SPENT FUEL TRANSPORTATION RISK ASSESSMENT: TRANSPORTATION ACCIDENT ANALYSIS.
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Explore the source record for details and available documents.
Constructed wetland treatment systems are used to remove selenium (Se) from flue‐gas desulfurization (FGD) wastewater (WW). However, direct confirmation of the mechanism responsible for FGD WW Se retention in soil is lacking. A laboratory‐based soil column study was performed to develop an evidence‐based mechanism of Se retention and to study the behavior and the retention capacity of FGD WW constituents in water‐saturated soil. A deoxygenated 1:1 mixture of FGD WW and raw water was delivered to the columns bottom‐up at a flux of 1.68 cm d −1 for 100 d. Some of the columns were flushed with the raw water at the same rate for an additional 100 d. Column effluent was analyzed for constituents of concern. Results showed a complete retention of FGD WW Se in the soil materials. Boron and fluorine were partially retained; however, sulfur, sodium, and chlorine retention was poor, agreeing with field observations. The FGD WW Se was retained in soil near the inlet end of the columns, indicating its limited mobility under reduced conditions. Sequential extraction procedure revealed that retained Se was mainly sequestered as stable/residual forms. Bulk‐ and micro‐X‐ray absorption near‐edge structure spectroscopy confirmed that Se was mainly retained as reduced/stable species [Se(IV), organic Se, and Se(0)]. This study provides direct evidence for FGD WW Se retention in water‐saturated soil via the transformation of oxidized Se into reduced/stable forms. Core Ideas The mechanism of FGD wastewater Se retention in water‐saturated soil was studied. Sequential fractionation of Se, micro‐XRF, and micro‐ and bulk‐XANES were used. Behavior of FGD wastewater constituents in saturated soil was comparable to field‐scale observations. FGD wastewater Se exhibited strong retention in reduced soil. Reduced/stable species of Se governed the retention mechanism.
Abstract not provided.
Abstract not provided.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The major objective of this project was to design an aircraft for use in the California Corridor in the year 2010. The design process, completed by students in a senior design class at California Polytechnic State University, San Luis Obispo, used a Class 1 airplane design analysis from Jan Roskam's Airplane Design. The California Condor (CC-38), a 38 passenger, 400 mph aircraft, was designed to meet the needs of tomorrow's passengers while conforming to the California Corridor's restrictions. Assumptions were made using today's technology with forecasts into 21st Century technology. Doubling today's commuter aircraft passenger capacity, travelling at Mach .57 with improved cruise efficiencies of over 10 percent, with the ability to land within field lengths of 4000 feet, are the CC-38's strongest points. The California Condor has a very promising future in helping to relieve the air traffic and airport congestion in the 21st Century.
Explore the source record for details and available documents.
The NASA Constellation uncrewed cargo mission delivers cargo to any designated location on the lunar surface (or other staging point) in a single mission. This capability is used to deliver surface infrastructure needed for lunar outpost construction, to provide periodic logistics resupply to support a continuous human lunar presence, and potentially deliver other assets to various locations.In the nominal mission mode, the Altair lunar lander is launched on Ares V into Low Earth Orbit (LEO), following a short Low Earth Orbit (LEO) loiter period, the Earth Departure Stage (EDS) performs the Trans Lunar Injection (TLI) burn and is then jettisoned. The Altair performs translunar trajectory correction maneuvers as necessary and performs the Lunar Orbit Insertion (LOI) burn. Altair then descends to the surface to land near a designated target, presumably in proximity to an Outpost location or another site of interest for exploration.Alternatively, the EDS and Altair Descent Stage could deliver assets to various staging points within their propulsive capabilities.
No abstract available
Explore the source record for details and available documents.