Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Verification & Validation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

CFD Validation with Experiment and Verification with Physics of a Propellant Damping Device

This paper will document our effort in validating a coupled fluid-structure interaction CFD tool in predicting a damping device performance in the laboratory condition. Consistently good comparisons of "blind" CFD predictions against experimental data under various operation conditions, design parameters, and cryogenic environment will be presented. The power of the coupled CFD-structures interaction code in explaining some unexpected phenomena of the device observed during the technology development will be illustrated. The evolution of the damper device design inside the LOX tank will be used to demonstrate the contribution of the tool in understanding, optimization and implementation of LOX damper in Ares I vehicle. It is due to the present validation effort, the LOX damper technology has matured to TRL 5. The present effort has also contributed to the transition of the technology from an early conceptual observation to the baseline design of thrust oscillation mitigation for the Ares I within a 10 month period.

Yang, H. Q.↗

Development and Use of Engineering Standards for Computational Fluid Dynamics for Complex Aerospace Systems

Computational fluid dynamics (CFD) and other advanced modeling and simulation (M&S) methods are increasingly relied on for predictive performance, reliability and safety of engineering systems. Analysts, designers, decision makers, and project managers, who must depend on simulation, need practical techniques and methods for assessing simulation credibility. The AIAA Guide for Verification and Validation of Computational Fluid Dynamics Simulations (AIAA G-077-1998 (2002)), originally published in 1998, was the first engineering standards document available to the engineering community for verification and validation (V&V) of simulations. Much progress has been made in these areas since 1998. The AIAA Committee on Standards for CFD is currently updating this Guide to incorporate in it the important developments that have taken place in V&V concepts, methods, and practices, particularly with regard to the broader context of predictive capability and uncertainty quantification (UQ) methods and approaches. This paper will provide an overview of the changes and extensions currently underway to update the AIAA Guide. Specifically, a framework for predictive capability will be described for incorporating a wide range of error and uncertainty sources identified during the modeling, verification, and validation processes, with the goal of estimating the total prediction uncertainty of the simulation. The Guide's goal is to provide a foundation for understanding and addressing major issues and concepts in predictive CFD. However, this Guide will not recommend specific approaches in these areas as the field is rapidly evolving. It is hoped that the guidelines provided in this paper, and explained in more detail in the Guide, will aid in the research, development, and use of CFD in engineering decision-making.

Lee, Hyung B.↗

Deployment of the Finite Volume Method in Pronghorn for Gas and Salt cooled Pebble Bed Reactors

This report summarizes the activities related to ”Complete FHR and HTGR pebble bed simulator, including initial validation” funded by the NEAMS thermal-hydraulics focus area. The activity revolves around the coarse-mesh thermal-hydraulics code Pronghorn and its application to gas and salt cooled Pebble bed reactor (PBR). The main difference between gas and salt cooled PBR from a thermal-hydraulics perspective is the fluid. To address the difference in fluid behavior, two separate approaches are implemented in the MOOSE Navier Stokes module: 1) a Boussinesq approximation and 2) a fully compressible formulation. The developed finite volume method capabilities are used for improving pre-existing gas-cooled and salt-cooled pebble-bed reactor models. A steady-state, multiphysics gas-cooled pebble-bed reactor model is created that couples the equilibrium core depletion capability developed in previous work, and the finite volume method capability developed for this report. The salt-cooled pebble-bed reactor model is upgraded to use the incompressible finite volume method capability and then extended to three spatial dimensions. Finally, several verification-and-validation exercises performed with Pronghorn are documented using the verification-and-validation report of the MooseDoc system. The goal of this effort to document the verification-and-validation level of Pronghorn and improve stakeholder confidence in the results obtained with Pronghorn.

97 MATHEMATICS AND COMPUTING↗

Human factors case study: An iterative approach to verifying and validating a new suite of reactor inspection and maintenance tooling - 177

An iterative approach was taken to perform the HF Verification and Validation (V and V) activities for a complex set of reactor inspection and maintenance tooling equipment known as the Bruce Reactor Inspection and Maintenance System (BRIMS). This paper is divided into the verification activities (of Human System Information Task Support and Design verifications) and the validation activities. The validation method used a graded approach by breaking validation activities into early usability testing and high fidelity validations. Early usability testing, allowed for issues and design concepts to be identified and explored. High fidelity validation activities tested that the final design requirements and operational goals of the system were met in the production equipment. The validation method has been described in detail by depicting the following: task selection criteria, tools, performance measures and data collection. Validation results demonstrate the benefits of the graded approach as issues were to be identified early in the design process, improvements were made during detailed design and additional testing could confirm that issues were resolved prior to commissioning. To capture and share the success of this iterative V and V approach lessons learned have been created for use in future V and V projects. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analytical Formulation for Sizing and Estimating the Dimensions and Weight of Wind Turbine Hub and Drivetrain Components

This report summarizes the theory, verification, and validation of a new sizing tool for wind turbine drivetrain components, the Drivetrain Systems Engineering (DriveSE) tool. DriveSE calculates the dimensions and mass properties of the hub, main shaft, main bearing(s), gearbox, bedplate, transformer if up-tower, and yaw system. The level of fi¬ delity for each component varies depending on whether semiempirical parametric or physics-based models are used. The physics-based models have internal iteration schemes based on system constraints and design criteria. Every model is validated against available industry data or finite-element analysis. The verification and validation results show that the models reasonably capture primary drivers for the sizing and design of major drivetrain components.

17 WIND ENERGY↗

Some guidance on preparing validation plans for the DART Full System Models.

Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generally applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different scenarios. Specific details contained in any given validation plan will vary according to application requirements and available resources.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Verification of High-Fidelity Neutronics Code PROTEUS for C5G7 Benchmark Problems

Under the DOE Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, the 3D whole core transport code PROTEUS has been developed at Argonne National Laboratory to perform the detailed 3D transport calculation for various reactor types including irregular or complex geometric reactors. PROTEUS includes two distinct transport solvers: SN and MOC. Among them, the MOC solver based on the extruded geometry, thus named MOCEX, can produce the faithful 3-D transport solutions by employing the rigorous and robust 2D/3D MOC formulation. This formulation overcomes the drawbacks of a full 3D MOC method requiring enormous memory and computational resources and resolves the instability issues of the 2D/1D method as well. The solution of MOCEX converges to that of a Monte Carlo code as the discretization of angle, space and energy is refined, unlike the 2D/1D method. As a verification and validation (V and V) effort of PROTEUS-MOCEX, this paper presents verification test results using the well-known 3D C5G7 benchmark problems by solving and comparing eigenvalues and pin powers with MCNP solutions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Third Annual Workshop on Space Operations Automation and Robotics (SOAR 1989)

Papers presented at the Third Annual Workshop on Space Operations Automation and Robotics (SOAR '89), hosted by the NASA Lyndon 8. Johnson Space Center at Houston, Texas, on July 25-27, 1989, are documented herein. During the three days, approximately 100 technical papers wer3 presented by experts from NASA, the USAF, universities, and technical companies. Also held were panel discussions on Air Force/NASA AI Overview and Expert System Verification and Validation. Tutorial sessions included Neural Networks; Theory and Application of Back Propagation; Verification and Validation of Expert Systems/ Evaluation of Expert System Tools; and Technical Environment for Modular Architectures for Robotics in Space; and are not documented herein. Technical topics addressed included intelligent systems, robotics, human factors, and environment.

Knowledge representation↗

CTF (Subchannel) Calculations and Validation L3:VVI.H2L.P15.01

The goal of the Verification and Validation Implementation (VVI) High to Low (Hi2Lo) process is utilizing a validated model in a high resolution code to generate synthetic data for improvement of the same model in a lower resolution code. This process is useful in circumstances where experimental data does not exist or it is not sufficient in quantity or resolution. Data from the high-fidelity code is treated as calibration data (with appropriate uncertainties and error bounds) which can be used to train parameters that affect solution accuracy in the lower-fidelity code model, thereby reducing uncertainty. This milestone presents a demonstration of the Hi2Lo process derived in the VVI focus area. The majority of the work performed herein describes the steps of the low-fidelity code used in the process with references to the work detailed in the companion high-fidelity code milestone (Reference 1). The CASL low-fidelity code used to perform this work was Cobra Thermal Fluid (CTF) and the high-fidelity code was STAR-CCM+ (STAR). The master branch version of CTF (pulled May 5, 2017 – Reference 2) was utilized for all CTF analyses performed as part of this milestone. The statistical and VVUQ components of the Hi2Lo framework were performed using Dakota version 6.6 (release date May 15, 2017 – Reference 3). Experimental data from Westinghouse Electric Company (WEC – Reference 4) was used throughout the demonstrated process to compare with the high-fidelity STAR results. A CTF parameter called Beta was chosen as the calibration parameter for this work. By default, Beta is defined as a constant mixing coefficient in CTF and is essentially a tuning parameter for mixing between subchannels. Since CTF does not have turbulence models like STAR, Beta is the parameter that performs the most similar function to the turbulence models in STAR. The purpose of the work performed in this milestone is to tune Beta to an optimal value that brings the CTF results closer to those measured in the WEC experiments.

97 MATHEMATICS AND COMPUTING↗

CYVET: A Cyber-Physical Assurance Framework Based on a Semi-Supervised Vetting Approach

The project is designed to directly address the needs described in the Topic Area 4 (“Cybersecurity Verification and Validation”) of the CEDS’19 Research Call. The proposed CYVET system directly addresses the need to elevate the current industry capabilities to verify and validate OT cybersecurity and associated control system infrastructure. Currently, there is a significant gap in the energy sector’s capability in that regard during infrastructure improvement, equipment procurement, and compliance certification. CYVET provides that needed capability. CYVET is device and architecture agnostic and thus broadly applicable across the energy sector. The goal of this project is to develop and deliver a cybersecurity verification and validation framework testing capability to verify and validate OT equipment, software, and the underlying control system architecture. The primary project objectives are (i) Verification: the synthesis and reconciliation of standards and vendor supplied features, (ii) Validation: the generation, execution, and presentation of testing scripts of verified security features, and (3) Demonstration: apply the developed technology capabilities for verification and validation at a relevant end-user facility in the energy sector.

Lopez Jr, Juan↗

Operational Modal Analysis of the Space Launch System Mobile Launcher on the Crawler Transporter ISVV-010 Rollout

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation between the Vehicle Assembly Building and launch pad 39B by the Crawler Transporter, and provides the launch platform at the launch pad. As part of the Verification and Validation of the Mobile Launcher and Crawler Transporter, two rollouts of the Mobile Launcher transported by the Crawler Transporter, Integrated System Verification and Validation (ISVV) 005 and 010, have been performed to demonstrate the Crawler Transporter’s ability to transport the Mobile Launcher. ISVV-005 occurred in September 2018 and ISVV-010 occurred in late June 2019. ISVV-005 and ISVV-010 also provided the opportunity to gather data that can be used identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics and refine the estimates of the Artemis I integrated launch vehicle rollout forcing functions. While the rollout environment has historically produced relatively small launch vehicle structural loads for the Saturn/Apollo and Space Shuttle programs in comparison to launch and ascent loads, these relatively small structural loads are inputs to structural fatigue analyses. The same holds true for the Space Launch System. Because the rollout forces acting on the Mobile Launcher and the Crawler Transporter are not directly measurable, Operational Modal Analysis techniques, instead of traditional Experimental Modal Analysis techniques, provide an empirical means to identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics. The ISVV-010 rollout modal characteristics provide important supplemental modal information, which along with the Mobile Launcher modal test that was performed in June 2019 immediately prior to ISVV-010 rollout, combine to reduce uncertainty in the test correlated Mobile Launcher on the Crawler Transporter finite element model. A well test correlated finite element model will play a key role in the Building Block approach the Space Launch System program has implemented as part of its certification process for the Artemis I flight and in refining the Artemis I rollout forcing functions. At the time of the ISVV-005 rollout in September 2018, the Mobile Launcher was still undergoing construction, and therefore its modal characteristics are not directly comparable to those of the Mobile Launcher during the June 2019 Mobile Launcher modal test and subsequent ISVV-010 rollout. Hence the ISVV-005 rollout modal characteristics will not be looked at in this paper. This paper will briefly describe the Mobile Launcher and Crawler Transporter physical characteristics, ISVV-010 rollout data collection, the challenges in implementing Operational Modal Analysis techniques due in part to the Crawler Transporter harmonics, and how these challenges were overcome to obtain the ISVV-010 Mobile Launcher on the Crawler Transporter rollout modal characteristics.

Apollo↗

Operational Modal Analysis of the Space Launch System Mobile Launcher on the Crawler Transporter ISVV-010 Rollout

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation between the Vehicle Assembly Building and launch pad 39B by the Crawler Transporter, and provides the launch platform at the launch pad. As part of the Verification and Validation of the Mobile Launcher and Crawler Transporter, two rollouts of the Mobile Launcher transported by the Crawler Transporter, Integrated System Verification and Validation (ISVV) 005 and 010, have been performed to demonstrate the Crawler Transporter’s ability to transport the Mobile Launcher. ISVV-005 occurred in September 2018 and ISVV-010 occurred in late June 2019. ISVV-005 and ISVV-010 also provided the opportunity to gather data that can be used identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics and refine the estimates of the Artemis I integrated launch vehicle rollout forcing functions. While the rollout environment has historically produced relatively small launch vehicle structural loads for the Saturn/Apollo and Space Shuttle programs in comparison to launch and ascent loads, these relatively small structural loads are inputs to structural fatigue analyses. The same holds true for the Space Launch System. Because the rollout forces acting on the Mobile Launcher and the Crawler Transporter are not directly measurable, Operational Modal Analysis techniques, instead of traditional Experimental Modal Analysis techniques, provide an empirical means to identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics. The ISVV-010 rollout modal characteristics provide important supplemental modal information, which along with the Mobile Launcher modal test that was performed in June 2019 immediately prior to ISVV-010 rollout, combine to reduce uncertainty in the test correlated Mobile Launcher on the Crawler Transporter finite element model. A well test correlated finite element model will play a key role in the Building Block approach the Space Launch System program has implemented as part of its certification process for the Artemis I flight and in refining the Artemis I rollout forcing functions. At the time of the ISVV-005 rollout in September 2018, the Mobile Launcher was still undergoing construction, and therefore its modal characteristics are not directly comparable to those of the Mobile Launcher during the June 2019 Mobile Launcher modal test and subsequent ISVV-010 rollout. Hence the ISVV-005 rollout modal characteristics will not be looked at in this paper. This paper will briefly describe the Mobile Launcher and Crawler Transporter physical characteristics, ISVV-010 rollout data collection, the challenges in implementing Operational Modal Analysis techniques due in part to the Crawler Transporter harmonics, and how these challenges were overcome to obtain the ISVV-010 Mobile Launcher on the Crawler Transporter rollout modal characteristics.

Apollo↗

A Greenhouse-Gas Information System: Monitoring and Validating Emissions Reporting and Mitigation

This study and report focus on attributes of a greenhouse-gas information system (GHGIS) needed to support MRV&V needs. These needs set the function of such a system apart from scientific/research monitoring of GHGs and carbon-cycle systems, and include (not exclusively): the need for a GHGIS that is operational, as required for decision-support; the need for a system that meets specifications derived from imposed requirements; the need for rigorous calibration, verification, and validation (CV&V) standards, processes, and records for all measurement and modeling/data-inversion data; the need to develop and adopt an uncertainty-quantification (UQ) regimen for all measurement and modeling data; and the requirement that GHGIS products can be subjected to third-party questioning and scientific scrutiny. This report examines and assesses presently available capabilities that could contribute to a future GHGIS. These capabilities include sensors and measurement technologies; data analysis and data uncertainty quantification (UQ) practices and methods; and model-based data-inversion practices, methods, and their associated UQ. The report further examines the need for traceable calibration, verification, and validation processes and attached metadata; differences between present science-/research-oriented needs and those that would be required for an operational GHGIS; the development, operation, and maintenance of a GHGIS missions-operations center (GMOC); and the complex systems engineering and integration that would be required to develop, operate, and evolve a future GHGIS.

54 ENVIRONMENTAL SCIENCES↗

Analysis of Validating and Verifying OpenACC Compilers 3.0 and Above

OpenACC is a high-level directive-based parallel programming model that can manage the sophistication of heterogeneity in architectures and abstract it from the users. The portability of the model across CPUs and accelerators has gained the model a wide variety of users. This means it is also crucial to analyze the reliability of the compilers’ implementations. To address this challenge, the OpenACC Validation and Verification team has proposed a validation testsuite to verify the OpenACC implementations across various compilers with an infrastructure for a more streamlined execution. This paper will cover the following aspects: (a) the new developments since the last publication on the testsuite, (b) outline the use of the infrastructure, (c) discuss tests that highlight our workflow process, (d) analyze the results from executing the testsuite on various systems, and (e) outline future developments.

Jarmusch, Aaron↗

Evaluation of 3D Simulation Capabilities within xRAGE using a Suite of Test Problems

This presentation describes a 3D verification and validation suite for xRAGE. Three verification test problems for hydrodynamics are presented: the Kidder ball problem, the Verney shell problem, and a 5-material compression problem. There is excellent agreement between 2D and 3D XRAGE simulation results for these problems, and between the xRAGE results and the benchmark solutions. In addition, two 3D ICF test problems are presented, based on an OMEGA direct drive capsule experiment, and on a NIF indirect drive capsule experiment. These two ICF test problems are used to evaluate two hydrodynamic methods within xRAGE. In addition to hydrodynamics the simulations also include three temperature plasma physics, thermal conduction and radiation diffusion. When simulating either capsule in 3D the newer unsplit hydrodynamic method in xRAGE produces more vorticity relative to the older default method. For the indirect drive capsule the 3D simulations are in reasonable agreement with the experimental values of ion temperature and neutron production. Unstable 3D vortex rings are present near the DT ice/carbon interface which enhance the confinement of the DT ice.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Adopting Code Verification Methodology Based on Model Form

Code verification is an essential part of credibility analysis for computational models. It assesses whether the mathematical model is implemented correctly into the code and whether the numerical methods behave consistently, and is done before solution verification and validation. Robust guidance for code verification exists in the literature. However, there is no known, concise guide for selecting the approach based on the model form that also presents an overview of the common elements. This document was written to address this gap as an accessible reference for beginning a code-verification effort.

97 MATHEMATICS AND COMPUTING↗

Adapting Code Verification Methodology to Model Form

Code verification is an essential part of credibility analysis for computational models. It assesses whether the mathematical model is implemented correctly into the code and whether the numerical methods behave consistently, and is done before solution verification and validation. Robust guidance for code verification exists in the literature. However, there is no known, concise guide for selecting the approach based on the model form that also presents an overview of the common elements. This document was written to address this gap as an accessible reference for beginning a code-verification effort.

97 MATHEMATICS AND COMPUTING↗