Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “pilot”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

TU-FG-201-06: Remote Dosimetric Auditing for Clinical Trials Using EPID Dosimetry: A Pilot Study

Purpose: To perform a pilot study for remote dosimetric credentialing of intensity modulated radiation therapy (IMRT) based clinical trials. The study introduces a novel, time efficient and inexpensive dosimetry audit method for multi-center credentialing. The method employs electronic portal imaging device (EPID) to reconstruct delivered dose inside a virtual flat/cylindrical water phantom. Methods: Five centers, including different accelerator types and treatment planning systems (TPS), were asked to download two CT data sets of a Head and Neck (H&N) and Postprostatectomy (P-P) patients to produce benchmark plans. These were then transferred to virtual flat and cylindrical phantom data sets that were also provided. In-air EPID images of the plans were then acquired, and the data sent to the central site for analysis. At the central site, these were converted to DICOM format, all images were used to reconstruct 2D and 3D dose distributions inside respectively the flat and cylindrical phantoms using inhouse EPID to dose conversion software. 2D dose was calculated for individual fields and 3D dose for the combined fields. The results were compared to corresponding TPS doses. Three gamma criteria were used, 3%3mm-3%/2mm–2%/2mm with a 10% dose threshold, to compare the calculated and prescribed dose. Results: All centers had a high pass rate for the criteria of 3%/3 mm. For 2D dose, the average of centers mean pass rate was 99.6% (SD: 0.3%) and 99.8% (SD: 0.3%) for respectively H&N and PP patients. For 3D dose, 3D gamma was used to compare the model dose with TPS combined dose. The mean pass rate was 97.7% (SD: 2.8%) and 98.3% (SD: 1.6%). Conclusion: Successful performance of the method for the pilot centers establishes the method for dosimetric multi-center credentialing. The results are promising and show a high level of gamma agreement and, the procedure is efficient, consistent and inexpensive. Funding has been provided from Department of Radiation Oncology, TROG Cancer Research and the University of Newcastle. Narges Miri is a recipient of a University of Newcastle postgraduate scholarship.

60 APPLIED LIFE SCIENCES↗

Developing a monitoring and verification plan with reference to the Australian Otway CO2 pilot project

The Australian Cooperative Research Centre for Greenhouse Gas Technologies (CO2CRC) is currently injecting 100,000 tons of CO{sub 2} in a large-scale test of storage technology in a pilot project in southeastern Australia called the CO2CRC Otway Project. The Otway Basin, with its natural CO{sub 2} accumulations and many depleted gas fields, offers an appropriate site for such a pilot project. An 80% CO{sub 2} stream is produced from a well (Buttress) near the depleted gas reservoir (Naylor) used for storage (Figure 1). The goal of this project is to demonstrate that CO{sub 2} can be safely transported, stored underground, and its behavior tracked and monitored. The monitoring and verification framework has been developed to monitor for the presence and behavior of CO{sub 2} in the subsurface reservoir, near surface, and atmosphere. This monitoring framework addresses areas, identified by a rigorous risk assessment, to verify conformance to clearly identifiable performance criteria. These criteria have been agreed with the regulatory authorities to manage the project through all phases addressing responsibilities, liabilities, and to assure the public of safe storage.

54 ENVIRONMENTAL SCIENCES↗

Demonstration of a Pilot-Scale Plant for Biomass Torrefaction and Briquetting

Abstract. A semi-mobile torrefaction and densification pilot plant was constructed in order to determine ideal operating conditions and evaluate briquette quality and throughput rate using forest residuals as the input feedstock. Experiments were conducted at various conditions with feedstock moisture content ranging from 4% to 25% (wet basis), reactor residence times of 10 and 20 min, and final product temperatures between 214°C and 324°C. Optimal operating conditions, evaluated based on throughput rate, specific electricity demand, torrefied briquette grindability, briquette volumetric energy density, and briquette durability, were identified to occur with a short residence time (10 min), low feedstock moisture content (<11% wet basis), and high final product temperature between 267°C and 275°C. These conditions were able to process 510 to 680 kg h -1 (wet basis) feedstock with a dry mass yield of 79% to 84% to produce torrefied biomass with a higher heating value of 21.2 to 23.0 MJ kg -1 (dry basis) compared to 19.6 MJ kg -1 for the original biomass. Torrefied briquettes produced at these conditions had a neatly stacked packing density of 990 kg m -3 and a volumetric energy density of 21,800 MJ m -3 . Their specific grinding energy was an average 37% of the energy required to grind a raw biomass briquette. These torrefied briquettes were more durable (94% DU) than raw briquettes (85% DU) directly following production, but were less durable after undergoing temperature and humidity fluctuations associated with long distance transportation (74% DU for torrefied and 84% DU for raw biomass briquettes). Results from this pilot plant are promising for commercial scale production of high quality torrefied briquettes and should lead to additional research and development of a torrefaction system optimized for a higher throughput rate at these conditions. Keywords: Biomass, Biomass conversion technology, Bioenergy, Briquetting, Densification, Forest residuals, Pyrolysis, Torrefaction.

Agriculture↗

2021–2022 Can Do Colorado E-Bike Full-Scale Pilot Program Study

In 2021–2022, the Colorado Energy Office conducted a full-scale pilot program study on e-bike usage as part of the Can Do Colorado initiative, providing e-bikes to low-income participants across the state. A [2020 mini pilot program study](https://www.nlr.gov/transportation/secure-transportation-data/tsdc-2020-can-do-colorado-e-bike-pilot-program.html) informed the full-scale study. Both studies used pedal-assist e-bikes, which feature an electric motor and battery to help power the bike. The motor amplifies the power behind each pedal stroke, augmenting the energy you put into the bike. #### Data Collection Agency The Colorado Energy Office conducted the study in partnership with local organizations in Adams and Broomfield counties (Smart Commute Metro North), Boulder (Community Cycles), Durango (Four Corners Office for Resource Efficiency), Fort Collins (City of Fort Collins), Pueblo (Pueblo County), and Vail (Town of Vail). #### Survey Methodology Program participants received an e-bike and accessories at no cost and manually submitted travel data and feedback via the CanBikeCO smartphone app. Developed in partnership with NLR, the app used a customized version of the open-source [NLR OpenPATH platform](https://www.nlr.gov/transportation/openpath.html). #### Survey Records and Data Survey records include 170 participants. The six datasets contain up to 18 months of partially automated travel diaries, combining sensed and surveyed travel behavior data—patterns of multimodal, end-to-end, individual human mobility—as well as demographic information from participants. The number of e-bike trips and e-bike miles traveled per location are 1,560 and 4,179 for Adams and Broomfield counties; 8,481 and 27,000 for Boulder; 2,815 and 6,307 for Durango; 3,483 and 7,080 for Fort Collins; 4,022 and 14,887 for Pueblo, and 1,206 and 3,3361 for Vail.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

First Ever Polymer Flood Field Pilot - A Game Changer to Enhance the Recovery of Heavy Oils on Alaska’s North Slope

The development pace of Alaska’s vast, 20-25 billion barrels, heavy oil resources has been very slow due to high development costs and low oil recovery using conventional waterflood, and the impracticality of deploying thermal methods due to the presence of continuous permafrost. Although, polymer flooding has attracted attention and has become a promising EOR technique in heavy oil reservoirs due to the extensive application of horizontal wells and advancement of polymer flooding technology, no field tests have been performed to date in Alaska’s underdeveloped heavy oil reservoirs. The overall objective of this research is to perform a field experiment to validate the use of polymer flooding for extracting heavy oil in Alaska’s challenging environment. Two pre-existing pairs of horizontal injection and production wells in an isolated fault block of the Schrader Bluff heavy oil reservoir at the Milne Point Field are currently being used for the field experiment. Hydrolyzed polyacrylamide (HPAM) polymer injection started on August 28, 2018 at 600 ppm (4 cP viscosity) concentration ramping up to 1,800 ppm (45 cP viscosity) over a three week time period, and has been maintained at an average concentration of ~1,800 ppm. Current injection rates in the two horizontal injectors are ~2,200 and 600 bwpd. Laboratory experiments to determine the polymer retention, optimum water salinity, synergistic effects of water salinity and polymer, and handling of produced fluids, in support of the field experiment, are currently ongoing. Similarly, reservoir simulation of coreflood behavior and history match of previous waterfloods to predict polymer flood performance in the project area are also conducted in parallel. The field data and scientific knowledge that have been collected since the start of the injection indicates that the field pilot is performing as predicted. To date, no unexpected injectivity issues or polymer breakthrough have been encountered, and the two horizontal producers are showing positive response to the polymer injection, resulting in incremental increase in oil production rate. Since the research is still in its early stages, selected field, laboratory and simulation results are presented and discussed to highlight the integrative approach adopted in this first ever polymer flood field pilot in Alaska.

02 PETROLEUM↗

A Pilot-Scale Evaluation of Natural Gas-Based Foam at Elevated Pressure and Temperature Conditions

Abstract Nitrogen (N2) and Carbon Dioxide (CO2) foams have been used as hydraulic fracturing fluids for several decades to reduce water usage and minimize damage in water-sensitive reservoirs. These foam treatments require gases to be liquefied and transported to site. An alternative approach would be to use natural gas (NG) that is readily available from nearby wells, pipelines, and processing facilities as the internal, gaseous phase to create a NG-based foam. Hydraulic fracturing with NG foam is a relatively inexpensive option, makes use of an abundant and often wasted resource, and may even provide production benefits in certain reservoirs. As part of an ongoing development project sponsored by the Department of Energy (DOE), the surface process to create NG foam is being developed and the properties of NG foam are being explored. This paper presents recent results from a rigorous pilot-scale demonstration of NG foam over a range of operating scenarios relevant to surface and bottomhole conditions with a variety of base-fluid mixtures. The Pilot-scale Foam Test Facility (PFTF) used in these investigations is first described. The PFTF is capable of generating foamed fluids at pressures up to 7,500 psig and at temperatures in excess of 300°F. Then, results from several investigations aimed at proving NG foam at conditions relevant to the field are presented. NG foam was characterized using rheology measurements and flow visualization techniques. Experiments were performed to investigate the texture and stability of NG foam generated by two different mixing methods: one using a custom designed tee to match mixing velocities in the field where the gas phase is jetted into the aqueous stream, and another to ensure comprehensive mixing for laboratory analysis. Parametric studies were conducted to explore the effects of flow rate, foam quality, and temperature on the stability of NG foam. Moreover, different fluid preparations were used to investigate the effect of base fluid and additive concentrations on the stability of NG foams. Additional laboratory studies that investigated foam stability with produced water and multicomponent NG mixtures are also reported. The NG foams explored in these investigations exhibited typical, shear-thinning behavior observed in rheological studies of N2- and CO2-based foams. The measured viscosity and observed stability indicate that NG foams are well suited for fracturing applications. Like other foams, NG foam exhibits sensitivity to operating temperature characterized by a decrease in apparent viscosity as temperature increases. Rapid foam breakdown was observed at significantly elevated temperatures exceeding 290°F. In addition to fluid characterization, these investigations also yielded several key lessons that should be applied to future field demonstrations of NG foam.

Beck, Griffin↗

U.S. Nuclear Regulatory Commission Extremely Low Probability of Rupture pilot study : xLPR framework model user's guide.

For the U.S. Nuclear Regulatory Commission (NRC) Extremely Low Probability of Rupture (xLPR) pilot study, Sandia National Laboratories (SNL) was tasked to develop and evaluate a probabilistic framework using a commercial software package for Version 1.0 of the xLPR Code. Version 1.0 of the xLPR code is focused assessing the probability of rupture due to primary water stress corrosion cracking in dissimilar metal welds in pressurizer surge nozzles. Future versions of this framework will expand the capabilities to other cracking mechanisms, and other piping systems for both pressurized water reactors and boiling water reactors. The goal of the pilot study project is to plan the xLPR framework transition from Version 1.0 to Version 2.0; hence the initial Version 1.0 framework and code development will be used to define the requirements for Version 2.0. The software documented in this report has been developed and tested solely for this purpose. This framework and demonstration problem will be used to evaluate the commercial software's capabilities and applicability for use in creating the final version of the xLPR framework. This report details the design, system requirements, and the steps necessary to use the commercial-code based xLPR framework developed by SNL.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Final Work Plan: ISCR Pilot Test at Montgomery City, Missouri

This document presents a Work Plan for field-scale pilot testing of an in situ chemical reduction (ISCR) technology for the treatment of carbon tetrachloride contamination identified in soils and groundwater at the site of the grain storage facility formerly operated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in Montgomery City, Missouri. The pilot test is recommended to support the identification and evaluation of candidate remedial technologies for possible implementation at the former Montgomery City facility, in the context of the site characterization (remedial investigation/feasibility study [RI/FS]) being conducted by the CCC/USDA at this location at the request of the Missouri Department of Natural Resources (MDNR).

LaFreniere, L. M.↗

Greenbelt Homes Pilot Energy Efficiency Program Phase 1 Summary: Existing Conditions and Baseline Energy Use

A multiyear pilot energy efficiency retrofit project has been undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 co-operative of circa 1930 and 1940 homes in Greenbelt, Maryland. The three predominant construction methods of the townhomes in the community are materials common to the area and climate zone including 8 in. concrete masonry unit (CMU) block, wood frame with brick veneer and wood frame with vinyl siding. GHI has established a pilot project that will serve as a basis for decision making for the rollout of a decade-long community upgrade program that will incorporate energy efficiency upgrades to the building envelope from the exterior and equipment with the modernization of other systems like plumbing, mechanical equipment, and cladding.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Extended Operations of the Pratt & Whitney Rocketdyne Pilot-Scale Compact Reformer: Year 6 - Activity 3.2 - Development of a National Center for Hydrogen Technology

U.S. and global demand for hydrogen is large and growing for use in the production of chemicals, materials, foods, pharmaceuticals, and fuels (including some low-carbon biofuels). Conventional hydrogen production technologies are expensive, have sizeable space requirements, and are large carbon dioxide emitters. A novel sorbent-based hydrogen production technology is being developed and advanced toward field demonstration that promises smaller size, greater efficiency, lower costs, and reduced to no net carbon dioxide emissions compared to conventional hydrogen production technology. Development efforts at the pilot scale have addressed materials compatibility, hot-gas filtration, and high-temperature solids transport and metering, among other issues, and have provided the basis for a preliminary process design with associated economics. The process was able to achieve a 93% hydrogen purity on a purge gasfree basis directly out of the pilot unit prior to downstream purification.

08 HYDROGEN↗

Light Water Reactor Sustainability Constellation Pilot Project FY13 Summary Report

Summary report for Light Water Reactor Sustainability (LWRS) activities related to the R. E. Ginna and Nine Mile Point Unit 1 for FY13. This report summarizes the activities in focus areas performed from October 1, 2012 through September 30, 2013. (FY13). Refer to INL/EXT-11-23461, Light Water Reactor Sustainability Constellation Pilot Project FY11 Summary Report for the period from October 1, 2010 through September 30, 2011. (FY11) and INL/EXT-12-27304, Light Water Reactor Sustainability Constellation Pilot Project FY12 Summary Report, for the period from October 1, 2011 through September 30, 2012 (FY12).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

PILOT TESTING: PRETREATMENT OPTIONS TO ALLOW RE-USE OF FRAC FLOWBACK AND PRODUCED BRINE FOR GAS SHALE RESOURCE DEVELOPMENT

The goal of the A&M DOE NETL Project No. DE-FE0000847 was to develop a mobile, multifunctional water treatment capability designed specifically for “pre-treatment” of field waste brine. The project consisted of constructing s mobile “field laboratory” incorporating new technology for treating high salinity produced water and using the lab to conduct a side-by-side comparison between this new technology and that already existing in field operations. A series of four field trials were performed utilizing the mobile unit to demonstrate the effectiveness of different technology suitable for use with high salinity flow back brines and produced water. The design of the mobile unit was based on previous and current work at the Texas A&M Separation Sciences Pilot Plant. The several treatment techniques which have been found to be successful in both pilot plant and field tests had been tested to incorporate into a single multifunctional process train. Eight different components were evaluated during the trials, two types of oil and grease removal, one BTEX removal step, three micro-filters, and two different nanofilters. The performance of each technique was measured by its separation efficiency, power consumption, and ability to withstand fouling. The field trials were a success. Four different field brines were evaluated in the first trial in New York. Over 16,000 gallons of brine were processed. Using a power cost of $.10 per kWh, media pretreatment power use averaged $0.004 per barrel, solids removal $.04 per barrel and brine “softening” $.84 per barrel. Total power cost was approximately $1.00 per barrel of fluid treated. In Pennsylvania, brines collected from frac ponds were tested in two additional trials. Each of the brines was converted to an oil-free, solids-free brine with no biological activity. Brines were stable over time and would be good candidates for use as a make-up fluid in a subsequent fracturing fluid design. Reports on all of the field trials and subcontractor research have been summarized in this Final Report. Individual field trial reports and research reports are contained in the companion volume titled “Appendices”

Burnett, David↗

Conceptual Design for the Pilot-Scale Plutonium Oxide Processing Unit in the Radiochemical Processing Laboratory

This report describes a conceptual design for a pilot-scale capability to produce plutonium oxide for use as exercise and reference materials, and for use in identifying and validating nuclear forensics signatures associated with plutonium production. This capability is referred to as the Pilot-scale Plutonium oxide Processing Unit (P3U), and it will be located in the Radiochemical Processing Laboratory at the Pacific Northwest National Laboratory. The key unit operations are described, including plutonium dioxide (PuO2) dissolution, purification of the Pu by ion exchange, precipitation, and conversion to oxide by calcination.

plutonium oxide↗

100-OL-1 Operable Unit Field Portable X-Ray Fluorescence (XRF) Analyzer Pilot Study Plans

A pilot study is being conducted to support the approval of the Remedial Investigation/Feasibility Study (RI/FS) Work Plan to evaluate the 100-OL-1 Operable Unit (OU) pre-Hanford orchard lands. Based on comments received by the U.S. Environmental Protection Agency (EPA) and Washington State Department of Ecology, the pilot study will evaluate the use of field portable X-ray fluorescence (XRF) spectrometry measurements for evaluating lead and arsenic concentrations on the soil surface as an indicator of past use of lead arsenate pesticide residue in the OU. The work will be performed in the field during the summer of 2014, and assist in the planning for the characterization activities in the RI/FS.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Field-Metered Data from Portable Unit Dehumidifiers in the U.S. Residential Sector: Initial Results of a Pilot Study

The work described herein is intended to enrich the body of literature regarding dehumidifiers in residential settings—in particular the hours of use and energy consumption of various types of dehumidifiers. In the United States, portable unit dehumidifiers most commonly are used in basements during humid summer days in northern climates. Dehumidifier energy consumption differs among households depending on settings selected by the user, frequency of use, and conditions of operation. Although some estimates of dehumidifier use have been developed, and a few metering studies performed, there remains a paucity of metered data collected from individual households that use dehumidifiers. For this study we obtained field data on the energy consumption of dehumidifiers to supplement currently available analyses. Our goal was to obtain data from a pilot study that we could use to develop initial distributions describing the capacities and applications of dehumidifiers used in individual homes. More precisely characterizing the use of dehumidifiers in real-world applications will enable a more accurate estimate of the range of energy use in various operational modes. Our pilot field-metering exercise was aimed at compiling real-time data on the energy consumption of portable dehumidifiers in residential households in the New England and Mid-Atlantic areas. Our analysis furthers the process of developing a more precise estimate of dehumidifier energy use, which will support the evaluation of the potential energy savings and attendant costs associated with more energy efficient dehumidifiers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Pilot Scale Advanced Fogging Demonstration

Radiological contamination control is crucial during decommissioning and demolition (D&D) activities, as well as during modifications to existing radiological systems. It is well known that contamination, in some cases substantial contamination, is present throughout the exhaust ductwork in several older processing facilities within the Department of Energy (DOE) complex, due to years of processing radioactive materials in areas served by closed ventilation systems. Accumulations of radioactive dust and lint – commonly found in laundry facilities, exhaust ventilation ducting, and exhaust stacks – present a specific contamination control issue. Particle suspension is more likely to occur during cleaning, modification, or demolition of these systems and during disposal site exhumation. In a recent demolition of large ventilation ducting (~10’ × 10’ cross section, ~100’ long) at Brookhaven National Laboratory, a spray coating was manually applied to the inside of the duct – requiring painters, dressed in anti-contamination clothing and an airline respirator system, to enter the duct.1 The advanced fogging technique offers an alternative method to mitigate these airborne contamination hazards with minimal personnel entry. Experiments in 2006 developed a useful fog solution using three different chemical constituents. Optimization of the fog recipe and use of commercially available equipment were identified as needs that had not been addressed. During 2012 development work it was noted that low concentrations of the components hampered coverage and drying in the United Kingdom’s National Nuclear Laboratory’s testing much more so than was evident in the 2006 tests. In fiscal year 2014 the Idaho National Laboratory undertook a systematic optimization of the fogging formulation and conducted a non-radioactive, pilot scale demonstration using commercially available fogging equipment. While not as sophisticated as the equipment used in earlier testing, the new approach is much less expensive and readily available for smaller scale operations. Pilot scale testing was important to validate new equipment of an appropriate scale, optimize the chemistry of the fogging solution, and to realize the conceptual approach.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Greenbelt Homes Pilot Energy Efficiency Program Phase 1 Summary: Existing Conditions and Baseline Energy Use

A multi-year pilot energy efficiency retrofit project has been undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 co-operative of circa 1930 and '40 homes. The three predominate construction methods of the townhomes in the community are materials common to the area and climate zone including 8” CMU block, wood frame with brick veneer and wood frame with vinyl siding. GHI has established a pilot project that will serve as a basis for decision making for the roll out of a decade-long community upgrade program that will incorporate energy efficiency to the building envelope and equipment with the modernization of other systems like plumbing, mechanical equipment, and cladding.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reinvestigation into Closure Predictions of Room D at the Waste Isolation Pilot Plant

Room D was an in-situ, isothermal, underground experiment conducted at theWaste Isolation Pilot Plant between 1984 and 1991. The room was carefully instrumented to measure the horizontal and vertical closure immediately upon excavation and for several years thereafter. Early finite element simulations of salt creep around Room D under predicted the vertical closure by 4.5×, causing investigators to explore a series of changes to the way Room D was modeled. Discrepancies between simulations and measurements were resolved through a series of adjustments to model parameters, which were openly acknowledged in published reports. Interest in Room D has been rekindled recently by the U.S./German Joint Project III and Project WEIMOS, which seek to improve the predictions of rock salt constitutive models. Joint Project participants calibrate their models solely against laboratory tests, and benchmark the models against underground experiments, such as room D. This report describes updating legacy Room D simulations to today’s computational standards by rectifying several numerical issues. Subsequently, the constitutive model used in previous modeling is recalibrated two different ways against a suite of new laboratory creep experiments on salt extracted from the repository horizon of the Waste Isolation Pilot Plant. Simulations with the new, laboratory-based, calibrations under predict Room D vertical closure by 3.1×. A list of potential improvements is discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗