Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Advances in Above- and In-Water Radiometry, Volume 3: Hybridspectral Next-Generation Optical Instruments

This publication documents the scientific advances associated with new instrument systems and accessories built to improve above- and in-water observations of the apparent optical properties (AOPs) for a diversity of water masses, including optically complex waters. The principal objective is to be prepared for the launch of next-generation ocean color satellites with the most capable commercial off-the-shelf (COTS) instrumentation in the shortest time possible. The technologies described herein are entirely new hybrid sampling capabilities, so as to satisfy the requirements established for next-generation missions. Both above- and in-water instruments are documented with software options for autonomous control of data collection activities as applicable. The instruments were developed for the Hybridspectral Alternative for Remote Profiling of Optical Observations for NASA Satellites (HARPOONS) vicarious calibration project. The state-of-the-art accuracy required for vicarious calibration also led to the development of laboratory instruments to ensure the field observations were within uncertainty requirements. Separate detailed presentations of the individual instruments provide the hardware designs, accompanying software for data acquisition and processing, and examples of the results achieved.

Hooker, Stanford B.↗

Orbital transfer vehicle launch operations study: Manpower summary and facility requirements, volume 5

All manpower numbers, number of heads (by skill), serial time and manhours have been accumulated and compiled on a per subtask basis in spreadsheet format for both the ground based and the space based data flows. To aid in identifying the facility resources required to process the Ground Based Orbital Transfer Vehicle (GBOTV) and/or the space based orbital transfer vehicle (SBOTV) through the ground facilities at Kennedy Space Center (KSC), a software application package was developed using a general purpose data base management system known as Data Flex. The facility requirements are used as the basic input to this software application. The resources of the KSC facility that could be used by orbital transfer vehicle program were digitized in the same format used to identify facility requirements. The facility capabilities were digitized in this format for subsequent, automated comparative analyses. Composite facility requirements are compared to each of the baseline facility capabilities and the system generates a relative score that indicates how each facility weighs against the composite requirements in relation to the other facilities in the set.

Source record↗

Preliminary GPS orbit determination results for the Extreme Ultraviolet Explorer

A single-frequency Motorola Global Positioning System (GPS) receiver was launched with the Extreme Ultraviolet Explorer mission in June 1992. The receiver utilizes dual GPS antennas placed on opposite sides of the satellite to obtain full GPS coverage as it rotates during its primary scanning mission. A data set from this GPS experiment has been processed at the Jet Propulsion Laboratory with the GIPSY-OASIS 2 software package. The single-frequency, dual antenna approach and the low altitude (approximately 500 km) orbit of the satellite create special problems for the GPS orbit determination analysis. The low orbit implies that the dynamics of the spacecraft will be difficult to model, and that atmospheric drag will be an important error source. A reduced-dynamic solution technique was investigated in which ad hoc accelerations were estimated at each time step to absorb dynamic model error. In addition, a single-frequency ionospheric correction was investigated, and a cycle-slip detector was written. Orbit accuracy is currently better than 5 m. Further optimization should improve this to about 1 m.

Gold, Kenn↗

Development and Testing of Automatically Generated ACS Flight Software for the MAP Spacecraft

By integrating the attitude determination and control system (ACS) analysis and design, flight software development, and flight software testing processes, it is possible to improve the overall spacecraft development cycle, as well as allow for more thorough software testing. One of the ways to achieve this integration is to use code-generation tools to automatically generate components of the ACS flight software directly from a high-fidelity (HiFi) simulation. In the development of the Microwave Anisotropy Probe (MAP) spacecraft, currently underway at the NASA Goddard Space Flight Center, approximately 1/3 of the ACS flight software was automatically generated. In this paper, we will examine each phase of the ACS subsystem and flight software design life cycle: analysis, design, and testing. In the analysis phase, we scoped how much software we would automatically generate and created the initial interface. The design phase included parallel development of the HiFi simulation and the hand-coded flight software components. Everything came together in the test phase, in which the flight software was tested, using results from the HiFi simulation as one of the bases of comparison for testing. Because parts of the spacecraft HiFi simulation were converted into flight software, more care needed to be put into its development and configuration control to support both the HiFi simulation and flight software. The components of the HiFi simulation from which code was generated needed to be designed based on the fact that they would become flight software. This process involved such considerations as protecting against mathematical exceptions, using acceptable module and parameter naming conventions, and using an input/output interface compatible with the rest of the flight software. Maintaining good configuration control was an issue for the HiFi simulation and the flight software, and a way to track the two systems was devised. Finally, an integrated test approach was devised to support flight software testing at both the unit- and build-test levels using the HiFi simulation to generate data for performance verification. Another benefit of the simulation and code-generation application used on the MAP project is that it supported bringing flight software and test data into the HiFi simulation environment. It was possible to integrate parts of the hand-coded flight software into the HiFi simulation, and also possible to import flight software test data for comparison and performance verification. This capability was used to incorporate the flight software Kalman filter into the HiFi simulation. This enabled us to greatly increase the amount of testing that could be done on the filter, because we could exert a greater degree of control over the software-only simulation than over the flight software test environment. Also, since the simulation could be used to run the Kalman filter faster than real time, our testing efficiency was greatly increased. We will conclude our discussion with a summary of the lessons learned thus far using automatically- generated code for the MAP project, and the spacecraft status as we work towards our scheduled launch in the year 2000.

ODonnell, James R., Jr.↗

Volatile Organic Analyzer (VOA) in 2006: Repair, Revalidation, and Restart of Elektron Event

The Volatile Organic Analyzer (VOA) was launched to the International Space Station (ISS) in August 2001 and was the first instrument to provide near real-time measurement of volatile organic compounds in a spacecraft atmosphere. The VOA performed an analysis of the ISS air approximately twice a month for most of its operation through May 2003. This intermittent operation, caused by a software interface issue with the ISS communication bus, slowed the validation of the VOA. However, operational validation was completed in 2003 when analysis of air samples collected in grab sample containers (GSCs) compared favorably with simultaneous VOA runs (1). The VOA has two channels that provide redundant function, albeit at slightly reduced performance, when only one channel is operating (2). Most target compounds can be detected on both channels. In January 2003, the VOA identified a malfunction in the channel 2 preconcentrator and it shut down that channel. The anomaly profile suggested that a fuse might have failed, but the root cause could not be determined. In May 2003, channel 1 was shut down when the detector s elevated temperature could not longer be maintained. Since both VOA channels were now deactivated, VOA operations ended until an in-flight repair could be planned and executed. This paper describes the process to repair the VOA and to revalidate it for operations, and then an account is given of the VOA s contribution following a contingency event on ISS.

Limero, Thomas↗

Installation of TVC Actuators in a Two Axis Inertial Load Simulator Test Stand

This paper is about the installation of Space Shuttle Main Engines (SSME) actuators in the new Two Axis Inertial Load Simulator (ILS) at MSFC. The new test stand will support the core stage of the Space Launch System (SLS). Because of the unique geometry of the new test stand standard actuator installation procedures will not work. I have been asked to develop a design on how to install the actuators into the new test stand. After speaking with the engineers and technicians I have created a possible design solution. Using Pro Engineer design software and running my own stress calculations I have proven my design is feasible. I have learned how to calculate the stresses my design will see from this task. From the calculations I have learned I have over built the apparatus. I have also expanded my knowledge of Pro Engineer and was able to create a model of my idea.

Dziubanek, Adam↗

Assimilation of Wind Profiles from Multiple Doppler Radar Wind Profilers for Space Launch Vehicle Applications

Space launch vehicles utilize atmospheric winds in design of the vehicle and during day-of-launch (DOL) operations to assess affects of wind loading on the vehicle and to optimize vehicle performance during ascent. The launch ranges at NASA's Kennedy Space Center co-located with the United States Air Force's (USAF) Eastern Range (ER) at Cape Canaveral Air Force Station and USAF's Western Range (WR) at Vandenberg Air Force Base have extensive networks of in-situ and remote sensing instrumentation to measure atmospheric winds. Each instrument's technique to measure winds has advantages and disadvantages in regards to use for vehicle engineering assessments. Balloons measure wind at all altitudes necessary for vehicle assessments, but two primary disadvantages exist when applying balloon output on DOL. First, balloons need approximately one hour to reach required altitude. For vehicle assessments this occurs at 60 kft (18.3 km). Second, balloons are steered by atmospheric winds down range of the launch site that could significantly differ from those winds along the vehicle ascent trajectory. Figure 1 illustrates the spatial separation of balloon measurements from the surface up to approximately 55 kft (16.8 km) during the Space Shuttle launch on 10 December 2006. The balloon issues are mitigated by use of vertically pointing Doppler Radar Wind Profilers (DRWPs). However, multiple DRWP instruments are required to provide wind data up to 60 kft (18.3 km) for vehicle trajectory assessments. The various DRWP systems have different operating configurations resulting in different temporal and spatial sampling intervals. Therefore, software was developed to combine data from both DRWP-generated profiles into a single profile for use in vehicle trajectory analyses. Details on how data from various wind measurement systems are combined and sample output will be presented in the following sections.

Decker, Ryan K.↗

Data Preservation: Final Step in the Life Cycle of a Mission

Many NASA Earth Observing System (EOS) have either already reached the end of their active life or are nearing it. Preservmissionsation of data products is a fairly well defined task for the NASA EOS Data Centers or DAACs.The Goddard Earth Sciences Data and Information Services Center (GES-DISC) has implemented a repository system, which is capable of long-term archive of documentation artifacts and other associated digital content. The existing GES-DISC Repository System is based on Fedora Commons, an open-source repository management software, for cost savings and flexibility.The first mission to utilize the GES-DISC Repository System was the High Resolution Dynamics Limb Sounder (HIRDLS) on the Aura spacecraft. Since then, the GES DISC has gathered documentation from the UARS and TOMS into the Repository. The Microwave Limb Sounder (MLS) team has begun delivering some early pre-launch documents to the GES-DISC Repository System as well. Other missions in planning or progress include AIRS, OMI, SORCE, SNPP Sounder, and TRMM.

Johnson, J.↗

Results of the Updated NASA Kennedy Space Center 50-MHz Doppler Radar Wind Profiler Operational Acceptance Test

We present here the methodology and results of the Operational Acceptance Test (OAT) performed on the new Kennedy Space Center (KSC) 50-MHz Doppler Radar Wind Profiler (DRWP). On day-of-launch (DOL), space launch vehicle operators have used data from the DRWP to invalidate winds in prelaunch loads and trajectory assessments due to the DRWP's capability to quickly identify changes in the wind profile within a rapidly-changing wind environment. The previous DRWP has been replaced with a completely new system, which needs to undergo certification testing before being accepted for use in range operations. The new DRWP replaces the previous three-beam system made of coaxial cables and a copper wire ground plane with a four-beam system that uses Yagi antennae with enhanced beam steering capability. In addition, the new system contains updated user interface software while maintaining the same general capability as the previous system. The new DRWP continues to use the Median Filter First Guess (MFFG) algorithm to generate a wind profile from Doppler spectra at each range gate. DeTect (2015) contains further details on the upgrade. The OAT is a short-term test designed so that end users can utilize the new DRWP in a similar manner to the previous DRWP during mission operations at the Eastern Range in the midst of a long-term certification process. This paper describes the Marshall Space Flight Center Natural Environments Branch's (MSFC NE's) analyses to verify the quality and accuracy of the DRWP's meteorological data output as compared to the previous DRWP. Ultimately, each launch vehicle program has the responsibility to certify the system for their own use.

Barbre', Robert E., Jr.↗

Information Technology and the Autonomous Control of a Mars In-Situ Propellant Production System

With the rapidly increasing performance of information technology, i.e., computer hardware and software systems, as well as networks and communication systems, a new capability is being developed that holds the clear promise of greatly increased exploration capability, along with dramatically reduced design, development, and operating costs. These new intelligent systems technologies, utilizing knowledge-based software and very high performance computer systems, will provide new design and development tools, scheduling mechanisms, and vehicle and system health monitoring capabilities. In addition, specific technologies such as neural nets will provide a degree of machine intelligence and associated autonomy which has previously been unavailable to the mission and spacecraft designer and to the system operator. One of the most promising applications of these new information technologies is to the area of in situ resource utilization. Useful resources such as oxygen, compressed carbon dioxide, water, methane, and buffer gases can be extracted and/or generated from planetary atmospheres, such as the Martian atmosphere. These products, when used for propulsion and life-support needs can provide significant savings in the launch mass and costs for both robotic and crewed missions. In the longer term the utilization of indigenous resources is an enabling technology that is vital to sustaining long duration human presence on Mars. This paper will present the concepts that are currently under investigation and development for mining the Martian atmosphere, such as temperature-swing adsorption, zirconia electrolysis etc., to create propellants and life-support materials. This description will be followed by an analysis of the information technology and control needs for the reliable and autonomous operation of such processing plants in a fault tolerant manner, as well as the approach being taken for the development of the controlling software. Finally, there will be a brief discussion of the verification and validation process so crucial to the implementation of mission-critical software.

Gross, Anthony R.↗

Rapidly quantifying the relative distention of a human bladder

A device and method of rapidly quantifying the relative distention of the bladder in a human subject are disclosed. The ultrasonic transducer which is positioned on the subject in proximity to the bladder is excited by a pulser under the command of a microprocessor to launch an acoustic wave into the patient. This wave interacts with the bladder walls and is reflected back to the ultrasonic transducer, when it is received, amplified and processed by the receiver. The resulting signal is digitized by an analog-to-digital converter under the command of the microprocessor and is stored in the data memory. The software in the microprocessor determines the relative distention of the bladder as a function of the propagated ultrasonic energy; and based on programmed scientific measurements and individual, anatomical, and behavioral characterists of the specific subject as contained in the program memory, sends out a signal to turn on any or all of the audible alarm, the visible alarm, the tactile alarm, and the remote wireless alarm.

Companion, John A.↗

Development of a Compact, Ground-Based Ozone DIAL System

We are developing a portable, eye-safe, ground-based ozone lidar instrument specialized for ozone differential absorption lidar (DIAL) measurements in the troposphere. This prototype instrument is intended to operate at remote field sites and to serve as the basic unit for future monitoring projects requiring multi-instrument networks, such as that proposed for the Global Tropospheric Ozone Project (GTOP). GTOP is currently being formulated by a scientific panel of the International Global Atmospheric Chemistry Project to meet its goal to better understand the processes that control the global distribution of tropospheric ozone. In order for the lidar to be widely deployed in networks, it must be fairly easy to use and maintain as well as being cost-competitive with ground station launching ozone sondes which operate several times a day. To achieve these goals, emphasis is placed upon the incorporation of: (1) all-solid state transmitters which can reliably produce 20-40 mJ pulses; (2) a highly efficient, narrow-bandpass receiver; (3) dual analog and photon-counting detector channels; and (4) flexible, user-friendly control software.

Chyba, T. H.↗

Statistical and Probabilistic Extensions to Ground Operations' Discrete Event Simulation Modeling

NASA's human exploration initiatives will invest in technologies, public/private partnerships, and infrastructure, paving the way for the expansion of human civilization into the solar system and beyond. As it is has been for the past half century, the Kennedy Space Center will be the embarkation point for humankind's journey into the cosmos. Functioning as a next generation space launch complex, Kennedy's launch pads, integration facilities, processing areas, launch and recovery ranges will bustle with the activities of the world's space transportation providers. In developing this complex, KSC teams work through the potential operational scenarios: conducting trade studies, planning and budgeting for expensive and limited resources, and simulating alternative operational schemes. Numerous tools, among them discrete event simulation (DES), were matured during the Constellation Program to conduct such analyses with the purpose of optimizing the launch complex for maximum efficiency, safety, and flexibility while minimizing life cycle costs. Discrete event simulation is a computer-based modeling technique for complex and dynamic systems where the state of the system changes at discrete points in time and whose inputs may include random variables. DES is used to assess timelines and throughput, and to support operability studies and contingency analyses. It is applicable to any space launch campaign and informs decision-makers of the effects of varying numbers of expensive resources and the impact of off nominal scenarios on measures of performance. In order to develop representative DES models, methods were adopted, exploited, or created to extend traditional uses of DES. The Delphi method was adopted and utilized for task duration estimation. DES software was exploited for probabilistic event variation. A roll-up process was used, which was developed to reuse models and model elements in other less - detailed models. The DES team continues to innovate and expand DES capabilities to address KSC's planning needs.

Trocine, Linda↗

Architecting the Human Space Flight Program with Systems Modeling Language (SysML)

The next generation of missions in NASA's Human Space Flight program focuses on the development and deployment of highly complex systems (e.g., Orion Multi-Purpose Crew Vehicle, Space Launch System, 21st Century Ground System) that will enable astronauts to venture beyond low Earth orbit and explore the moon, near-Earth asteroids, and beyond. Architecting these highly complex system-of-systems requires formal systems engineering techniques for managing the evolution of the technical features in the information exchange domain (e.g., data exchanges, communication networks, ground software) and also, formal correlation of the technical architecture to stakeholders' programmatic concerns (e.g., budget, schedule, risk) and design development (e.g., assumptions, constraints, trades, tracking of unknowns). This paper will describe how the authors have applied System Modeling Language (SysML) to implement model-based systems engineering for managing the description of the End-to-End Information System (EEIS) architecture and associated development activities and ultimately enables stakeholders to understand, reason, and answer questions about the EEIS under design for proposed lunar Exploration Missions 1 and 2 (EM-1 and EM-2).

scheduling↗

Mars Sample Return Using Commercial Capabilities: ERV Trajectory and Capture Requirements

Mars Sample Return was presented as the highest priority planetary science mission of the next decade [1]. Lemke et al. [2] present a Mars Sample Return mission concept in which the sample is returned directly from the surface of Mars to an Earth orbit. The sample is recovered in Earth Orbit instead of being transferred between spacecraft in Mars Orbit. This paper provides the details of this sample recovery in Earth orbit and presents as such a sub-element of the overall Mars sample return concept given in [2]. We start from the assumption that a Mars Ascent Vehicle (MAV), initially landed on Mars using a modified SpaceX Dragon capsule, has successfully delivered the sample, already contained within an Earth Return Vehicle (ERV), to a parking orbit around Mars. From the parking orbit, the ERV imparts sufficient Delta-V to inject itself into an earthbound trajectory and to be captured into an Earth orbit eventually. We take into account launch window and Delta-V considerations as well as the additional constraint of increased safety margins imposed by planetary protection regulations. We focus on how to overcome two distinct challenges of the sample return that are driven by the issues of planetary protection: (1) the design of an ERV trajectory meeting all the requirements including the need to avoid contamination of Earth's atmosphere; (2) the concept of operations for retrieving the Martian samples in Earth orbit in a safe way. We present an approach to retrieve the samples through a rendezvous between the ERV and a second SpaceX Dragon capsule. The ERV executes a trajectory that brings it from low Mars orbit (LMO) to a Moon-trailing Earth orbit at high inclination with respect to the Earth-Moon plane. After a first burn at Trans-Earth Injection (TEI), the trajectory uses a second burn at perigee during an Earth flyby maneuver to capture the ERV in Earth orbit. The ERV then uses a non-propulsive Moon flyby to come to a near-circular Moon-trailing orbit. To perform the Earth Orbit Rendezvous (EOR), a second Dragon capsule is then launched from Earth and a similar lunar flyby is performed to rendezvous with the ERV. The requirements for rendezvous, close proximity operations and capture of the sample canister are described. A concept of operations for sample retrieval is presented along with design specifications of the ERV, the required modifications to the Dragon capsule, as well as the hardware, software, sensors, actuators, and capture mechanisms used. In our concept, a container is mounted to the front hatch of Dragon, capable of accommodating the sample canister and sealing it from the rest of the capsule. The sample canister is captured using a robotic arm with a magnetic grappling mechanism. Dragon then performs a propulsive maneuver to return to Earth for a controlled re-entry while the ERV (sans sample container) is left in the Moon trailing orbit. Contingency cases and related mitigation strategies are also discussed, including the advantages and disadvantages of performing the ERV rendezvous with a crew.

Faber, Nicolas F.↗

Comparing On-Orbit and Ground Performance for an S-Band Software-Defined Radio

NASA's Space Communications and Navigation Testbed was installed on an external truss of the International Space Station in 2012. The testbed contains several software-defined radios (SDRs), including the Jet Propulsion Laboratory (JPL) SDR, which underwent performance testing throughout 2013 with NASAs Tracking and Data Relay Satellite System (TDRSS). On-orbit testing of the JPL SDR was conducted at S-band with the Glenn Goddard TDRSS waveform and compared against an extensive dataset collected on the ground prior to launch. This paper will focus on the development of a waveform power estimator on the ground post-launch and discuss the performance challenges associated with operating the power estimator in space.

International Space Station↗

Delivery of Colloid Micro-Newton Thrusters for the Space Technology 7 Mission

Two flight-qualified clusters of four Colloid Micro-Newton Thruster (CMNT) systems have been delivered to the Jet Propulsion Laboratory (JPL). The clusters will provide precise spacecraft control for the drag-free technology demonstration mission, Space Technology 7 (ST7). The ST7 mission is sponsored by the NASA New Millennium Program and will demonstrate precision formation flying technologies for future missions such as the Laser Interferometer Space Antenna (LISA) mission. The ST7 disturbance reduction system (DRS) will be on the ESA LISA Pathfinder spacecraft using the European gravitational reference sensor (GRS) as part of the ESA LISA Technology Package (LTP). Developed by Busek Co. Inc., with support from JPL in design and testing, the CMNT has been developed over the last six years into a flight-ready and flight-qualified microthruster system, the first of its kind. Recent flight-unit qualification tests have included vibration and thermal vacuum environmental testing, as well as performance verification and acceptance tests. All tests have been completed successfully prior to delivery to JPL. Delivery of the first flight unit occurred in February of 2008 with the second unit following in May of 2008. Since arrival at JPL, the units have successfully passed through mass distribution, magnetic, and EMI/EMC measurements and tests as part of the integration and test (I&T) activities including the integrated avionics unit (IAU). Flight software sequences have been tested and validated with the full flight DRS instrument successfully to the extent possible in ground testing, including full functional and 72 hour autonomous operations tests. Delivery of the cluster assemblies along with the IAU to ESA for integration into the LISA Pathfinder spacecraft is planned for the summer of 2008 with a planned launch and flight demonstration in late 2010.

Precision Formation Flying↗

Space Launch System (SLS) Human Factors Engineering Modeling & Analysis

The Human Systems Integration & Engineering (HSI&E) team at NASA’s Marshall Space Flight Center (MSFC) strives to advocate for the humans in the loop of Space Launch System’s (SLS) ground operations. Using assessment methods like human simulation, virtual reality, and physical mockups, both flight hardware and ground support equipment (GSE) are evaluated for human integration. Those ranging from 5th percentile female (approximately 5’2” tall) to 95th percentile male (approximately 6’2” tall) should be able to perform all SLS stacking operations. Operations include element physical mates, element electrical mates, and testing activities. The primary human simulation software used is Process Simulate Human (PSH) made by Siemens. This software supplies highly accurate human manikins that can interact with CAD models. PSH was used to evaluate the Transportation and Integration Platform’s (TIP) side opening that was designed for access to the Payload Adapter (PLA) cables. Technicians will need to access these cables for testing purposes before element stacking at Kennedy Space Center (KSC). After performing an analysis in PSH using the TIP side opening, it was found that neither a 5th percentile female or a 95th percentile male could perform the task as the designers had intended. There is a C-beam that blocks access to the cables (both physically and visually). An alternative analysis was performed using PSH to look at another access point to the PLA cables. Although this method would disrupt already established procedures and produce more work, the designers confirmed it was an option. Instead of technicians accessing the cables through the side opening in the TIP, a human simulation was performed for going through a panel opening in the bottom of the TIP. This method requires removal of a TIP panel and a stepladder of at least 36 inches for a 5th percentile female to access the cables.

human factors↗