Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Multiphysics Modeling of Hydrokinetic Turbine Energy Conversion System

Hydrokinetic turbines (HKTs) hold great promise as a renewable energy source, but high maintenance costs and limited energy output hinder their widespread adoption. The lack of comprehensive research on HKT drivetrain designs creates a knowledge gap in enhancing generation efficiency and cost reduction. A model of the HKT system with a focus on electric drivetrains and power converters is required to address this knowledge gap. This paper first introduces a MATLAB-averaged model integrating electrical-mechanical-thermal domains and aging behaviors within multi-time frames. Then a PLECS model, which incorporates maximum power point tracking and dq reference framed control for AC-DC-AC power converters, is enriched by a dynamic thermal model to predict fast transients accurately. These models optimize the design at the component level, resulting in improved integrated system performance. Furthermore, the validation of the models is carried out through hardware experiments for the averaged model and hardware-in-the-loop testing for the dynamic model.

ADVANCED PROPULSION SYSTEMS,HYDRO ENERGY↗

Scalable Predictive Control and Optimization for Grid Integration of Large-Scale Distributed Energy Resources: Preprint

Integration of a large number of distributed energy resources (DERs) into the power grid needs a scalable power balancing method. We formulate the power balancing problem as a look-ahead optimization problem to be solved sequentially by a power distribution system aggregator based on a model predictive control (MPC) framework. Solving large-scale look-ahead control problem requires proper configuration of the control steps. In this paper, to solve large-scale control problems, we propose a variable time granularity where control time steps nearby the current control step have finer resolutions. The aggregator objective includes maximization of power production revenue and minimization of power purchasing expense, renewable power curtailment, and mileage costs for energy storage and electric vehicle (EV) charging stations while satisfying system capacity and operational constraints. The control problem is formulated as a mixed-integer linear program (MILP) and solved using the XpressMP solver. We perform simulations considering a copper plate representation of a large distribution network consisting of 2507 devices (controllable DERs) including curtailable photovoltaics (PVs), energy storage batteries, EV charging stations, and buildings with heating, ventilation, and air conditioning units (HVACs). We show the effectiveness of the proposed approach in managing DERs interactively for maximum energy trading profit and local supply-demand power balancing. Finally, we demonstrate that the proposed method outperformed other benchmark controllers regarding computation time without compromising operational performance.

DER↗

Lunar Surface Stirling Power Systems Using Isotope Heat Sources

For many years, NASA has used the decay of plutonium-238 (Pu-238) (in the form of the General Purpose Heat Source (GPHS)) as a heat source for Radioisotope Thermoelectric Generators (RTGs), which have provided electrical power for many NASA missions. While RTGs have an impressive reliability record for the missions in which they have been used, their relatively low thermal to electric conversion efficiency and the scarcity of plutonium-238 (Pu-238) has led NASA to consider other power conversion technologies. NASA is considering returning both robotic and human missions to the lunar surface and, because of the long lunar nights (14.75 Earth days), isotope power systems are an attractive candidate to generate electrical power. NASA is currently developing the Advanced Stirling Radioisotope Generator (ASRG) as a candidate higher efficiency power system that produces greater than 160 W with two GPHS modules at the beginning of life (BOL) (~32% efficiency). The ASRG uses the same Pu-238 GPHS modules, which are used in RTG, but by coupling them to a Stirling convertor provides a four-fold reduction in the number of GPHS modules. This study considers the use of americium-241 (Am-241) as a substitute for the Pu-238 in Stirling- convertor-based Radioisotope Power Systems (RPS) for power levels from tens of watts to 5 kWe. The Am-241 is used as a substitute for the Pu-238 in GPHS modules. Depending on power level, different Stirling heat input and removal systems are modeled. It was found that substituting Am-241 GPHS modules into the ASRG reduces power output by about one-fifth while maintaining approximately the same system mass. In order to obtain the nominal 160 W of electrical output of the Pu-238 ASRG requires 10 Am-241 GPHS modules. Higher power systems require changing from conductive coupling heat input and removal from the Stirling convertor to either pumped loops or heat pipes. Liquid metal pumped loops are considered as the primary heat transportation on the hot end and water pumped loop/heat pipe radiator is considered for the heat rejection side for power levels above 1 kWe.

Schmitz, Paul C.↗

Energy Scheduling-based Operating Envelopes including a Distribution System Branch Screening Algorithm

This paper presents an energy scheduling-based formulation for computing operating envelopes including a distribution branch screening algorithm, termed DBS-ES. The contribution of the paper is two-fold: firstly, it presents an innovative methodology for calculating operating envelopes using energy scheduling (baseline), and secondly, it enhances this methodology by incorporating a custom distribution branch screening algorithm (DBS-ES). The custom algorithm leverages power system knowledge to reduce both model build time and total processing time while maintaining the same scheduling results as the baseline. The effectiveness of the proposed approach is demonstrated through experiments on the IEEE13, IEEE123, and EPRI Secondary test feeders. Results highlight a 24.5% decrease in model build time and an 8.17% decrease in total processing time when using DBS-ES compared to the baseline, specifically for the IEEE123 test feeder. Additionally, the paper briefly discusses the influence of utility-controlled storage on computing operating envelopes, noting a general incre

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Vehicle Managed Charging: Forward-Looking Estimates of Bulk Power System Value

When and where electric vehicle charging occurs has significant implications for power systems supporting widespread electric vehicle deployment with high shares of wind and solar generation. Numerous studies have estimated the value of scheduling or otherwise managing electric vehicle charging in such power systems. This study improves on those earlier works by leveraging detailed simulation models for electric vehicle adoption, electric vehicle use, electric vehicle charging, and bulk power system operations; and linking them with methods for describing charging flexibility at both the individual vehicle and aggregate levels. This study closely analyzes electric vehicle managed charging (EVMC) performance along the dimensions of flexibility type (within-charging session or within-week scheduling), dispatch mechanism (direct load control or one of several price-based mechanisms), and participation rate, under the assumptions of ubiquitous chargers and all trips completed on time. The study is located in a passenger light-duty vehicle adoption scenario with 100% electric vehicle sales by 2035, and in an envisioned 2038 New England power system for which within-region generation is 84% clean.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Modelling and analysis of nuclear reactor system coupled with a liquid metal battery

Traditionally, nuclear power plants in the U.S. provide baseload power to the power grid because they have less flexibility for ramping their output power than natural gas peaking plants. However, achieving climate goals to reduce the consumption of fossil‐based natural gas places pressure on nuclear power plants and other power generators to ramp up their power output to balance grid generation with demand. This paper presents the modelling and performance analysis of a nuclear reactor system (NRS) coupled to a liquid‐metal battery (LMB) to improve its dynamic response and enable its black start capability. The NRS and LMB thermal behaviour are modelled in Dymola, while the electrical dynamics of the LMB and power grid are modelled in RTDS‐RSCAD. Both simulation platforms are coupled and share their thermal and electrical data using a Transmission Control Protocol/Internet Protocol (TCP/IP) communication protocol. The dynamic performance of the NRS‐LMB integration is tested on the IEEE 9 bus, which demonstrates its ability to respond and provide frequency and voltage regulation. The black start capability of the NRS‐LMB is also evaluated by simulating a grid outage and using the LMB to supply the auxiliary loads required to bring the NRS back online as soon as possible. The results show that coupling an NRS to an LMB improves the system dynamic performance and enables it to black start after being disconnected from the grid for several days.

25 ENERGY STORAGE↗

Analysis of Reactive Power Load Modeling Techniques for PV Impact Studies [Slides]

The increasing availability of advanced metering infrastructure (AMI) data has led to significant improvements in load modeling accuracy. However, since many AMI devices were installed to facilitate billing practices, few utilities record or store reactive power demand measurements from their AMI. When reactive power measurements are unavailable, simplifying assumptions are often applied for load modeling purposes, such as applying constant power factors to the loads. The objective of this work is to quantify the impact that reactive power load modeling practices can have on distribution system analysis, with a particular focus on evaluating the behaviors of distributed photovoltaic (PV) systems with advanced inverter capabilities. Quasi-static time-series simulations were conducted after applying a variety of reactive power load modeling approaches, and the results were compared to a baseline scenario in which real and reactive power measurements were available at all customer locations on the circuit. Overall, it was observed that applying constant power factors to loads can lead to significant errors when evaluating customer voltage profiles, but that performing per-phase time-series reactive power allocation can be utilized to reduce these errors by about 6x, on average, resulting in more accurate evaluations of advanced inverter functions.

14 SOLAR ENERGY↗

A method for assessing economic, environmental, and reliability tradeoffs of interregional transmission connecting ERCOT (the Texas grid) to the eastern and western grids

Reliable development of the power grid is an evolving concern for humanity due to extreme weather that frequently threatens power sector infrastructure. The state of Texas is a uniquely structured testbed for grid planners to study when looking for solutions to development, innovation, and overcoming such challenges. Because of its size and islanded structure, Texas is small enough to model, but big enough to matter. Texas is a global leader in energy production, energy consumption, and maintains an unusually diverse fuel mix. In addition, the state has experienced winter freezes, heat waves, wind storms, droughts and floods that have threatened power sector infrastructure or caused recent blackouts and calls for demand side conservation. One of the most devastating of these events was the North American winter storm, dubbed “Winter Storm Uri” by the Weather Channel, that froze the region in February 2021 and led to an extended power outage event that put the majority of Texan residents in darkness for days. While preparing to avoid such outage events in the future, various tools have been proposed to improve grid reliability, including energy efficiency, demand response, and distributed energy resources. An additional option would be to develop interregional transmission that connects the Texas grid to other national grids. To assess the merits of this idea, we developed a novel, universally-applicable and internationally-relevant framework to study how the Texas grid would evolve alongside access to various interregional ties. This method allows us to stress the synthetic grid structure and analyze how it would respond to the shock of a simulated winter storm event. Our method leverages open-source modeling tools, such as PowerGenome, pyGRETA, and GenX to synthesize unique zonal grid data, construct a consolidated network of model regions, and simulate different developmental pathways of capacity expansion and operational dispatch. We demonstrate our method with an analysis connecting the Electric Reliability Council of Texas (ERCOT), the grid that serves most of Texas, the Western Electricity Coordinating Council (WECC), the grid that serves the western half of the contiguous U.S., and the Eastern Interconnect, the grid that serves the eastern half of the contiguous U.S. Our results indicate that the cost-optimal capacity of interregional transmission connecting the ERCOT grid to other grids lies between 9–13 GW assuming baseline conditions. Building this amount of connecting capacity in one or multiple directions lowers the costs and emissions of development and operation by up to $16 billion and 257 million metric tonnes (MMT) respectively. Additionally, our results show that the interregional connections between ERCOT and other national grids reduce the amount of total load shed required through mild winter storm events. However, our results also show that there is a threshold of very extreme winter storm conditions, spanning multiple service areas, above which the connections exacerbate resource adequacy problems. Therefore, the results indicate that the connections need to be carefully planned alongside the rest of the grid infrastructure to avoid over-reliance on specific resources or technology options.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Finite element analysis using NASTRAN applied to helicopter transmission vibration/noise reduction

A finite element NASTRAN model of the complete forward rotor transmission housing for the Boeing Vertol CH-47 helicopter was developed and applied to reduce transmission vibration/noise at its source. In addition to a description of the model, a technique for vibration/noise prediction and reduction is outlined. Also included are the dynamic response as predicted by NASTRAN, test data, the use of strain energy methods to optimize the housing for minimum vibration/noise, and determination of design modifications which will be manufactured and tested. The techniques presented are not restricted to helicopters but are applicable to any power transmission system. The transmission housing model developed can be used further to evaluate static and dynamic stresses, thermal distortions, deflections and load paths, fail-safety/vulnerability, and composite materials.

Howells, R. W.↗

Numerical simulation of the actuation system for the ALDF's propulsion control valve

A numerical simulation of the actuation system for the propulsion control valve (PCV) of the NASA Langley Aircraft Landing Dynamics Facility was developed during the preliminary design of the PCV and used throughout the entire project. The simulation is based on a predictive model of the PCV which is used to evaluate and design the actuation system. The PCV controls a 1.7 million-pound thrust water jet used in propelling a 108,000-pound test carriage. The PCV can open and close in 0.300 second and deliver over 9,000 gallons of water per sec at pressures up to 3150 psi. The numerical simulation results are used to predict transient performance and valve opening characteristics, specify the hydraulic control system, define transient loadings on components, and evaluate failure modes. The mathematical model used for numerically simulating the mechanical fluid power system is described, and numerical results are demonstrated for a typical opening and closing cycle of the PCV. A summary is then given on how the model is used in the design process.

Korte, John J.↗

MULTI-FIDELITY MODELING AND UNCERTAINTY QUANTIFICATION OF INVERTER BASED RESOURCES IN INTEGRATED T&D SYSTEMS

Uncertainty quantification plays a pivotal role in improving the accuracy and reliability of inverter operation within modern power systems that are increasingly dominated by inverter-based resources (IBRs). IBRs, especially those operating under grid forming (GFM) control, rely heavily on a complex set of control parameters and system measurements to maintain voltage, frequency, and power balance. Traditional deterministic modeling approaches often fail to capture these parameter deviations, potentially resulting in suboptimal control actions, reduced system stability, or even instability under high penetration of IBRs. In this paper, we demonstrate the application of model calibration and uncertainty quantification (UQ) principles to an integrated transmission and distribution (T&D) model involving a GFM converter and provide a framework for prioritizing control improvements, guiding robust design, and informing adaptive strategies that can accommodate real-time variability in system conditions. The proposed approach could be valuable in enhancing the robustness of current and future power systems under increased IBR penetrations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design and Off-design Performance of 100 Kwe-class Brayton Power Conversion Systems

The NASA Glenn Research Center in-house computer model Closed Cycle Engine Program (CCEP) was used to explore the design trade space and off-design performance characteristics of 100 kWe-class recuperated Closed Brayton Cycle (CBC) power conversion systems. Input variables for a potential design point included the number of operating units (1, 2, 4), cycle peak pressure (0.5, 1, 2 MPa), and turbo-alternator shaft speed (30, 45, 60 kRPM). The design point analysis assumed a fixed turbine inlet temperature (1150 K), compressor inlet temperature (400 K), working-fluid molecular weight (40 g/mol), compressor pressure ratio (2.0), recuperator effectiveness (0.95), and a Sodium-Potassium (NaK) pumped-loop radiator. The design point options were compared on the basis of thermal input power, radiator area, and mass. For a nominal design point with defined Brayton components and radiator area, off-design cases were examined by reducing turbine inlet temperature (as low as 900 K), reducing shaft speed (as low as 50% of nominal), and circulating a percentage (up to 20%) of the compressor exit flow back to the gas cooler. The off-design examination sought approaches to reduce thermal input power without freezing the radiator.

Johnson, Paul K.↗

Design and Off-Design Performance of 100 kWe-Class Brayton Power Conversion Systems

The NASA Glenn Research Center in-house computer model Closed Cycle Engine Program (CCEP) was used to explore the design trade space and off-design performance characteristics of 100 kWe-class recuperated Closed Brayton Cycle (CBC) power conversion systems. Input variables for a potential design point included the number of operating units (1, 2, 4), cycle peak pressure (0.5, 1, 2 MPa), and turbo-alternator shaft speed (30, 45, 60 kRPM). The design point analysis assumed a fixed turbine inlet temperature (1150 K), compressor inlet temperature (400 K), helium-xenon working-fluid molecular weight (40 g/mol), compressor pressure ratio (2.0), recuperator effectiveness (0.95), and a Sodium-Potassium (NaK) pumped-loop radiator. The design point options were compared on the basis of thermal input power, radiator area, and mass. For a nominal design point with defined Brayton components and radiator area, off-design cases were examined by reducing turbine inlet temperature (as low as 900 K), reducing shaft speed (as low as 50 percent of nominal), and circulating a percentage (up to 20 percent) of the compressor exit flow back to the gas cooler. The off-design examination sought approaches to reduce thermal input power without freezing the radiator.

Johnson, Paul K.↗

Distribution System Dataset Generator for AI Applications [SWR-24-75]

This software is a simple, light-weight python package to generate pytorch compatible machine learning graph dataset representing electric power distribution system. User is able to use these graph datasets to test their graph generation artificial intelligence (AI) models, link prediction AI models, graph classification AI models and so much more. This package uses grid-data-models (https://github.com/NREL-Distribution-Suites/grid-data-models) as input data format for power distribution system. NREL-Ditto (https://github.com/NREL-Distribution-Suites/ditto) tool can be leveraged to transform popular distribution system file formats such as opendss, cyme and synergi to grid-data-models.

Duwadi, Kapil↗

Projecting Future Colorado River Basin Water and Hydropower Operations

Drought, variable renewable energy (VRE) resources (primarily wind and photovoltaic technologies), and power markets can all impact hydropower plant operations. We analyze how these three factors collectively may potentially change the future operation and economics of federal dams and hydropower plants located in the Colorado River Basin (CRB). Federal CRB energy and capacity resources, including 4,200 MW of hydropower capacity, are marketed by Western Area Power Administration (WAPA) and sold through long-term Firm Electric Service (FES) contracts to entities located in 15 western and central States that serve millions of electricity consumers. The parameters of FES contracts allow a wide range of scheduling flexibility for FES customers. The FES customers will adjust the timing of energy delivery according to the changing water, power market, and VRE contribution level to the power grid. We simulate and project water and hydropower operations with two models: 1) reservoir operation and 2) power system operation (production cost) with various temporal granularity. We consider two sets of grid scenarios (one representing today's infrastructure, and one representing higher VRE contributions in 2036) and two sets of water scenarios (drought and normal hydrology). We modeled scenarios to understand the power market-energy price levels and patterns, FES customer scheduling, hydropower economics, WAPA finances and hydropower operation for various hydrologic conditions, and VRE contribution level to the power grid. The detailed modeling framework includes: (1) creating ensembles of CRB hydrologic and hydropower futures, (2) selecting representative futures, (3) simulation of FES customer contracts, (4) simulating western U.S. power grid economic scheduling and dispatch under two VRE contribution levels, utilizing information from modeling steps (1)-(4), (5) assessment of reservoir water and hydropower operation, and (6) comparing scenario operations and economics. Our study team comprising WAPA, and an interdisciplinary team of national labs will gain insight into how WAPA can prepare for and adapt its practices in response to an evolving U.S. power grid.

Colorado River↗

Managing Increased Electric Vehicle Shares on Bulk Power Systems

The convergence of transportation electrification, other load growth, and the integration of many power sector technologies presents a complex planning problem requiring realistic, region-specific modeling and analysis to ensure the power system can support new loads quickly and affordably.

33 ADVANCED PROPULSION SYSTEMS↗

Advances in the Co-Simulation of Detailed Electrical and Whole-Building Energy Performance

This article describes recent co-simulation advances for the simultaneous modeling of detailed building electrical distribution systems and whole-building energy performance. The co-simulation architecture combines the EnergyPlus® engine for whole-building energy modeling with a new Modelica library for building an electrical distribution system model that is based on harmonic power flow. This new library allows for a higher-fidelity modeling of electrical power flows and losses within buildings than is available with current building electrical modeling software. We demonstrate the feasibility of the architecture by modeling a simple, two-zone thermal chamber with internal power electronics converters and resistive loads, and we validate the model using experimental data. The proposed co-simulation capability significantly expands the capabilities of building electrical distribution system models in the context of whole-building energy modeling, thus enabling more complex analyses than would have been possible with individual building performance simulation tools that are used to date.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗