algorithms are realized using model-based engineering (MBE) methods from a hybrid of the Unified Modeling Language (UML) and Systems Modeling Language (SysML), SFE methods are a natural fit to provide an in depth analysis of the interactive behavior of these algorithms with the SLS LV subsystem models. For this, the M&FM algorithms and the SLS LV subsystem models are modeled using constructs provided by Matlab which also enables modeling of the accompanying interfaces providing greater flexibility for integrated testing and analysis, which helps forecast expected behavior in forward VMET integrated testing activities. In VMET, the M&FM algorithms are prototyped and implemented using the same C++ programming language and similar state machine architectural concepts used by the FSW group. Due to the interactive complexity of the algorithms, VMET testing thus far has verified all the individual M&FM subsystem algorithms with select subsystem vendor models but is steadily progressing to assessing the interactive behavior of these algorithms with LV subsystems, as represented by subsystem models. The novel SFE applications has proven to be useful for quick look analysis into early integrated system behavior and assessment of the M&FM algorithms with the modeled LV subsystems. This early MBE analysis generates vital insight into the integrated system behaviors, algorithm sensitivities, design issues, and has aided in the debugging of the M&FM algorithms well before full testing can begin in more expensive, higher fidelity but more arduous environments such as VMET, FSW testing, and the Systems Integration Lab7 (SIL). SFE has exhibited both expected and unexpected behaviors in nominal and off nominal test cases prior to full VMET testing. In many findings, these behavioral characteristics were used to correct the M&FM algorithms, enable better test coverage, and develop more effective test cases for each of the LV subsystems. This has improved the fidelity of testing and planning for the next generation of M&FM algorithms as the SLS program evolves from non-crewed to crewed flight, impacting subsystem configurations and the M&FM algorithms that control them. SFE analysis has improved robustness and reliability of the M&FM algorithms by revealing implementation errors and documentation inconsistencies. It is also improving planning efficiency for future VMET testing of the M&FM algorithms hosted in the LV flight computers, further reducing risk for the SLS launch infrastructure, the SLS LV, and most importantly the crew.

Trevino, Luis↗

Augmented Method to Improve Thermal Data for the Figure Drift Thermal Distortion Predictions of the JWST OTIS Cryogenic Vacuum Test

The JWST Optical Telescope Element (OTE) assembly is the largest optically stable infrared-optimized telescope currently being manufactured and assembled, and is scheduled for launch in 2018. The JWST OTE, including the 18 segment primary mirror, secondary mirror, and the Aft Optics Subsystem (AOS) are designed to be passively cooled and operate near 45K. These optical elements are supported by a complex composite backplane structure. As a part of the structural distortion model validation efforts, a series of tests are planned during the cryogenic vacuum test of the fully integrated flight hardware at NASA JSC Chamber A. The successful ends to the thermal-distortion phases are heavily dependent on the accurate temperature knowledge of the OTE structural members. However, the current temperature sensor allocations during the cryo-vac test may not have sufficient fidelity to provide accurate knowledge of the temperature distributions within the composite structure. A method based on an inverse distance relationship among the sensors and thermal model nodes was developed to improve the thermal data provided for the nanometer scale WaveFront Error (WFE) predictions. The Linear Distance Weighted Interpolation (LDWI) method was developed to augment the thermal model predictions based on the sparse sensor information. This paper will encompass the development of the LDWI method using the test data from the earlier pathfinder cryo-vac tests, and the results of the notional and as tested WFE predictions from the structural finite element model cases to characterize the accuracies of this LDWI method.

Thermal Modeling↗

NASA Near Earth Network (NEN) DVB-S2 Demonstration Testing for Enhancing Higher Data Rates for CubeSat/Small Satellite Missions at X-/Ka-band

National Aeronautics and Space Administration (NASA) CubeSat/SmallSat missions are moving to higher data rates. Digital Video Broadcast, Satellite Second Generation (DVB-S2) is a communications standard that uses power and bandwidth efficient modulation and coding techniques to deliver performance approaching radio frequency (RF) channel theoretical limits. The Near Earth Network (NEN) will test DVB-S2’s ability to provide higher data rates for CubeSat/SmallSat missions at X-band and Ka-band at Wallops Flight Facility (WFF). The goal is to upgrade the NEN with DVB-S2 to increase science data return for missions and enable support for more CubeSat/SmallSat missions. This paper describes NEN DVB-S2 X-band and Ka-band demonstration objectives, scope, and performance measures as well as NEN channel test configuration. The NEN has planned 2020 tests to demonstrate all modulation and coding schemes in the Consultative Committee for Space Data Systems (CCSDS) DVB-S2 standard over X-band and Ka-band. A link analysis study for the trade-offs among achievable data rates, modulations, codes, spacecraft antenna sizes and power amplifiers (PA) is provided. This paper identifies Commercial off-the-shelf (COTS) CubeSat/SmallSat X-band and Ka-band communication systems and discusses low cost DVB-S2 X-band software defined radio (SDR) transmitter development concepts and implementation with a practical system for CubeSats/SmallSats.

Yen Wong↗

Status of Mars Retropropulsion Testing in the Langley Unitary Plan Wind Tunnel

Future Mars human landings will be enabled by a powered descent phase starting at supersonic conditions, something which has never been done before on a Mars mission. Significant aerosciences challenges exist due to jet interactions between the retrorocket engine plumes, freestream flow, and vehicle that will affect the aerodynamic behavior during powered descent. Historically, wind tunnel tests have been used to study the interactions with inert gas exhaust simulants in place of rocket engines. On the computational side, flowfield simulations have been completed at full-scale conditions, but the available ground and flight data are not appropriate for calibrating computational uncertainties for aerodynamic interference on proposed Mars descent vehicles, due to insufficient data, dissimilar vehicle geometries, and disparate operating conditions. A wind tunnel test has been designed to begin addressing powered descent aerodynamics risks for large-scale human Mars entry concepts and to identify gaps in computational predictive capabilities. The test will be conducted in the NASA Langley Unitary Plan Wind Tunnel and is designed with improvements in model design and data products over past tests. The test campaign will be run using sub-scale model geometries derived from NASA powered descent reference vehicles: a blunt low lift-to-drag vehicle and a more slender geometry that generates higher unpowered lift. Both models have been fabricated and are ready for testing. The blunt model is equipped with the flexibility to examine the effects of nozzle pointing direction, number, location, size, and area ratio. The main measurements are heatshield aerodynamic interference forces and moments with a custom flow-through balance, discrete and distributed heatshield pressure, and high-speed flowfield visualization. This paper covers the test objectives, facility, models and instrumentation, and planned test matrix.

Mars↗

Electric power system test and verification program

Space Station Freedom's (SSF's) electric power system (EPS) hardware and software verification is performed at all levels of integration, from components to assembly and system level tests. Careful planning is essential to ensure the EPS is tested properly on the ground prior to launch. The results of the test performed on breadboard model hardware and analyses completed to date have been evaluated and used to plan for design qualification and flight acceptance test phases. These results and plans indicate the verification program for SSF's 75-kW EPS would have been successful and completed in time to support the scheduled first element launch.

Rylicki, Daniel S.↗

Development and Field Testing of the FootFall Planning System for the ATHLETE Robots

The FootFall Planning System is a ground-based planning and decision support system designed to facilitate the control of walking activities for the ATHLETE (All-Terrain Hex-Limbed Extra-Terrestrial Explorer) family of robots. ATHLETE was developed at NASA's Jet Propulsion Laboratory (JPL) and is a large six-legged robot designed to serve multiple roles during manned and unmanned missions to the Moon; its roles include transportation, construction and exploration. Over the four years from 2006 through 2010 the FootFall Planning System was developed and adapted to two generations of the ATHLETE robots and tested at two analog field sites (the Human Robotic Systems Project's Integrated Field Test at Moses Lake, Washington, June 2008, and the Desert Research and Technology Studies (D-RATS), held at Black Point Lava Flow in Arizona, September 2010). Having 42 degrees of kinematic freedom, standing to a maximum height of just over 4 meters, and having a payload capacity of 450 kg in Earth gravity, the current version of the ATHLETE robot is a uniquely complex system. A central challenge to this work was the compliance of the high-DOF (Degree Of Freedom) robot, especially the compliance of the wheels, which affected many aspects of statically-stable walking. This paper will review the history of the development of the FootFall system, sharing design decisions, field test experiences, and the lessons learned concerning compliance and self-awareness.

SunSpiral, Vytas↗

Status of Mars Retropropulsion Testing in the Langley Unitary Plan Wind Tunnel

Future Mars human landings will be enabled by a powered descent phase starting at supersonic conditions, something which has never been done before on a Mars mission. Significant aerosciences challenges exist due to jet interactions between the retrorocket engine plumes, freestream flow, and vehicle that will affect the aerodynamic behavior during powered descent. Historically, wind tunnel tests have been used to study the interactions with inert gas exhaust simulants in place of rocket engines. On the computational side, flowfield simulations have been completed at full-scale conditions, but the available ground and flight data are not appropriate for calibrating computational uncertainties for aerodynamic interference on proposed Mars descent vehicles, due to insufficient data, dissimilar vehicle geometries, and disparate operating conditions. A wind tunnel test has been designed to begin addressing powered descent aerodynamics risks for large-scale human Mars entry concepts and to identify gaps in computational predictive capabilities. The test will be conducted in the NASA Langley Unitary Plan Wind Tunnel and is designed with improvements in model design and data products over past tests. The test campaign will be run using sub-scale model geometries derived from NASA powered descent reference vehicles: a blunt low lift-to-drag vehicle and a more slender geometry that generates higher unpowered lift. Both models have been fabricated and are ready for testing. The blunt model is equipped with the flexibility to examine the effects of nozzle pointing direction, number, location, size, and area ratio. The main measurements are heatshield aerodynamic interference forces and moments with a custom flow-through balance, discrete and distributed heatshield pressure, and high-speed flowfield visualization. This paper covers the test objectives, facility, models and instrumentation, and planned test matrix.

Supersonic Retropropulsion↗