Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “continuous integration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Space Technology 5: Changing the Mission Design without Changing the Hardware

The Space Technology 5 (ST-5) Project is part of NASA's New Millennium Program. The validation objectives are to demonstrate the research-quality science capability of the ST-5 spacecraft; to operate the three spacecraft as a constellation; and to design, develop, test and flight-validate three capable micro-satellites with new technologies. A three-month flight demonstration phase is planned, beginning in March 2006. This year, the mission was re-planned for a Pegasus XL dedicated launch into an elliptical polar orbit (instead of the Originally-planned Geosynchronous Transfer Orbit.) The re-plan allows the mission to achieve the same high-level technology validation objectives with a different launch vehicle. The new mission design involves a revised science validation strategy, a new orbit and different communication strategy, while minimizing changes to the ST-5 spacecraft itself. The constellation operations concepts have also been refined. While the system engineers, orbit analysts, and operations teams were re-planning the mission, the implementation team continued to make progress on the flight hardware. Most components have been delivered, and the first spacecraft is well into integration and test.

Carlisle, Candace C.↗

Low Power Camera-on-a-Chip Using CMOS Active Pixel Sensor Technology

A second generation image sensor technology has been developed at the NASA Jet Propulsion Laboratory as a result of the continuing need to miniaturize space science imaging instruments. Implemented using standard CMOS, the active pixel sensor (APS) technology permits the integration of the detector array with on-chip timing, control and signal chain electronics, including analog-to-digital conversion.

Space Microelectronics Image Sensors APS Digital I↗

Low Power Camera-on-a-Chip Using CMOS Active Pixel Sensor Technology

A second generation image sensor technology has been developed at the NASA Jet Propulsion Laboratory as a result of the continuing need to miniaturize space science imaging instruments. Implemented using standard CMOS, the active pixel sensor (APS) technology permits the integration of the detector array with on-chip timing, control and signal chain electronics, including analog-to-digital conversion.

Space Microelectronics Image Sensors APS Digital I↗

SERVIR's Contributions and Benefits to Belize thru Spatial Data Infrastructure (SDI) Development

Dan Irwin, the SERVIR Project Manager is being honored with the privilege of delivering the opening remarks at Belize s second celebration of GIS Day, a weeklong event to be held at the University of Belize's campus in the nation s capital, Belmopan. The request has been extended by the GIS Day Planning Committee which operates under the auspices of Belize s Ministry of Natural Resources & the Environment, which is the focal ministry for SERVIR. In the 20-30 min. allotted for the opening remarks, the SERVIR Project Manager will expound on how SERVIR, operating under the auspices of NASA s Ecological Forecasting Program, contributes to spatial data infrastructure (SDI) development in Belize. NASA s contributions to the region - particularly work under the Mesoamerican Biological Corridor - will be highlighted. Continuing, the remarks will discuss SERVIR s role in Belize s steadily expanding SDI, particularly in the context of delivering integrated decision support products via web-based infrastructure. The remarks will close with a call to the parties assembled to work together in the application of Earth Observation Systems technologies for the benefit of Belizean society as a whole. NASA s strong presence in Belize s GIS Day celebrations will be highlighted as sustained goodwill of the American people - in partial fulfillment of goals set forth under the Global Earth Observation System of Systems (GEOSS).

Irwin, Daniel E.↗

Single-Pole Double-Throw MMIC Switches for a Microwave Radiometer

In order to reduce the effect of gain and noise instabilities in the RF chain of a microwave radiometer, a Dicke radiometer topology is often used, as in the case of the proposed surface water and ocean topography (SWOT) radiometer instrument. For this topology, a single-pole double-throw (SPDT) microwave switch is needed, which must have low insertion loss at the radiometer channel frequencies to minimize the overall receiver noise figure. Total power radiometers are limited in accuracy due to the continuous variation in gain of the receiver. High-frequency SPDT switches were developed in the form of monolithic microwave integrated circuits (MMICs) using 75 micron indium phosphide (InP) PIN-diode technology. These switches can be easily integrated into Dicke switched radiometers that utilize microstrip technology.

Montes, Oliver↗

Asteroid Redirect Crewed Mission Space Suit and EVA System Maturation

The Asteroid Redirect Crewed Mission (ARCM) requires a Launch/Entry/Abort (LEA) suit capability and short duration Extra Vehicular Activity (EVA) capability from the Orion spacecraft. For this mission, the pressure garment that was selected, for both functions, is the Modified Advanced Crew Escape Suit (MACES) with EVA enhancements and the life support option that was selected is the Exploration Portable Life Support System (PLSS). The proposed architecture was found to meet the mission constraints, but much more work is required to determine the details of the required suit upgrades, the integration with the PLSS, and the rest of the tools and equipment required to accomplish the mission. This work has continued over the last year to better define the operations and hardware maturation of these systems. EVA simulations have been completed in the NBL and interfacing options have been prototyped and analyzed with testing planned for late 2014. For NBL EVA simulations, in 2013, components were procured to allow in-house build up for four new suits with mobility enhancements built into the arms. Boots outfitted with clips that fit into foot restraints have also been added to the suit and analyzed for possible loads. Major suit objectives accomplished this year in testing include: evaluation of mobility enhancements, ingress/egress of foot restraint, use of foot restraint for worksite stability, ingress/egress of Orion hatch with PLSS mockup, and testing with two crew members in the water at one time to evaluate the crew's ability to help one another. Major tool objectives accomplished this year include using various other methods for worksite stability, testing new methods for asteroid geologic sampling and improving the fidelity of the mockups and crew equipment. These tests were completed on a medium fidelity capsule mockup, asteroid vehicle mockup, and asteroid mockups that were more accurate for an asteroid type EVA than previous tests. Another focus was the design and fabrication of the interface between the MACES and the PLSS. The MACES was not designed to interface with a PLSS, hence an interface kit must accommodate the unique design qualities of the MACES and provide the necessary life support function connections to the PLSS. A prototype interface kit for MACES to PLSS has been designed and fabricated. Unmanned and manned testing of the interface will show the usability of the kit while wearing a MACES. The testing shows viability of the kit approach as well as the operations concept. The design will be vetted through suit and PLSS experts and, with the findings from the testing, the best path forward will be determined. As the Asteroid Redirect Mission matures, the suit/life support portion of the mission will mature along with it and EVA Tools & Equipment can be iterated to accommodate the overall mission objectives and compromises inherent in EVA Suit optimization. The goal of the EVA architecture for ARCM is to continue to build on the previously developed technologies and lessons learned, and accomplish the ARCM EVAs while providing a stepping stone to future missions and destinations.

Bowie, Jonathan T.↗

Thermodynamic Performance of the 3-Stage ADR for the Astro-H Soft X-Ray Spectrometer Instrument

The Soft X-ray Spectrometer (SXS) instrument[1] on Astro-H[2] will use a 3-stage ADR[3] to cool the microcalorimeter array to 50 mK. In the primary operating mode, two stages of the ADR cool the detectors using superfluid helium at ≤1.20 K as the heat sink[4]. In the secondary mode, which is activated when the liquid helium is depleted, the ADR uses a 4.5 K Joule-Thomson cooler as its heat sink. In this mode, all three stages operate together to continuously cool the (empty) helium tank and singleshot cool the detectors. The flight instrument - dewar, ADR, detectors and electronics - were integrated in 2014 and have since undergone extensive performance testing. This paper presents a thermodynamic analysis of the ADR's operation, including cooling capacity, heat rejection to the heat sinks, and various measures of efficiency.

adiabatic demagnetization refrigerator↗

Overview of ERA Integrated Technology Demonstration (ITD) 51A Ultra-High Bypass (UHB) Integration for Hybrid Wing Body (HWB)

The NASA Environmentally Responsible Aircraft Project (ERA) was a ve year project broken into two phases. In phase II, high N+2 Technical Readiness Level demonstrations were grouped into Integrated Technology Demonstrations (ITD). This paper describes the work done on ITD-51A: the Vehicle Systems Integration, Engine Airframe Integration Demonstration. Refinement of a Hybrid Wing Body (HWB) aircraft from the possible candidates developed in ERA Phase I was continued. Scaled powered, and unpowered wind- tunnel testing, with and without acoustics, in the NASA LARC 14- by 22-foot Subsonic Tunnel, the NASA ARC Unitary Plan Wind Tunnel, and the 40- by 80-foot test section of the National Full-Scale Aerodynamics Complex (NFAC) in conjunction with very closely coupled Computational Fluid Dynamics was used to demonstrate the fuel burn and acoustic milestone targets of the ERA Project.

Flamm, Jeffrey D.↗

NASA Agile Community of Practice 2024-2026 Report

This 2024-2026 report provides a summary of the products and activities executed by the NASA Agile Community of Practice (CoP) during its second and third years. Building on the foundation established in its inaugural year, the CoP continued to advance Agile values and principles across NASA centers. The report highlights key initiatives, including specialized framework training, AI integration in Agile toolkits, and active participation in agency-wide project management and systems engineering workshops.

Agile↗

Discovering System Health Anomalies Using Data Mining Techniques

We present a data mining framework for the analysis and discovery of anomalies in high-dimensional time series of sensor measurements that would be found in an Integrated System Health Monitoring system. We specifically treat the problem of discovering anomalous features in the time series that may be indicative of a system anomaly, or in the case of a manned system, an anomaly due to the human. Identification of these anomalies is crucial to building stable, reusable, and cost-efficient systems. The framework consists of an analysis platform and new algorithms that can scale to thousands of sensor streams to discovers temporal anomalies. We discuss the mathematical framework that underlies the system and also describe in detail how this framework is general enough to encompass both discrete and continuous sensor measurements. We also describe a new set of data mining algorithms based on kernel methods and hidden Markov models that allow for the rapid assimilation, analysis, and discovery of system anomalies. We then describe the performance of the system on a real-world problem in the aircraft domain where we analyze the cockpit data from aircraft as well as data from the aircraft propulsion, control, and guidance systems. These data are discrete and continuous sensor measurements and are dealt with seamlessly in order to discover anomalous flights. We conclude with recommendations that describe the tradeoffs in building an integrated scalable platform for robust anomaly detection in ISHM applications.

Sriastava, Ashok, N.↗

Keeping Communication Continuous

General Dynamics Decision Systems employees have played a role in supplying telemetry, tracking, and control (TT&C) and other communications systems to NASA and the U.S. Department of Defense for over 40 years. Providing integrated communication systems and subsystems for nearly all manned and unmanned U.S. space flights, the heritage of this Scottsdale, Arizona-based company includes S-band transceivers that enabled millions of Americans to see Neil Armstrong and hear his prophetic words from the Moon in 1969. More recently, Decision Systems has collaborated with NASA s Goddard Space Flight Center to develop transponders, wireless communications devices that pick up and automatically respond to an incoming signal, for NASA s Tracking and Data Relay Satellite System (TDRSS). Four generations of Decision Systems TDRSS transponders have been developed under Goddard s sponsorship. The company s Fourth Generation TDRSS User Transponder (TDRSS IV) allows low-Earth-orbiting spacecraft to communicate continuously with a single ground station at White Sands, New Mexico, through a constellation of geostationary relay satellites positioned at key locations around the Earth. In addition to the communications of forward link control commands and return link telemetry data, the TDRSS IV also supports spacecraft orbit tracking through coherent turn-around of a pseudo-noise ranging code and two-way Doppler tracking.When the NSBF adopted the use of global positioning system receivers for balloon position tracking, Decision Systems concluded that a simpler, noncoherent transceiver could provide the NSBF with the necessary TDRSS communications without the additional cost and complexity of a coherent transponder. The solution was to take the core design of the TDRSS IV Transponder, but remove the extra functionality that supported coherent turn-around. This would simplify the production effort, reduce the testing required, and result in a lower cost product with smaller size, weight, and power consumption. Once NSBF and Decision Systems agreed on a concept for this new product, known as the Multi-Mode Transceiver (MMT), the NSBF approached Goddard for approval and funding.

Source record↗

Continuous cardiac output measurement - Aspects of Doppler frequency analysis

From the suprasternal notch blood flow velocity in the aorta can be measured non-invasively by a Doppler probe. Integration over systole after frequency analysis gives a measure of stroke volume if a separate diameter observation is incorporated. Frequency analysis by a zero crossing counter or by a set of parallel phaselock loops was less effective than a set of bandpass filters. Observations on dogs, baboons and humans before and after exercise or surgery suggest the indications to be useful. Application to judging heart failure by the effect of introducing a volume load is indicated. Changes in output also are measured in freely moving subjects.

Mackay, R. S.↗

Practical applications of remote sensing technology

Land managers increasingly are becoming dependent upon remote sensing and automated analysis techniques for information gathering and synthesis. Remote sensing and geographic information system (GIS) techniques provide quick and economical information gathering for large areas. The outputs of remote sensing classification and analysis are most effective when combined with a total natural resources data base within the capabilities of a computerized GIS. Some examples are presented of the successes, as well as the problems, in integrating remote sensing and geographic information systems. The need to exploit remotely sensed data and the potential that geographic information systems offer for managing and analyzing such data continues to grow. New microcomputers with vastly enlarged memory, multi-fold increases in operating speed and storage capacity that was previously available only on mainframe computers are a reality. Improved raster GIS software systems have been developed for these high performance microcomputers. Vector GIS systems previously reserved for mini and mainframe systems are available to operate on these enhanced microcomputers. One of the more exciting areas that is beginning to emerge is the integration of both raster and vector formats on a single computer screen. This technology will allow satellite imagery or digital aerial photography to be presented as a background to a vector display.

Whitmore, Roy A., Jr.↗

Streamlining GNC Architecture Development and FSW Integration for the Mars Ascent Vehicle

The Mars Ascent Vehicle (MAV) will be the first vehicle to perform an ascent from the surface of another atmospheric planetary body outside of the Earth-Moon system. Significant light-time delay requires complete autonomy of flight throughout ascent, and naturally a high level of reliability is desired in both MAV’s hardware and software subsystems. The MAV Guidance, Navigation and Controls (GNC) team and the MAV Flight Software (FSW) team have partnered together to improve the efficiency of algorithm integration onto the MAV flight processor, and to increase confidence that said integration is successful and without human error. An interface architecture is proposed for the GNC suite that allows both the guidance and navigation subsystems to provide code algorithms directly in C++, and the controls subsystem to provide MATLAB Simulink auto-coded algorithms. Several continuous integration/deployment (CI/CD) methodologies have been considered for ease of transition of algorithm code from the GNC team to the FSW team. The GNC/FSW teams also worked together to develop a cFS-friendly wrapper which abstracts the integration of the GNC algorithm code into an interface-level API that is compatible with cFS. Several iterations of vehicle GNC code have been produced between the GNC/FSW team’s partnership, and this strong interface between these two teams have allowed the GNC/FSW teams to greatly increase confidence of efficient and error-free implementation of the GNC code onto MAV for a successful flight.

Engineering↗

Mars Ascent Vehicle GNC Targeting Routines with Considerations for Flight Software Development

The Mars Ascent Vehicle (MAV) will be the first vehicle to perform an ascent from the surface of another atmospheric planetary body outside of the Earth-Moon system. Significant light-time delay requires complete autonomy of flight throughout ascent, and naturally a high level of reliability is desired in both MAV’s hardware and software subsystems. The MAV Guidance, Navigation and Controls (GNC) team and the MAV Flight Software (FSW) team have partnered together to improve the efficiency of algorithm integration onto the MAV flight processor, and to increase confidence that said integration is successful and without human error. An interface architecture is proposed for the GNC suite that allows both the guidance and navigation subsystems to provide code algorithms directly in C++, and the controls subsystem to provide MATLAB Simulink auto-coded algorithms. Several continuous integration/deployment (CI/CD) methodologies have been considered for ease of transition of algorithm code from the GNC team to the FSW team. The GNC/FSW teams also worked together to develop a cFS-friendly wrapper which abstracts the integration of the GNC algorithm code into an interface-level API that is compatible with cFS. Several iterations of vehicle GNC code have been produced between the GNC/FSW team’s partnership, and this strong interface between these two teams have allowed the GNC/FSW teams to greatly increase confidence of efficient and error-free implementation of the GNC code onto MAV for a successful flight.

Jason Everett↗

Support for global science: Remote sensing's challenge

Remote sensing uses a wide variety of techniques and methods. Resulting data are analyzed by man and machine, using both analog and digital technology. The newest and most important initiatives in the U. S. civilian space program currently revolve around the space station complex, which includes the core station as well as co-orbiting and polar satellite platforms. This proposed suite of platforms and support systems offers a unique potential for facilitating long term, multidisciplinary scientific investigations on a truly global scale. Unlike previous generations of satellites, designed for relatively limited constituencies, the space station offers the potential to provide an integrated source of information which recognizes the scientific interest in investigating the dynamic coupling between the oceans, land surface, and atmosphere. Earth scientist already face problems that are truly global in extent. Problems such as the global carbon balance, regional deforestation, and desertification require new approaches, which combine multidisciplinary, multinational research teams, employing advanced technologies to produce a type, quantity, and quality of data not previously available. The challenge before the international scientific community is to continue to develop both the infrastructure and expertise to, on the one hand, develop the science and technology of remote sensing, while on the other hand, develop an integrated understanding of global life support systems, and work toward a quantiative science of the biosphere.

Estes, J. E.↗

A Virtual Laboratory for Aviation and Airspace Prognostics Research

Integration of Unmanned Aerial Vehicles (UAVs), autonomy, spacecraft, and other aviation technologies, in the airspace is becoming more and more complicated, and will continue to do so in the future. Inclusion of new technology and complexity into the airspace increases the importance and difficulty of safety assurance. Additionally, testing new technologies on complex aviation systems and systems of systems can be challenging, expensive, and at times unsafe when implementing real life scenarios. The application of prognostics to aviation and airspace management may produce new tools and insight into these problems. Prognostic methodology provides an estimate of the health and risks of a component, vehicle, or airspace and knowledge of how that will change over time. That measure is especially useful in safety determination, mission planning, and maintenance scheduling. In our research, we develop a live, distributed, hardware- in-the-loop Prognostics Virtual Laboratory testbed for aviation and airspace prognostics. The developed testbed will be used to validate prediction algorithms for the real-time safety monitoring of the National Airspace System (NAS) and the prediction of unsafe events. In our earlier work1 we discussed the initial Prognostics Virtual Laboratory testbed development work and related results for milestones 1 & 2. This paper describes the design, development, and testing of the integrated tested which are part of milestone 3, along with our next steps for validation of this work. Through a framework consisting of software/hardware modules and associated interface clients, the distributed testbed enables safe, accurate, and inexpensive experimentation and research into airspace and vehicle prognosis that would not have been possible otherwise. The testbed modules can be used cohesively to construct complex and relevant airspace scenarios for research. Four modules are key to this research: the virtual aircraft module which uses the X-Plane simulator and X-PlaneConnect toolbox, the live aircraft module which connects fielded aircraft using onboard cellular communications devices, the hardware in the loop (HITL) module which connects laboratory based bench-top hardware testbeds and the research module which contains diagnostics and prognostics tools for analysis of live air traffic situations and vehicle health conditions. The testbed also features other modules for data recording and playback, information visualization, and air traffic generation. Software reliability, safety, and latency are some of the critical design considerations in development of the testbed.

LVC-DE↗

Apollo Program Management, Kennedy Space Center, Florida

The evolution of the Kennedy Space Center as the launch organization for Apollo/ Saturn V involved the concurrent solution of numerous complex problems. A significant increase in manpower was involved. Large and complex checkout and launch facilities were to be designed and constructed. Expansion of operational capabilities required the establishment and integration of a Government-Contractor operational team. From an initial cadre of approximately 200 civil service personnel of the Army Ballistic Missile Agency, transferred to NASA in 1960 following its establishment, expansion to the present civil service level of 2,900 occurred in the last seven years. Established within NASA as a directorate of the Marshall Space Flight Center, KSC achieved center status in 1962. With its designation as a Center, KSC accomplished the development and staffing of an organization that could perform procurement, resources, financial, and other management requirements formerly provided by the parent organization. In addition to continuing launch operations for established programs, KSC undertook the design and construction of large, new, and unique launch facilities for Apollo/Saturn V. With the expansion of the civil service work force, KSC integrated contractor organizations employing 23,000 personnel at the Center to perform specific operational and support missions under the technical supervision and observation of the Government team. The management techniques, organizational concepts, and continuing efforts utilized to meet the Apollo goals and challenges are discussed in this document.

Source record↗