Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program evaluation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Generating Semi-Markov Models Automatically

Abstract Semi-Markov Specification Interface to SURE Tool (ASSIST) program developed to generate semi-Markov model automatically from description in abstract, high-level language. ASSIST reads input file describing failure behavior of system in abstract language and generates Markov models in format needed for input to Semi-Markov Unreliability Range Evaluator (SURE) program (COSMIC program LAR-13789). Facilitates analysis of behavior of fault-tolerant computer. Written in PASCAL.

Johnson, Sally C.↗

The Impact (Influence) of Stakeholder Participation in the Logic Modeling Process: A Case Study from NASA Goddard Space Flight Center

This is a three-paper dissertation that responds to a call for empirical research on stakeholder influence in the implementation of evaluation recommendations. The literature is consistent but mostly theoretical: stakeholder participation should positively influence and increase the probability of implementation (see e.g., Christie, 2011; Cousins and Earl, 1992); Fetterman, 2004). In response, I use two Goddard Space Flight Center engineering technical training and development programs to build a causal pathway argument supporting my proposition that stakeholder influence in the logic modeling process impacts organizational decision-making and change. I first introduce the logic modeling process as a tool to involve stakeholders in program and evaluation design (paper 1), then use the data collection process to implement the collaboratively constructed logic model outcomes (paper 2), and finally, I triangulate the data using the Toal (2009) Evaluation Involvement Scale (paper 3). I do this to “increase the validity of the findings” (Noble & Heale, 2019, p. 67) and to garner potential mechanisms. I found that stakeholder participation in the logic modeling process positively influenced the use of data to inform recommendations which in turn positively influenced implementation of evaluation recommendations. I identified the process itself as the mechanism and the key decision points as links or influencers. Potential factors included power and interest (measured by role) and time-on-job.

Organizational Decision-Making↗

Simulation of traffic control signal systems

In recent years there has been considerable interest in the development and testing of control strategies for networks of urban traffic signal systems by simulation. Simulation is an inexpensive and timely method for evaluating the effect of these traffic control strategies since traffic phenomena are too complex to be defined by analytical models and since a controlled experiment may be hazardous, expensive, and slow in producing meaningful results. This paper describes the application of an urban traffic corridor program, to evaluate the effectiveness of different traffic control strategies for the Massachusetts Avenue TOPICS Project.

Connolly, P. J.↗

The Summer Robotic Autonomy Course

We offered a first Robotic Autonomy course this summer, located at NASA/Ames' new NASA Research Park, for approximately 30 high school students. In this 7-week course, students worked in ten teams to build then program advanced autonomous robots capable of visual processing and high-speed wireless communication. The course made use of challenge-based curricula, culminating each week with a Wednesday Challenge Day and a Friday Exhibition and Contest Day. Robotic Autonomy provided a comprehensive grounding in elementary robotics, including basic electronics, electronics evaluation, microprocessor programming, real-time control, and robot mechanics and kinematics. Our course then continued the educational process by introducing higher-level perception, action and autonomy topics, including teleoperation, visual servoing, intelligent scheduling and planning and cooperative problem-solving. We were able to deliver such a comprehensive, high-level education in robotic autonomy for two reasons. First, the content resulted from close collaboration between the CMU Robotics Institute and researchers in the Information Sciences and Technology Directorate and various education program/project managers at NASA/Ames. This collaboration produced not only educational content, but will also be focal to the conduct of formative and summative evaluations of the course for further refinement. Second, CMU rapid prototyping skills as well as the PI's low-overhead perception and locomotion research projects enabled design and delivery of affordable robot kits with unprecedented sensory- locomotory capability. Each Trikebot robot was capable of both indoor locomotion and high-speed outdoor motion and was equipped with a high-speed vision system coupled to a low-cost pan/tilt head. As planned, follow the completion of Robotic Autonomy, each student took home an autonomous, competent robot. This robot is the student's to keep, as she explores robotics with an extremely capable tool in the midst of a new community for roboticists. CMU provided undergraduate course credit for this official course, 16-162U, for 13 students, with all other students receiving course credit from National Hispanic University.

Nourbakhsh, Illah R.↗

Prediction of Muscle Performance During Dynamic Repetitive Exercise

A method for predicting human muscle performance was developed. Eight test subjects performed a repetitive dynamic exercise to failure using a Lordex spinal machine. Electromyography (EMG) data was collected from the erector spinae. Evaluation of the EMG data using a 5th order Autoregressive (AR) model and statistical regression analysis revealed that an AR parameter, the mean average magnitude of AR poles, can predict performance to failure as early as the second repetition of the exercise. Potential applications to the space program include evaluating on-orbit countermeasure effectiveness, maximizing post-flight recovery, and future real-time monitoring capability during Extravehicular Activity.

Byerly, D. L.↗

Basis of Knowledge for Oxidizing Chemicals in TRU Waste - 18654

A new Waste Isolation Pilot Plant (WIPP) document for implementing new requirements in the WIPP Waste Acceptance Criteria (WAC) titled Basis of Knowledge for Evaluating Oxidizing Chemicals in the TRU waste was issued in July, 2017 and has now been implemented on several waste streams. The February 14, 2014, airborne radiation release in Room 7 of the WIPP underground disposal unit 7 was caused by an exothermic chemical reaction of nitrate oxidizing chemicals and organic materials in a single 55-gallon container. That event exposed hazards not previously evaluated in the WIPP safety basis. A new WIPP Documented Safety Analysis (DSA), Revision 5b, was developed that addressed potential hazards related to the airborne radiation release and evaluated and addressed new fire hazard scenarios. The revised hazards analysis within the DSA specifically included potential chemical exothermic reactions in waste containers and propagating fires. Compliance with WAC was credited as initial conditions to the hazards analysis, and Chapter 18 was added making the WIPP WAC compliance program a safety management program within the DSA. The WIPP DSA, Revision 5b, Chapter 18, and the WIPP WAC require the use of this document when performing the enhanced acceptable knowledge (AK) process on transuranic (TRU) waste determined to contain oxidizing chemicals. The WIPP WAC was revised to address the conditions and requirements of DSA Revision 5b. The use of this Basis of Knowledge (BoK) by WIPP Certified Programs is specified in the WIPP WAC, Appendix H, Enhanced Acceptable Knowledge. This document establishes criteria that must be used by the WIPP Certified Programs to evaluate TRU waste containing one or more oxidizing chemicals to determine acceptability at the WIPP as-is and to identify when additional evaluation or treatment is required. This BoK also includes options and requirements to be used by TRU waste sites when further evaluation, testing, and/or treatment are required. The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) will review requests, plans, and technical justifications and provide written decisions prior to implementation by the TRU waste sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Decay Data Evaluations at IFIN-HH, Romania

An IAEA Coordinated Research Project (CRP) on Updated Decay Data Library for Actinides was implemented during the period 2005-2012. The author participated in the CRP, as a representative of the Horia Hulubei National Institute of Physics and Nuclear Engineering (IFIN-HH), the Radionuclide Metrology Laboratory. Decay data for five actinide nuclides were evaluated by the author, according to the procedures and rules of the international cooperation Decay Data Evaluation Project (DDEP): {sup 236}U, {sup 234}Th, {sup 228}Ra, {sup 211}Bi and {sup 211}Po. The most important results, conclusions and some recommendations of the evaluator are presented. The IFIN-HH involvement in several new international and national research projects in the field is briefly mentioned; new evaluations and experimental determination of some nuclear decay data (photon absolute emission probability, half-life) for nuclear medicine applications are foreseen.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Final Report for Water Electrodialysis Reversal Pilot

This final report presents all the work and tests performed during ION Clean Energy’s Water Electrodialysis Reversal Pilot referred to as the “WERP” Project (DE-FE-0032066). ION Clean Energy Engineering (ION) and Nebraska Public Power District (NPPD) executed the Electrodialysis Reversal (EDR) Pilot Study and developed a commercial cost estimate needed to evaluate the retrofit of an EDR system to NPPD’s Gerald Gentleman Station (GGS). The proven project team was comprised of NPPD, Sargent & Lundy (S&L) and ElectroSep, who is a leading developer, fabricator and operator of electrodialysis units. ION, working in conjunction with NPPD and ElectoSep, developed a test program for evaluating the performance of the EDR technology proposed to be employed and evaluated for this pilot. The Department of Energy’s National Energy and Technology Laboratory (DOE/NETL) awarded ION Clean Energy, Inc. a single budget period (BP) of $816,759 with $207,942 of in-kind contribution from NPPD to investigate ElectroSep’s Electrodialysis technology to clean grey water from NPPD’s GGS.

01 COAL, LIGNITE, AND PEAT↗

LANL Meteorology Program Self-Assessment 2025 Update

The LANL Meteorological (Met) Program has been subject to several external reviews over the past 19 years. The DOE Meteorological Coordinating Council (DMCC) conducted an initial Met Program Site Assist Visit (SAV) in August 2006 (DMCC 2006). A follow-up SAV in August 2015 assessed progress (DMCC 2015), and in June 2023, the DOE Meteorological Subcommittee (DMSC), successor to the DMCC, conducted a second follow-up SAV (DMSC 2023), in which the Met Program was evaluated relative to the following 8 high-level questions: • What is the state of the meteorological services provided to its customers? • What is the quality of meteorological data provided to its customers and is it adequate and available to meet all customer needs? • What is the quality of atmospheric transport and diffusion modeling provided to its customers and is it applicable to complex wind flow patterns at LANL? • Are the current and future meteorological service customers being serviced appropriately? • Are there adequate human resources to meet present and future program customer needs and are they being appropriately leveraged? • Are existing instrumentation, facilities, and systems adequate to meet present and future customer needs? • Are LANL meteorological services conducted in an efficient, cost-effective manner? • Is meteorological data used to ensure safety & health of LANL personnel? More specific evaluations were performed relative to 23 performance objectives extracted from the ANSI/ANS-3.11- 2024 national standard and 14 separate performance objectives associated with consequence assessment and atmospheric transport and diffusion modeling in the consequence assessment element of DOE G 151.1-1B. In 2023, the DMSC SAV Team also reviewed the status of each of the 18 remaining recommendations from its 2015 SAV. Based on this review, DMSC stated in its Exit Briefing that the LANL meteorological program has gotten much stronger and more robust since 2015 and now represents one of the better managed programs within the DOE complex.

54 ENVIRONMENTAL SCIENCES↗

Monitoring and evaluation of green public procurement programs

Effective procurement policies can help governments save considerable amounts of money while also reducing energy consumption. Additionally, private sector companies which purchase large numbers of energy-consuming devices can benefit from procurement policies that minimize life-cycle energy costs. Both public and private procurement programs offer opportunities to generate market-transforming demand for energy efficient appliances and lighting fixtures. In recent years, several governments have implemented policies to procure energy efficient products and services. When deploying these policies, efforts have focused on developing resources for implementation (guidelines, energy efficiency specifications for tenders, life cycle costing tools, training, etc.) rather than defining monitoring systems to track progress against the set objectives. Implementation resources are necessary to make effective policies; however, developing Monitoring and Evaluation (M and E) mechanisms are critical to ensure that the policies are effective. The purpose of this article is to provide policy makers and procurement officials with a preliminary map of existing approaches and key components to monitor Energy Efficient Procurement (EEP) programs in order to contribute to the improvement of their own systems. Case studies are used throughout the paper to illustrate promising approaches to improve the M and E of EEP programs, from the definition of the system or data collection to complementary instruments to improve both the monitoring response and program results.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

New Resolved Resonance Region Evaluation for 63Cu and 65Cu for Nuclear Criticality Safety Program

A new resolved resonance region evaluation of 63Cu and 65Cu was done in the energy region from 10-5 eV to 99.5 keV. The R-Matrix SAMMY method using the Reich-Moore approximation was used to create a new set of consistent resonance parameters. The new evaluation was based on three experimental transmission data sets; two measured at ORELA and one from MITR, and two radiative capture experimental data sets from GELINA. A total of 141 new resonances were identied for 63Cu and 117 for 65Cu. The corresponding set of external resonances for each isotope was based on the identied resonances above 99.5 keV from the ORELA transmission data. The negative external levels (bound levels) were determined to match the dierential thermal cross section measured at the MITR. Double dierential elastic scattering cross sections were calculated from the new set of resonance parameters. Benchmarking calculations were carried out on a set of ICSBEP benchmarks. This work is in support of the DOE Nuclear Criticality Safety Program.

Sobes, Vladimir↗

The 1985 National Aeronautics and Space Administration's Summer High School Apprenticeship Research Program (SHARP)

In 1985, a total of 126 talented high school students gained first hand knowledge about science and engineering careers by working directly with a NASA scientist or engineer during the summer. This marked the sixth year of operation for NASA's Summer High School Apprenticeship Research Program (SHARP). The major priority of maintaining the high standards and success of prior years was satisfied. The following eight sites participated in the Program: Ames Research Center, Ames' Dryden Flight Research Facility, Goddard Space Flight Center, Goddard's Wallop Flight Facility, Kennedy Space Center, Langley Research Center, Lewis Research Center, and Marshall Space Flight Center. Tresp Associates served as the SHARP contractor and worked closely with NASA staff at headquarters and the sites just mentioned to plan, implement, and evaluate the program.

Source record↗

Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States

This article evaluates the first year of the Section 1603 Treasury cash grant program, which enables renewable power projects in the U.S. to elect cash grants in lieu of the federal tax credits that are otherwise available. To date, the program has been heavily subscribed, particularly by wind power projects, which had received 86% of the nearly $2.6 billion in grants that had been disbursed as of March 1, 2010. As of that date, 6.2 GW of the 10 GW of new wind capacity installed in the U.S. in 2009 had applied for grants in lieu of production tax credits. Roughly 2.4 GW of this wind capacity may not have otherwise been built in 2009 absent the grant program; this 2.4 GW may have supported approximately 51,600 short-term full-time-equivalent (FTE) gross job-years in the U.S. during the construction phase of these wind projects, and 3,860 longterm FTE gross jobs during the operational phase. The program’s popularity stems from the significant economic value that it provides to renewable power projects, relative to the otherwise available tax credits. Although grants reward investment rather than efficient performance, this evaluation finds no evidence at this time of either widespread “gold-plating” or performance problems.

17 WIND ENERGY↗

Automated Work Packages Prototype: Initial Design, Development, and Evaluation. Light Water Reactor Sustainability Program

The goal of the Automated Work Packages (AWP) project is to demonstrate how to enhance work quality, cost management, and nuclear safety through the use of advanced technology. The work described in this report is part of the digital architecture for a highly automated plant project of the technical program plan for advanced instrumentation, information, and control (II&C) systems technologies. This report addresses the DOE Milestone M2LW-15IN0603112: Describe the outcomes of field evaluations/demonstrations of the AWP prototype system and plant surveillance and communication framework requirements at host utilities. A brief background to the need for AWP research is provided, then two human factors field evaluation studies are described. These studies focus on the user experience of conducting a task (in this case a preventive maintenance and a surveillance test) while using an AWP system. The remaining part of the report describes an II&C effort to provide real time status updates to the technician by wireless transfer of equipment indications and a dynamic user interface.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Study of propellant dynamics in a shuttle type launch vehicle

A method and an associated digital computer program for evaluating the vibrational characteristics of large liquid-filled rigid wall tanks of general shape are presented. A solution procedure was developed in which slosh modes and frequencies are computed for systems mathematically modeled as assemblages of liquid finite elements. To retain sparsity in the assembled system mass and stiffness matrices, a compressible liquid element formulation was incorporated in the program. The approach taken in the liquid finite element formulation is compatible with triangular and quadrilateral structural finite elements so that the analysis of liquid motion can be coupled with flexible tank wall motion at some future time. The liquid element repertoire developed during the course of this study consists of a two-dimensional triangular element and a three-dimensional tetrahedral element.

Jones, C. E.↗

Completion Report for Model Evaluation Well ER-5-5: Corrective Action Unit 98: Frenchman Flat

Model Evaluation Well ER-5-5 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of Nevada Environmental Management Operations at the Nevada National Security Site (formerly known as the Nevada Test Site). The well was drilled in July and August 2012 as part of a model evaluation well program in the Frenchman Flat area of Nye County, Nevada. The primary purpose of the well was to provide detailed geologic, hydrogeologic, chemical, and radiological data that can be used to test and build confidence in the applicability of the Frenchman Flat Corrective Action Unit flow and transport models for their intended purpose. In particular, this well was designed to obtain data to evaluate the uncertainty in model forecasts of contaminant migration from the upgradient underground nuclear test MILK SHAKE, conducted in Emplacement Hole U-5k in 1968, which were considered to be uncertain due to the unknown extent of a basalt lava-flow aquifer present in this area. Well ER-5-5 is expected to provide information to refine the Phase II Frenchman Flat hydrostratigraphic framework model, if necessary, as well as to support future groundwater flow and transport modeling. The 31.1-centimeter (cm) diameter hole was drilled to a total depth of 331.3 meters (m). The completion string, set at the depth of 317.2 m, consists of 16.8-cm stainless-steel casing hanging from 19.4-cm carbon-steel casing. The 16.8-cm stainless-steel casing has one slotted interval open to the basalt lava-flow aquifer and limited intervals of the overlying and underlying alluvial aquifer. A piezometer string was also installed in the annulus between the completion string and the borehole wall. The piezometer is composed of 7.3-cm stainless-steel tubing suspended from 6.0-cm carbon-steel tubing. The piezometer string was landed at 319.2 m, to monitor the basalt lava-flow aquifer. Data collected during and shortly after hole construction include composite drill cuttings samples collected every 3.0 m, various geophysical logs, preliminary water quality measurements, and water-level measurements. The well penetrated 331.3 m of Quaternary–Tertiary alluvium, including an intercalated layer of saturated basalt lava rubble. No well development or hydrologic testing was conducted in this well immediately after completion; however, a preliminary water level was measured in the piezometer string at the depth of 283.4 m on September 25, 2012. No tritium above the minimum detection limit of the field instruments was detected in this hole. Future well development, sampling, and hydrologic testing planned for this well will provide more accurate hydrologic information for this site. The stratigraphy, general lithology, and water level were as expected, though the expected basalt lava-flow aquifer is basalt rubble and not the dense, fractured lava as modeled. The lack of tritium transport is likely due to the difference in hydraulic properties of the basalt lava-flow rubble encountered in the well, compared to those of the fractured aquifer used in the flow and transport models.

58 GEOSCIENCES↗