Wind Plant Ramping Behavior
With the increasing wind penetrations, utilities and operators (ISOs) are quickly trying to understand the impacts on system operations and planning. This report focuses on ramping imapcts within the Xcel service region.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
With the increasing wind penetrations, utilities and operators (ISOs) are quickly trying to understand the impacts on system operations and planning. This report focuses on ramping imapcts within the Xcel service region.
A flyer briefly describing the EERE Technology Commercialization Portal along with an example of one of its marketing summaries.
The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation) and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. In order to improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively, by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. In this report, a new methodology to predict the uncertainty ranges for the required balancing capacity, ramping capability and ramp duration is presented. Uncertainties created by system load forecast errors, wind and solar forecast errors, generation forced outages are taken into account. The uncertainty ranges are evaluated for different confidence levels of having the actual generation requirements within the corresponding limits. The methodology helps to identify system balancing reserve requirement based on a desired system performance levels, identify system “breaking points”, where the generation system becomes unable to follow the generation requirement curve with the user-specified probability level, and determine the time remaining to these potential events. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (California ISO) real life data have shown the effectiveness of the proposed approach. A tool developed based on the new methodology described in this report will be integrated with the California ISO systems. Contractual work is currently in place to integrate the tool with the AREVA EMS system.
Seattle Steam Company provides thermal energy service (steam) to the majority of buildings and facilities in downtown Seattle, including major hospitals (Swedish and Virginia Mason) and The Northwest (Level I) Regional Trauma Center. Seattle Steam has been heating downtown businesses for 117 years, with an average length of service to its customers of 40 years. In 2008 and 2009 Seattle Steam developed a biomass-fueled renewable energy (bio-energy) system to replace one of its gas-fired boilers that will reduce greenhouse gases, pollutants and the amount of waste sent to landfills. This work in this sub-project included several distinct tasks associated with the biomass project development as follows: a. Engineering and Architecture: Engineering focused on development of system control strategies, development of manuals for start up and commissioning. b. Training: The project developer will train its current operating staff to operate equipment and facilities. c. Flue Gas Clean-Up Equipment Concept Design: The concept development of acid gas emissions control system strategies associated with the supply wood to the project. d. Fuel Supply Management Plan: Development of plans and specifications for the supply of wood. It will include potential fuel sampling analysis and development of contracts for delivery and management of fuel suppliers and handlers. e. Integrated Fuel Management System Development: Seattle Steam requires a biomass Fuel Management System to track and manage the delivery, testing, processing and invoicing of delivered fuel. This application will be web-based and accessed from a password-protected URL, restricting data access and privileges by user-level.
In this work, we present validation test results of fully coupled neutronics and thermal-hydraulics models of the Molten Salt Reactor Experiment (MSRE) against experimental data of the zero power pump transients and the natural circulation tests at low power. To capture the strong coupling between neutronics and thermal-hydraulics due to fuel circulation, and to account for the delayed neutron precursor (DNP) distribution, the porous media thermal-hydraulics solver Pronghorn was fully coupled to the spatial neutron dynamics code Griffin, which solves the neutron diffusion equation, and to the 0-D point kinetics solver Squirrel, using a 2-D homogenized representation of the MSRE. The validation test results show very good agreement with experimental data for both point kinetics and spatial dynamics simulations, capturing the strong feedback effect and DNP losses in the MSRE. The 0-D code Squirrel accurately predicted the time-dependent behavior in the MSRE given the steady-state spatial dynamics solution of Griffin.
On Friday June 26, 2009, the neutron beam shutter for the VULCAN diffractometer at the SNS was opened for the first time. Initial measurements to characterize the instrument performance are reported. It is shown that the measurement results are by and large in agreement with design calculations. New research opportunities with VULCAN are discussed.
The Tropospheric Emission Spectrometer (TES) is an infrared, high spectral resolution Fourier transform spectrometer with a 3.3 to 15.4 micron wavelength coverage. TES is a scanning instrument intended for determining the chemical state of the Earth's lower atmosphere (troposphere) from the surface to 30+ km. TES produces vertical profiles of important pollutant and greenhouse gases such as carbon monoxide, ozone, methane, and water vapor on a global scale every other day. TES was launched into orbit onboard NASA's earth Observing System Aura spacecraft on July 15, 2004 from Vandenberg Air Force Base, California.
During RHIC Run 10, the first phase of the LLRF Upgrade was successfully completed. This involved replacing the aging VME based system with a modern digital system based on the recently developed RHIC LLRF Upgrade Platform, and commissioning the system as part of the normal RHIC start up process. At the start of Run 11, the second phase of the upgrade is underway, involving a significant expansion of both hardware and functionality. This paper will review the commissioning effort and provide examples of improvements in system performance, flexibility and scalability afforded by the new platform. The RHIC LLRF upgrade is based on the recently developed RHIC LLRF Upgrade Platform. The major design goals of the platform are: (1) Design a stand alone, generic, digital, modular control architecture which can be configured to satisfy all of the application demands we currently have, and which will be supportable and upgradeable into the foreseeable future; and (2) It should integrate seamlessly into existing controls infrastructure, be easy to deploy, provide access to all relevant control parameters (eliminate knobs), provide vastly improved diagnostic data capabilities, and permit remote reconfiguration. Although the system is still in its infancy, we think the initial commissioning results from RHIC indicate that these goals have been achieved, and that we've only begun to realize the benefits the platform provides.
Entrepreneurial separation to transfer technology (ESTT) program is that entrepreneurs terminate their employment with Sandia. The term of the separation is two years with the option to request a third year. Entrepreneurs are guaranteed reinstatement by Sandia if they return before ESTT expiration. Participants may start up or helpe expand technology businesses.
OSHA regulation 29CFR1910.147 specifies control of hazardous energy requirements for 'the servicing and maintenance of machines and equipment in which the unexpected energization or start up of the machines or equipment, or release of stored energy could cause injury to employees.' Class 3B and Class 4 laser beams must be considered hazardous energy sources because of the potential for serious eye injury; careful consideration is therefore needed to safely de-energize these lasers. This paper discusses and evaluates control of hazardous energy principles in this OSHA regulation, in ANSI Z136.1 ''Safe Use of Lasers,'' and in ANSI Z244.1 ''Control of Hazardous Energy, Lockout/Tagout and Alternative Methods.'' Recommendations are made for updating and improving CoHE (control of hazardous energy) requirements in these standards for their applicability to safe laser operations.
In 2004 ventilation planning was initiated to exploit a remote area of Deer Creek mine's reserve (near Huntington, Utah), the Mill Fork Area, located under a mountain. A push-pull ventilation system was selected. This article details the design process of the ventilation system upgrade, the procurement process for the new fans, and the new fan startup testing. 5 figs., 1 photo.
In this paper we consider a possibility of designing a fast reactor core that operates without reactivity margin for a long time. This study is based on the physical principle of fast reactor operating in a self-adjustable neutron-nuclear regime (SANNR-1) introduced by L.P. Feoktistov (1988-1993) and improved by V. Ya. Gol'din SANNR-2 (1995). The mathematical modeling of active zones of fast reactors in SANNR modes is held by authors since 1992. The numerical simulation is based on solving the neutron transport equation coupled with quasi-diffusion equations. The calculations have been performed using standard 26 energy groups. We use a hierarchy of spatial models of 1D, 1.5D, 2D, and 3D geometries. The spatial models of higher dimensionality are used for verification of results. The calculations showed that operation of the reactor in this mode increases its efficiency, safety and simplifies management. It is possible to achieve continuous work of the reactor in SANNR-2 during 7-10 years without fuel overloads by means of further optimization of the mode. Small reactivity margin is used only for the reactor start up. After first 10-15 days the reactor in SANNR-2 operates without reactivity margin. (authors)
The operation and maintenance of nuclear power plants, the nuclear fuel cycle in general, research laboratories and pharmaceutical, medical and industrial facilities generate low-level radioactive waste which, along with the historical radioactive waste from past nuclear activities, needs to be treated and stored, awaiting final disposal. Plasma technology offers a very effective way of treating this waste with a high volume reduction factor (VRF), free from organics, liquids and moisture, and meets without a doubt the acceptance criteria for safe storage and disposal. By means of a plasma beam of approximately 5000 deg. C, the inorganic materials are melted into a glassy slag, containing most of the radioactive isotopes while the organic material is gasified and afterwards oxidized in an afterburner and purified in an off-gas cleaning system. This paper describes the principles of plasma, the different waste feed systems, off-gas treatment and operational experience and future plasma plants. More specifically, it presents the new full-scale plasma facility for the treatment of radioactive waste at the Kozloduy Nuclear Power Plant in Bulgaria for which construction and assembly was finalized end of August 2016. It also describes in more detail the Site Acceptance Tests (SAT) of this facility. This facility is designed and built as an EPC contract by the Joint Venture Iberdrola Ingenieria y Construccion (Spain) and Belgoprocess (Belgium). (authors)
The Charter for the Evaluation and Screening (E and S) of Nuclear Fuel Cycle Options requested by the US Department of Energy calls for the identification of promising fuel cycle options to help guide the future directions of research and development in this area. The final report for this study, which was produced by various national laboratory and industry experts, collected the expansive set of fuel cycle options into 40 evaluation groups (EGs). In support of this study, detailed steady-state physics and mass flow data for each of these groups were compiled into a set of Fuel Cycle Data Packages (FCDPs). The data in the FCDPs were then used to quantify the nine criteria detailed in the study to identify the most promising EGs. In addition to supporting the E and S study, data from these FCDPs can be used to benchmark fuel cycle simulation tools for equilibrium calculations. Once benchmarked, their dynamic modeling capabilities can support the continuing effort to determine the most effective approaches for transitioning to proposed advanced future fuel cycles. While steady-state conditions can be calculated directly in some cases, fuel cycle simulation tools allow for the transition scenarios to be simultaneously optimized on multiple parameters such as the fissile material availability, the amount of desirable material in storage, and the time required for transition. In addition to fuel cycle simulations where material availability is considered and is often a constraint to achieving transition, determining the technology needs to enable a transition to take place is also a key consideration (e.g., what technology is needed, when it is needed, and whether it is needed only during the transition and not for the equilibrium fuel cycle). This paper evaluates the material and technology issues and challenges associated with a transition from a uranium-based fuel cycle (such as that operating in the US today, represented by EG01) to a thorium-based fuel cycle, recognizing that thorium requires fissile material to start up. Based on the findings of the E and S report, the two most promising thorium fuel cycle options are considered in this report: (1) EG26, a thermal spectrum molten salt reactor (MSR), and (2) EG28, represented by a sodium fast reactor (SFR, fast spectrum) and a resource-renewable boiling water reactor (RBWR, intermediate spectrum). (authors)
Transient testing is critical for understanding how new fuels perform in accident conditions such as transient overpower and/or under cooling events. In February of 2014, The U.S. Department of Energy (DOE) determined that a Finding of No Significant Impact (FONSI) was appropriate for the resumption of transient testing of nuclear fuels and materials. At that point, work began on the restart of the Transient Reactor Test Facility (TREAT), which was the DOE preferred alternative for reestablishing transient testing capability for nuclear fuels and materials in the U.S. Significant progress has been made in the restart of TREAT for transient testing since the FONSI in 2014. The progress made since 2014 towards restarting TREAT and the current status is documented in this summary. (author)
SLAC's COHE program requires compliance with OSHA Regulation 29CFR1910.147, 'The control of hazardous energy (lockout/tagout)'. This regulation specifies lockout/tagout requirements during service and maintenance of equipment in which the unexpected energization or start up of the equipment, or release of stored energy, could cause injury to workers. Class 3B and Class 4 laser radiation must be considered as hazardous energy (as well as electrical energy in associated equipment, and other non-beam energy hazards) in laser facilities, and therefore requires careful COHE consideration. This paper describes how COHE is achieved at SLAC to protect workers against unexpected Class 3B or Class 4 laser radiation, independent of whether the mode of operation is normal, service, or maintenance.
Abstract not provided.
No abstract prepared.