Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SERVICE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Post service examination of a tritium permeator and a turbomolecular pump from the CAPER Facility at the Tritium Laboratory Karlsruhe

After 8 years of operation at the CAPER facility at the Tritium Laboratory Karlsruhe, a permeator used to separate hydrogen species from processed gases ceased operation due to multiple heater failures. This was subjected to post service examination to find the cause of the failures. This paper describe the methods used to locate the failures in the heaters and the likely cause. It was also necessary to determine the tritium inventory embedded in the structure for safe disposal. Destructive examination, adapted from a full combustion technique, was used on sections of the permeator. A fine black powder deposit, presumed to be mostly carbon, coated the surfaces of the inlet section of the feed side. This powder contained nearly half of the tritium within the permeator. The likely source of the powder and the consequences for the operation and eventual decommissioning of the ITER Tritium Plant are discussed. A failed turbomolecular pump from CAPER was also examined. There was evidence of wear on the emergency support bearing, but more importantly, when the pump internals were exposed to the glove box atmosphere (dry air) large quantities of tritium were rapidly released, this despite the isotopic swamping before removal from the CAPER glove box. Significant uptake of tritium in electrical insulation was also found. (authors)

42 ENGINEERING↗

Radon Fluxes from an Earthen Barrier Over Uranium Mill Tailings After Two Decades of Service - 17234

Radon (Rn) fluxes were measured at a disposal facility for uranium mill tailings after two decades of service. The facility was closed with an earthen cover vegetated with grasses. Measurements were made on the surface of the Rn barrier and directly on the surface of the tailings. Fluxes were measured using extra small (area = 0.018 m{sup 2}), small (0.071 m{sup 2}), medium (0.59 m{sup 2}), and large (2.32 m{sup 2}) flux chambers to evaluate the impact of measurement scale on Rn flux. Activated carbon (AC) passive collectors and electric radon detectors (RAD7) were used to measure Rn concentrations. Tests were conducted at various locations on each cover representing conditions that can lead to different levels of soil structural development and different water content. Rn fluxes at the surface of the Rn barrier were much lower than Rn fluxes measured at the surface of the tailings, indicating the barrier remained effective for Rn containment. Geometric mean Rn fluxes measured at the surface of the Rn barrier in each test pit were below the regulatory requirement (0.74 Bq/m{sup 2}- s). Rn concentrations measured using AC samplers in the flux chambers were 60% of concentrations measured using the RAD7, on average, and Rn fluxes computed with the AC data were 9% of those computed with the RAD7 data, on average. Size of the flux chamber had no systematic effect on Rn flux, indicating that 20 y of soil forming processes had not created a pore network causing scale-dependent Rn flux. Geometric mean Rn fluxes in the test pits were similar regardless of differences in surface conditions (vegetation, thickness of soil cover) known to influence soil forming processes and soil structure, but were lower in areas where surface conditions promoted higher water content in the Rn barrier. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An IAEA Initiative to Provide Effective Stakeholder Support Services for International Decommissioning and Environmental Remediation - 17341

The International Atomic Energy Agency (IAEA) has initiated a collaborative effort to promote stakeholder support activities through a stakeholder engagement advisory program (SEAP) as part of Phase II of the Constraints to Implementing Decommissioning and Environmental Remediation (CIDER II) program. CIDER II is a collaborative project involving a broad range of Member States, large and small, with ongoing and/or planned decommissioning and environmental remediation (D and ER) programs. The intent of this sub-group of CIDER II is to facilitate better sharing of information and knowledge in areas of stakeholder communication, engagement and participation, and a framework for directly using stakeholder input in the decision making process. The goal is to support trust building in D and ER decisions for radioactive contamination and facilities. A main premise of the CIDER II program is that stakeholder acceptance is necessary for successful D and ER decisions to be made. This paper introduces some of the major challenges to implementing such a broad scale of support for stakeholder engagement, and approaches to overcoming those challenges. Major challenges include the need to address D and ER decision making in different countries with their different languages, cultures, religions, management structures, and politics. For example, in some cases it might be important strategically to first garner support from upper levels of social, management or political hierarchies, including for example, approaching community leaders, and allowing those leaders to directly address their community. Other sites might have more success, for example, if stakeholder interaction starts with the community members. A specific project strategy also probably depends on who makes the request for stakeholder support services. Once the CIDER II SEAP gains traction, there will be a need to prioritize requests from Member States for assistance in connection with specific D and ER projects. A prioritization tool will be developed based on stakeholder engaged structured decision making (SDM). The projects in which support will initially be focused will span a wide range of D and ER problems, types of stakeholder groups, and technical issues such as potential risk to human health and the environment. A database management system will also be designed to capture information from the different proposed projects and will be expanded to house implemented projects for future reference. The case study database will be an integral part of a web-based system that also contains technical approaches for stakeholder involvement depending on the situational environment. A community of practice will be formed that will involve technical experts in stakeholder engagement and structured decision making, and informed representatives from Member States. This will address the need for SEAP to build capacity and provide education for solving D and ER problems. The web-based system will include technical tools for use by the projects, such as: identification of stakeholder groups; social network analysis (how stakeholders are connected); case study forms; best practice forms; information sheets; and 4tools that will directly support optimization of stakeholder guided solutions to D and ER problems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Further Development of an ISOCS - based Advanced In Situ Gamma Spectrometry Services Tool for Waste Measurements - 17452

Canberra's In Situ Object Counting System is an established tool used for gamma spectrometry allowing a physical representation of complex geometries and mathematical calculation of the calibration function while avoiding the need for radioisotope standards. The ISOCS Uncertainty Estimator tool can be used to calculate defensible systematic calibration uncertainties. However the uncertainties depend on knowledge of the properties of the item being measured and for poorly characterized materials these can be large, often leading to large costs for waste sentencing. An ISOCS-based advanced in-situ gamma spectrometry services tool has been developed to reduce those uncertainties. This system is based on generating and comparing a range of candidate geometry models that yield figures of merit indicative of improved consistency between modelled data and available diverse measurement data. The approach and results of initial performance testing have previously been published, demonstrating an analysis procedure and enhanced accuracy for measurement of a low density 200 litre waste drum, based on measurements with known sources placed at different positions. It was shown how the accuracy of assay of Am-241 in a light matrix can be significantly improved. Further analysis has now been performed, with reference to measurements of a second drum, containing a standard matrix of higher density, and with a multiple radionuclide line source (Ba-133, Cs-137, Eu-152 and Am-241). These measurements represent a more challenging waste assay scenario, corresponding to potentially much larger assay uncertainties. Our results show how the assay uncertainty can be reduced, by careful application of AIGS, from relative values of the order of 100% to a few 10's of %. Furthermore, we demonstrate, through extended analysis of the test drum data, how an AIGS measurement program can be optimized to reduce the number of required measurement positions substantially. This paper describes these new results with comment on their importance and potential application for real waste assay projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Advanced ISOCS In Situ Gamma Spectrometry Services Tool to Reduce Uncertainties in Waste Characterization Projects - 16311

Canberra's In Situ Object Counting System (ISOCS) is an established tool used for gamma spectrometry allowing a physical representation of complex geometries and mathematical calculation of the calibration function. It avoids the need for radioisotope standards which can be costly and prohibitively difficult to produce. Uncertainties in the sample - detector geometry lead to uncertainties in the calibrations. Canberra's ISOCS Uncertainty Estimator (IUE) tool offers an automated means of accommodating known model geometry uncertainties, with calculation of robust defensible calibration uncertainties. However these uncertainties may be large leading to potential over-estimation of under-estimation of activity. This can be equated directly to waste disposal costs if one is using ISOCS for waste sentencing to classify wastes as (for example) Transuranic Waste (TRU) or Low Level Waste (LLW). An Advanced ISOCS in-situ Gamma Spectrometry (AIGS) services tool has been developed to reduce the uncertainties. This system is based on generating and comparing geometry models that yield Figures of Merit (FoM) indicative of improved consistency between modelled data and available diverse measurement data. This paper describes the development and features of AIGS, focusing on recent testing with radioisotope sources in a 200 litre drum filled with a simulated waste matrix. The results demonstrate a significant advantage for Am-241 where uncertainties can otherwise amount to a factor of 2 or more. We show how our specialist teams can develop procedures for deployment of standard ISOCS hardware, adapting measurement geometries and procedures through careful planning, to provide data that can be used to greatly reduce the uncertainties in the measured activities. Lastly, we comment on the range of potential applications for this new technique and the wider benefits for the decommissioning industry. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cameco Corporation's Approach to Legacy and Ongoing Waste Management Within the Fuel Services Division - 19124

Since 2011, a Fuel Services Division (FSD) employee has been dedicated to oversee divisional waste management with the goal of accelerating the recycle/disposal of accumulated legacy radioactive wastes stored at its Ontario operations in Blind River and Port Hope. The Blind River Refinery (BRR) and Port Hope Conversion Facility (PHCF) were previously owned by the federal Crown Corporation, Eldorado Nuclear, becoming part of Cameco in 1988 and Cameco Fuel Manufacturing (CFM), previously known as Zircatec Precision Industries, becoming part of Cameco in 2006. Accumulated legacy radioactive waste is stored at each of the facilities. This radioactive waste has accumulated from operations beginning in the 1930's in Port Hope and the 1980's in Blind River. Due to minimal commercially available outlets for the disposal and/or treatment of these wastes, the waste was managed onsite by storage in underutilized space in buildings, trailers and/or in the secured yard. This relatively low-cost practice meant that over decades, the inventory increased at an unsustainable rate until available space became a limiting factor. During this time, the labelling, inventory records, characterization details and other history of many of the waste materials was not maintained adequately. Due to the volume of waste that had accumulated, campaigns to address these deficiencies in information were not considered feasible, sustaining the issue of accumulation of low-level radioactive waste. Since 2011, FSD has completed annual campaigns to address the accumulated legacy waste, which has included processing of material for decontamination to meet the unrestricted release criteria under the Canadian Nuclear Substance and Radiation Devices Regulations (NSRDR), disposal of marginally contaminated wastes (<500 ppm uranium) at a permitted landfill in the United States, processing of contaminated materials to reduce the volume of low-level radioactive waste and disposal at a designated facility in Port Hope. In addition FSD has undertaken significant changes to radioactive waste management practices at each of the facilities. Multiple characterization techniques, including visual observation, review of process and other historical records, laboratory analysis and radiation scanning have been utilized in campaign planning to identify the scope and appropriate waste management technique(s) to reduce the inventory of stored material. This divisional waste management program has resulted in a significant change to how radioactive waste is generated, inventoried, characterized and managed within FSD and has increased the visibility within the leadership team of the opportunities and challenges of waste management, such as alignment with decommissioning planning, project planning and budgeting. The heightened awareness has led to better financial and physical resource planning to execute waste projects with a current projected elimination of the legacy waste within FSD by 2025. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Factors Affecting the Service-life of HDPE Geomembranes in an LLW Disposal Facility - 19320

The assessment of a suitable maximum allowable strain (MAS) for high density polyethylene (HDPE) geomembranes (GMBs) considered suitable for a proposed low level radioactive waste engineered containment mound with a 550-year design-life is described in the context of the available literature and data in 2018. Consideration is given to both the material properties and the factors contributing to the development of sustained tensile strain in the GMB. The assessment is based on the service-life of the GMB eventually being reached due to stress cracking after depletion of the protective antioxidants to a residual value. With respect to the selection of a GMB with a suitable stress crack resistance (SCR), it is noted that morphological changes can result in a substantial reduction in SCR with time, from the initial just manufactured value (SCRo) to a more representative value (SCRm), as the material tends to a thermodynamically more stable post-manufactured state. Thus, SCRm should be considered more representative of the true SCR of the material than the value obtained from the off-roll material just after manufacture. SCRm of can be estimated by aging the candidate GMBs in liquid at 55 deg. C for 270 days. Considering the potential implications of failure of the textured GMB to be used at this facility, and the potential for repair and replacement if it does fail, it is recommended that a maximum allowable strain (MAS), from all sources, of 3%, 4% and 5% be adopted on the base, side slopes, and cover GMBs, respectively. These maximum allowable strain values were selected considering the nature of the waste to be contained and the design-life that is required; they may be too conservative for some other applications with a much shorter design-life or lower consequence of premature failure. It is also indicated that the most critical locations on the GMB are often the welded seams where GMB panels are joined or repaired. Welds act a stress-raisers (increasing the stress and strain the GMB compared to that on either side of the weld). To minimize the need for patching areas damaged by the removal of samples for destructive tests, it is recommended that destructive tests on welds should generally be restricted to the minimum possible. It is also recommended that the German limits on welded GMB thickness be adopted in construction. Since strains can be significantly increased by failure to construct in accordance with the design drawings and specifications, it is recommended that there be Construction Quality Assurance (CQA) by very experienced personnel with a good knowledge of compacted clay liners, Geosynthetic Clay Liners (GCLs), and GMBs and the facility design, and that there be an experienced individual watching the construction work at all times prior to completion of the liner system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ISOCS-based Extended In Situ Gamma Spectrometry Services Tool SuperISOCS for Waste Measurements - 20275

Canberra's In Situ Object Counting System (ISOCS) is an established tool used for gamma spectrometry. It allows physical representation of complex geometries and mathematical calculation of the calibration function while avoiding the need for radioisotope standards. ISOCS provides a large range of templates to generate the geometry for most nuclear waste components in nuclear facilities. Nonetheless, there are some complex geometries where the accuracy attainable is limited by the conventional ISOCS templates. An ISOCS-based extended in-situ Gamma Spectrometry service tool has been developed, based on the so-called SuperISOCS (SISOCS) software. This tool was developed to generate the most complex geometries. The principle of geometry construction is based on the composition of 8 different primitive geometries. The primitive object is able to be cut and to change a part of an object. An object is able to overlap to another one to form a more complex object. These functions refine the modelled geometry compared to the real objects and decrease the measurement systematic error because they allow the mathematical model to represent the real-life geometry more faithfully through reducing the approximations and simplifications that need to be made The algorithm of SISOCS is the same as that of standard ISOCS. A set of calculations was done in comparison with MCNP efficiency calculation and SISOCS results. 80 different models were compared between SISOCS and MCNP, with added 30 cases compared between ISOCS and SISOCS. The average differences were less than 2%, for all energy's efficiency calculations. In this paper we illustrate the benefits that this new tool can provide, in terms of improved accuracy for complex realistic geometries, through simulation of some example scenarios. Furthermore, we demonstrate, through SISOCS modelling of the real object data test, the comparison between SISOCS to ISOCS calculations for the same geometry. This paper describes the added functions that are easily employed using SISOCS. Our results show the potential application and benefit of this technique for real waste assay projects and the way to integrate the tool into the waste assay systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fissile material found in electrical junction box at nuclear fuel services, Inc. - 14569

On October 29, 2014 at Nuclear Fuel Services, Inc., while troubleshooting a failed heater control circuit, fissile material was found in a small electrical junction box that contained a Resistance Temperature Detector (RTD). The RTD was mounted inside a stainless steel thermowell located in a uranium recovery boildown loop. Over time, the end of the thermowell had become pitted allowing fissile solution to penetrate the thermowell and collect in the electrical junction box. Conduit connected the small electrical junction box to an unfavorable geometry electrical panel, providing a credible scenario where an unsafe volume of fissile liquid could potentially collect in an unfavorable geometry. This postulated upset scenario had not been analyzed by Nuclear Criticality Safety (NCS). Prior to restart of the operation, a corrective action was taken to replace the damaged thermowell. Additionally, a review of other fissile systems was completed to identify all unfavorable geometry electrical panels where the potential for a similar accident scenario existed. Drain holes were drilled in the bottom of all those identified. Analysis of the damaged thermowell is ongoing. Expanded details of the incident, the short term and planned long term corrective actions, and lessons learned are discussed. (authors)

42 ENGINEERING↗

Circumvention of safety related equipment at nuclear fuel services, Inc. - 14570

On June 17, 2014, at Nuclear Fuel Services, Inc. (NFS), an employee was observed improperly operating two (2) spring return (i.e., spring closed) valves identified as Safety Related Equipment (SRE). These valves were also identified as Items Relied on for Safety (IROFS). The valves were important for both Nuclear Criticality Safety (NCS) and Chemical Safety purposes. The valves were observed to be 'propped' in the open position, thereby circumventing the intended safety function of the valves. The event was reported to the NRC Operations Center on June 18, 2014 (Event no. 50208); and, NFS' investigation concluded that the cause (of the event) was due to a willful act by a Nuclear Process Operator. In addition, when reviewing the event for NRC reportability, there was an organizational focus on NCS accident sequences with limited consideration of other aspects of the Integrated Safety Analysis (ISA). In other words, when determining reportability, the performance requirements for NCS accident sequences were reviewed and determined to be satisfied; however, the chemical safety accident sequences had not been considered during this review. The initial event and the reportability issues were entered into NFS' Corrective Action Program (CAP) and investigated. The investigation also included human performance and safety culture implications. This paper summarizes the circumstances surrounding the event and discusses the lessons learned as a result of the event investigation and review. (authors)

42 ENGINEERING↗

Graph Neural Network-based Tracking as a Service

Recent studies have shown promising results for track finding in dense environments using Graph Neural Network (GNN)-based algorithms. However, GNN-based track finding is computationally slow on CPUs, necessitating the use of coprocessors to accelerate the inference time. Additionally, the large input graph size demands a large device memory for efficient computation, a requirement not met by all computing facilities used for particle physics experiments, particularly those lacking advanced GPUs. Furthermore, deploying the GNN-based track-finding algorithm in a production environment requires the installation of all dependent software packages, exclusively utilized by this algorithm. These computing challenges must be addressed for the successful implementation of GNN-based track-finding algorithm into production settings. In response, we introduce a ``GNN-based tracking as a service'' approach, incorporating a custom backend within the NVIDIA Triton inference server to facilitate GNN-based tracking. This paper presents the performance of this approach using the Perlmutter supercomputer at NERSC.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Circular Economy for Photovoltaics in Service of Energy Transition

The challenge of energy transition is immediate and immense; current projections target 75 TW of photovoltaics (PV) capacity by 2050. While any transition to renewable energy technology is preferable to the current fossil-based system, it is ideal to improve the sustainability of PV to minimize negative environmental and social impacts. Circular economy (CE) has been proposed as a method to improve the sustainability of PV, especially for emerging materials like perovskites. CE is a set of actions, principles, and systems which aim to design out waste and keep products and materials in use, to reduce environmental impacts and enable sustainable development. At the most basic level, CE is "reduce, reuse, recycle", the R-actions, in ranked order. CE of a PV technology can be metricized in a variety of ways, such as the Material Circularity Indicator (Smith and Jones, Ellen MacArthur Foundation, 2019) or recycling rates. Unfortunately, standard CE metrics have several shortcomings for measuring renewable energy technologies in the context of deployment for energy transition (Figge 2018, Saidani 2019): 1) Only measure mass flows; 2) De-prioritization of the use phase in favor of mass circularity when scoring; and 3) Tight focus on a single product scale The use phase and energy flows of PV are key to energy transition, and therefore need to be quantified. Additionally, correlating product-scale to system-scale is necessary for quantifying the environmental impacts of energy transition. Life Cycle Assessment (LCA) can address some of these concerns, but also focuses on a single product scale and has trouble capturing the dynamics of system-scale energy transition, such as the interaction of module lifetime with manufacturing demands for energy transition deployment schedules. Therefore, we developed an open-source Python-based system dynamics model to quantify the mass, energy and carbon impacts of CE R-actions for PV technologies in the energy transition; PV in the CE (PV ICE) (Ovaitt & Mirletz 2021). The tool captures supply chains from material extraction through end of life, incorporating 5 circular end of life pathways. PV ICE takes in any evolving bill of materials, module properties and deployment schedule to support researchers and decision makers with data-backed insights. In this work, we quantify and compare proposed CE sustainable PV module designs and lifecycle management strategies, spanning currently commercialized technologies, government and industry technology targets, and several low Technology Readiness Level (TRL) emerging PV technologies, including perovskites. Our analyses capture the projected evolutions of lifetime, efficiency and material circularity of these PV technologies, as well as their material supply chains. Our analyses emphasize the importance of examining a suite of metrics to identify priorities and tradeoffs, and inform design or lifecycle management decisions holistically. Previous analyses have demonstrated the central importance of PV module lifetime to support energy transition while minimizing impacts. High levels of material circularity (>90%) enable minimizing lifecycle wastes, can reduce virgin material demands if paired with improving efficiency, but demonstrate tradeoffs in energy return on investment. In the fervor of new material and technology development, it is important to remember that CE is not the end goal; decarbonization and energy transition are the end goal. CE should be used in service to improve the sustainability of PV, and R-actions evaluated for their usefulness and efficacy to this end.

carbon↗

Evaluation of Machine Learning Models for Automated Data Analysis in In-Service Nuclear Power Plant Inspections

The commercial nuclear power industry is facing a potential shortage of certified nondestructive evaluation (NDE) analysts to meet future in-service inspection demands. Automated data analysis (ADA) currently supports human inspectors in tasks such as eddy current evaluations for steam generator examinations. Machine learning (ML) systems are nearing the capability to pass performance demonstration tests for ultrasonic testing (UT) inspections of reactor pressure vessel upper head penetrations in nuclear power plants (NPPs). Current research and development is focused on assisted analysis (AA) of ADA versus fully automated examinations. This presentation will cover assessment of ML flaw detection on dissimilar metal weld (DMW) piping joints.

36 MATERIALS SCIENCE↗

Experimental and Computational Study of Weld Drop-Through Hydraulic Effects in Multi-Layer Concentric Pipes Servicing Cryogenic Liquid Hydrogen

The Cryogenic Moderator System (CMS) at the Oak Ridge National Laboratory (ORNL)-Spallation Neutron Source (SNS) supplies liquid hydrogen, through vacuum insulated transfer lines to the moderators. The welding process used to make the transfer lines produces weld drop-through, which can constrict the flow of hydrogen and/or cause thermal bridges between adjacent layers. To ensure proper operation of the CMS it is therefore necessary to conduct a flow test to verify the pressure drop caused by the welds. Measurements in as-built piping sections intended to provide liquid hydrogen service to the SNS-CMS system were performed to test the effect of weld penetrations into the fluid flow area focusing on pressure drop effects. The reference test sections were designed using prototypical piping dimensions, materials and expected penetration welds. A numerical study using Computational Fluid Dynamics (CFD) tools in the transfer lines provided a conversion factor from the pressure drop measured in the lines with water to the expected pressure drop using liquid cryogenic hydrogen. The results show evidence of a maximum pressure drop modification in water of 78 KPa in the tested parts, which scales to liquid hydrogen as PHydrogen = 5.2 KPa. The maximum measured equivalent blockage area percentage was found in the as-built TDM transfer line spool 2 with a value of 31%. The measured values obtained in the as-built transfer lines provided accurate values to estimate the expected total pressure drop in the CMS system providing operational limits for the current recirculatory capacity. The effect of the weld drop-through in hydrogen evacuation capacity scenarios was better evaluated as a result of this study.

Dominguez-Ontiveros, Elvis [ORNL] (ORCID:000000018↗

Coordinated Wind Power Plant and Battery Control for Active Power Services

This article considers joint active power control of wind turbines and battery storage to follow a plant-level power reference signal. The joint control dynamically curtails the energy from a subset of the wind turbines and stores or withdraws energy from the battery to meet the power reference setpoint while accounting for wind plant aerodynamic interactions, such as wake losses. As a use case, we study the performance of the controller in maintaining a constant power output over hourly periods. A wind plant operating in this way would rely much less on other grid resources to meet its contractual agreements, thereby improving grid reliability, especially in grids with high penetration of wind and solar generation. We compare the operation of the wind plant under joint active power control to standard power-maximizing control with battery support. We present an analysis of the performance of the control system architecture. To study the impact of the battery size on performance, we simulate a 50-MW wind plant supported by batteries ranging from 8 to 64?MWh. We then evaluate the over and undergeneration penalties incurred by the plant during the simulation period.

17 WIND ENERGY↗