Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Real-Time Projection to Verify Plan Success During Execution

The Mission Data System provides a framework for modeling complex systems in terms of system behaviors and goals that express intent. Complex activity plans can be represented as goal networks that express the coordination of goals on different state variables of the system. Real-time projection extends the ability of this system to verify plan achievability (all goals can be satisfied over the entire plan) into the execution domain so that the system is able to continuously re-verify a plan as it is executed, and as the states of the system change in response to goals and the environment. Previous versions were able to detect and respond to goal violations when they actually occur during execution. This new capability enables the prediction of future goal failures; specifically, goals that were previously found to be achievable but are no longer achievable due to unanticipated faults or environmental conditions. Early detection of such situations enables operators or an autonomous fault response capability to deal with the problem at a point that maximizes the available options. For example, this system has been applied to the problem of managing battery energy on a lunar rover as it is used to explore the Moon. Astronauts drive the rover to waypoints and conduct science observations according to a plan that is scheduled and verified to be achievable with the energy resources available. As the astronauts execute this plan, the system uses this new capability to continuously re-verify the plan as energy is consumed to ensure that the battery will never be depleted below safe levels across the entire plan.

Wagner, David A.↗

Towards a Formal Semantics of Flight Plans and Trajectories

In the National Airspace System, ight plans are often used only as a planning tool by air trac controllers and aircraft operators. These plans are implicitly translated into trajectories by the pilot or by the ight management system, and subsequently own by the aircraft. This translation process inevitably introduces di erences between the plan and the trajectory. However, given the current intended usage, exact correspondence between the plan and the trajectory is not needed. To achieve greater capacity and eciency, future air trac management concepts are being designed around the use of trajectories where predictability is extremely important. In this paper, a mathematical relationship between ight plans and trajectories is explored with the goal of making feasible, highly accurate predictions of future positions and velocities of aircraft. The goal here is to describe, in mathematically precise detail, a formal language of trajectories, whereby all receivers of the trajectory information will be able to arrive at precisely the same trajectory predication and to do this without having aircraft broadcast a large amount of data. Although even a four-dimensional ight plan is simple in structure, this paper will show that it is inherently ambiguous and will explore these issues in detail. In e ect, we propose that a rigorous semantics for ight plans can be developed and this will serve as an important stepping stone towards trajectory-based operations in the National Airspace System.

Hagen, George E.↗

Integrated Extravehicular Activity Human Research Plan: 2017

Multiple organizations within NASA as well as industry and academia fund and participate in research related to extravehicular activity (EVA). In October 2015, representatives of the EVA Office, the Crew and Thermal Systems Division (CTSD), and the Human Research Program (HRP) at NASA Johnson Space Center agreed on a formal framework to improve multi-year coordination and collaboration in EVA research. At the core of the framework is an Integrated EVA Human Research Plan and a process by which it will be annually reviewed and updated. The over-arching objective of the collaborative framework is to conduct multi-disciplinary cost-effective research that will enable humans to perform EVAs safely, effectively, comfortably, and efficiently, as needed to enable and enhance human space exploration missions. Research activities must be defined, prioritized, planned and executed to comprehensively address the right questions, avoid duplication, leverage other complementary activities where possible, and ultimately provide actionable evidence-based results in time to inform subsequent tests, developments and/or research activities. Representation of all appropriate stakeholders in the definition, prioritization, planning and execution of research activities is essential to accomplishing the over-arching objective. A formal review of the Integrated EVA Human Research Plan will be conducted annually. Coordination with stakeholders outside of the EVA Office, CTSD, and HRP is already in effect on a study-by-study basis; closer coordination on multi-year planning with other EVA stakeholders including academia is being actively pursued. Details of the preliminary Integrated EVA Human Research Plan are presented including description of ongoing and planned research activities in the areas of: physiological and performance capabilities; suit design parameters; EVA human health and performance modeling; EVA tasks and concepts of operations; EVA informatics; human-suit sensors; suit sizing and fit; and EVA injury risk and mitigation. This paper represents the 2017 update to the Integrated EVA Human Research Plan.

Abercromby, Andrew↗

Overview of the PLEXIL Plan Execution Technology and its Applications in Autonomous Piloting Projects at NASA

Automated planning is a key Artificial Intelligence technology enabling Unmanned Aerial Systems (UAS) and the eminent reality of Urban Air Mobility (UAM). It produces plans, which formalize procedures often performed by humans. Plans differ from other kinds of computer programs in their ability to react and interact with a dynamically changing environment. Aviation plans must encode the procedural knowledge, reasoning capability, and capacity for multi-tasking held by competent human pilots. Correct execution of these plans (performed by software called an executive) in the dynamic airspace environment is vital to the success of each automated flight, and the safety of the vehicle and all things in its path. In the early 2000s NASA developed a plan representation language and executive called PLEXIL (Plan Execution Interchange Language) that has successfully been applied in several NASA aviation and UAS projects. Autonomy Operating System (AOS), Cockpit Hierarchical Automated Planning and Execution (CHAP-E), and ICAROUS are all projects that have used PLEXIL to help encode and automatically execute flight procedures, some normally performed by human pilots. AOS also automates a subset of pilot/Air Traffic Control communication towards enabling UAS entry into the National Airspace. PLEXIL has been open-source software since 2008 and has seen usage in a wide range of prototypical autonomy applications in academia, government, and industry. In this presentation, we describe PLEXIL and highlight its significant accomplishments in the aviation domain.

Dalal, Michael↗

Integrated Research Plan to Assess the Combined Effects of Space Radiation, Altered Gravity, and Isolation and Confinement on Crew Health and Performance: Implementation Strategy

This document supplements the white paper titled CBS Integrated Research Plan: Problem Statement. The Problem Statement describes why it is important to implement a fully integrated research plan to derive risk estimates for the combined, potentially synergistic, effects of the three major spaceflight hazards (space radiation; isolated, confined, and extreme environments; altered gravity). These risk estimates will help establish acceptable maximum decrement or change in a physiological or behavioral parameter during or after spaceflight, and the acceptable limit of exposure to the combined spaceflight hazards. This Implementation Strategy describes how the research plan will accomplish the CBS Integrated Research Plan goals. The Implementation Strategy includes approaches to evaluate relationships among biological responses underlying three risks that are managed by three of NASA’s Human Research Project (HRP) organizational “elements”. This CBS (Acute effects of radiation on CNS, BMed, Sensorimotor) Integrated Research Plan also identifies strategies to monitor and mitigate decrements to operationally relevant performance. Currently, the strategy that was initiated in 2018, includes an eight-year research plan and a four-year validation plan that extend to the year 2030. Once the monitoring tools and countermeasures are developed, they will be validated and refined during four years of early exploration missions. The planned tasks and their associated research products and deliverables have been mapped to the individual research emphases to clearly demonstrate how each research area helps ensure crew health and safety during exploration missions.

Susan Steinberg↗

Parsing-based Approaches for Verification and Recognition of Hierarchical Plans

Hierarchical Task Networks were proposed as a method todescribe plans by decomposition of tasks to sub-tasks untilprimitive tasks, actions, are obtained. Plan verification assumesa complete plan as input, and the objective is findinga task that decomposes to this plan. In plan recognition, aprefix of the plan is given and the objective is finding a taskthat decomposes to the (shortest) plan with the given prefix.This paper describes how to verify and recognize plans usinga common method known from formal grammars, by parsing.

Bartak, Roman↗

The Revised WIPP Passive Institutional Controls Program - A Conceptual Plan - 13145

The Department of Energy/Carlsbad Field Office (DOE/CBFO) is responsible for managing all activities related to the disposal of TRU and TRU-mixed waste in the geologic repository, 650 m below the land surface, at WIPP, near Carlsbad, New Mexico. The main function of the Passive Institutional Controls (PIC's) program is to inform future generations of the long-lived radioactive wastes buried beneath their feet in the desert. For the first 100 years after cessation of disposal operations, the rooms are closed and the shafts leading underground sealed, WIPP is mandated by law to institute Active Institutional Controls (AIC's) with fences, gates, and armed guards on patrol. At this same time a plan must be in place of how to warn/inform the future, after the AIC's are gone, of the consequences of intrusion into the geologic repository disposal area. A plan was put into place during the 1990's with records management and storage, awareness triggers, permanent marker design concepts and testing schedules. This work included the thoughts of expert panels and individuals. The plan held up under peer review and met the requirements of the U.S. Environmental Protection Agency (EPA). Today the NEA is coordinating a study called the 'Preservation of Records, Knowledge and Memory (RK and M) Across Generations' to provide the international nuclear waste repository community with a guide on how a nuclear record archive programs should be approached and developed. CBFO is cooperating and participating in this project and will take what knowledge is gained and apply that to the WIPP program. At the same time CBFO is well aware that the EPA and others are expecting DOE to move forward with planning for the future WIPP PIC's program; so a plan will be in place in time for WIPP's closure slated for the early 2030's. The DOE/CBFO WIPP PIC's program in place today meets the regulatory criteria, but complete feasibility of implementation is questionable, and may not be in conformance with the international guidance being developed. International guidance currently under development may suggest that the inter-generational equity principle strives to warn the future, however, in doing so not to unduly burden present generations. Building markers and monuments that are out of proportion to the risk being presented to the future is not in keeping with generational equity. With this in mind the DOE/CBFO is developing conceptual plans for re-evaluating and revising the current WIPP PIC's program. These conceptual plans will suggest scientific and technical work that must be completed to develop a 'new' PICs program that takes the best ideas of the present plan, blended with new ideas from the RK and M project, and proposed alternative permanent markers designs and materials in consideration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prototyping and validating requirements of radiation and nuclear emergency plan simulator

Organizational incapability in developing unrealistic, impractical, inadequate and ambiguous mechanisms of radiological and nuclear emergency preparedness and response plan (EPR) causing emergency plan disorder and severe disasters. These situations resulting from 65.6% of poor definition and unidentified roles and duties of the disaster coordinator. Those unexpected conditions brought huge aftermath to the first responders, operators, workers, patients and community at large. Hence, in this report, we discuss prototyping and validating of Malaysia radiation and nuclear emergency preparedness and response plan simulation model (EPRM). A prototyping technique was required to formalize the simulation model requirements. Prototyping as systems requirements validation was carried on to endorse the correctness of the model itself against the stakeholder’s intensions in resolving those organizational incapability. We have made assumptions for the proposed emergency preparedness and response model (EPRM) through the simulation software. Those assumptions provided a twofold of expected mechanisms, planning and handling of the respective emergency plan as well as in bringing off the hazard involved. This model called RANEPF (Radiation and Nuclear Emergency Planning Framework) simulator demonstrated the training emergency response perquisites rather than the intervention principles alone. The demonstrations involved the determination of the casualties’ absorbed dose range screening and the coordination of the capacity planning of the expected trauma triage. Through user-centred design and sociotechnical approach, RANEPF simulator was strategized and simplified, though certainly it is equally complex.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

State Engagement in Electric Distribution System Planning

Electric distribution system planning is focused on assessing needed physical and operational changes to the local grid to maintain safe, reliable, and affordable service. While electric utilities have always engaged in this activity, the planning horizon has typically been short and involvement by state utility regulators minimal. Safety, reliability, and affordability remain top objectives for deeper state engagement in longer-term distribution system planning. Other drivers are proposed utility investments to replace aging infrastructure and modernize grids, opportunities to improve distribution system efficiency, enabling consumers to have greater control over energy costs and sources, and integrating higher levels of distributed energy resources (DERs) such as rooftop solar, distributed energy storage, and price-responsive demand. This report provides a snapshot of current state engagement in distribution system planning: •Part 1 describes activities in states that have adopted some elements of integrated distribution system planning and analysis (see Figure 1): New York, California, Hawaii, Massachusetts, and Minnesota. It summarizes their impetus for early action, stated goals, regulatory requirements, additional state activities related to distribution system planning, and next steps. •Part 2 covers a broader array of state approaches throughout the country. For example, some of these states have long-standing distribution reliability and performance codes, requiring regulated utilities to report regularly on poor-performing circuits and propose investments for improvements. Other states require regulated utilities to make filings related to proposed grid modernization investments. A growing number of states are beginning to consider comprehensive distribution system planning processes. As this report highlights, approaches vary significantly from state to state, in part stemming from differences in electricity market structure. States can learn from each other and tailor successful approaches to their unique circumstances. Reviewing the broad range of legislative and public utility commission activities described in this report is a useful starting point.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Guide for Incorporating Energy Efficiency in State Energy Plans

State energy planning offers an opportunity for states to develop a vision of their energy future. States that include energy efficiency policies and programs in their energy plans are well-positioned to develop programs that support energy policies that increase energy affordability, reliability, and resiliency. The two most cited goals of the forty states with active energy plans as of 2017 are to: (1) ensure a reliable supply of energy and (2) manage costs so energy is affordable for businesses and residents. Energy efficiency is an important strategy for achieving both goals. To explore these areas fully, states may also wish to update or build on their existing state energy plans. States may want to consider the use of enhanced stakeholder engagement experts and/or modeling approaches described in this guide. Energy planning teams–often led by state energy offices–should also consider the use of metrics or other approaches to track implementation progress over time. States may wish to use the examples, plans, and resources referenced as they develop their own unique energy plans.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Principles for Equitable Transmission Planning

Energy justice is gaining traction in the planning processes that govern the generation and supply of electric power in the U.S., with a growing number of federal and state authorities applying it as a framework to ensure that the benefits of a clean energy future extend to all levels of society. However, the principles of energy justice have not yet been integrated into electric transmission planning processes, which are designed to meet established reliability criteria and have not historically considered externalities like social inequities. This paper presents a review of transmission planning requirements in the U.S. and existing literature on energy justice, then synthesizes them to propose a framework for incorporating energy justice principles into transmission planning processes to yield more equitable outcomes. By applying procedural and recognition justice principles to create more extensive, inclusive, and diverse public participation in the planning process, planners can gain insight into—and begin to correct—the inequities created by previous planning decisions. Equipped with this understanding and informed by affected communities, planners can improve the distributional outcomes of the planning process and identify opportunities for energy system investments that will restore communities and place them on more equitable footing.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NANA Strategic Energy Plan & Energy Options Analysis

NANA Strategic Energy Plan summary NRC, as an Alaska Native Corporation, has committed to addressing the energy needs for its shareholders. The project framework calls for implicit involvement of the IRA Councils in the Steering Committee. Tribal Members, from the NRC to individual communities, will be involved in development of the NANA Energy Plan. NRC, as the lead tribal entity, will serve as the project director of the proposed effort. The NRC team has communicated with various governmental and policy stakeholders via meetings and discussions, including Denali Commission, Alaska Energy Authority, and other governmental stakeholders. Work sessions have been initiated with the Alaska Village Electric Cooperative, the NW Arctic Borough, and Kotzebue Electric Association. The NRC Strategic Energy Plan (SEP) Steering committee met monthly through April and May and weekly starting in June 2008 in preparation of the energy summit that was held from July 29-31, 2008. During preparations for the energy summit and afterwards, there was follow through and development of project concepts for consideration. The NANA regional energy summit was held from July 29-31, 2008, and brought together people from all communities of the Northwest Arctic Borough. The effort was planned in conjunction with the Alaska Energy Authority’s state-wide energy planning efforts. Over $80,000 in cash contributions was collected from various donors to assist with travel from communities and to develop the summit project. Available funding resources have been identified and requirements reviewed, including the Denali Commission, U.S. Dept. of Agriculture, and the Alaska Energy Authority. A component of the overall plan will be a discussion of energy funding and financing. There are current project concepts submitted, or are ready for submittal, in the region for the following areas: • Wind-diesel in Deering, Buckland, Noorik, and Kiana areas; potential development around Red Dog mine. • Biomass Feasibility analysis in the upper Kobuk; • Run of the river hydroelectric development for the Upper Kobuk; • Solar photovoltaic (PV) power demonstration projects for Noatak, Ambler, Selawik, Kiana, and Noorvik; • Heat Recovery for several communities; In September 2008, the NRC team participated at the Alaska Rural Energy Conference in Girdwood, Alaska In November 2008, the NRC team gave a presentation on the NANA regional energy plans at a DOE Tribal Energy Program conference in Denver, Colorado. In January 2009, the final SEP report was submitted to NRC.

13 HYDRO ENERGY↗

Brazil's Action Plan for Rapid Decarbonization of Power Sectors

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at the CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The second cohort of action plans will be presented at CEM15 in Brazil. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions, given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for Planning, Building and Operating, as well as Stakeholder Engagement where appropriate based on country priorities. They complement, but are differentiated from, other international power sector initiatives such as the Breakthrough Agenda (whose broad purpose is to raise collective ambition) and the Global Power System Transformation Consortium (whose goals are to convene power system operators to accelerate research innovations and foster peer learning). These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change.

21st Century Power Partnership↗

Recent advances and challenges in optimization models for expansion planning of power systems and reliability optimization

Optimization models for expansion planning of power systems aim to determine capacities, investment timing, and location of power systems to satisfy the power demands while minimizing the total cost. The models have become complex in recent years to reflect both regulations on conventional energy sources and the increasing penetration of renewable energy sources (RES). This paper reviews the basic concepts and optimization models for expansion planning of power systems. We first explain the definition and features of generation expansion planning (GEP), transmission expansion planning (TEP), and generation and transmission expansion planning (GTEP). To address the computational challenges of large-scale expansion planning problems, we review several simplifications including temporal and spatial aggregation, and decomposition methods. This paper also addresses power system reliability defined as the probability of satisfying the load demand while withstanding failures of components. Finally, the goal of this paper is to provide a research overview, discuss trends in expansion planning of power systems, and suggest directions for future research.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Evaluating California local land use plan's environmental impact reports

Local land use planning has profound impacts on environmental quality; however, few empirical studies have been conducted to systematically measure local land use plans' environmental assessment quality and to identify the factors influencing it. This paper analyzes the quality of 40 Environmental Impact Reports (EIRs) of local jurisdictions' land use plans in California. A plan evaluation protocol defined by five core components and sixty-three indicators is developed to measure the quality of local land use plans' EIRs. The descriptive results indicate that the local jurisdictions produce relatively good quality on its EIRs, but there is still much room for improvement. There are large variations in the quality of EIRs across local jurisdictions. The regression results further highlight three major factors that can significantly influence local land use plan's EIR quality: number of planners, plan updating ability, and development pressure.

54 ENVIRONMENTAL SCIENCES↗

Influence of FDG-PET on Computed Tomography-Based Radiotherapy Planning for Locally Recurrent Nasopharyngeal Carcinoma

Purpose: Assuming F-18-fluoro-2-deoxy-D-glucose positron emission tomography (FDG-PET)/computed tomography (CT) to be more accurate in representing the true disease extent than CT alone, we prospectively designed this study to evaluate how the addition of FDG-PET influences CT-based radiotherapy planning for locally recurrent nasopharyngeal carcinoma. Patients and Methods: All patients underwent FDG-PET/CT simulation scans. For each patient, the gross tumor volume (GTV) was separately delineated with or without the addition of PET information and defined as GTV{sub PET/CT} and GTV{sub CT}, respectively. Corresponding planning target volumes (PTV) were generated for the GTV{sub CT} (PTV{sub CT}) and GTV{sub PET/CT} (PTV{sub PET/CT}). Three-dimensional conformal radiotherapy plans were separately created for PTV{sub CT} and PTV{sub PET/CT}. To assess the potential geographic miss of the PET/CT-based disease in CT-based treatment planning, the size and location of the GTV{sub PET/CT}, PTV{sub PET/CT}, and PTV{sub CT} were analyzed, and the three-dimensional conformal radiotherapy plans created using the PTV{sub CT} were evaluated with the GTV{sub PET/CT} and PTV{sub PET/CT} information. Results: A total of 43 patients were enrolled in this study. Distant metastasis was found in 4 patients with the addition of the PET information. The 39 patients without distant metastasis proceeded to three-dimensional conformal radiotherapy planning. Inadequate coverage of the GTV{sub PET/CT} and PTV{sub PET/CT} by the PTV{sub CT} occurred in 7 (18%) and 20 (51%) patients, respectively. This resulted in <95% of the GTV{sub PET/CT} and PTV{sub PET/CT} receiving {>=}95% of the prescribed dose in 4 (10%) and 13 (33%) patients, respectively. Conclusions: The addition of FDG-PET information might influence CT-based radiotherapy planning for locally recurrent nasopharyngeal carcinoma by altering the definition of the target volume, with the potential to avoid a geographic miss of true disease.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Influence of Lipiodol Agent on Proton Beam Range in Radiotherapy Planning Using Computed Tomography for Hepatocellular Carcinoma

Purpose: To evaluate the influence of lipiodol on the proton beam range, which has not yet been determined. Methods and Materials: Two computed tomography (CT) data sets were obtained with a T25-flask containing lipiodol and water that was placed above a water phantom. The plan with the lipiodol CT images was performed, and then a verification plan was applied to the water CT images. The actual proton beam ranges in the lipiodol and water were measured under same conditions, and we compared the calculated proton beam range in the treatment planning system with measured values. Results: The calculated distal range in the treatment planning system was 12 cm in water, which was 3.87 cm longer than that in lipiodol (8.13 cm). In contrast, the measured distal range was 12 {+-} 0.01 cm in water, which was 0.21 {+-} 0.01 cm longer than that of lipiodol (11.78 {+-} 0.01 cm). A 3.65 {+-} 0.01-cm range shift was found in the calculated range compared with the measured range. For 10 hepatocellular carcinoma patients, the distal range in the verification plan with the corrected CT images in which the Hounsfield unit (HU) value of lipiodolized lesion was replaced with the average HU value of the surrounding tissue was 0.61 {+-} 0.26 cm (range, 0.26-0.99) longer than that in the plan with uncorrected CT images. Conclusions: It could be relevant for the purposes of range calculation of proton beams in the treatment planning system that the HU value of a lipiodolized lesion is replaced by the average HU value of the surrounding normal tiss0008.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Radiotherapy Treatment Plans With RapidArc for Prostate Cancer Involving Seminal Vesicles and Lymph Nodes

Purpose: Dosimetric results and treatment delivery efficiency of RapidArc plans to those of conventional intensity-modulated radiotherapy (IMRT) plans were compared using the Eclipse treatment planning system for high-risk prostate cancer. Materials and Methods: This study included 10 patients. The primary planning target volume (PTV{sub P}) contained prostate, seminal vesicles, and pelvic lymph nodes with a margin. The boost PTV (PTV{sub B}) contained prostate and seminal vesicles with a margin. The total prescription dose was 75.6 Gy (46.8 Gy to PTV{sub P} and an additional 28.8 Gy to PTV{sub B}; 1.8 Gy/fraction). Three plans were generated for each PTV: Multiple-field IMRT, one-arc RapidArc (1ARC), and two-arc RapidArc (2ARC). Results: In the primary IMRT with PTV{sub P}, average mean doses to bladder, rectum and small bowel were lower by 5.9%, 7.7% and 4.3%, respectively, than in the primary 1ARC and by 3.6%, 4.8% and 3.1%, respectively, than in the primary 2ARC. In the boost IMRT with PTV{sub B}, average mean doses to bladder and rectum were lower by 2.6% and 4.8% than with the boost 1ARC and were higher by 0.6% and 0.2% than with the boost 2ARC. Integral doses were 7% to 9% higher with RapidArc than with IMRT for both primary and boost plans. Treatment delivery time was reduced by 2-7 minutes using RapidArc. Conclusion: For PTVs including prostate, seminal vesicles, and lymph nodes, IMRT performed better in dose sparing for bladder, rectum, and small bowel than did RapidArc. For PTVs including prostate and seminal vesicles, RapidArc with two arcs provided plans comparable to those for IMRT. The treatment delivery is more efficient with RapidArc.

62 RADIOLOGY AND NUCLEAR MEDICINE↗