Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SITE APPROVALS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Technical Review Report for the Model 9978-96 Package Safety Analysis Report for Packaging (S-SARP-G-00002, Revision 1, March 2009)

This Technical Review Report (TRR) documents the review, performed by Lawrence Livermore National Laboratory (LLNL) Staff, at the request of the Department of Energy (DOE), on the 'Safety Analysis Report for Packaging (SARP), Model 9978 B(M)F-96', Revision 1, March 2009 (S-SARP-G-00002). The Model 9978 Package complies with 10 CFR 71, and with 'Regulations for the Safe Transport of Radioactive Material-1996 Edition (As Amended, 2000)-Safety Requirements', International Atomic Energy Agency (IAEA) Safety Standards Series No. TS-R-1. The Model 9978 Packaging is designed, analyzed, fabricated, and tested in accordance with Section III of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME B&PVC). The review presented in this TRR was performed using the methods outlined in Revision 3 of the DOE's 'Packaging Review Guide (PRG) for Reviewing Safety Analysis Reports for Packages'. The format of the SARP follows that specified in Revision 2 of the Nuclear Regulatory Commission's Regulatory Guide 7.9, i.e., 'Standard Format and Content of Part 71 Applications for Approval of Packages for Radioactive Material'. Although the two documents are similar in their content, they are not identical. Formatting differences have been noted in this TRR, where appropriate. The Model 9978 Packaging is a single containment package, using a 5-inch containment vessel (5CV). It uses a nominal 35-gallon drum package design. In comparison, the Model 9977 Packaging uses a 6-inch containment vessel (6CV). The Model 9977 and Model 9978 Packagings were developed concurrently, and they were referred to as the General Purpose Fissile Material Package, Version 1 (GPFP). Both packagings use General Plastics FR-3716 polyurethane foam as insulation and as impact limiters. The 5CV is used as the Primary Containment Vessel (PCV) in the Model 9975-96 Packaging. The Model 9975-96 Packaging also has the 6CV as its Secondary Containment Vessel (SCV). In comparison, the Model 9975 Packagings use Celotex{trademark} for insulation and as impact limiters. To provide a historical perspective, it is noted that the Model 9975-96 Packaging is a 35-gallon drum package design that has evolved from a family of packages designed by DOE contractors at the Savannah River Site. Earlier package designs, i.e., the Model 9965, the Model 9966, the Model 9967, and the Model 9968 Packagings, were originally designed and certified in the early 1980s. In the 1990s, updated package designs that incorporated design features consistent with the then-newer safety requirements were proposed. The updated package designs at the time were the Model 9972, the Model 9973, the Model 9974, and the Model 9975 Packagings, respectively. The Model 9975 Package was certified by the Packaging Certification Program, under the Office of Safety Management and Operations. The Model 9978 Package has six Content Envelopes: C.1 ({sup 238}Pu Heat Sources), C.2 ( Pu/U Metals), C.3 (Pu/U Oxides, Reserved), C.4 (U Metal or Alloy), C.5 (U Compounds), and C.6 (Samples and Sources). Per 10 CFR 71.59 (Code of Federal Regulations), the value of N is 50 for the Model 9978 Package leading to a Criticality Safety Index (CSI) of 1.0. The Transport Index (TI), based on dose rate, is calculated to be a maximum of 4.1.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Sequential Comparison of Seed Loss and Prostate Dosimetry of Stranded Seeds With Loose Seeds in {sup 125}I Permanent Implant for Low-Risk Prostate Cancer

Purpose: To compare stranded seeds (SSs) with loose seeds (LSs) in terms of prostate edema, dosimetry, and seed loss after {sup 125}I brachytherapy. Methods and Materials: Two prospective cohorts of 20 men participated in an institutional review board-approved protocols to study postimplant prostate edema and its effect on dosimetry. The LS cohort underwent brachytherapy between September 2002 and July 2003 and the SS cohort between April 2006 and January 2007. Both cohorts were evaluated sequentially using computed tomography-magnetic resonance imaging fusion-based dosimetry on Days 0, 7, and 30. No hormonal therapy or supplemental beam radiotherapy was used. Results: Prostate edema was less in the SS cohort at all points (p = NS). On Day 0, all the prostate dosimetric factors were greater in the LS group than in the SS group (p = 0.003). However, by Days 7 and 30, the dosimetry was similar between the two cohorts. No seeds migrated to the lung in the SS cohort compared with a total of five seeds in 4 patients in the LS cohort. However, the overall seed loss was greater in the SS cohort (24 seeds in 6 patients; 1.1% of total vs. 0.6% for LSs), with most seeds lost through urine (22 seeds in 5 patients). Conclusion: Despite elimination of venous seed migration, greater seed loss was observed with SSs compared with LSs, with the primary site of loss being the urinary tract. Modification of the technique might be necessary to minimize this. Prostate dosimetry on Days 7 and 30 was similar between the SS and LS cohorts.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Optics Supply Planning System

The purpose of this study is to specify the design for an initial optics supply planning system for NIF, and to present quality assurance and test plans for the construction of the system as specified. The National Ignition Facility (NIF) is a large laser facility that is just starting operations. Thousands of specialized optics are required to operate the laser, and must be exchanged over time based on the laser shot plan and predictions of damage. Careful planning and tracking of optic exchanges is necessary because of the tight inventory of spare optics, and the long lead times for optics procurements and production changes. Automated inventory forecasting and production planning tools are required to replace existing manual processes. The optics groups members who are expected to use the supply planning system are the stakeholders for this project, and are divided into three groups. Each of these groups participated in a requirements specification that was used to develop this design. (1) Optics Management--These are the top level stakeholdersk, and the final decision makers. This group is the interface to shot operations, is ultimately responsible for optics supply, and decides which exchanges will be made. (2) Work Center Managers--This group manages the on site optics processing work centers. They schedule the daily work center operations, and are responsible for developing long term processing, equipment, and staffing plans. (3) Component Engineers--This group manages the vendor contracts for the manufacture of new optics and the off site rework of existing optics. They are responsible for sourcing vendors, negotiating contracts, and managing vendor processes. The scope of this analysis is to describe the structure and design details of a system that will meet all requirements that were described by stakeholders and documented in the analysis model for this project. The design specifies the architecture, components, interfaces, and data stores of the system at a level of detail that can be used for construction and deployment. Test and quality assurance plans are also included to insure that the system delivers all requirements when it is built. The design is for an automated forecasting prototype that allocates inventory and processing resources in response to potentially daily changes in the forecasted optics exchanges required to operate NIF. It will automatically calculate future inventory levels and processing rates based on current inventory and projected exchanges, procurements, and capacities. It will include screens that allow users to readily assess the feasibility of the forecast, identify failures to meet the demand, revise input data, and re-run the automated forecast calculation. In addition, the system will automatically retrieve the current exchange demand from an external database. Approved forecasts from the system will automatically update work order plans and procurement plans in the existing inventory and production control database. The timing of optics exchanges affects the forecast of damage and future exchanges, so an approved exchange plan will be fed back to the demand database and be used to calculate the next demand projection. The system will read the demand data and update the forecast and output files daily. This specification has been divided into two parts. This document, Part 1 lays out the major design decisions and specifies the architectural, component, and data structure designs. Part 2 will add interface designs, quality assurance and testing plans, and deployment details.

42 ENGINEERING↗

Plan for IER-443 Testing of the Y-12 and AWE Criticality Accident Alarm System Detectors at the Godiva IV Burst Reactor

This document provides the scope and details of the “Plan for Testing the Y-12 and AWE Criticality Accident Alarm System Detectors at the Godiva IV Burst Reactor”. Due to the relative simplicity of the testing goals, scope, and methodology, the NCSP Manager approved execution of the test when ready. No preliminary CED-1 or final design CED-2 reports were required or issued. The test will subject Criticality Accident Alarm System (CAAS) detectors supplied by Y- 12 and AWE to very intense and short duration mixed neutron and gamma radiation fields. The goals of the test will be to (1) substantiate functionality, for both existing and newly acquired Y- 12 CAAS detectors, and (2) the ability of the AWE detectors to provide quality temporal dose information after a hypothetical criticality accident. ANSI/ANS-8.3.1997 states that the “system shall be sufficiently robust as to actuate an alarm signal when exposed to the maximum radiation expected”, which has been defined at Y-12, in Documented Safety Analyses (DSAs), to be a dose rate of 10 Rad/s. ANSI/ANS-8.3.1997 further states that “alarm actuation shall occur as a result of a minimum duration transient” which may be assumed to be 1 msec. The pulse widths and dose rates which will be achieved in this test will exceed these requirements. Pulsed radiation fields will be produced by the Godiva IV fast metal burst reactor at the National Criticality Experimental Research Center (NCERC) at the Nevada National Security Site (NNSS). The magnitude of the pulses and the relative distances to the detectors will be varied to afford a wide range of radiation fluence and pulse widths. The magnitude of the neutron and gamma fields will be determined by reactor temperature rise to fluence and dose conversions which have been previously established through extensive measurements performed under IER-147. The requirements for CAAS systems to detect and alarm under a “minimum accident of concern” as well as other functional requirements specified in ANSI/ANS-8.3.1997, are not included in the test. Routine and periodic maintenance and calibrations performed at Y-12 and AWE are intended to provide adequate confirmation for meeting these requirements.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Targeting Human Central Nervous System Protein Kinases: An Isoform Selective p38αMAPK Inhibitor That Attenuates Disease Progression in Alzheimer’s Disease Mouse Models

The first kinase inhibitor drug approval in 2001 initiated a remarkable decade of tyrosine kinase inhibitor drugs for oncology indications, but a void exists for serine/threonine protein kinase inhibitor drugs and central nervous system indications. Stress kinases are of special interest in neurological and neuropsychiatric disorders due to their involvement in synaptic dysfunction and complex disease susceptibility. Clinical and preclinical evidence implicates the stress related kinase p38αMAPK as a potential neurotherapeutic target, but isoform selective p38αMAPK inhibitor candidates are lacking and the mixed kinase inhibitor drugs that are promising in peripheral tissue disease indications have limitations for neurologic indications. Therefore, pursuit of the neurotherapeutic hypothesis requires kinase isoform selective inhibitors with appropriate neuropharmacology features. Synaptic dysfunction disorders offer a potential for enhanced pharmacological efficacy due to stress-induced activation of p38αMAPK in both neurons and glia, the interacting cellular components of the synaptic pathophysiological axis to be modulated. We report a novel isoform selective p38αMAPK inhibitor, MW01-18-150SRM (= MW150), that is efficacious in suppression of hippocampal-dependent associative and spatial memory deficits in two distinct synaptic dysfunction mouse models. A synthetic scheme for biocompatible product and positive outcomes from pharmacological screens are presented. The high-resolution crystallographic structure of the p38αMAPK:MW150 complex documents active site binding, reveals a potential low energy conformation of the bound inhibitor, and suggests a structural explanation for MW150’s exquisite target selectivity. As far as we are aware, MW150 is without precedent as an isoform selective p38MAPK inhibitor or as a kinase inhibitor capable of modulating in vivo stress related behavior

59 BASIC BIOLOGICAL SCIENCES↗

Performance Assessment for the Disposal of Low-Level Waste in the 200 West Area Burial Grounds (Annual Status Report FY 2022)

This annual review provides the projected dose estimates of radionuclide inventories disposed in the active 200 West Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. These estimates are calculated using the original dose methodology developed in the performance assessment (PA) analysis (WHC-EP-0645). The estimates are compared with the performance objectives defined in U.S. Department of Energy requirements (DOE O 435.1 and its companion documents DOE M 435.1-1 and DOE-STD-5002-2017). All performance objectives are currently satisfied, and operational waste acceptance criteria (HNF-EP-0063) and waste acceptance practices continue to be sufficient to maintain compliance with performance objectives. Inventory estimates and associated dose estimates from future waste disposal actions are unchanged from previous years’ evaluations that indicate potential impacts well below performance objectives; therefore, future compliance with DOE O 435.1 is expected. Within the active burial grounds, low-level and mixed low-level waste currently may be disposed only in two lined trenches in the 218-W-5 Burial Ground (Trenches 31 and 34) until they are either filled or a decision is made to close these trenches. Some mixed low-level waste is also disposed at the Environmental Restoration Disposal Facility in the 200 West Area (which is covered under a separate PA). During this (fiscal year 2022) reporting period (October 1, 2021, through September 30, 2022), waste was disposed to the 200 West Area LLBGs. Continued groundwater monitoring of the 200 West Area LLBGs indicates no groundwater contamination due to LLBG waste. Current assumptions about future land use at the Hanford Site are consistent with PA analysis assumptions of a postclosure facility that will not be degraded by human activity. The LLBGs are in an area identified for waste management and containment of residual contamination (DOE/EIS-0391). The current closure plan for the LLBGs (DOE/RL-2000-70) estimates that the 200 West LLBGs will be closed in the 2050 timeframe. The Disposal Authorization Statement, other technical basis documents, and the radioactive waste management basis are of continued adequacy to meet the performance objectives of DOE O 435.1. Overall, there are no substantive changes to primary PA assumptions and no changes to the PA analysis conclusion; therefore, compliance with DOE O 435.1 and the Disposal Authorization Statement is maintained. A new PA to evaluate the long-term impacts of three disposal trenches that are currently active within the 200 East and 200 West Areas (Trench 94 in the 200 East Area and Trenches 31 and 34 in the 200 West Area) was initiated in fiscal year 2019 and completed in fiscal year 2022. Corrective actions addressing 3 key issues and 31 secondary issues identified during the review process were developed and submitted to the Low-Level Waste Disposal Facility Federal Review Group Co-Chairs for review and approval. This PA provides additional technical basis for the continued adequacy of the existing Operating Disposal Authorization Statement.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY 2026 Midyear Report: Seismic Monitoring of Underground Vibration Sources Using Distributed Acoustic Sensing and Seismometers

Safeguards-relevant temporal changes in underground facilities can be observed using geophysical monitoring techniques. Seismic waves, in particular, provide valuable insights into subsurface activities and can serve as an important tool for detecting anomalous events that may indicate containment breaches at geological repositories. This midyear report summarizes ongoing efforts to automatically and rapidly detect and locate anomalous vibration signals that could be indicative of potential containment breaches. Previous work during FY25 focused on compiling continuous seismic datasets from two underground sites and developing a database of continuous waveforms and ground-truth event data derived from multiple sensing modalities. Building on this foundation, we are adapting anomaly detection and geolocation algorithms to explore methods for monitoring underground activities using two relatively low-maintenance sensing technologies: a dense surface geophone array deployed at the Pleasant Gap mine in Pennsylvania, and a three-dimensional fiber-optic cable array for distributed acoustic sensing (DAS) installed in the subsurface at the Sanford Underground Research Facility (SURF) in South Dakota. This report summarizes work conducted during the first two quarters of FY26, during which we refined a dynamic power spectral density (PSD)-based detector, applied it independently to each geophone station, and then combined the per‑station detections with density-based spatial clustering of applications with noise (DBSCAN) to cluster events and produce spatial maps over a nine‑day interval. In addition, we outline plans for a field trial at the Waste Isolation Pilot Plant (WIPP) in New Mexico to compare traditional seismic monitoring approaches with DAS techniques and to evaluate the benefits of combined data analysis. Activities during the past two quarters have included the preparation and submission of a Field Test Plan to WIPP for approval, as well as submission to headquarters for review and feedback.

58 GEOSCIENCES↗

Clarification of Institutional Controls at the Rocky Flats Site Central Operable Unit and Implementation of the Soil Disturbance Review Plan - 13053

Cleanup and closure of DOE's Rocky Flats Site in Colorado, which was placed on the CERCLA National Priority List in 1989, was accomplished under CERCLA, RCRA, and the Colorado Hazardous Waste Act (CHWA). The physical cleanup work was completed in late 2005 and all buildings and other structures that composed the Rocky Flats industrial complex were removed from the surface, but remnants remain in the subsurface. Other remaining features include two landfills closed in place with covers, four groundwater treatment systems, and surface water and groundwater monitoring systems. Under the 2006 Corrective Action Decision/Record of Decision for Rocky Flats Plant (US DOE) Peripheral Operable Unit and the Central Operable Unit (CAD/ROD), the response actions selected for the Central Operable Unit (OU) are institutional controls (ICs), physical controls, and continued monitoring and maintenance. The objectives of these ICs were to prevent unacceptable exposure to remaining subsurface contamination and to prevent contaminants from mobilizing to surface water and to prevent interfering with the proper functioning of the engineered components of the remedy. An amendment in 2011 of the 2006 CAD/ROD clarified the ICs to prevent misinterpretation that would prohibit work to manage and maintain the Central OU property. The 2011 amendment incorporated a protocol for a Soil Disturbance Review Plan for work subject to ICs that requires approval from the State and public notification by DOE prior to conducting approved soil-disturbing work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-D-9A-07: Imaging Dose and Cancer Risk in Image-Guided Radiotherapy of Cancers

Purpose: To systematically evaluate the imaging doses and cancer risks associated with various imaging procedures involving ionizing radiation during image-guided radiotherapy of an increasingly large number of cancer patients. Methods: 141 patients (52 brain cases, 47 thoracic cases, 42 abdominal cases, aged 3 to 91 years old) treated between October 2009 and March 2010 were included in this IRB-approved retrospective study. During the whole radiotherapy course, each patient underwent at least one type of imaging procedures, i.e., kV portal, MV portal and kVCBCT, besides CT simulations. Based on Monte Carlo modeling and particle transport in human anatomy of various dimensions, the correlations between the radiation doses to the various organs-at-risk (OARs) at the head, the thoracic and the abdominal regions and one's weight, circumference, scan mAs and kVp have been obtained and used to estimate the radiation dose from a specific imaging procedure. The radiation-induced excess relative risk (ERR) was then estimated with BEIR VII formulism based on one's gender, age and radiation dose. 1+ ERR was reported in this study as relative cancer risk. Results: For the whole cohort of 141 patients, the mean imaging doses from various imaging procedures were 8.3 cGy to the brain, 10.5 cGy to the lungs and 19.2 cGy to the red bone marrow, respectively. Accordingly, the cancer risks were 1.140, 1.369 and 2.671, respectively. In comparison, MV portal deposited largest doses to the lungs while kVCBCT delivered the highest doses to the red bone marrow. Conclusion: The compiled imaging doses to a patient during his/her treatment course were patient-specific and site-dependent, varying from 1.2 to 263.5 cGy on average, which were clinically significant and should be included in the treatment planning and overall decision-making. Our results indicated the necessity of personalized imaging to maximize its clinical benefits while reducing the associated cancer risks. Sichuan University Scholarship.

60 APPLIED LIFE SCIENCES↗

SU-E-J-10: Imaging Dose and Cancer Risk in Image-Guided Radiotherapy of Cancers

Purpose: To systematically evaluate imaging doses and cancer risks to organs-at-risk as a Result of cumulative doses from various radiological imaging procedures in image-guided radiotherapy (IGRT) in a large cohort of cancer patients. Methods: With IRB approval, imaging procedures (computed tomography, kilo-voltage portal imaging, megavoltage portal imaging and kilo-voltage cone-beam computed tomography) of 4832 cancer patients treated during 4.5 years were collected with their gender, age and circumference. Correlations between patient’s circumference and Monte Carlo simulated-organ dose were applied to estimate organ doses while the cancer risks were reported as 1+ERR using BEIR VII models. Results: 80 cGy or more doses were deposited to brain, lungs and RBM in 273 patients (maximum 136, 278 and 267 cGy, respectively), due largely to repetitive imaging procedures and non-personalized imaging settings. Regardless of gender, relative cancer risk estimates for brain, lungs, and RBM were 3.4 (n = 55), 2.6 (n = 49), 1.8 (n = 25) for age group of 0–19; 1.2 (n = 87), 1.4 (n = 98), 1.3 (n = 51) for age group of 20–39; 1.0 (n = 457), 1.1 (n = 880), 1.8 (n=360) for age group of 40–59; 1.0 (n = 646), 1.1 (n = 1400), 2.3 (n = 716) for age group of 60–79 and 1.0 (n = 108),1.1 (n = 305),1.6 (n = 147) for age group of 80–99. Conclusion: The cumulative imaging doses and associated cancer risks from multi-imaging procedures were patient-specific and site-dependent, with up to 2.7 Gy imaging dose deposited to critical structures in some pediatric patients. The associated cancer risks in brain and lungs for children of age 0 to 19 were 2–3 times larger than those for adults. This study indicated a pressing need for personalized imaging protocol to maximize its clinical benefits while reducing associated cancer risks. Sichuan University Scholarship.

60 APPLIED LIFE SCIENCES↗

ISS Payload Operations Training During the COVID-19 Pandemic: Impacts and Solutions

Introduction: The onset and the protracted duration of the COVID-19 pandemic brought a dramatic and rapid transformation to almost every aspect of humanity in 2020. The world’s space agencies and their missions were not immune to the unpredictable and wide-sweeping changes. One discipline principally affected was mission operations and the various groups supporting that critical function. Mission support teams, especially for complex and crewed missions like the International Space Station (ISS) were forced to rapidly rethink how and where control center staff performed their vital work. Operations training – an essential element to mission ops, had unique hurdles to overcome. Operations training is responsible for preparing astronaut crews for their scientific missions, providing recurring proficiency and currency material to flight controllers, as well as ensuring new team members are ready to join their colleagues on console. Every element of training was impacted by COVID restrictions. From orientation and introductory classes for new controllers, training for scientists and payload developers, to simulations and advanced lessons, critical On the Job Training (OJT) and final evaluations; all aspects faced new challenges. Operations trainers at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama, were forced to rethink, retool, and become more efficient with trainees and training resources in order to continue supporting payload operations on the ISS. Impacts and Barriers to Operations Training: The pandemic started in the United States in early March 2020. Immediately, NASA mandated that the support for ISS real-time operations was critical. As a result, physical access to the ISS Payload Operations Center was restricted to only those people supporting console operations. Thus, use of on-site NASA facilities and any trainer to trainee face-to-face interaction was not authorized. Trainers and trainees had to quickly shift to 100% remote learning. In the short term, this was not a problem since NASA had already prepared Information Technology (IT) resources that facilitated remote access to mission resources like classes, documents and teleconferences. However, instructors quickly discovered the classes that they were accustomed to delivering in a large classroom environment did not translate well to remote teaching. The lack of non-verbal communication with the class became a major barrier to instruction. Another significant hurdle to operations training was the mandate that all simulations could only be held remotely. The logistics of planning and executing even small simulations proved to be challenging, almost impossible, due to IT technology and public internet limitations. With simulations essentially stopped, as well as the restrictions on most OJT training, trainees were essentially stopped in their advancement towards certification. An additional barrier that had to be overcome was the formal documentation of the curriculum objectives. Even though NASA had been deliberately transitioning to electronic documents for years, some organizations were still relying on “pen and ink” documents to formalize training completion. The logistics of implementing secure and controlled e-signature documents in a standardized, NASA approved format had to be addressed. Lesson Learned and Efficiencies: Once the various limitations were identified, ISS trainers at MSFC discussed, proposed, and prioritized new options and techniques. Transitioning to all electronic learning materials and certifications was a relevantly easy fix. Teaching courses to large and diverse groups took additional shifts in the NASA training paradigm. Likewise, methods and procedures for preparing astronauts for their missions were forced to be revised. Simulation supervisors and their teams were also forced to find more efficient techniques to provide realistic training experience. Communication and approvals from management was essential. In every case, the ISS payload operations instructors found novel and efficient solutions to all functions listed above. This paper will discuss the factors and solutions payloads operations trainers found to keep scientific research on the ISS flying forward to mission success.

ISS Operations↗

A Bottom's-Up Model for Siting and Developing Consent-Based Disposal Solutions for SNF and HLW in the USA - 17332

At the end of 2016, the licensing and continued development of the USA's only candidate HLW-repository since 1987 at the Yucca Mountain (YM) site in Nevada had been on hold since 2010 pending the enactment of enabling legislation for one or more of the following paths forward: 1. Re-start of the YM HLW repository. 2. Consent-based siting and development (S and D) of new HLW-repositories for commingled disposal of commercially- (CHLW) and defense-generated (DHLW) HLW. 3. Consent-based S and D of a repository and/or deep boreholes for DHLW only. Public trust in the implementing and regulating entities and a definitive say in an apolitical S and D process by the directly affected parties (DAPs) are historical imperatives for gaining public acceptance and maintaining sustained support of any or all of them. However, due to the widespread negative legacy currently attributed to past politically-controlled S and D organizations, an even more politically controlled organizational structure and an amorphous, 'consent-based', S and D model like that introduced twice in proposed Senate bills since June 2013 will exacerbate, rather than mitigate, the main root causes to past contentions, lawsuits, delays, and cost-increases. We therefore recommend: 1) Assigning the responsibility for safe disposal of CHLW to an independent, chartered public corporation with requisite subject-matter expertise and adequate financial resources. 2) Enacting a related law that: a. Defines 'consent-based' in measurable terms; b. Assigns irrevocable veto rights to facility host state(s) based upon the majority opinion of its legal residents at pre-determined S and D milestones. c. Requires Congressional approval before the facility can open and close. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The application of ICASPA to critical and safe mass calculations - 14586

ICASPA, an Improved Critical and Safe Parameters Algorithm, calculates the size of a fissile body for a given value of k-effective. ICASPA uses an iterative predictor/corrector algorithm in which the MONK9A code is used to derive a precise k-effective value for a given candidate body size; auxiliary equations are then used to adjust the body size. The process is repeated until MONK9A outputs the chosen target value of k-effective. EDF Energy operates eight nuclear power stations comprising one Pressurized Water Reactor (PWR) and seven Advanced Gas-cooled Reactor (AGR) stations. At these sites, the term 'fuel route' is used to encompass all of the ex-reactor arrangements for the handling and storage of fuel. The criticality safety cases for these fuel routes are based on the use of geometrically safe arrangements for the required quantities of fuel. The allowed quantities and arrangements of fuel are safely sub-critical, even under the contingency of accidental moderator ingress. The fuel route safety cases consider all credible potential fault conditions, including events such as dropped fuel. Any such events might change the geometry of the fuel elements, but it is difficult to calculate exact k-effective values for realistic models of dropped fuel. This difficulty is overcome by the use of an alternative approach in which limiting safe masses are calculated for bounding (worst-case) rearrangements of fuel rods and moderators, using geometries similar to those covered by criticality handbook data. Where required, the resulting safe masses are used to set safety case limits and conditions. For example, some fire extinguishants, such as water and ABC dry powder, are also effective moderators. Hence, in some fuel route areas, administrative criticality controls are used to either prohibit or limit the permitted quantities of these materials. This paper describes the work that has been carried out to adopt ICASPA as the approved calculation method for these safe mass calculations. The work has been carried out within the company quality assurance requirements for nuclear safety related software. It has involved the development of a configuration controlled version of ICASPA and the local verification and validation of the resulting code. The benefits from the adoption of ICASPA are also presented. These include accuracy improvements and, because the method uses the MONK9A code for k-effective calculations, the ability to use more sophisticated models for limiting case geometries. (authors)

42 ENGINEERING↗

Special Analysis for the Disposal of the Oak Ridge National Laboratory General Radioactive Sources Waste Stream at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This special analysis (SA) evaluates whether the Oak Ridge National Laboratory (ORNL) General Radioactive Sources waste stream (ORNLSOURCES01, Revision 3) is suitable for disposal by shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada National Security Site (NNSS). The ORNL General Radioactive Sources waste stream consists of sealed sources and solid radioactive sources that are no longer needed (ORNL 2015). The ORNL General Radioactive Sources waste stream required a special analysis because 26 radionuclides exceeded the NNSS Waste Acceptance Criteria (WAC) Action Levels (U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office [NNSA/NFO] 2015). However, review of the generator’s method to calculate waste concentration indicates that the concentrations are significantly overestimated. Waste concentrations are recalculated in this analysis using a list of individual sources provided by the generator. One radionuclide, radium-226 (226Ra), still exceeds its action level and a Special Analysis (SA) is required. The results indicate that all performance objectives can be met with disposal of the ORNL General Radioactive Sources in a SLB trench. Addition of the ORNL General Radioactive Sources inventory slightly increases the 222Rn flux density. The maximum mean and 95th percentile flux density remain less than the performance objective throughout the compliance period. The ORNL General Radioactive Sources waste stream had no significant effect on the maximum mean and 95th percentile for all other performance assessment results. The ORNL General Radioactive Sources waste stream is suitable for disposal by SLB at the Area 5 RWMS. However, because the activity concentrations on the waste profile sheet are significantly overestimated, approval of the sheet could potentially allow the disposal of high activity radiation sources. To ensure the generator does not include large radiation sources in its waste stream, a control is recommended on the maximum individual source activity from this generator.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Excavation and Repackaging of Retrievably-Stored, Remote-Handled Transuranic Waste at Oak Ridge National Laboratory

Between 1972 and 1981, remote-handled transuranic (RH-TRU) wastes generated at Oak Ridge National Laboratory (ORNL) were retrievably stored through shallow land burial in a series of 22 earthen trenches in the northern portion of Solid Waste Storage Area 5 in ORNL's Melton Valley. A Dispute Resolution Agreement signed by the Tennessee Department of Environment and Conservation and DOE specified removal of the buried (stored) waste to allow for repackaging, processing, and offsite disposal at an appropriate facility. A total of 204 concrete casks were successfully retrieved and over-packed from the 22-trench area between November 2004 and June 2006. Wastes originally stored in boxes, drums or placed without packaging was also recovered and repackaged. The repackaged wastes were transported to a nearby temporary storage facility at ORNL pending processing at DOE's Transuranic Waste Processing Center. In summary: The objective of the MVTRU Waste Retrieval Project was to satisfy conditions of the Dispute Resolution Agreement. This remedial action consisted of removal of all buried waste containers and loose items from the 22-trench area. The TRU waste casks were placed in steel overpacks, while other waste boxes, drums, and loose items were placed in steel drums or boxes. The over-packed waste was placed in an approved staging area until it can be accepted for treatment at the ORNL TRU Waste Processing Facility and ultimately disposed. A total of 204 casks were indicated by historical records to have been buried in the 22-Trench area, and 204 casks were found and over-packed during the retrieval operations. The historical records also indicated that some 18 steel or wood boxes, 12 steel drums, and approximately 15 m{sup 3} of loose waste were buried in the trenches. The contents of approximately 12 boxes, 3 drums, and approximately the expected 15 m{sup 3} quantity of loose waste were retrieved and over-packed. One significant deviation from the actions described in the Dispute Resolution Agreement occurred during the excavation of Trench 13. Pyrophoric material was encountered and a reaction occurred, causing a brief flame in the excavator bucket. No personnel contamination or radioactive material release occurred. The waste buried in Trench 13, consisting of approximately eight 208-liter (55-gal) drums and one 114-liter (30-gal) drum, was stabilized in-place due to risks associated with the retrieval and handling of this pyrophoric material. The Dispute Resolution Agreement completion date was revised to allow this material to remain stabilized in place as interim storage until a disposition path is established. The baseline schedule called for site mobilization and preparation to begin in November 2003, soil excavation and waste retrieval to be completed by March 2006, and site restoration and demobilization to be complete by April 2006, with the draft letter of completion submitted in May 2006. Soil excavation and waste retrieval were completed in March 2006 as planned, and no significant deviations to the baseline schedule were encountered. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wood-to-Fuel for California's Transportation Sector using Autothermal Pyrolysis (FRD-17-002 Progress Report)

In the month of December, we planned to have the Site License Agreement with SPI from them for final signatures, make further progress on the market assessment for the Wood-to-Bio-oil Market Report, and continue moving towards getting the subcontracts in place with Iowa State University and Frontline BioEnergy, LLC. The hope was to be able to get the finalized Site License Agreement back from SPI/Gary Blanc this month. Unfortunately, since we were in the immediate aftermath of fire season in California, and Gary was still unavailable as a result, we did not. Thankfully, it does not appear that there will be any major difficulties with getting the agreement finalized and signed, once Gary is available again, as SPI is constant in their support and eagerness for this effort to go forward, so we are not concerned that this is a risk to the project at this time. During the month of December, further research was completed on understand and evaluating the availability and potential availability of fire clearing, and other, forestry residue in California. Further investigations into the negative emissions of biomass pyrolysis products and their upgrading for use in other products (such as fuels) by incorporating carbon capture, drying and compression, and sequestration systems were conducted. The cost to achieve the maximum amount of negative emissions from these biomass-pyrolysis products with carbon capture and sequestration techniques was calculated. Sensitivity analysis was employed to understand how feedstock collection cost and product selling price affects this cost. We continued with the process towards subcontracting with Iowa State University and Frontline BioEnergy. Increased emphasis was placed on getting an updated budget from Frontline BioEnergy, LLC., so it can be submitted for approval of replacing a subcontractor, as we understand this is of utmost importance to the CAM. Frontline reported being very close to an updated budget, waiting on contracted labor costs remaining.

09 BIOMASS FUELS↗

ROV used in Sludge Retrieval and Treatment Project - 18575

The Orano-operated waste treatment site at La Hague, France, has treated large quantities of nuclear waste through-out its many decades of operation. During a period of over twenty years, a significant amount of the radioactive sludge resulting from the liquid waste treatment processes was placed into a set of adjoining tanks, called the STE2 silos. Now that those tanks are reaching capacity, a project has begun to retrieve this waste, transfer it to another location for homogenisation and characterization, and to then send it to another facility for conditioning and long-term storage. Because of the conditions inside and around these tanks, the waste retrieval process has many limitations. For example, the high radiation levels require that the retrieval be done efficiently, with a high removal rate and that operation be done remotely. The sludge retrieval tool will be operated and navigated while hidden inside the tank, under a significant amount of supernatant liquid, but needs to be accessible for maintenance and modifications and able to be transferred from one tank to the next. Additionally, the highly viscous consistency of the sludge requires special suction capabilities. All of these conditions need to be met, by a system that fits into the tanks' 900 mm (<3 ft) access ports. After almost three years of profound engineering, construction and testing efforts, a final design has been approved. The tool consists of a 250 kg (∼550 lb), remotely-operated vehicle (ROV) with an Archimedes-type screw attachment. It is delivered into and retrieved from the tank through a shielded glovebox that allows for maintenance and exchange of attachments. Sludge is sucked through a rotating screw and out a second tank opening with a consideration for limiting external water usage. To locate and navigate the tool, cameras detect LEDs attached to the ROV's buoys, and then calculate the ROV's position and orientation. With preliminary design and testing of the prototype complete, the project is preparing to award the ROV manufacturing contract and finalize the design of auxiliary systems, such as the rinsing and maintenance processes and localization instrumentation. After extensive final testing, the gloveboxes will be placed over the tanks in mid-2020, with entry into the first tank expected in April 2024. The ideas and experiences Orano is currently gathering during this effort will be of interest to laboratories and facilities that will soon be retrieving waste sludge from their aging storage tanks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Report on the ISCR Pilot Test Conducted at the Former CCC/USDA Grain Storage Facility in Montgomery City, Missouri, as of April 2013

The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) is conducting an environmental investigation at the former CCC/USDA grain storage facility on the county fairgrounds in Montgomery City, Missouri, to evaluate contamination associated with the former use of grain fumigants containing carbon tetrachloride at the site. The CCC/USDA studies have identified carbon tetrachloride in the soils (primarily unconsolidated glacial tills) at concentrations that exceed the U.S. Environmental Protection Agency (EPA) regional screening level (RSL) values for this compound in residential soils (610 μg/kg) but are below the corresponding RSL for industrial soils (3,000 μg/kg). Concentrations of carbon tetrachloride greater than the EPA maximum contaminant level (MCL; 5.0 μg/L) for this contaminant in drinking water were also identified in the shallow groundwater (Argonne 2012). On the basis of these findings, remedial actions are considered necessary to mitigate the present and potential future impacts of the contamination. In cooperation with the Missouri Department of Natural Resources (MDNR), the CCC/USDA has initiated a field-scale pilot test to evaluate an in situ technology for treatment of the carbon tetrachloride contamination. In this approach, a chemical amendment consisting primarily of slow-release organic matter and zero-valent iron is employed to induce oxygen-depleted, chemically reducing conditions in the subsurface. These conditions foster the in situ chemical reduction (ISCR) of carbon tetrachloride and its degradation products (chloroform, methylene chloride, and chloromethane) via both inorganic and biologically mediated processes. The chemical amendment being used, EHC™, was developed by the Adventus Group, Freeport, Illinois, and is now manufactured and distributed by FMC Environmental Solutions, Philadelphia, Pennsylvania. With the approval of the MDNR (2012), the ISCR technology is being tested in two target areas interpreted to represent contaminant source areas. The pilot test is being implemented on behalf of the CCC/USDA by Argonne National Laboratory. Approximately 80,000 lb of the EHC material was injected by using direct-push techniques at 99 locations in the target areas, from November 9 to December 15, 2012 (Argonne 2012). To determine the geochemical effects of the pilot injections and their impact on the levels of contamination in the test areas, an extended monitoring program (Argonne 2012) is being implemented. The program includes an initial “baseline” sampling event to document pre-treatment conditions and periodic post-injection monitoring events, approximately 1, 2, 4, 6, 9, and 12 months after the completion of the injection program (Argonne 2012). This report provides a brief summary of the specific activities conducted, with a compilation of the monitoring data obtained, during the baseline sampling event (October 2012) and the first, second, and third post-injection monitoring events (in January, February, and April 2013).

54 ENVIRONMENTAL SCIENCES↗