Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Safety Case”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Comparing Simulation Results with Traditional PRA Model on a Boiling Water Reactor Station Blackout Case Study

A previous study used RELAP and RAVEN to conduct a boiling water reactor station black-out (SBO) case study in a simulation based environment to show the capabilities of the risk-informed safety margin characterization methodology. This report compares the RELAP/RAVEN simulation results with traditional PRA model results. The RELAP/RAVEN simulation run results were reviewed for their input parameters and output results. The input parameters for each simulation run include various timing information such as diesel generator or offsite power recovery time, Safety Relief Valve stuck open time, High Pressure Core Injection or Reactor Core Isolation Cooling fail to run time, extended core cooling operation time, depressurization delay time, and firewater injection time. The output results include the maximum fuel clad temperature, the outcome, and the simulation end time. A traditional SBO PRA model in this report contains four event trees that are linked together with the transferring feature in SAPHIRE software. Unlike the usual Level 1 PRA quantification process in which only core damage sequences are quantified, this report quantifies all SBO sequences, whether they are core damage sequences or success (i.e., non core damage) sequences, in order to provide a full comparison with the simulation results. Three different approaches were used to solve event tree top events and quantify the SBO sequences: “W” process flag, default process flag without proper adjustment, and default process flag with adjustment to account for the success branch probabilities. Without post-processing, the first two approaches yield incorrect results with a total conditional probability greater than 1.0. The last approach accounts for the success branch probabilities and provides correct conditional sequence probabilities that are to be used for comparison. To better compare the results from the PRA model and the simulation runs, a simplified SBO event tree was developed with only four top events and eighteen SBO sequences (versus fifty-four SBO sequences in the original SBO model). The estimated SBO sequence conditional probabilities from the original SBO model were integrated to the corresponding sequences in the simplified SBO event tree. These results were then compared with the simulation run results.

99 GENERAL AND MISCELLANEOUS↗

ATR LEU fuel and burnable absorber neutronics performance optimization by fuel meat thickness variation

The Advanced Test Reactor (ATR) is a high power density and high neutron flux research reactor operating in the United States. Powered with highly enriched uranium (HEU), the ATR has a maximum thermal power rating of 250 MWth. Because of the large test volumes located in high flux areas, the ATR is an ideal candidate for assessing the feasibility of converting an HEU driven reactor to a low-enriched core. The present work investigates the necessary modifications and evaluates the subsequent operating effects of this conversion. A detailed plate-by-plate MCNP ATR 1/8th core model was developed and validated for a fuel cycle burnup comparison analysis. Using the current HEU U-235 enrichment of 93.0 % as a baseline, an analysis can be performed to determine the low-enriched uranium (LEU) density and U-235 enrichment required in the fuel meat to yield an equivalent K-eff between the HEU core th and the LEU core versus effective full power days (EFPD). The MCNP ATR 1/8th core model will be used to optimize the U-235 loading in the LEU core, such that the differences in K-eff and heat flux profile between the HEU and LEU core can be minimized. The depletion methodology MCWO was used to calculate K-eff versus EFPDs in this paper. The MCWO-calculated results for the LEU cases with foil (U-10Mo) types demonstrated adequate excess reactivity such that the K-eff versus EFPDs plot is similar to the reference ATR HEU case. Each HEU fuel element contains 19 fuel plates with a fuel meat thickness of 0.508 mm. In this work, the proposed LEU (U-10Mo) core conversion case with a nominal fuel meat thickness of 0.381 mm and the same U-235 enrichment (19.7 wt%) can be used to optimize the radial heat flux profile by varying the fuel meat thickness from 0.191 mm (7.5 mil) to 0.343 mm (13.5 mil) at the inner 4 fuel plates (1-4) and outer 4 fuel plates (16-19). In addition, 0.8g of a burnable absorber, Boron-10, was added in the inner and outer plates to reduce the initial excess reactivity, and the inner/outer heat flux more effectively. The optimized LEU relative radial fission heat flux profile is bounded by the reference ATR HEU case. However, to demonstrate that the LEU core fuel cycle performance can meet the Updated Final Safety Analysis Report (UFSAR) safety requirements, additional studies will be necessary to evaluate and compare safety parameters such as void reactivity and Doppler coefficients, control components worth (outer shim control cylinders, safety rods and regulating rod), and shutdown margins between the HEU and LEU cores. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Case Study of Recycling of Low Cobalt Batteries, OnTo Technology and King County Transit

Lithium-ion recycling is challenged by cost and safety related to low value elements and battery reactivity. OnTo is the first to demonstrate and develop technologies that address these challenges. Battery deactivation eliminates hazards and enables a roadmap for safe, low-cost end-of-life battery services essential to the industry. Deactivation coupled with Cathode-healing provides safety and efficiency in material recycling that can be applied all along the manufacturing value chain and for numerous chemistries in the market. Dr. Sloop will present recent developments in application and scale of these innovative technologies.

25 ENERGY STORAGE↗

[High Pressure Gas Tanks]

Four high-pressure gas tanks, the basis of this study, were especially made by a private contractor and tested before being delivered to NASA Kennedy Space Center. In order to insure 100% reliability of each individual tank the staff at KSC decided to again submit the four tanks under more rigorous tests. These tests were conducted during a period from April 10 through May 8 at KSC. This application further validates the predictive safety model for accident prevention and system failure in the testing of four high-pressure gas tanks at Kennedy Space Center, called Continuous Hazard Tracking and Failure Prediction Methodology (CHTFPM). It is apparent from the variety of barriers available for a hazard control that some barriers will be more successful than others in providing protection. In order to complete the Barrier Analysis of the system, a Task Analysis and a Biomechanical Study were performed to establish the relationship between the degree of biomechanical non-conformities and the anomalies found within the system on particular joints of the body. This relationship was possible to obtain by conducting a Regression Analysis to the previously generated data. From the information derived the body segment with the lowest percentage of non-conformities was the neck flexion with 46.7%. Intense analysis of the system was conducted including Preliminary Hazard Analysis (PHA), Failure Mode and Effect Analysis (FMEA), and Barrier Analysis. These analyses resulted in the identification of occurrences of conditions, which may be becoming hazardous in the given system. These conditions, known as dendritics, may become hazards and could result in an accident, system malfunction, or unacceptable risk conditions. A total of 56 possible dendritics were identified. Work sampling was performed to observe the occurrence each dendritic. The out of control points generated from a Weighted c control chart along with a Pareto analysis indicate that the dendritics "Personnel not Wearing Proper Protective and Hose/tubing located in high-traffic area" which account for 59.18% of total dendritic frequency need to be addressed to reduce the chance of a hazard from occurring. However, the occurrences of some dendritics are more important than others. As a result immediate, from a Weighted c perspective, corrective action should be taken to ameliorate the cause of the Class A dendritic "Personnel located under suspended or moving loads" rather than just the most commonly occurring dendritics. In any case the vast majority of data obtained indicates that testing operations possess a relatively high degree of safety.

Quintana, Rolando↗

Cost-effective Remediation of Legacy Uranium Mines in Canada - 19279

Canada's legacy uranium mines were developed and operated in the 1950's and the 1960's when environmental regulations applied to mining activities were not as stringent as they are today. Fortunately, the ore was very low grade and, most of these sites do not currently pose a significant risk. However, the mining practices used at the time would not be considered acceptable today and there is a need to ensure these sites are being managed properly, especially in the context of gaining public support for the development of new uranium mines. At the beginning of the Cold War nuclear arms race, uranium was in high demand. In 1948, bans on private uranium exploration and mining were lifted, resulting in extensive exploration activity across the country, with Canada's second uranium mine beginning production in 1953. By 1958, 19 uranium mills were operating and Canadian production peaked at 12,239 tonnes of uranium metal (tU). The uranium mining boom was short-lived as the United States, the major purchaser, soon had sufficient quantities of uranium to meet its needs and the Canadian contracts were not extended. Uranium mines began closing, and by 1965, only 4 remained in operation. Closure requirements were minimal at that time, and other than sealing shafts and other safety measures, the sites were abandoned by their owners and the wastes were not addressed. In many cases, the company that operated the mine, or its successor, still exists and is now addressing the wastes on its sites. However, sites for which a former operator cannot be found have become a government responsibility. It is not often practical or cost-effective to remediate legacy sites to the standards applied to modern uranium mines. Most of the sites pose a very low risk, due to the very low-grades of ore, their remote locations, and the fact that contamination has spread and dissipated over the last 50 years and the environment will continue to improve through natural attenuation. Owners of legacy uranium mine sites in Canada have developed and successfully carried out cost-effective remediation plans that meet regulatory requirements. Experience from the legacy sites that have been remediated to date in Canada has shown that costs for remediating legacy uranium mines need not be excessive, and should be similar to the cost of remediating other metal mines of comparable size. The main factor in the cost of remediating these sites is the amount of tailings that were generated. On a per unit cost basis (current U.S. dollars), costs of remediation, have ranged from US$0.83 to US$2.57 per tonne of tailings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Peculiarities of Transition from Operation to Decommissioning for the Chernobyl NPP - 18486

Usually the transition period is supposed to last around 5 years and to cover the eventual defueling of the reactor and the reactor cooling pool, completion of the characterization survey and preparation of all necessary documents to start the decommissioning activities in accordance with the decommissioning strategy chosen and the decommissioning plan approved. It was not the case for the Chernobyl NPP due to a number of reasons and obstacles, including delayed defueling due to unavailability of the storage capacities, lack of preparatory work due to prescheduled decommissioning, luck of experience of RBMK-type reactors decommissioning, influence of the destroyed Chernobyl-4 Unit and related works on site. All these factors not only delayed the completion of the characterization survey, but added complications to development of the decommissioning strategy and the decommissioning plan. De facto the issue of end state is still open as the end state for the destroyed Chernobyl-4 as well as the prospects of the exclusion zone transformation need further clarifications and justifications. As a result, the need to reconsider the standard concept of transition period was recognized already by the end of 2000, when Chernobyl-1 and Chernobyl-2 were out of operation for a few years. It was clear that the personnel had generally a bad perception of the prescheduled permanent shutdown decision and a low motivation to change and to learn. The first signs of organizational degradation were visible and the framework of the operational license did not fit well to prevent it. So it was decided to start the legal and organizational transformation into the decommissioning mode without waiting for polishing of the decommissioning strategy and decommissioning plan as in this case both documents seemed to need further adjustments anyway. The transition period (or the termination of operation as it called in the national nuclear safety regulations) was considered as the first phase of decommissioning to be covered by the decommissioning license. The detailed plan of activities for the transition period with proper safety justification documents was the main part of the relevant license application. Human resource management plan and adoption of the management system were important constituents as well. It was also considered reasonable to start some dismantling works already at this phase to avoid further delays and degradation, the works being carefully justified. Eventually such approach added to streamlining the decommissioning process and to avoid further organizational and technical degradation. Flexibility in transition from operation to decommissioning seems necessary in cases of prescheduled or post-accidental decommissioning but may be also beneficial for a scheduled decommissioning case. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

From Chills to Thrills: Revolutionizing Energy Efficiency and Load Flexibility in Supermarket Refrigeration

Open-vertical medium-temperature refrigerated display cases comprise nearly 50% of total case lineups in a typical supermarket, with more than 80% of their cooling load attributed to infiltration of warm and moist air from the surrounding space. The infiltration takes place across the air curtain system of the display case. While the air curtain acts as a thermal shield and as a cooling mechanism to maintain product temperature, it also entrains large amounts of heat and moisture from the adjacent space. Additionally, from food safety and quality standpoints, these fixtures are vulnerable to electric outages and traditionally cannot participate in load flexibility events. This paper describes key features of an innovative design of a self-contained, water-cooled, medium-temperature, open-vertical display case. The novel concept will eliminate the inefficient air curtain system and incorporate a hybrid radiant and low-airflow convective cooling design with a thermal-energy-storage-coupled heat exchanger integrated into the refrigeration circuit. The focus of this paper is on evaluating the thermal performance of the novel hybrid design in maintaining target product temperature. It presents thermal performance findings from thermo-fluid system modeling and robust state-of-the-art laboratory experiments used to validate those models. Load flexibility attributes from thermal energy storage are not discussed. A controlled-environment chamber at the National Renewable Energy Laboratory was leveraged to validate the thermal performance of the novel technology. Final results from bench-scale experiments indicate the proposed design maintained mean product temperatures within food safety guidelines.

commercial refrigeration↗

Understanding and Verifying Neural Networks

Deep Neural Networks (DNNs) have gained immense popularity in recent times and have widespread use in applications such as image classification, sentiment analysis, speech recognition and also in safety-critical applications such as autonomous driving. However, they suffer limitations such as lack of explainability and robustness which raise safety and security concerns in their usage. Further, the complex structure and large input spaces of DNNs act as an impediment to thorough verification and testing. The SafeDNN project at the Robust Software Engineering (RSE) group at NASA aims at exploring techniques to ensure that systems that use deep neural networks are safe, robust and interpretable. In this talk, I will be presenting our technique Prophecy that automatically infers formal properties of deep neural network models. The tool extracts patterns based on neuron activations as preconditions that imply certain desirable output properties of the model. I would be highlighting case studies that use Prophecy in obtaining explanations for network decisions, understanding correct and incorrect behavior, providing formal guarantees wrt safety and robustness, and debugging neural network models. We have applied the tool on image classification networks, neural network controllers providing turn advisories in unmanned aircrafts, regression models used for autonomous center-line tracking in aircrafts and neural network object detectors

Deep Neural Networks↗

Realized Benefits from the Model-Based Systems Engineering Infusion and Modernization Initiative

Although Model-Based Systems Engineering (MBSE) as a concept has existed for over a decade, overall acceptance within the National Aeronautics and Space Administration (NASA) has been slow and is now growing. Since 2016, NASA’s MBSE Infusion And Modernization Initiative (MIAMI) has proven MBSE’s value to and increased its adoption at NASA. MBSE Pathfinder projects provided focused use cases that demonstrated both qualitative and quantitative benefits for systems engineering activities, and demonstrated the ability to connect MBSE models with discipline models such as structural loads and safety and mission assurance. MIAMI assisted NASA’s field centers to establish or enhance an MBSE presence. MIAMI partners with JAXA’s Systems Technology Unit to share lessons learned and demonstrate how MBSE can be used across organizations. Following its successful test cases, MIAMI is using design thinking, lean startup, and high technology marketing methodologies to implement a targeted deployment of its Community of Practice and other resources.

MBSE↗

Assumption Generation for the Verification of Learning-Enabled Autonomous Systems

Providing safety guarantees for autonomous systems is difficultas these systems operate in complex environments that require the use of learning-enabled components, such as deep neural networks (DNNs) for visual perception. DNNs are hard to analyze due to their size (they can have thousands or millions of parameters), lack of formal specifications (DNNs are typically learnt from labeled data, in the absence of any formal or informal requirements), and sensitivity to small changes in the environment. We present an assume-guarantee style compositional approach for the formal verification of system-level safety properties of such autonomous systems. Our insight is that we can analyze the system in the absence of the DNN perception components by automatically synthesizing assumptions on the DNN behaviour that guarantee the satisfaction of the required safety properties. The synthesized assumptions are the weakest in the sense that they characterize the output sequences of all the possible DNNs that, plugged into the autonomous system, guarantee the required safety properties. The assumptions can be leveraged as run-time monitors over a deployed DNN to guarantee the safety of the overall system; they can also be mined to extract local specifications for use during training and testing of DNNs. We illustrate our approach on a case study taken from the autonomous airplanes domain that uses a complex DNN for perception

Autonomous systems↗

Software Validation Work With The ZPPR-15 Data

The analysis activities for fast reactors involve using many different pieces of software that are relied upon for their predictive capabilities. For this software to be considered reliable, documented proof that the predictions of the software are accurate is required. In this manuscript, the validation work that covers some of the Argonne software used in fast reactor design activities is discussed and displayed. This validation work includes neutron and gamma flux distributions, reaction rate distributions, and reactivity worth. In an ideal world, a reactor development program would have access to a comprehensive set of experimental facilities to help inform the design aspects of the reactor itself. While thermal-hydraulics experiments, and to a limited degree mechanical experiments, can be carried out today for validation needs, neutronics related experimental facilities are rather impractical because of the lack of experimental facilities. Given the desired time table for construction of new reactors, the reconstitution or creation of new neutronic experimental facilities is untenable and thus those reactor development programs must rely upon any available experimental measurements that are qualitatively similar to the design. While a methodology has been proposed to assess the similarity between the past experimental measurements and the reactor itself, that aspect is beyond the scope of this manuscript. In this manuscript, the focus is entirely placed on the analysis results for a series of experiments carried out at the ZPPR facility in Idaho in the mid-1980s. In this regard, this manuscript only shows the validation of the stated neutronics software for specific loadings of the ZPPR reactor. Because of the fuel form, its proposed enrichment, and the material content of the reactor core, the ZPPR-15 experiments were identified as potential validation data for the reactor. The ZPPR-15 experiments were intended as mockups of a 330 MWe Integral Fast Reactor program which was a follow on program to the Clinch River Breeder Reactor. In the ZPPR-15 series of experiments, measurements of the neutron spectrum, control rod worth, sodium void worth, foil reaction rate distributions, Doppler worth of heated samples, gamma dose, and axial expansion worth were all carried out and published. In many cases, these reactivity coefficients are good candidates to validate the reactivity coefficient calculation scheme used by the analysis software and included in the safety analysis activities of fast reactor development projects today. This manuscript discusses the modeling methodology and accuracy of the calculated experimental results using the LANL software MCNP and the ANL software package ARC (Argonne Reactor Codes). As will be shown, for many of the experimental measurements, the two software packages are found to be good predictive analysis tools for those experiments. In other cases, problems with the analysis methodology or underlying cross section data are exposed which indicates where predictive analysis is not as reliable. Finally, in some of the measurements the conclusion is reached that the experimental measurement cannot be reproduced with the analysis software as it is simply too difficult.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Software Validation Work With The ZPPR-15 Data

The analysis activities for fast reactors involve using many different pieces of software that are relied upon for their predictive capabilities. For this software to be considered reliable, documented proof that the predictions of the software are accurate is required. In this manuscript, the validation work that covers some of the Argonne software used in fast reactor design activities is discussed and displayed. This validation work includes neutron and gamma flux distributions, reaction rate distributions, and reactivity worth. In an ideal world, a reactor development program would have access to a comprehensive set of experimental facilities to help inform the design aspects of the reactor itself. While thermal-hydraulics experiments, and to a limited degree mechanical experiments, can be carried out today for validation needs, neutronics related experimental facilities are rather impractical because of the lack of experimental facilities. Given the desired time table for construction of new reactors, the reconstitution or creation of new neutronic experimental facilities is untenable and thus those reactor development programs must rely upon any available experimental measurements that are qualitatively similar to the design. While a methodology has been proposed to assess the similarity between the past experimental measurements and the reactor itself, that aspect is beyond the scope of this manuscript. In this manuscript, the focus is entirely placed on the analysis results for a series of experiments carried out at the ZPPR facility in Idaho in the mid-1980s. In this regard, this manuscript only shows the validation of the stated neutronics software for specific loadings of the ZPPR reactor. Because of the fuel form, its proposed enrichment, and the material content of the reactor core, the ZPPR-15 experiments were identified as potential validation data for the reactor. The ZPPR-15 experiments were intended as mockups of a 330 MWe Integral Fast Reactor program which was a follow on program to the Clinch River Breeder Reactor. In the ZPPR-15 series of experiments, measurements of the neutron spectrum, control rod worth, sodium void worth, foil reaction rate distributions, Doppler worth of heated samples, gamma dose, and axial expansion worth were all carried out and published. In many cases, these reactivity coefficients are good candidates to validate the reactivity coefficient calculation scheme used by the analysis software and included in the safety analysis activities of fast reactor development projects today. This manuscript discusses the modeling methodology and accuracy of the calculated experimental results using the LANL software MCNP and the ANL software package ARC (Argonne Reactor Codes). As will be shown, for many of the experimental measurements, the two software packages are found to be good predictive analysis tools for those experiments. In other cases, problems with the analysis methodology or underlying cross section data are exposed which indicates where predictive analysis is not as reliable. Finally, in some of the measurements the conclusion is reached that the experimental measurement cannot be reproduced with the analysis software as it is simply too difficult.

Aliberti, Gerardo↗

Run Time Assurance as an Alternate Concept to Contemporary Development Assurance Processes

NASA and the FAA sought industry research to identify and evaluate alternate concepts for assuring safety of airborne systems. This report documents a research effort focused on the evaluation of Run Time Assurance (RTA) as applied to a novel, airborne system architecture. The RTA pattern is applied to a case study focused on a notional integrated flight and propulsion control system for a DEP VTOL aircraft. During flight, while the high-automation algorithms are operating, the RTA system will monitor the aircraft state for any impending violation of safety requirements. When necessary, it will switch to the low-automation software to prevent such violations. Assurance practices for both baseline industry activities and the RTA approach were captured and compared to illustrate the required engineering design considerations, and possible advantages and disadvantages of each approach as part of this case study.

Eric M. Peterson↗

From Chills to Thrills: Revolutionizing Energy Efficiency and Load Flexibility in Supermarket Refrigeration: Preprint

Open-vertical medium-temperature refrigerated display cases comprise nearly 50% of total case lineups in a typical supermarket, with more than 80% of their cooling load attributed to infiltration of warm and moist air from the surrounding space. The infiltration takes place across the air curtain system of the display case. While the air curtain acts as a thermal shield and as a cooling mechanism to maintain product temperature, it also entrains large amounts of heat and moisture from the adjacent space. Additionally, from food safety and quality standpoints, these fixtures are vulnerable to electric outages and traditionally cannot participate in load flexibility events. This paper describes key features of an innovative design of a self-contained, water-cooled, medium-temperature, open-vertical display case. The novel concept will eliminate the inefficient air curtain system and incorporate a hybrid radiant and low-airflow convective cooling design with a thermal-energy-storage-coupled heat exchanger integrated into the refrigeration circuit. The focus of this paper is on evaluating the thermal performance of the novel hybrid design in maintaining target product temperature. It presents thermal performance findings from thermo-fluid system modeling and robust state-of-the-art laboratory experiments used to validate those models. Load flexibility attributes from thermal energy storage are not discussed. A controlled-environment chamber at the National Renewable Energy Laboratory was leveraged to validate the thermal performance of the novel technology. Final results from bench-scale experiments indicate the proposed design maintained mean product temperatures within food safety guidelines.

commercial refrigeration↗

Structural Design and Analysis of the Upper Pressure Shell Section of a Composite Crew Module

This paper presents the results of the structural design and analysis of the upper pressure shell section of a carbon composite demonstration structure for the Composite Crew Module (CCM) Project. The project is managed by the NASA Engineering and Safety Center with participants from eight NASA Centers, the Air Force Research Laboratory, and multiple aerospace contractors including ATK/Swales, Northrop Grumman, Lockheed Martin, Collier Research Corporation, Genesis Engineering, and Janicki Industries. The paper discusses details of the upper pressure shell section design of the CCM and presents the structural analysis results using the HyperSizer structural sizing software and the MSC Nastran finite element analysis software. The HyperSizer results showed that the controlling load case driving most of the sizing in the upper pressure shell section was the internal pressure load case. The regions around the cutouts were controlled by internal pressure and the main parachute load cases. The global finite element analysis results showed that the majority of the elements of the CCM had a positive margin of safety with the exception of a few hot spots around the cutouts. These hot spots are currently being investigated with a more detailed analysis. Local finite element models of the Low Impact Docking System (LIDS) interface ring and the forward bay gussets with greater mesh fidelity were created for local sizing and analysis. The sizing of the LIDS interface ring was driven by the drogue parachute loads, Trans-Lunar Insertion (TLI) loads, and internal pressure. The drogue parachute loads controlled the sizing of the gusset cap on the drogue gusset and TLI loads controlled the sizing of the other five gusset caps. The main parachute loads controlled the sizing of the lower ends of the gusset caps on the main parachute fittings. The results showed that the gusset web/pressure shell and gusset web/gusset cap interfaces bonded using Pi-preform joints had local hot spots in the Pi-preform termination regions. These regions require a detailed three-dimensional analysis, which is currently being performed, to accurately address the load distribution near the Pi-preform termination in the upper and lower gusset caps.

Sleight, David W.↗

Accumulation of gadolinium isotopes in used nuclear fuel - 14374

For the criticality safety control of damaged nuclear fuel, i.e., fuel debris, accounting for burnup credit (BUC) may become important if higher initial-uranium-enrichment fuel almost 5 wt% loaded into the reactor. In this case, if the presence of fission products (FP) could be confirmed, the negative reactivity effect of FP allows us to treat a substantially greater quantity of fuel debris in one removal and storage operation. In the technical development of the criticality safety control for fuel debris from the Fukushima accident in Japan, adopting BUC assuming the presence of the FP is being considered because the fuel used in the Fukushima Daiichi Nuclear Power Plant had a higher initial {sup 235}U enrichment, i.e., almost 5 wt%, than the fuel used at TMI-2. The Expert Group on Burnup Credit Criticality Safety (EGBUC) under the Working Party on Nuclear Criticality Safety (WPNCS) in the OECD/NEA Nuclear Science Committee carried out international burnup calculation benchmarks 'Phase-IIIB' and 'Phase-IIIC' for BWR fuel assemblies. In these benchmarks, the differences in the {sup 155}Gd calculation results of the participants generated keen interest because these differences were rather large. As the coordinators of the Phase-IIIC benchmark, the authors have conducted additional analyses on the accumulation of the gadolinium isotopes in used nuclear fuel during burnup. Without cooling time, the assembly-averaged amount of {sup 155}Gd against the burnup value depends on the burnout property of gadolinium in burnable poison rods. This is because the amount of gadolinium isotopes accumulated owing to the fission reaction is less than the residual gadolinium in the burnable poison rods. After the burnout of gadolinium isotopes in the burnable poison rods, the amount of {sup 155}Gd isotopes remains almost constant, which is defined by the balance between depletion due to the neutron capture reaction and generation due to beta-decay of {sup 155}Eu generated by the fission reaction. However, after a few years of cooling, the amount of {sup 155}Gd drastically increases owing to {sup 155}Eu decay. This effect is important for higher burnup fuel. In this case, the amount of gadolinium isotopes in the burnable poison rods is of less importance. This means that for better prediction of {sup 155}Gd, the adopted parameters and data pertaining to {sup 155}Eu generation have significantly greater importance than the burnup treatment of the burnable poison rods. The release behavior of europium as well as gadolinium during the severe accident should be examined. This paper provides basic information for considering {sup 155}Gd in the criticality safety evaluation of fuel debris. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Determining the Safety and Efficacy of Enhanced Recovery Protocols in Major Oncologic Surgery: An Institutional NSQIP Analysis

Background: Enhanced-recovery (ER) protocols are increasingly being utilized in surgical practice. Outside of colorectal surgery, however, their feasibility, safety, and efficacy in major oncologic surgery have not been proven. This study compared patient outcomes before and after multispecialty implementation of ER protocols at a large, comprehensive cancer center. Methods: Surgical cases performed from 2011 to 2016 and captured by an institutional NSQIP database were reviewed. Following exclusion of outpatient and emergent surgeries, 2747 cases were included in the analyses. Cases were stratified by presence or absence of ER compliance, defined by preoperative patient education and electronic medical record order set-driven opioid-sparing analgesia, goal-directed fluid therapy, and early postoperative diet advancement and ambulation. Results: Approximately half of patients were treated on ER protocols (46%) and the remaining on traditional postoperative (TP) protocols (54%). Treatment on an ER protocol was associated with decreased overall complication rates (20% vs. 33%, p < 0.0001), severe complication rates (7.4% vs. 10%, p = 0.010), and median hospital length of stay (4 vs. 5 days, p < 0.0001). There was no change in readmission rates (ER vs. TP, 8.6% vs. 9.0%, p = 0.701). Subanalyses of high magnitude cases and specialty-specific outcomes consistently demonstrated improved outcomes with ER protocol adherence, including decreased opioid use. Conclusions: This assessment of a large-scale ER implementation in multispecialty major oncologic surgery indicates its feasibility, safety, and efficacy. Future efforts should be directed toward defining the long-term oncologic benefits of these protocols.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Integrated Systems Engineering, Safety, Reliability and Risk Management – Minimizing Black Swan Events

This paper examines key barriers that can possibly inhibit safe and reliable mission execution and, in the worst case, result in loss of human life due to many unknown contributory factors that can lead to Black Swan events. Some of the representative contributory factors include decision errors, overconfidence and a host of common causes including cultural and human factors. Decisions are always easy to criticize in hindsight when more information is available after a major accident. Depending on the type and complexity of the project and/or mission, the catastrophic risks of drifting into failure can be alleviated by implementing uniquely and strategically tailored Integrated-System-of-Systems, dynamic, risk-informed decision management processes. This paper presents some of the lessons learned from James Webb Space Telescope (JWST), NASA’s Human Space Flight program, and industry that provide motivation to organizations working on mega-complex missions to prudently accomplish targeted mission success. These lessons are important for future human Lunar, Mars and Beyond missions planned to be pursued by NASA through a public-private partnership using nimble but effective safety-conscious, proven sound engineering practices including implementation of integrated risk mitigation practices.

SLS↗