Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “bolts”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Clearance Analysis of Node 3 Aft CBM to the Stowed FGB Solar Array

In early 2011, the ISS Vehicle Configuration Office began considering the relocation of the Permanent Multipurpose Module (PMM) to the aft facing Common Berthing Mechanism (CBM) on Node 3 to open a berthing location for visiting vehicles on the Node 1 nadir CBM. In this position, computer-aided design (CAD) models indicated that the aft end of the PMM would be only a few inches from the stowed Functional Cargo Block (FGB) port solar array. To validate the CAD model clearance analysis, in the late summer of 2011 the Image Science and Analysis Group (ISAG) was asked to determine the true geometric relationship between the on-orbit aft facing Node 3 CBM and the FGB port solar array. The desired measurements could be computed easily by photogrammetric analysis if current imagery of the ISS hardware were obtained. Beginning in the fall of 2011, ISAG used the Dynamic Onboard Ubiquitous Graphics (DOUG) program to design a way to acquire imagery of the aft face of Node 3, the aft end-cone of Node 1, the port side of pressurized mating adapter 1 (PMA1), and the port side of the FGB out to the tip of the port solar array using cameras on the Space Station Remote Manipulator System (SSRMS). This was complicated by the need to thread the SSRMS under the truss, past Node 3 and the Cupola, and into the space between the aft side of Node 3 and the FGB solar array to acquire more than 100 images from multiple positions. To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which the cameras are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which all of the needed imagery could be acquired. Based on a photogrammetric simulation, it was estimated that the location of the FGB solar array could be measured within an accuracy of about 1 in. in each axis relative to the ISS Analysis Coordinate System (ISSACS). In October 2011, a proposed image-acquisition plan was drafted by ISAG and released for review. The ISS Robotics flight control team (ROBO) proposed minor changes to SPDM positions 1 and 4 to meet ISS proximity requirements. The updated image acquisition plan and draft chit were presented to and approved by the Systems Working Group (SWG) November 18 and were sent to the Vehicle Configuration Board (VCB) in early December 2011. Working with ROBO on 3 successive days (February 21, 22, and 23), ISAG collected 161 images of the ISS. Approximately 40 images were collected from each of the four different SSRMS/SPDM positions, with each set mapping the region from the Node 3 end cone, across Node 1, along the forward port side portion of the FGB, and out the port side FGB solar arrays. From this imagery, the best 80 images were selected for use in the analysis. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for 54 handrail attachment bolts on the aft face of Node 3, in the ISSACS coordinate system. The results of this analysis produced the measured coordinates of 116 points distributed across the face of the FGB solar array panels (see figure 3) along with propagated uncertainty estimates in each coordinate axis. These results were sent to the ISS Vehicle Configuration Office, which sent them to the Configuration Analysis Modeling and Mass Properties (CAMMP) team for comparison with the Russian-provided CAD model for the retracted FGB solar arrays. The CAMMP analysis unexpectedly showed that the measured location of the port FGB solar array was up to 41-in. further outboard than the design and was slightly twisted about its rotational axis. The unexpected comparison results produced some initial concern regarding the accuracy of the photogrammetric measurements. To verify the measured results, ISAG personnel conducted a second analysis using just the imagery of the solar arrays in an arbitrary coordinate system defined by the three corner points of the inboard-most panel, with the design distance between points A1 and A10 as the only scale. The new measurements agreed with the original results to within less than 1 in. RMS in each axis, confirming the original solar array measurements. ISAG produced a final report for the ISS Vehicle Configuration Office documenting an apparent anomaly in the retracted configuration of the port FGB solar arrays. A copy of the measurement report was translated and sent to the Russian Space Agency. During a Vehicle Integrated Performance and Resources (VIPeR) teleconference September 24, 2012, the Russians acknowledged receipt of a translated copy of the ISAG report. The Russian representative stated that the head of the solar array design team claimed that the measured configuration was impossible unless the structure was physically broken. The Russians acknowledged that they had no expertise in photogrammetry, so the analysis technique employed was a "black box" to them, and they did not know how to use the ISAG results. They asked for a single image in which the overextension of the port solar array could be obviously seen. On November 10, 2012, during a face-to-face meeting with their Russian counterparts at JSC, ISAG presented nadir-view imagery of the FGB acquired during Space Shuttle rendezvous. Using the known width of the pressurized portion of the FGB as a scale, this analysis clearly showed that the port FGB solar array was extended outboard further than the Russian design for the retracted solar array.

Liddle, Donn↗

Design and Test of a Deployable Radiation Cover for the REgolith X-Ray Imaging Spectrometer

The REgolith X-ray Imaging Spectrometer (REXIS) instrument contains a one-time deployable radiation cover that is opened using a shape memory alloy actuator (a "Frangibolt") from TiNi Aerospace and two torsion springs. The door will be held closed by the bolt for several years in cold storage during travel to the target asteroid, Bennu, and it is imperative to gain confidence that the door will open at predicted operational temperatures. This paper briefly covers the main design features of the radiation cover and measures taken to mitigate risks to cover deployment. As the chosen FD04 model Frangibolt actuator has minimal flight heritage, the main focus of this paper is the testing, results and conclusions with the FD04 while discussing key lessons learned with respect to the use of the FD04 actuator in this application.

Carte, David B.↗

Johnson Space Center's Free Range Bicycle Program.- Fall 2015 Intern Report

NASA's Johnson Space Center is a big place, encompassing 1,620 acres and more than a hundred buildings. Furthermore, there are reportedly 15 thousand employees, all of which have somewhere to be. To facilitate the movement of all these people JSC has historically relied on human power. Pedaling their way towards deep space, bicycles have been the go to method. Currently there are about 200 Free Range Bicycles at JSC. Free Range Bicycles belong to nobody, except NASA, and are available for anybody to use. They are not to be locked or hidden (although frequently are) and the intention is that there will always be a bike to hop on to get where you're going (although it may not be the bike you rode in on). Although not without its own shortcomings, the Free Range Bicycle Program has continued to provide low cost, simple transportation for NASA's JSC. In addition to the approximately 200 Free Range Bicycles, various larger divisions (like engineering) will often buy a few dozen bikes for their team members to use or individuals will bring their own personal bike to either commute or use on site. When these bicycles fall into disrepair or are abandoned (from retirees etc) they become a problem at JSC. They are an eye sore, create a safety hazard and make it harder to find a working bike in a time of need. The Free Range Program hopes to address this first problem by "tagging out" abandoned or out of service bicycles. A bright orange "DO NOT OPERATE" tag is placed on the bike and given a serial number for tracking purposes. See picture to the right. If the bike has an active owner with intentions to repair the bike the bottom of the tag has instructions for how to claim the abandoned bicycle. After being tagged the owner of the bicycle has 30 days to claim the bicycle and either haul it off site or get it repaired (and labeled) in accordance with Johnson's Bicycle Policy. If the abandoned bicycle is not claimed within 30 days it becomes the property of the Government. The bicycle is then (in short) repaired, labeled, documented and converted to a free range bicycle. Bikes beyond repair are cannibalized of useable parts and then scrapped. That was nearly the first thing I did when arriving at work. After getting settled in and coordinating the purchase of 50 new bicycles (elaboration below); I started combing the Center. Bikes are hidden and tucked away in the oddest of places and it was my priority to root all of them out. I tagged 70 bikes on the center, setting a record. I tagged so many bikes I ran out tags and had to make more. Long ago it was discovered that the same harsh elements that wreak havoc on the bikes, destroy the tags before the 30 day timeframe. The tags are labeled with instructions on how to claim the bike and numbered, then these paper labels are laminated with packing tape. It sounds like a simple process but nothing fits right, everything has to be trimmed, put on straight and is generally a pain in the neck. So I made an assembly process and knocked out a few hundred to save having to do it again for a while. I walked the center and tagged bikes at every building hiding in nearly every nook and cranny. Thus, in conclusion, I've done many things here at JSC on my first term and had a blast doing it. I've learned a lot from my multi-faceted roles and continual challenges. In short I've done my best to get folks at JSC on bikes and keep folks at JSC on bikes and tended a flock of free range bicycles. Everything from turning the rusty bolts and oiling chains to coordinating a $20,000 deal on 50 new free range bicycles. I am proud of the bicycle shop I have built and am infinitely grateful to the people who lead, help, guide and support me. I have fixed a great number of bicycles and cleaned the center of unsightly and unsafe piles of bicycles. I am immensely thankful for this opportunity to learn and serve and appreciate the privilege of coming back for a second term. A second term, in which I will continue to develop this awesome program.

Lee-Stockton, Willem↗

High-Repeatability, Robot Friendly, ORU Interface

A robot-friendly coupling device for an Orbital Replacement Unit (ORU). The invention will provide a coupling that is detached and attached remotely by a robot. The design of the coupling must allow for slight misalignments, over torque protection, and precision placement. This is accomplished by using of a triangular interface having three components. A base plate assembly is located on an attachment surface, such as a satellite. The base plate assembly has a cup member, a slotted member, and a post member. The ORU that the robot attaches to the base plate assembly has an ORU plate assembly with two cone members and a post member which mate to the base plate assembly. As the two plates approach one another, one cone member of the ORU plate assembly only has to be placed accurately enough to fall into the cup member of the base plate assembly. The cup forces alignment until a second cone falls into a slotted member which provides final alignment. A single bolt is used to attach the two plates. Two deflecting plates are attached to the backs of the plates. When pressure is applied to the center of the deflecting plates, the force is distributed preventing the ORU & base plates from deflecting. This accounts for precision in the placement of the article.

Voellmer, George M.↗

Tethered Space Satellite-1 (TSS-1): Technical Roundabouts

In the early 1990's US and Italian scientists collaborated to study the electrodynamics of dragging a satellite on a tether through the electrically charged portion of Earth's atmosphere called the ionosphere. An electrical current induced in the long wire could be used for power and thrust generation for a satellite. Other tether uses include momentum exchange, artificial gravity, deployment of sensors or antennas, and gravity-gradient stabilization for satellites. Before the Tethered Space Satellite (TSS-1), no long tether had ever been flown, so many questions existed on how it would actually behave. The TSS consisted of a satellite with science experiments attached to a 12.5 mile long, very thin (0.10 inch diameter) copper wire assembly wound around a spool in the deployer reel mechanism. With the Space Shuttle at an altitude of 160 nautical miles above earth, the satellite was to be deployed by raising it from the Shuttle bay on a boom facing away from Earth. Once cleared of the bay, the deployer mechanism was to slowly feed out the 12-plus miles of tether. Scientific data would be collected throughout the operation, after which the satellite would be reeled back in. Pre-flight testing system level tests involved setting up a tether receiver to catch the 12.5 mile tether onto another reel as it was being unwound by the deployer reel mechanism. Testing only the reel mechanism is straightforward. This test becomes more complicated when the TSS is mounted on the flight pallet at Kennedy Space Center (KSC). The system level tests must be passed before the pallet can be installed into the Space Shuttle cargo bay. A few months before flight, the TSS payload had been integrated onto the Spacelab pallet and system level tests, including unreeling and reeling the tether, had been successfully completed. Some of this testing equipment was then shipped back to the contractor Martin Marietta. Systems-level load analyses, which cannot be run until all information about each payload is finalized, was run in parallel with the physical integration of the hardware into the Shuttle payload bay. The coupled loads analysis, as it is called, incorporates any updates to the model due to system level tests, and any changes that were found during integration. The coupled loads analysis revealed that a single bolt attaching the deployer reel mechanism to the support structure had a "negative margin" - which is an indication that it might fail during operation. Hardware certification rules do not allow for hardware to fly with negative margins, so this issue had to be resolved before the flight. Since there is conservatism in engineering analysis, there is an option to "waive" the margin requirement, and fly the experiment as is. On the other hand, a structural failure of one payload could have serious or catastrophic consequences to other payloads and possibly the mission. Minor design changes or fixes might be feasible within the payload bay prior to launch. Any major design changes that required the spooling test to validate the hardware, or for the pallet to be removed, would cause TSS not to be ready for the Shuttle launch.

O'Connor, Brian↗

Discussion of Yellow Starthistle Response to Irradiance, Photoperiod, and CO2

Yellow Starthistle (Centaurea solstitialis) is a native annual weed of Eurasia and since introduction into the US has become an invasive and noxious weed. It grows in a rosette habit during the vegetative state and usually bolts in summer to produce a large and branched flowering stem. Time to flowering in Yellow Starthistle has been attributed to photoperiod, nitrogen nutrition, temperature, and water stress. We executed a series of studies to investigate the role of light, both photoperiod and photosynthetic photon flux, on flowering and development in Yellow Starthistle. Treatments were presented in 4 ways: (1) Varying day length with constant photosynthetic photon flus (PPF) - providing increasing daily integrated Photosynthetic Photon (PP) exposure with longer day lengths, (2) Varying day length while adjusting PPF to maintain daily PP exposure for all treatments, (3) Extending photoperiod treatments beyond common 12-h photosynthetic period with low light levels to maintain both PPF and daily PP across all treatments; and (4) Reciprocal exchange of plant among photoperiod treatments. Yellow Starthistle appears to be a long-day plant with a critical day length requirement between 14-h and 16-h to induce transition from vegetative to floral stages in development. PPF and daily absorbed photons did not affect time to vegetative / floral stage transition, but did affect factors such as biomass accumulation and canopy parameters such as specific leaf mass. Reciprocal exchange of plants between floral inducing and inhibiting photoperiod treatments, starting at 2-weeks post germination, had no effect on to flower. Flowering was determined by photoperiod experienced during the first 2-weeks (or less) post germination. Yellow Starthistle net photosynthetic response to elevated atmospheric CO2 concentrations over a range of photosynthetically active radiation flux rates and temperatures will also be presented and discussed.

Photons↗

Close Range Photogrammetry in Space - Measuring the On-Orbit Clearance between Hardware on the International Space Station

When photogrammetrists read an article entitled "Photogrammetry in Space" they immediately think of terrestrial mapping using satellite imagery. However in the last 19 years the roll of close range photogrammetry in support of the manned space flight program has grown exponentially. Management and engineers have repeatedly entrusted the safety of the vehicles and their crews to the results of photogrammetric analysis. In February 2010, the Node 3 module was attached to the port side Common Berthing Mechanism (CBM) of the International Space Station (ISS). Since this was not the location at which the module was originally designed to be located on the ISS, coolant lines containing liquid ammonia, were installed externally from the US Lab to Node 3 during a spacewalk. During mission preparation I had developed a plan and a set of procedures to have the astronauts acquire stereo imagery of these coolant lines at the conclusion of the spacewalk to enable us to map their as-installed location relative to the rest of the space station. Unfortunately, the actual installation of the coolant lines took longer than expected and in an effort to wrap up the spacewalk on time, the mission director made a real-time call to drop the photography. My efforts to reschedule the photography on a later spacewalk never materialized, so rather than having an as-installed model for the location of coolant lines, the master ISS CAD database continued to display an as-designed model of the coolant lines. Fast forward to the summer of 2015, the ISS program planned to berth a Japanese cargo module to the nadir Common Berthing Mechanism (CBM), immediately adjacent to the Node 3 module. A CAD based clearance analysis revealed a negative four inch clearance between the ammonia lines and a thruster nozzle on the port side of the cargo vehicle. Recognizing that the model of the ammonia line used in the clearance analysis was "as-designed" rather than "as-installed", I was asked to determine the real clearance between the ammonia lines and expected position of the thruster bell using existing on-orbit imagery. Imagery of the area of interest, taken several years earlier from the Space Shuttle during a fly-around of the ISS, was found and used to set a stereo pair. Space Vision System Targets and Handrail bolts measured in the ISS analytical coordinate system (ISSACS) prior to launch, were used to obtain an absolute orientation so all photogrammetric measurement's would be in the ISSACS coordinate system. Coordinates for the design location of the edges of the thruster bell, when the cargo vehicle was fully berthed to the ISS, were displayed in 3-D relative to the as-installed ammonia lines. This immediately revealed a positive clearance, which was later quantified to be a minimum of 10" +/0.5". The analysis was completed over a single weekend by a single analyst. Using updated imagery, acquired from the station's robotic arm, a complete as-installed model of the coolant lines was generated from stereo photography and replaced the design model in the master ISS CAD database.

Liddle, Donn↗

Actuators Using Piezoelectric Stacks and Displacement Enhancers

Actuators are used to drive all active mechanisms including machines, robots, and manipulators to name a few. The actuators are responsible for moving, manipulating, displacing, pushing and executing any action that is needed by the mechanism. There are many types and principles of actuation that are responsible for these movements ranging from electromagnetic, electroactive, thermo-mechanic, piezoelectric, electrostrictive etc. Actuators are readily available from commercial producers but there is a great need for reducing their size, increasing their efficiency and reducing their weight. Studies at JPL’s Non Destructive Evaluation and Advanced Actuators (NDEAA) Laboratory have been focused on the use of piezoelectric stacks and novel designs taking advantage of piezoelectric’s potential to provide high torque/force density actuation and high electromechanical conversion efficiency. The actuators/motors that have been developed and reviewed in this paper are operated by various horn configurations as well as the use of pre-stress flexures that make them thermally stable and increases their coupling efficiency. The use of monolithic designs that pre-stress the piezoelectric stack eliminates the use of compression stress bolt. These designs enable the embedding of developed solid-state motors/actuators in any structure with the only macroscopically moving parts are the rotor or the linear translator. Finite element modeling and design tools were used to determine the requirements and operation parameters and the results were used to simulate, design and fabricate novel actuators/motors. The developed actuators and performance will be described and discussed in this paper.

rotary devices↗

Discussion of Yellow Starthistle Response to Photosynthetic Irradiance, Photoperiod, and CO2

Yellow Starthistle (Centaurea solstitialis) is a native annual weed of Eurasia and since introduction into the United STates has become an invasive and noxious weed. It grows in a rosette habit during the vegetative state and usually bolts in summer to produce a large and branched flowering stem. Time to flowering in Yellow Starthistle has been attributed to photoperiod, nitrogen nutrition, temperature, and water stress. We executed a series of studies to investigate the role of light, both photoperiod and photosynthetic photon flux, on flowering and development in Yellow Starthistle. Treatments were presented in 4 ways: 1) varying day length with constant photosynthetic photon flus (PPF) providing increasing daily integrated Photosynthetic Photon (PP) exposure with longer day lengths 2) varying day length while adjusting PPF to maintain daily PP exposure for all treatments 3) extending photoperiod treatments beyond common 12-h photosynthetic period with low light levels to maintain both PPF and daily PP across all treatments4)reciprocal exchange of plant among photoperiod treatments Yellow Starthistle appears to be a long-day plant with a critical day length requirement between 14-h and 16-h to induce transition from vegetative to floral stages in development. PPF and daily absorbed photons did not affect time to vegetative floral stage transition, but did affect factors such as biomass accumulation and canopy parameters such as specific leaf mass. Reciprocal exchange of plants between floral inducing and inhibiting photoperiod treatments, starting at 2-weeks post germination, had no effect on to flower. Flowering was determined by photoperiod experienced during the first 2-weeks (or less) post germination.Yellow Starthistle net photosynthetic response to elevated atmospheric CO2 concentrations over a range of photosynthetically active radiation flux rates and temperatures will also be presented and discussed.

Photosynthetic↗

Quantification of Dynamic Model Validation Metrics Using Uncertainty Propagation from Requirements

The Space Launch System, NASA's new large launch vehicle for long range space exploration, is presently in the final design and construction phases, with the first launch scheduled for 2019. A dynamic model of the system has been created and is critical for calculation of interface loads and natural frequencies and mode shapes for guidance, navigation, and control (GNC). Because of the program and schedule constraints, a single modal test of the SLS will be performed while bolted down to the Mobile Launch Pad just before the first launch. A Monte Carlo and optimization scheme will be performed to create thousands of possible models based on given dispersions in model properties and to determine which model best fits the natural frequencies and mode shapes from modal test. However, the question still remains as to whether this model is acceptable for the loads and GNC requirements. An uncertainty propagation and quantification (UP and UQ) technique to develop a quantitative set of validation metrics that is based on the flight requirements has therefore been developed and is discussed in this paper. There has been considerable research on UQ and UP and validation in the literature, but very little on propagating the uncertainties from requirements, so most validation metrics are "rules-of-thumb;" this research seeks to come up with more reason-based metrics. One of the main assumptions used to achieve this task is that the uncertainty in the modeling of the fixed boundary condition is accurate, so therefore that same uncertainty can be used in propagating the fixed-test configuration to the free-free actual configuration. The second main technique applied here is the usage of the limit-state formulation to quantify the final probabilistic parameters and to compare them with the requirements. These techniques are explored with a simple lumped spring-mass system and a simplified SLS model. When completed, it is anticipated that this requirements-based validation metric will provide a quantified confidence and probability of success for the final SLS dynamics model, which will be critical for a successful launch program, and can be applied in the many other industries where an accurate dynamic model is required.

Brown, Andrew M.↗

NASA's Space Launch System Gains Momentum Toward Integration and Testing

NASA's Space Launch System (SLS) entered a new phase in 2017, completing major structural manufacturing on the core stage and delivering the first flight hardware to NASA's Kennedy Space Center (KSC). The program is now transitioning to integration, assembly and testing in preparation for launch readiness in late 2019. Core stage prime contractor Boeing concluded welding of the major core stage components for Exploration Mission 1 (EM-1) with the liquid hydrogen flight tank, following completion of the engine section, liquid oxygen tank, and forward skirt. Technicians also completed assembly of the bolted intertank, and all sections are currently in hardware integration. The engine section structural test article was shipped to NASA's Marshall Space Flight Center (MSFC) and began testing in 2017. The core stage pathfinder shipped to NASA's Michoud Assembly Facility (MAF). Booster prime contractor Orbital ATK made significant progress casting motor segments for SLS, with several segments finishing processing and in storage. Forward and aft sections of the boosters are being refurbished at KSC. RS-25 prime contractor Aerojet Rocketdyne completed SLS adaptation testing and qualification of four new EM-1 controllers. The four EM-1 engines are ready and waiting for shipment from NASA's Stennis Space Center (SSC) to Michoud Assembly Facility (MAF) for core stage integration in preparation for green run testing at SSC. The EM-1 Interim Cryogenic Propulsion System (ICPS) became the first major piece of SLS to arrive at KSC. Welding is complete on the EM-1 Launch Vehicle Stage Adapter (LVSA) and the flight Orion Stage Adapter (OSA). SLS is critical to U.S. leadership in future human and robotic space exploration, including a presence on the moon in preparation for missions deeper into space. This paper will elaborate on 2017 SLS progress and progress envisioned for 2018.

Askins, Bruce R.↗

Recent Advances to Estimation of Fixed-Interface Modal Models Using Dynamic Substructuring

In 2010, Allen & Mayes proposed to estimate the fixed-interface modes of a structure by measuring the modes of the structure bolted to a fixture and then applying constraints to the fixture using the transmission simulator method. While the method proved useful, and has indeed been used in studies since that point, a few peculiarities were noted. First, in some cases the estimated fixed-base natural frequencies were observed to converge very slowly to the true values (in simulated experiments) as the number of constraints was increased. To formulate these constraints, prior studies used only the free-interface modes of the fixture or the measured modes of the assembly. This work extends that to consider other sets of constraints, showing improved results. Furthermore, in some prior studies it has been observed that there were errors of more than 10% in the natural frequencies even when the fixture motion was hundreds of times smaller than the motion of the structure of interest (and so it had presumably been removed). This work explores this phenomenon, seeking to use the strain energy in the fixture, to the extent that it can be estimated using a test-analysis model for the fixture, as a metric to predict frequency error. The proposed methods are explored by applying them to simulated measurements from a beam and from the NASA Space Launch System coupled to the Mobile Launcher.

Allen, Mathew S.↗

The Effect of Hole Quality on the Bearing Strength of Carbon Fiber Laminates

On programs involving flight hardware for launch vehicles that the author has been involved in over the years, the question always arises as to how to best machine and inspect holes drilled for fasteners. While common sense dictates that ‘well-drilled’ holes are desired over ‘poorly drilled’ holes for bolt bearing applications, the effect of hole quality on the bearing strength of carbon fiber laminates has not been extensively studied in the open literature. If this effect is not quantitatively known, the question of what hole quality needs to be required for the flight hardware cannot be answered. In addition, the function of the part with respect to the holes needs to be taken into account. There is no such thing as a defect-free hole since some chip-out of fibers within the hole will occur regardless of drill bit and backing plate pressure. For most holes machined in a carbon fiber laminate, some extent of delamination and fiber breakout on the entrance and exit of the hole is going to occur. Much time and money can be spent on trying to perfect the drilling technique and subsequent inspection of holes in carbon fiber laminates, including adding extra plies of cloth to the surfaces to help prevent fiber breakout; but is this effort really justified if little-to-no increase in bearing strength is realized by good-quality holes over those of lesser quality?

Nettles, A. T.↗

The Infrared Spectrograph on the Spitzer Space Telescope

The Infrared Spectrograph (IRS) instrument on the Spitzer Space Telescope covered the 5 to 38 micron wavelength range at low and medium spectral resolutions. The instrument was very popular during Spitzer’s 5.7 year-long cold mission. Every year it attracted the most proposals, and garnered more observing hours, of any of the science instruments. This success was the culmination of a very long development period, where the instrument design changed radically. When the instrument was first selected by NASA in 1984 it was very complicated. As part of the overall reduction of the size of the SIRTF Observatory following its recovery from the mission’s cancellation in 1991 the IRS became smaller and much, much simpler. The only aspect of the instrument that increased from the original design was the pixel count of the detectors. The new, lean, IRS based on eight axioms: (1) SIRTF is a cost-driven mission; (2) Only Boeing Si:As and Si:Sb 128x128 BIB arrays shall be used; (3) The IRS has all Aluminum housing and optics; (4) Simple optics consisting of surfaces of revolution, flat gratings, and “bolt-and-go” tolerances; (5) No moving parts; (6) Redundancy only for credible single-point failures; (7) Strive for an observing efficiency of 80%; (8) The IRS shall be capable of internal health assessment. This led to a simple, robust, but still extremely powerful final instrument composed of four distinct modules. Many of the features developed for the IRS were subsequently employed in other spacecraft and SOFIA science instrumentation. This presentation will cover the developmental history of the IRS instrument, its final design and performance, and will especially highlight the sage decisions that Jim Houck made along the way that led to its highly successful career on the Spitzer Space Telescope.

Roellig, Thomas L.↗

Lunar Glovebox Balance with Wireless Technology

The most important equipment required for processing lunar samples is a high-quality mass balance for maintaining accurate weight inventory, security, and scientific study. After careful review, a Curation Office memo by Michael Duke in 1978 chose the Mettler PL200 to be used for sample weight measurements inside the gloveboxes (Fig. 3). These commercial off-the-shelf (COTS) balances did not meet the strict accepted material requirements in the Lunar lab. As a result, each balance housing, weighing pan, and wiring was custom retrofitted to meet Lunar Operating Procedure (LOP) 54 requirements [for material construction restrictions]. The original design drawings for the custom housings, readout support stands, and wiring were done by the JSC engineering directorate. The 1977- 1978 schematics, drawings, and files are now housed in the curation Data Center. Per the design specifications, the housing was fabricated from aluminum grade 6061 T6, seamless welds, and anodized per MIL-A-8625 type I, class I. The balance feet were TFE Teflon and any required joints were sealed with Viton A gaskets. The readout display and support stands outside the glovebox were fabricated from 300 series stainless steel with #4 finish and mounted to the glovebox with welded bolts. Wire harnesses that linked the balance with the outside display and power were encapsulated with TFE Teflon and transported through custom Deutsch wire bulk head pass-through systems from inside to outside the glovebox. These Deutsch connectors were custom fabricated with 316L stainless steel bodies, Viton A O-rings, aluminum 6061 with electroless nickel plating, Teflon (replacing the silicone), and gold crimp connectors (no soldering). Many of the Deutsch connectors may have been used in the Apollo program high vacuum complex in building 37 and date to about 1968 to 1970.

Zeigler, Ryan A.↗

Adhesive Joining of Composite Laminates Using Epoxy Resins with Stoichiometric Offset

Polymer matrix composites are used in high performance structures because of their excellent specific strength, toughness and stiffness along the fiber. To realize the full performance advantages of composites, complex, built-up structures must be assembled with adhesive, but uncertainty in bond strength requires manufacturers to install bolts or other crack arrest features to ensure safety in critical applications. The inherent uncertainty in adhesive bonds stems from the material discontinuity at the composite-to-adhesive interfaces, which are susceptible to contamination. In contrast, composites made by co-curing, although limited in size and complexity, result in predictable structures that may be certifiable for commercial aviation with reduced dependence on redundant load paths.1 The pro-posed technology uses a stoichiometric offset of the hardener-to-epoxy ratio on the faying surfaces of laminates. Assembly of the components in a subsequent “secondary-co-cure” process results in a joint with no material discontinuities.

Palmieri, Frank L.↗

Demonstration of Multilayer Insulation, Vapor Cooling of Structure, and Mass Gauging for Large Scale Upper Stages: Structural Heat Intercept, Insulation, and Vibration Evaluation Rig (SHIIVER) Final Report

Testing was completed on the Structural Heat Intercept, Insulation, and Vibration Evaluation Rig (SHIIVER) between August 2019 and January 2020. SHIIVER was designed to be a test bed for the scaling of cryogenic fluid management technologies as applied to large upper stages and long duration in-space stages. The hardware consists of a 4 meter diameter stainless steel tank, structural skirts supporting the tank in the aft direction, and an aluminum forward skirt with vapor cooling channels bolted to it. The initial testing of the SHIIVER hardware was with liquid hydrogen and liquid nitrogen (as a substitute fluid for liquid oxygen and liquid methane) and sought to demonstrate the use of boil-off vapor to intercept heat on a structural skirt, multilayer insulation (MLI) on the tank domes, and the radio frequency mass gauge (RFMG). Testing was completed in four stages: a baseline thermal vacuum test prior to installation of the MLI, a thermal vacuum test after the MLI installation, a reverberant acoustic test, and a subsequent thermal vacuum test to verify that no damage occurred during the reverberant acoustic testing. Each thermal vacuum test with chamber wall at ambient temperature and vacuum level in the 10-6 torr range was conducted continuously between approximately 90% full and 25% full. Test results showed that the vapor cooling reduced the heat load to the tank by approximately 10%, but the boil-off by less than 3% at 50% full with no MLI on the domes. It reduced the heat load to the tank by approximately 10%, but the boil-off was essentially unchanged at 50% full whether or not vapor cooling was operational with MLI on the domes. The MLI reduced the heat load to the tank by approximately 40% at all fill levels, but the boil-off by approximately 25% at 90% full and 45% below 65% full. The RFMG performed well over all fill ranges, and several RF tank modes were used to gauge the mass of fluid in the tank. SHIIVER was then exposed to an acoustic environment of 147 dB OASPL (overall sound pressure level) in a reverberant chamber. The acoustic environment and profile envelopes the upper stage internal acoustic level of several different modern launch vehicles. No structural or thermal performance changes were observed as a result of acoustic testing. Final thermal vacuum testing after the acoustic testing showed no degradation to the MLI due to the acoustic environment as measured via system heat loads.

SHIIVER↗

Latent Cure Epoxy Matrix Resins for Reliable Assembly of Thermoset Composite Structures

Polymer matrix composites are used in high performance structures because of their excellent specific strength, toughness, and stiffness. To realize their full potential, complex composite structures must be assembled with adhesive, but uncertainty in bond performance often requires manufacturers to install bolts or other crack-arrest features to ensure safety in critical applications.1 The inherent uncertainty in adhesive bonds stems from the material discontinuity at the composite-to-adhesive interfaces, which are susceptible to contamination and other causes of inter-facial weakness.2 In contrast, co-cured composites, although limited in size and complexity, result in predictable structures that may be certifiable for commercial aviation with reduced dependence on redundant load paths.1 The technology proposed here uses a stoichiometric offset of the hardener-to-epoxy ratio on the faying surfaces of epoxy compo-site laminates. Assembly of the components in a subsequent “secondary co-cure” process results in a joint with no material discontinuities (Figure 1)

Frank L. Palmieri↗