Development of a Geothermal Module in reV: Quantifying the Geothermal Potential While Accounting for the Geospatial Intersection of the Grid Infrastructure and Land Use Characteristics: Preprint

The Renewable Energy Potential (reV) model is a geospatial platform for estimating technical potential and developing renewable energy supply curves, initially developed for wind and solar technologies. The model evaluates deployment constraints, considering land use, environmental, and cultural factors, and estimates the distance to existing grid features to connect future plants (Maclaurin et al., 2021). A pressing deficiency in the reV model, however, is representation of geothermal electricity generation technologies. To address this gap, we developed a novel geothermal generation module for reV that allows for representation and analysis at the same level of detail as other renewable technologies. This paper describes our process for evaluating data sources for the modeling, and presents five preliminary reV geothermal results. More specifically, we present two sets of resource data that represent upper and lower bounds for geothermal potential. We then present several sensitivity runs using the upper bound resource data; the results are encouraging that levelized cost of electricity (LCOE) can be reduced by optimizing the location and estimated capacity of the spatially diverse geothermal resource while considering the distance to existing grid infrastructure. Our preliminary supply curves and levelized cost of electricity (LCOE) results should be considered with care due to the highly uncertainty in geothermal resource potential data. We present median LCOE values for the conterminous U.S. for five scenarios: four hydrothermal (3.5km depth) and one EGS (4.5km depth). The capital and operating costs for each respective technology are modeled. We also compare results using two different resource data sources.

exclusions↗

Modeling with Tritium Accountancy Using MELCOR Fusion

An overview of MELCOR for fusion as a safety analysis tool for presentation to fusion industry members, given as a powerpoint presentation. This is a remix of previously approved and used slides at various conferences.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Constraining GREA, an alternative theory accounting for the present cosmic acceleration

The origin of the Universe's late-time accelerated expansion remains unknown. The General Relativistic Entropic Acceleration (GREA) theory offers a compelling alternative to $Λ$CDM, attributing cosmic acceleration to entropy growth associated with cosmic and black hole horizons, without invoking a cosmological constant. We test GREA against the latest DESI DR2 Baryon Acoustic Oscillations (BAO), multiple Type Ia supernova compilations (Union3, Pantheon$\texttt{+}$, DES-SN5YR), and cosmic microwave background (CMB) distance measurements. While GREA is not nested within $Λ$CDM, it achieves a comparable goodness-of-fit, highlighting its potential as a theoretically motivated framework that circumvents some of the fine-tuning issues of the standard $Λ$CDM cosmology. We find that the best-fit model features a transient phantom crossing at $z \lesssim 2$, with $w_a\equiv \mathrm{d} w(a=1)/\mathrm{d}a \simeq-0.3$, in good agreement with observations. However, its present-day value $w_0\equiv w(z=0)$ is tightly constrained to be $w_0\simeq-1$. Upcoming low-redshift (i.e. $z < 1$) cosmological probes, from both background and perturbations, will offer promising avenues for further exploring the viability of the GREA theory.

Calderon, R. [Prague, Inst. Phys.] (ORCID:00000002↗

STARTUP REACTIVITY ACCOUNTABILITY ATTRIBUTED TO ISOTOPIC TRANSMUTATIONS IN THE IRRADIATED BERYLLIUM REFLECTOR OF THE HIGH FLUX ISTOTOPE REACTOR

The objective of this study is to develop a methodology to predict the reactivity impact as a function of outage time between cycles of 3He, 6Li, and other poisons in the High Flux Isotope Reactor s (HFIR) beryllium reflector. The reactivity worth at startup of the HFIR has been incorrectly predicted in the past after the reactor has been shut-down for long periods of time. The incorrect prediction was postulated to be due to the erroneous calculation of 3He buildup in the beryllium reflector. It is necessary to develop a better estimate of the start-of-cycle symmetric critical control element positions since if the estimated and actual symmetrical critical control element positions differ by more than $1.55 in reactivity (approximately one-half inch in control element startup position), HFIR is to be shutdown and a technical evaluation is performed to resolve the discrepancy prior to restart. 3He is generated and depleted during operation, but during an outage, the depletion of 3He ceases because it is a stable isotope. 3He is born from the radioactive decay of tritium, and thus the concentration of 3He increases during shutdown. The computer program SCALE, specifically the TRITON and CSAS5 control modules including the KENO V.A, COUPLE, and ORIGEN functional modules were utilized in this study. An equation relating the down time (td) to the change in symmetric control element position was generated and validated against measurements for approximately 40 HFIR operating cycles. The newly-derived correlation was shown to improve accuracy of predictions for long periods of down time.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The Ural Electrochemical Integrated Plant Sustainability Program of Nuclear Material Protection, Control and Accounting System Upgrades

UEIP has been working on a comprehensive sustainability program that includes establishing a site sustainability working group, information gathering, planning, organizing, developing schedule and estimated costs, trhough joint UEIP-US DOE/NNSA National Laboratory sustainability contracts. Considerable efforts have been necessary in the sustainability planning, monitoring, and control of the scope of work using tools such as Microsoft Excel, Microsoft Project and SAP R/3. While information interchanges within the sustainability program provides adequate US assurances that US funds are well spent through its quarterly reporting methodology, proper information security and protection measures are taken throughout the process. Decommissioning of outdated equipment has also become part of determining sustainability requirements and processes. The site’s sustainability program has facilitated the development of a transition plan toward eventual full Russian funding of sustaining nuclear security upgrades.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Assessing I 2 S-LWR economic competitiveness using systematic differential capital cost evaluation methodology

One of the major factors impeding nuclear power plant (NPP) construction is their economics. In this study, a systematic differential economics evaluation approach was developed through the use of the Code of Accounts guidelines to assess the costs of nuclear power plants. The methodology, entirely based on publicly available data, may serve as a template to evaluate direct costs for reactors of any size and design at any stage of developments. In particular, this approach was used to assess the costs of the Integral Inherently Safe Light Water Reactor (I 2 S-LWR). The I 2 S-LWR is a design concept of a large (~1000 MWe) light water reactor. One of its key design features promoting inherent safety is implementation of an integral primary circuit configuration, which however necessitates a compact design of the core and primary circuit components. Through the methodology here presented, a representative loop PWR design was taken as a reference and the differential cost was estimated for each individual account based on the design difference, or similarity. Cost scaling techniques were applied to the accounts representing systems that differ from the ones of the reference PWR. Cost estimating techniques were used to evaluate cost of innovative components that are not part of standard PWR designs. By evaluating the cost difference of the I 2 S-LWR from the standard PWR, rather than the absolute cost, the uncertainty in the estimate is reduced. A similar approach was used by ORNL to estimate the cost of a Fluoride-salt High-temperature Reactor (FHR). A traditional four-loop PWR plant with a core thermal power of 3417 MWth (1144 MWe) was selected as the reference. Costs for that plant were prepared in 1978 by the Department of Energy (DOE) Energy Economics Data Base (EEDB), averaging actual cost incurred in the construction of several nuclear power plants (NPP), itemized with a great level of detail according to the Code of Accounts. This best estimate costs are denoted PWR12-BE. For each account, the cost of equipment, site labor and site material is provided. Industry experts at Westinghouse Electric Company performed a “sanity check” of the cost items, adjusting the cost of several items to match the current market and supply chain data. The detailed cost assessment of I 2 S-LWR was performed, systematically analyzing cost for each account, and applying the differential economics approach. First, Relative importance of each account, i.e., its contribution to the total cost was established, to help focus analysis on the most significant contributors. Moreover, the accounts describing components that are different than that of the PWR12-BE were identified. The integral configuration of the reactor has important implications on the cost of the reactor plant equipment (accounts 22x). Turbine generator equipment (Accounts 23x) is not believed to be much different than that of the reference design. I 2 S-LWR structures (Accounts 21x) mainly differ from that of a standard LWR as several buildings (containment building, shield building, annex building, waste processing building, fuel storage building) are integrated into a single building (nuclear island). Yardwork has a higher cost for the I 2 S-LWR, as the NI is partially below grade. On the other hand, due to its compact Nuclear Island footprint, I 2 S-LWR facilitates (and includes in its reference version) the use of seismic isolators, which contribute to reducing the direct cost. The total capital investment cost (TCIC), on the $/kW basis, of I 2 S-LWR is 5.84% lower than that of PWR12-BE, in spite of the lower power output of I 2 S-LWR. However, for the Western US (0.7 g), benefits of the seismic isolation are more pronounced, and the I 2 S-LWR total capital investment cost is 13.02% lower than that of PWR12-BE. If the I 2 S-LWR is compared to a PWR10-BE (traditional loop design, but scaled to the same power level as I 2 S-LWR), the savings are even higher, in the range 11.12%–17.89%. The analysis indicates that I 2 S-LWR has potential to offer an economically attractive design, with TCIC lower than that of a nuclear power plant based on a traditional loop PWR design. In other words, I 2 S-LWR design offers significantly enhanced safety, while at the same time improving economics. The differential economics approach developed in this paper can be used in identifying changes in cost of key components in order to improve the economics of a nuclear reactor design. The method can also help compare the economics of advanced Generation IV reactors and innovative water-cooled SMR (Small Modular Reactors) with respect to standard LWR technologies. In summary, the differential economics approach and can be used as a tool capable of helping stakeholder decisions.

Economic↗

Economic Model for Estimation of GDP Losses in the MACCS Offsite Consequence Analysis Code

The MACCS (MELCOR Accident Consequence Code System) code is the U.S. Nuclear Regulatory Commission (NRC) tool used to perform probabilistic health and economic consequence assessments for atmospheric releases of radionuclides. It is also used by international organizations, both reactor owners and regulators. It is intended and most commonly used for hypothetical accidents that could potentially occur in the future rather than to evaluate past accidents or to provide emergency response during an ongoing accident. It is designed to support probabilistic risk and consequence analyses and is used by the NRC, U.S. nuclear licensees, the Department of Energy, and international vendors, licensees, and regulators. This report describes the modeling framework, implementation, verification, and benchmarking of a GDP-based model for economic losses that has recently been developed as an alternative to the original cost-based economic loss model in MACCS. The GDP-based model has its roots in a code developed by Sandia National Laboratories for the Department of Homeland Security to estimate short-term losses from natural and manmade accidents, called the Regional Economic Accounting analysis tool (REAcct). This model was adapted and modified for MACCS and is now called the Regional Disruption Economic Impact Model (RDEIM). It is based on input-output theory, which is widely used in economic modeling. It accounts for direct losses to a disrupted region affected by an accident, indirect losses to the national economy due to disruption of the supply chain, and induced losses from reduced spending by displaced workers. RDEIM differs from REAcct in its treatment and estimation of indirect loss multipliers, elimination of double counting associated with inter-industry trade in the affected area, and that it is designed to be used to estimate impacts for extended periods that can occur from a major nuclear reactor accident, such as the one that occurred at the Fukushima Daiichi site in Japan. Most input-output models do not account for economic adaptation and recovery, and in this regard RDEIM differs from its parent, REAcct, because it allows for a user-definable national recovery period. Implementation of a recovery period was one of several recommendations made by an independent peer review panel to ensure that RDEIM is state-of-practice. For this and several other reasons, RDEIM differs from REAcct. Both the original and the RDEIM economic loss models account for costs from evacuation and relocation, decontamination, depreciation, and condemnation. Where the original model accounts for an expected rate of return, based on the value of property, that is lost during interdiction, the RDEIM model instead accounts for losses of GDP based on the industrial sectors located within a county. The original model includes costs for disposal of crops and milk that the RDEIM model currently does not, but these costs tend to contribute insignificantly to the overall losses. This document discusses three verification exercises to demonstrate that the RDEIM model is implemented correctly in MACCS. It also describes a benchmark study at five nuclear power plants chosen to represent the spectrum of U.S. commercial sites. The benchmarks provide perspective on the expected differences between the RDEIM and the original cost-based economic loss models. The RDEIM model is shown to consistently predict larger losses than the original model, probably in part because it accounts for national losses by including indirect and induced losses; whereas, the original model only accounts for regional losses. Nonetheless, the RDEIM model predicts losses that are remarkably consistent with the original cost-based model, differing by 16% at most for the five sites combined with three source terms considered in this benchmark.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

PipeSight: A High-Performance Computing Platform for Pipeline Integrity Management

The Phase I feasibility study completed as part of this project has led to a number of innovative technologies being developed and has laid the foundation for a successful Phase II effort to commercialize a platform for managing the integrity of pipelines for the damage mechanisms of the new, hybrid-energy based economy. To ground the development efforts and direction of the project, an extensive market research and customer discovery effort was undertaken early in Phase I. Through this effort, a number of pipeline owners and operators were interviewed, and the following key findings were discovered about the pipeline industry: • Small pipeline operators do not have the central engineering groups necessary to perform their own independent analysis of inspection data, but instead rely on summarized tally sheets provided to them by inspection service providers. • The time it takes to go from an inspection to a completed engineering assessment, even for small segments of pipeline, can take anywhere from 30-120 days. During this delay, critical threats can (and have been known to) cause failures. • Uncertainty is often not accounted for in the assessment of pipeline integrity. The tally sheets provided by third-party service providers are almost always deterministic in nature, identifying threats that present a concern only to the current (not the future) integrity of the pipeline. • It is uncommon to apply the latest technologies to perform advanced assessments of damaged pipelines. There is a desire to use more advanced analysis capabilities to assess threats. Many pipeline operators indicated that they would often excavate a pipeline to perform an inspection and find that the damage was not as bad as they anticipated, thus using limited resources unnecessarily. Companies are not consistent in their use of inspection data to determine corrosion rates, and those that do only calculate deterministic corrosion rates. • The industry has prominently relied on time-based inspections but has recently started to transition to risk-based inspections. However, there appears to be no uniform guidance on how to do so while properly accounting for all sources of uncertainty. • Companies are not storing inspection data in a manner that allows for the ready determination of temporal trends. • Predictive maintenance principles and practices are beginning to be used by early adopters • Some pipelines are being re-purposed to transport different process fluids than they were designed for, e.g., H 2 and CO 2 rich process streams to serve the new hybrid-energy based economy, which are presenting new integrity concerns for the existing pipeline network that crisscrosses the United States. As a result of these discoveries, we were able to target the development efforts in Phase I to best serve the needs of the industry. In Phase I, we developed a way to correlate multiple large-scale scans of the pipeline to determine a probabilistic corrosion rate that accounts for all sources of error and uncertainty in the inspection process. This probabilistic corrosion rate can be used to predict the future thickness distribution of the pipe wall. We demonstrate how this analysis may be performed in an analytical fashion and has been implemented in such a manner that it can be readily distributed using GPU computing through integration of the Kokkos programming model. We also make a very novel extension of the analytical corrosion rate model to Bayesian Networks (an explainable AI technique) that can account for non-parametric distributions of corrosion rates. With the predictions made above for the probabilistic corrosion rate and corresponding future distribution of the pipe wall thickness, we can assess the integrity of the pipeline through the use of a probabilistic engineering assessment. We developed a novel screening data analysis approach that can rapidly identify ‘hotspots’ (local thin areas) where the integrity of the pipeline is a concern. Once more, we implemented this screening approach in C++ to leverage GPU computing via the Kokkos programming model. After the critical hotspots are identified, we developed a program that can automatically generate an advanced finite element model of the damaged regions. Since the number of damaged regions that require advanced analysis can number in the thousands, we integrated an open-source container-native workflow engine for orchestrating parallel jobs on the cloud. Initially, these advanced numerical models were only designed to account for loading due to internal pressure. However, in a slight pivot from the initial Phase I proposal, we developed a complete pipe stress analysis program (called Simflex) which can simulate the complete pipeline and its response to thermal expansion, pressure, thermal bowing, weight, wind, earthquake, support displacement, support friction and external forces. This pipe stress analysis program was written generically, to handle any piping system, but contains the features needed to model long pipelines (i.e., it incorporates a model for soil mechanics and can account for the nonlinear boundary conditions necessary to simulate long underground pipelines). This pipe stress analysis program can simulate any segment of the pipeline (simple or complex) under any set of conditions and loads, to determine the supplemental loads (axial forces and bending moments) at the location of damage. This enables the most accurate state of stress to be accounted for in the pipeline, which can prove critical when evaluating the integrity of a damaged region. In the process of developing the technologies to perform the integrity assessment of the pipeline, we also extended one of the industry standard approaches for performing the assessment of local thin areas that extend more in the circumferential direction than the longitudinal direction of the pipeline. This approach was presented to the API 579-1/AS ME FFS-1 steering committee in November 2021 for consideration in the next edition of the industry standard for Fitness-For-Service (expected to be released in 2023). To help pipeline operators make decisions with the results on any integrity assessment, we developed a new approach to the life-cycle management of pipelines which uses a Bayesian Decision Network. The network is designed to help pipeline operators plan and prioritize inspection activities and ultimately make smarter, more cost-effective decisions. The Bayesian approach accounts for all sources of uncertainty and carries them through to the final optimal decisions, providing a probabilistic framework for optimizing inspection intervals. The proof-of-concept networks developed in the feasibility study are complete, verified, and are focused on a subset of the pipeline. To expand this novel approach to the scale necessary for an entire network of pipelines in Phase II, we will leverage the DOE-funded Bengi solver for industrial-scale decision making with Bayesian Networks [22]. Once implemented, we will be able to provide the pipeline industry with a much-needed tool for optimal inspection planning using truly explainable artificial intelligence (XAI). To handle all of these advanced capabilities into a cloud-based platform, the architecture of the Equity Engineering Cloud (EEC) was extended to include Argo Workflows, a framework capable of distributing and managing a massive number of jobs that consume their own resources, such that thousands of serial finite element simulations can be run in parallel. As part of this substantial undertaking, we also integrated Argo Continuous Delivery (CD) into the EEC, to aid with the rapid prototyping and iterations that will be imperative to the success of the PipeSight platform’s Agile development process in Phase II. As part of the pipe stress analysis program, we also developed a custom visualizer that leverages the DOE-funded VTK visualization library. We added custom contouring capabilities and a means for interacting visually with both the inputs and outputs of the pipe stress analysis program. We also developed routines for automating the post-processing of the finite element simulations to determine if any failure criteria are met and to visualize the deformations, stresses and strains in ParaView using the exodus II file format (a subset of netCDF).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report. October 1 - December 31, 2009.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY 2010 for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208); for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208); and for the Tropical Western Pacific (TWP) locale is 1,876.8 hours (0.85 x 2,208). The ARM Mobile Facility (AMF) deployment in Graciosa Island, the Azores, Portugal, continues; its OPSMAX time this quarter is 2,097.60 hours (0.95 x 2,208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are the result of downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP locale has historically had a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. Beginning this quarter, the SGP began a transition to a smaller footprint (150 km x 150 km) by rearranging the original and new instrumentation made available through the American Recovery and Reinvestment Act (ARRA). The central facility and 4 extended facilities will remain, but there will be up to 16 surface new characterization facilities, 4 radar facilities, and 3 profiler facilities sited in the smaller domain. This new configuration will provide observations at scales more appropriate to current and future climate models. The TWP locale has the Manus, Nauru, and Darwin sites. These sites will also have expanded measurement capabilities with the addition of new instrumentation made available through ARRA funds. It is anticipated that the new instrumentation at all the fixed sites will be in place within the next 12 months. The AMF continues its 20-month deployment in Graciosa Island, Azores, Portugal, that started May 1, 2009. The AMF will also have additional observational capabilities within the next 12 months. Users can participate in field experiments at the sites and mobile facility, or they can participate remotely. Therefore, a variety of mechanisms are provided to users to access site information. Users who have immediate (real-time) needs for data access can request a research account on the local site data systems. This access is particularly useful to users for quick decisions in executing time-dependent activities associated with field campaigns at the fixed sites and mobile facility locations. The eight computers for the research accounts are located at the Barrow and Atqasuk sites; the SGP central facility; the TWP Manus, Nauru, and Darwin sites; the AMF; and the DMF at PNNL. However, users are warned that the data provided at the time of collection have not been fully screened for quality and therefore are not considered to be official ACRF data. Hence, these accounts are considered to be part of the facility activities associated with field campaign activities, and users are tracked. In addition, users who visit sites can connect their computer or instrument to an ACRF site data system network, which requires an on-site device account. Remote (off-site) users can also have remote access to any ACRF instrument or computer system at any ACRF site, which requires an off-site device account. These accounts are also managed and tracked.

54 ENVIRONMENTAL SCIENCES↗

Analysis of the Relationship Between Vehicle Weight/Size and Safety, and Implications for Federal Fuel Economy Regulation

This report analyzes the relationship between vehicle weight, size (wheelbase, track width, and their product, footprint), and safety, for individual vehicle makes and models. Vehicle weight and footprint are correlated with a correlation coefficient (R{sup 2}) of about 0.62. The relationship is stronger for cars (0.69) than for light trucks (0.42); light trucks include minivans, fullsize vans, truck-based SUVs, crossover SUVs, and pickup trucks. The correlation between wheelbase and track width, the components of footprint, is about 0.61 for all light vehicles, 0.62 for cars and 0.48 for light trucks. However, the footprint data used in this analysis does not vary for different versions of the same vehicle model, as curb weight does; the analysis could be improved with more precise data on footprint for different versions of the same vehicle model. Although US fatality risk to drivers (driver fatalities per million registered vehicles) decreases as vehicle footprint increases, there is very little correlation either for all light vehicles (0.01), or cars (0.07) or trucks (0.11). The correlation between footprint and fatality risks cars impose on drivers of other vehicles is also very low (0.01); for trucks the correlation is higher (0.30), with risk to others increasing as truck footprint increases. Fatality risks reported here do not account for differences in annual miles driven, driver age or gender, or crash location by vehicle type or model. It is difficult to account for these factors using data on national fatal crashes because the number of vehicles registered to, for instance, young males in urban areas is not readily available by vehicle type or model. State data on all police-reported crashes can be used to estimate casualty risks that account for miles driven, driver age and gender, and crash location. The number of vehicles involved in a crash can act as a proxy of the number of miles a given vehicle type, or model, is driven per year, and is a preferable unit of exposure to a serious crash than the number of registered vehicles. However, because there are relatively few fatalities in the states providing crash data, we calculate casualty risks, which are the sum of fatalities and serious or incapacitating injuries, per vehicle involved in a crash reported to the police. We can account for driver age/gender and driving location effects by excluding from analysis crashes (and casualties) involving young males and the elderly, and occurring in very rural or very urban counties. Using state data on all police-reported crashes in five states, we find that excluding crashes involving young male and elderly drivers has little effect on casualty risk; however, excluding crashes that occurred in the most rural and most urban counties (based on population density) increases casualty risk for all vehicle types except pickups. This suggests that risks for pickups are overstated unless they account for the population density of the county in which the crashes occur. After removing crashes involving young males and elderly drivers, and those occurring in the most rural and most urban counties, we find that casualty risk in all light-duty vehicles tends to increase with increasing weight or footprint; however, the correlation (R{sup 2}) between casualty risk and vehicle weight is 0.31, while the correlation with footprint is 0.23. These relationships are stronger for cars than for light trucks. The correlation between casualty risk in frontal crashes and light-duty vehicle wheelbase is 0.12, while the correlation between casualty risk in left side crashes and track width is 0.36. We calculated separately the casualty risks vehicles impose on drivers of the other vehicles with which they crash. The correlation between casualty risk imposed by light trucks on drivers of other vehicles and light truck footprint is 0.15, while the correlation with light truck footprint is 0.33; risk imposed on others increases as light truck weight or footprint increases. Our analysis indicates that, after excluding crashes involving young male and elderly drivers, and crashes in very rural and very urban counties, and accounting for vehicle weight and footprint, sports cars, pickup trucks and truck-based SUVs have higher risk to their drivers than cars, while import luxury cars and crossover SUVs have lower risk to their drivers than cars. Similarly, pickups and sports cars impose a large casualty risk on drivers of other vehicles, after accounting for vehicle weight and footprint. Our analysis suggests that excluding young male and elderly drivers, and crashes in very rural and urban counties, accounting for vehicle weight, footprint, and type explains only about half of the variability in casualty risk to drivers, and to drivers of other vehicles, by vehicle model.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗