Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “delivery”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Unmanned Aerial System (UAS) Traffic Management (UTM): Enabling Low-Altitude Airspace and UAS Operations

Many civilian applications of Unmanned Aerial Systems (UAS) have been imagined ranging from remote to congested urban areas, including goods delivery, infrastructure surveillance, agricultural support, and medical services delivery. Further, these UAS will have different equipage and capabilities based on considerations such as affordability, and mission needs applications. Such heterogeneous UAS mix, along with operations such as general aviation, helicopters, gliders must be safely accommodated at lower altitudes. However, key infrastructure to enable and safely manage widespread use of low-altitude airspace and UAS operations therein does not exist. Therefore, NASA is exploring functional design, concept and technology development, and a prototype UAS Traffic Management (UTM) system. UTM will support safe and efficient UAS operations for the delivery of goods and services

UAV↗

Nanochanneled Device and Related Methods

A nanochannel delivery device and method of manufacturing and use. The nanochannel delivery device comprises an inlet, an outlet, and a nanochannel. The nanochannel may be oriented parallel to the primary plane of the nanochannel delivery device. The inlet and outlet may be in direct fluid communication with the nanochannel.

Ferrari, Mauro↗

Arrival Metering Precision Study

This paper describes the background, method and results of the Arrival Metering Precision Study (AMPS) conducted in the Airspace Operations Laboratory at NASA Ames Research Center in May 2014. The simulation study measured delivery accuracy, flight efficiency, controller workload, and acceptability of time-based metering operations to a meter fix at the terminal area boundary for different resolution levels of metering delay times displayed to the air traffic controllers and different levels of airspeed information made available to the Time-Based Flow Management (TBFM) system computing the delay. The results show that the resolution of the delay countdown timer (DCT) on the controllers display has a significant impact on the delivery accuracy at the meter fix. Using the 10 seconds rounded and 1 minute rounded DCT resolutions resulted in more accurate delivery than 1 minute truncated and were preferred by the controllers. Using the speeds the controllers entered into the fourth line of the data tag to update the delay computation in TBFM in high and low altitude sectors increased air traffic control efficiency and reduced fuel burn for arriving aircraft during time based metering.

human/systems↗

An Optimizing Space Data-Communications Scheduling Method and Algorithm with Interference Mitigation, Generalized for a Broad Class of Optimization Problems

NASA's space data-communications infrastructure-the Space Network and the Ground Network-provide scheduled (as well as some limited types of unscheduled) data-communications services to user spacecraft. The Space Network operates several orbiting geostationary platforms (the Tracking and Data Relay Satellite System (TDRSS)), each with its own servicedelivery antennas onboard. The Ground Network operates service-delivery antennas at ground stations located around the world. Together, these networks enable data transfer between user spacecraft and their mission control centers on Earth. Scheduling data-communications events for spacecraft that use the NASA communications infrastructure-the relay satellites and the ground stations-can be accomplished today with software having an operational heritage dating from the 1980s or earlier. An implementation of the scheduling methods and algorithms disclosed and formally specified herein will produce globally optimized schedules with not only optimized service delivery by the space data-communications infrastructure but also optimized satisfaction of all user requirements and prescribed constraints, including radio frequency interference (RFI) constraints. Evolutionary algorithms, a class of probabilistic strategies for searching large solution spaces, is the essential technology invoked and exploited in this disclosure. Also disclosed are secondary methods and algorithms for optimizing the execution efficiency of the schedule-generation algorithms themselves. The scheduling methods and algorithms as presented are adaptable to accommodate the complexity of scheduling the civilian and/or military data-communications infrastructure within the expected range of future users and space- or ground-based service-delivery assets. Finally, the problem itself, and the methods and algorithms, are generalized and specified formally. The generalized methods and algorithms are applicable to a very broad class of combinatorial-optimization problems that encompasses, among many others, the problem of generating optimal space-data communications schedules.

ground stations↗

Systems Engineering and Technology Considerations of a Mars Ascent Vehicle

A Mars Ascent Vehicle (MAV) systems engineering study is underway to define the driving requirements, system architecture, major risks, and required technology developments to support the launch of a rock core sample to a specified delivery orbit for later retrieval and return to Earth. The proposed MAV would essentially be a small-scale launch vehicle, the first of its kind to be launched autonomously from another planet. The MAV would be a flight element of the proposed Mars Sample Return (MSR) campaign architecture, which currently assumes a 2018 launch of the sample caching mission and a 2024 (Earth) launch date of the MAV and lander, with arrival on Mars in 2025. After 9 months on the surface the MAV would be erected and launched to a specified delivery orbit. In the delivery orbit it would release its payload, a 5 kg sphere containing the rock core sample. An orbiter would rendezvous and capture the payload, returning it to Earth a year later.

entry, descent, and landing (EDL)↗

Combining Solar Electric Propulsion and Chemical Propulsion for Crewed Missions to Mars

This paper documents the results of an investigation of human Mars mission architectures that leverage near-term technology investments and infrastructures resulting from the planned Asteroid Redirect Robotic Mission (ARRM), including high-power Solar Electric Propulsion (SEP) and a human presence in Lunar Distant Retrograde Orbit (LDRO). The architectures investigated use a combination of SEP and chemical propulsion elements. Through this combination of propulsion technologies, these architectures take advantage of the high efficiency SEP propulsion system to deliver cargo, while maintaining the faster trip times afforded by chemical propulsion for crew transport. Evolved configurations of the Asteroid Redirect Vehicle (ARV) are considered for cargo delivery. Sensitivities to SEP system design parameters, including power level and propellant quantity, are presented. For the crew delivery, liquid oxygen and methane stages were designed using engines common to future human Mars landers. Impacts of various Earth departure orbits, Mars loiter orbits, and Earth return strategies are presented. The use of the Space Launch System for delivery of the various architecture elements was also investigated and launch vehicle manifesting, launch scheduling and mission timelines are also discussed. The study results show that viable Mars architecture can be constructed using LDRO and SEP in order to take advantage of investments made in the ARRM mission.

Percy, Tom↗

Combining Solar Electric and Chemical Propulsion for Crewed Missions to Mars

This paper documents the results of an investigation of human Mars mission architectures that leverage near-term technology investments and infrastructures resulting from the planned Asteroid Redirect Mission, including high-power Solar Electric Propulsion (SEP) and a human presence in Lunar Distant Retrograde Orbit (LDRO). The architectures investigated use a combination of SEP and chemical propulsion elements. Through this combination of propulsion technologies, these architectures take advantage of the high efficiency SEP propulsion system to deliver cargo, while maintaining the faster trip times afforded by chemical propulsion for crew transport. Evolved configurations of the Asteroid Redirect Vehicle (ARV) are considered for cargo delivery. Sensitivities to SEP system design parameters, including power level and propellant quantity, are presented. For the crew delivery, liquid oxygen and methane stages were designed using engines common to future human Mars landers. Impacts of various Earth departure orbits, Mars loiter orbits, and Earth return strategies are presented. The use of the Space Launch System for delivery of the various architecture elements was also investigated and launch vehicle manifesting, launch scheduling and mission timelines are also discussed. The study results show that viable Mars architecture can be constructed using LDRO and SEP in order to take advantage of investments made in the ARM mission.

Percy, Tom↗

Integrated Test Approach

This paper describes a testing methodology undertaken on the Facilities Development and Operations Contract (FDOC) by Lockheed Martin. The methodology was defined with the intent of reducing project schedule time to enable NASA's Johnson Space Center (JSC) to be able to deliver the Mission Control Center (MCC) 21 project as quickly as possible. 21 represents the 21st century where NASA JSC is updating its control center with new technology and operational concepts in order to support NASA customers wanting to use control center assets to support space vehicle operations. In collaboration with the NASA customer, a new test concept was conceived early during MCC21 project planning with the goal of reducing project delivery time. One enabler that could help reduce delivery time was testing. Within the project, testing was performed by two entities, software development responsible for subsystem testing and system test responsible for system integration testing. The MCC21 project took a deliberate review of testing to determine how it could be performed differently to realize an overall reduction in test time to support the goal of a more rapid project delivery.

Cotton, Will↗

Recent Progress with the JWST Observatory

The James Webb Space Telescope (JWST) is a large aperture (6.5 meter), cryogenic space telescope with a suite of near and mid-infrared instruments covering the wavelength range of 0.6 micrometers - 28 micrometers. JWST's primary science goal is to detect and characterize the first galaxies. It will also study the assembly of galaxies, star formation, and the formation of evolution of planetary systems. JWST is a segmented mirror telescope operating at (is) approximately 40K, a temperature achieved by passive cooling of the observatory, via a large, 5-layer membrane-based sunshield. We present an overview of the observatory systems design, the science instruments and the mission science objectives. With the completion of the Spacecraft Critical Design Review, the spacecraft has also fully transitioned to fabrication. We will discuss recent highlights associated with the Observatory, including completion and delivery of the primary mirror segments, delivery of the primary mirror backplane and its wings, and the delivery of five template membrane layers. We will also summarize the current predicted performance of the telescope, including stray light, pointing and image quality following the completion of the final design review. Finally, the current schedule through to launch will be presented with a summary of integration and test activities planned when the science payload is delivered to Northrop Grumman following cryo-optical testing at the Johns Space Flight Center.

James Webb Space Telescope (JWST)↗

Robust Exploration and Commercial Missions to the Moon Using NTR LANTR Propulsion and Lunar-Derived Propellants

NASAs current focus is on the Journey to Mars sometime around the mid-to-late 2030s. However, it is also supporting the development of commercial cargo and crew delivery to the ISS (e.g., SpaceX, Orbital Sciences, SNC, Boeing) where inflatable habitation technology (e.g., Bigelow Aerospaces BEAM) is currently being tested Significant private sector interest in commercial lunar activities has also been expressed by Bigelow Aerospace, Golden Spike Company, Shackleton Energy Company (SEC), and most recently by United Launch Alliance (ULA) in their Cislunar-1000 plan Lunar-derived propellant (LDP) production specifically LLO2 and LLH2 offers significant mission leverage and are central themes of both SECs and ULAs plans for commercial lunar development. An efficient, proven propulsion technology with reuse capability like NTP offers the potential for affordable access through space essential to realizing commercial lunar missions.This presentation examines the performance potential of an evolutionary lunar transportation system (LTS) architecture using NTR initially, then transitioning to LANTR as LDPs(e.g., LLO2 from regolith or volcanic glass, LLO2 and LLH2 from lunar polar ice deposits) become available in lunar orbit (LO) Mission applications range from cargo delivery, to crewed landing, to routine commuter flights to and from transportation system nodes located in both lunar equatorial and lunar polar orbits. This presentation examines the performance potential of an evolutionary lunar transportation system (LTS) architecture using NTR initially, then transitioning to LANTR as LDPs (e.g., LLO2 from regolith or volcanic glass, LLO2 and LLH2 from lunar polar ice deposits) become available in lunar orbit (LO) Mission applications range from cargo delivery, to crewed landing, to routine commuter flights to and from transportation system nodes located in both lunar equatorial and lunar polar orbits.

Spacecraft Design↗

Building an Economical and Sustainable Lunar Infrastructure to Enable Lunar Industrialization

A new concept study was initiated to examine the architecture needed to gradually develop an economical, evolvable and sustainable lunar infrastructure using a public/private partnerships approach. This approach would establish partnership agreements between NASA and industry teams to develop a lunar infrastructure system that would be mutually beneficial. This approach would also require NASA and its industry partners to share costs in the development phase and then transfer operation of these infrastructure services back to its industry owners in the execution phase. These infrastructure services may include but are not limited to the following: lunar cargo transportation, power stations, communication towers and satellites, autonomous rover operations, landing pads and resource extraction operations. The public/private partnerships approach used in this study leveraged best practices from NASA's Commercial Orbital Transportation Services (COTS) program which introduced an innovative and economical approach for partnering with industry to develop commercial cargo services to the International Space Station. This program was planned together with the ISS Commercial Resupply Services (CRS) contracts which was responsible for initiating commercial cargo delivery services to the ISS for the first time. The public/private partnerships approach undertaken in the COTS program proved to be very successful in dramatically reducing development costs for these ISS cargo delivery services as well as substantially reducing operational costs. To continue on this successful path towards installing economical infrastructure services for LEO and beyond, this new study, named Lunar COTS (Commercial Operations and Transport Services), was conducted to examine extending the NASA COTS model to cis-lunar space and the lunar surface. The goals of the Lunar COTS concept are to: 1) develop and demonstrate affordable and commercial cis-lunar and surface capabilities, such as lunar cargo delivery and surface power generation, in partnership with industry; 2) incentivize industry to establish economical and sustainable lunar infrastructure services to support NASA missions and initiate lunar commerce; and 3) encourage creation of new space markets for economic growth and benefit. A phased-development approach was also studied to allow for incremental development and demonstration of capabilities needed to build a lunar infrastructure. This paper will describe the Lunar COTS concept goals, objectives and approach for building an economical and sustainable lunar infrastructure. It will also describe the technical challenges and advantages of developing and operating each infrastructure element. It will also describe the potential benefits and progress that can be accomplished in the initial phase of this Lunar COTS approach. Finally, the paper will also look forward to the potential of a robust lunar industrialization environment and its potential effect on the next 50 years of space exploration.

Zuniga, Allison F.↗

GN and C Subsystem Concept for Safe Precision Landing of the Proposed Lunar MARE Robotic Science Mission

The Lunar MARE (Moon Age and Regolith Explorer) Discovery Mission concept targets delivery of a science payload to the lunar surface for sample collection and dating. The mission science is within a 100-meter radius region of smooth lunar maria terrain near Aristarchus crater. The location has several small, sharp craters and rocks that present landing hazards to the spacecraft. For successful delivery of the science payload to the surface, the vehicle Guidance, Navigation and Control (GN&C) subsystem requires safe and precise landing capability, so design infuses the NASA Autonomous precision Landing and Hazard Avoidance Technology (ALHAT) and a gimbaled, throttleable LOX/LCH4 main engine. The ALHAT system implemented for Lunar MARE is a specialization of prototype technologies in work within NASA for the past two decades, including a passive optical Terrain Relative Navigation (TRN) sensor, a Navigation Doppler Lidar (NDL) velocity and range sensor, and a Lidar-based Hazard Detection (HD) sensor. The landing descent profile is from a retrograde orbit over lighted terrain with landing near lunar dawn. The GN&C subsystem with ALHAT capabilities will deliver the science payload to the lunar surface within a 20-meter landing ellipse of the target location and at a site having greater than 99% safety probability, which minimizes risk to safe landing and delivery of the MARE science payload to the intended terrain region.

MARE (Moon Age and Regolith Explorer)↗

Biocompatible Capsules and Methods of Making

Embodiments of the invention include capsules for containing medical implants and delivery systems for release of active biological substances into a host body. Delivery systems comprise a capsule comprising an interior enclosed by walls, and a source of active biological substances enclosed within the capsule interior, wherein the active biological substances are free to diffuse across the capsule walls. The capsule walls comprise a continuous mesh of biocompatible fibers and a seal region where two capsule walls overlap. The interior of the capsule is substantially isolated from the medium surrounding the capsule, except for diffusion of at least one species of molecule between the capsule interior and the ambient medium, and prevents cell migration into or out of the capsule. Methods for preparing and using the capsules and delivery systems are provided.

Loftus, David J.↗

Space Chicken: A Historical Look at How the Critical Path Changes over a Mission’s Development

The critical path in schedule analysis defines the series of tasks that have no schedule slack leading to the delivery of a system. The critical path for NASA science missions, which typically runs through a spacecraft subsystem or a scientific instrument, is dynamic and changes over the development lifetime of a project. Often the critical path at the start of preliminary design will be through a specific spacecraft subsystem while the final, delivered critical path item is often a scientific instrument that is delivered late. The research for this paper looks at the postulated critical path at different milestones, and the actual critical path item at final delivery, for a variety of NASA science missions to understand what elements are impacting the delivery schedule the most. Recommendations are made based on these quantitative results relative to what elements should potentially be considered more often in early development schedules to more robustly plan for development issues.

Bitten, Robert↗

TPSAS-NF1676L-13680-DND

The International Space Station will require a continuous supply of replacement parts for ongoing maintenance and repair after the retirement of the Space Shuttle. These parts, existing line-replaceable items collectively called Orbital Replacement Units, include heavy and oversized items such as Control Moment Gyroscopes and stowed radiator arrays originally intended for delivery aboard the Space Shuttle. Current resupply spacecraft have limited to no capability to deliver these external logistics. In support of NASA?s Exploration Systems Architecture Study, a team at Langley Research Center designed an Unpressurized Cargo Delivery Vehicle to deliver bulk cargo to the Space Station. The Unpressurized Cargo Delivery Vehicle was required to deliver at least 13,200 lb of cargo mounted on at least 18 Flight Releasable Attachment Mechanisms. The baseline vehicle design developed here has a cargo capacity of 16,000 lbs mounted on up to 20 Flight Releasable Attachment Mechanisms. Major vehicle components are a 5.5m-diameter cargo module containing two detachable cargo pallets with the payload, a Service Module to provide propulsion and power, and an aerodynamic nose cone. To reduce cost and risk, the Service Module is identical to the one used for the Crew Exploration Vehicle design. The Crew Launch Vehicle design recommended in the Exploration Systems Architecture Study was used to launch one annual resupply flight to the International Space Station.

K Chauncey Wu↗

Airspace Technology Demonstration 2 (ATD-2): Integrated Arrival/Departure/Surface (IADS) System Demonstration - Technology Transfer Document Summary (ReadMe) (Version 2.5 - Initial Phase 3 Metroplex IADS)

Airspace Technology Demonstration – 2 (ATD-2) is part of NASA’s Airspace Technology Demonstrations (ATD) Project under its Airspace Operations and Safety Program (AOSP). ATD-2 is a multi-year research and development effort to improve the predictability and operational efficiency of the air traffic system in metroplex environments while maintaining or improving throughput by enhancing and integrating arrival, departure, and surface prediction, scheduling, and management systems. In order to ensure that the products of this knowledge and technology transfer are relevant and useful, NASA has created strong partnerships with the FAA and industry stakeholders. This summary document and accompanying artifacts satisfy the next delivery of research transition products (RTPs) defined in the IADS research transition team (RTT) plan. With the ATD-2 project extended for another year, this Tech Transfer 2.5 constitutes an interim delivery of artifacts from the Phase 3 field demonstration. The final Phase 3 tech transfer delivery is planned for August 2021.

ATD-2, IADS, Phase 3, tech transfer↗

Regenerative ECLSS and Logistics Analysis for Sustained Lunar Surface Missions

As NASA begins to develop concepts for sustained crew missions to the lunar surface, it will be essential to evaluate the logistics requirements needed to enable such missions. Lunar surface missions will involve crews of four astronauts living on the surface for periods of 30 days or longer. Astronauts will either live in a surface habitat or transfer between a habitat and a pressurized rover. The amount of logistics that must be delivered to the surface to support the crew, support the surface systems, and conduct science could be substantial. Because NASA plans to conduct these missions on an annual basis, the complexity and cost of logistics delivery will likely drive campaign sustainability. The amount of required logistics is partially a function of the ECLSS system in the habitable elements on the surface. The higher the capability of regenerative ECLSS that can be accommodated, the lower the logistics requirements. However, the increased regenerative ECLSS capabilities will also increase the initial delivery mass of elements and require additional maintenance and spares to maintain the systems. This paper describes an effort to evaluate lunar sustained logistics requirements, including sensitivity analysis for ECLSS architecture options and their impact on requirements. The authors determine logistics requirements using an integrated surface ECLSS model. The model considers different configurations of rover and habitat setups with multiple ECLSS options on both. The tool can also model gas and liquid transfer options between the habitat and the rover. The authors use the model to evaluate several different ECLSS configurations and their logistics requirements. The authors then complete a sensitivity analysis that compares logistic requirements and the initial delivery mass over increasing ECLSS capabilities. Finally, the authors make recommendations for an ECLSS architecture option that balances the tradeoffs between logistics requirements and ECLSS mass.

Environmental Control and Life Support↗

BioNutrients-2: Improvements to the BioNutrients-1 Nutrient Production System

The BioNutrients (BN) project aims to develop an on-demand nutrient production system capable of rapid and safe delivery of multiple nutrients in a single-use production pack for long-duration missions. The general concept of this system will be to develop an edible engineered microorganism capable of surviving during long-term storage, revival and growth of that microorganism for product production, and delivery of precise quantities of nutrients for human consumption. BN-1 is a five-year flight project currently on the International Space Station (ISS). It is testing the long-term storage of various microorganisms for the biomanufacturing of space relevant compounds and to validate the performance of the first generation (Gen-1) of production packs. The BN-2 project is a continuation of the BN-1 flight project and intends to expand the projects overall scope by introducing novel products, broadening the range of microbial food sources, and improving previously designed hardware from the BN-1 project. We are in the process of optimizing our platform biomanufacturing technology for in situ production of yogurt and kefir on the ISS. BN-2 will test the efficacy of this technology for future delivery of probiotic organisms which can be engineered to produce additional nutritional supplements (consumption by the crew is not planned in this project). Furthermore, to improve the feasibility of this technology for mission use we have transitioned from a hard-shell pack to a Gen-2, fluorinated ethylene propylene (FEP) bag. The single-use FEP bioreactor will facilitate growth of known organisms and ensure a contaminant free environment, while reducing mass and volume. These bioreactors will be employed for production of additional space relevant products in the BN-2 project. On-orbit testing of Gen-2 production packs will be necessary for future iterations, in order to optimize bag design and product production for eventual flight use by the crew.

BioNutrients↗