Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Automated Administrative Data Bases

Improved productivity and more effective response to information requirements for internal management, NASA Centers, and Headquarters resulted from using automated techniques. Modules developed to provide information on manpower, RTOPS, full time equivalency, and physical space reduced duplication, increased communication, and saved time. There is potential for greater savings by sharing and integrating with those who have the same requirements.

Marrie, M. D.↗

An Open Source Extensible Smart Energy Framework

Aggregated distributed energy resources are the subject of much interest in the energy industry and are expected to play an important role in meeting our future energy needs by changing how we use, distribute and generate electricity. This energy future includes an increased amount of energy from renewable resources, load management techniques to improve resiliency and reliability, and distributed energy storage and generation capabilities that can be managed to meet the needs of the grid as well as individual customers. These energy assets are commonly referred to as Distributed Energy Resources (DER). DERs rely on a means to communicate information between an energy provider and multitudes of devices. Today DER control systems are typically vendor-specific, using custom hardware and software solutions. As a result, customers are locked into communication transport protocols, applications, tools, and data formats. Today’s systems are often difficult to extend to meet new application requirements, resulting in stranded assets when business requirements or energy management models evolve. By partnering with industry advisors and researchers, an implementation DER research platform was developed called the Smart Energy Framework (SEF). The hypothesis of this research was that an open source Internet of Things (IoT) framework could play a role in creating a commodity-based eco-system for DER assets that would reduce costs and provide interoperable products. SEF is based on the AllJoynTM IoT open source framework. The demonstration system incorporated DER assets, specifically batteries and smart water heaters. To verify the behavior of the distributed system, models of water heaters and batteries were also developed. An IoT interface for communicating between the assets and a control server was defined. This interface supports a series of “events” and telemetry reporting, similar to those defined by current smart grid communication standards. The results of this effort demonstrated the feasibility and application potential of using IoT frameworks for the creation of commodity-based DER systems. All of the identified commodity-based system requirements were met by the AllJoyn framework. By having commodity solutions, small vendors can enter the market and the cost of implementation for all parties is reduced. Utilities and aggregators can choose from multiple interoperable products reducing the risk of stranded assets. Based on this research it is recommended that interfaces based on existing smart grid communication protocol standards be created for these emerging IoT frameworks. These interfaces should be standardized as part of the IoT framework allowing for interoperability testing and certification. Similarly, IoT frameworks are introducing application level security. This type of security is needed for protecting application and platforms and will be important moving forward. Recommendations are that along with DER-based data model interfaces, platform and application security requirements also be prescribed when IoT devices support DER applications.

25 ENERGY STORAGE↗

Decommissioning costs - some international perspectives and initiatives. Presentation for Panel discussion. Session No. 024: 'Getting a Handle on Decommissioning Costs - a Global Perspective'

Financing for decommissioning: Are the cost estimates valid? Are the financing arrangements suitable? Are the fund management systems appropriate? Cost estimates are estimated, analysed and updated on a regular basis, but cost comparisons are not straight-forward. There is an incomplete understanding of variability between estimates. Multiple internal and external factors impact estimates: Institutional, legal and policy, purpose, Strategies and plans, overall context, Facility characteristics and history Contingencies and risk, Limited actual cost data. The financing arrangements: there exists a range of systems in place for the implementation of Funding Policy and Strategy, but there are Considerable variations in: Calculating funding requirements, contributions/provisions, Allocating risks and requirements for securities Managing funds and accounting, adjusting the system, Managing disbursements, Reporting and supervision. All cost estimates for future decommissioning activities include considerable uncertainties. These uncertainties will gradually diminish with growing experience from current and planned projects. Different costing methods have different data requirements. Their reliability depends on the extent to which various data are available and applicable to the specific case being considered. Independent of the assessment method, some uncertainty is inevitable in all estimates of future costs. Analysis of the costing method may be useful in order to locate the key uncertainties in each specific estimate. NEA's Decommissioning Cost Estimation Group (DCEG) was Created in 2008 to foster the exchange of information and experience. It Aims to enhance the credibility, reliability, and auditability of the cost estimation process. It Helps define international good practices in decommissioning cost estimation. However, some major challenges remain. Weaknesses in: Understanding relations between estimates and actual costs, Lack of relevant cost data, sharing data. How might be addressed: Improved sharing of cost data, Systematic analyses of estimates and actual costs, Developing benchmarking approaches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demand Capacity Balancing at Vertiports for Initial Strategic Conflict Management of Urban Air Mobility Operations

Urban Air Mobility (UAM) is a new transportation concept that enables highly automated, cooperative, passenger or cargo-carrying air transportation services in and around urban areas. To achieve the high level of operational density and complexity desired by the UAM community, an airspace system that allows UAM operators to readily access and operate safely and efficiently in the airspace is needed. This airspace system will require air traffic management designed to reduce the risk of conflicts and loss of separation between UAM flights. In general, strategic conflict management is considered as the first layer of conflict management for safe flight operations to condition the traffic to reduce the need for airborne separation provision, the second layer of conflict management. Demand Capacity Balancing (DCB) is one of the concept components to achieve strategic conflict management. DCB strategically evaluates traffic demand and resource capacities to allow UAM operators to determine when, where and how they operate, while mitigating conflicting needs for airspace and vertiport capacity. DCB can be applied whenever UAM demand exceeds the capacity in airspace or at vertiports. As the UAM ecosystem evolves with advanced technologies and matured operational procedures, more complicated conflict management will likely be needed. In the current UAM ‘Concept of Operation (ConOps) 1.0’ operational stage defined by FAA, however, it will be meaningful to explore the demand capacity balancing at vertiports only, as an initial strategic conflict management approach for UAM operations because vertiport capacity seems to be a bottleneck of UAM traffic. For this research, we developed a demand-capacity imbalance detection and resolution service for UAM. This DCB service identifies the demand from operators and compares the demand to a given capacity at the shared resources (i.e., vertiports) over the upcoming time horizon which is divided into time bins having a constant interval. When a new flight plan is submitted, the algorithm embedded in the DCB service checks the available time bins based on the desired departure time and estimated arrival time at origin and destination vertiports, respectively. If the time bins for the originally desired times are already occupied by other flights (i.e., demand is at or above capacity), the algorithm finds the next available time bins for takeoff and landing and shifts the conflicting departure time to the earliest time that satisfies the capacity constraints at both origin and destination vertiports. The details of the algorithm will be described in the final manuscript. Figure 1 shows that the proposed DCB algorithm works well for a sample traffic scenario. In this example, a total of 144 flights, split between two operators, are planned over 2 hours, traveling 10 routes between five vertiports. In the heatmaps, the horizontal axis shows 12 time bins where each bin represents a 12-minute interval, and the vertical axis shows five vertiports. The number in each cell shows the number of operations, counting both departures and arrivals, at a specific vertiport in each time bin. For the given capacity of 2 operations/vertiport/bin, Figure 1 shows that the original demand sometimes exceeds the capacity, but the modified demand is reduced to the given capacity after resolving demand-capacity imbalances. When UAM flights are operated, it is expected that many practical issues would arise in the federated system architecture with multiple operators. UAM operators may experience a time synchronization issue due to communication delay between operator and vehicle. UAM vehicles would fly at different flight speeds, depending on vehicle models. Actual departure and arrival times can have large variations, compared to the schedule. The lead time from flight plan submission to desired departure time can vary by service type (e.g., regular shuttle service vs. on-demand service). Using the proposed DCB algorithm, we also investigated how the actual flight schedule and DCB performance are affected by these uncertainties such as unsynchronized times between operators, flight speed differences, lead time differences, and departure time errors. The final manuscript will include the background of this research work, the description of the DCB algorithm and its use cases with traffic scenarios. It will also provide the analytical results about the impact of various uncertainties that can occur in actual UAM operations on the DCB at vertiports, in terms of demand distribution changes, number of simultaneous operations, and delay propagation.

Urban Air Mobility↗

Management of optics

American Science and Engineering, Inc., designed the large X-ray optic for the HEAO-2 X-ray Telescope. The key element in this project was the High Resolution Mirror Assembly (HRMA), subcontracting the fabrication of the optical surfaces and their assembly and alignment. The roles and organization of the key participants in the creation of HRMA are defined, and the degree of interaction between the groups is described. Management of this effort was extremely complex because of the intricate weaving of responsibilities, and AS&E, as HEAO-2 Program managers, needed to be well versed in the scientific objectives, the technical requirements, the program requirements, and the subcontract management. Understanding these factors was essential for implementing both technical and management controls, such as schedule and budget constraints, in-process control, residence requirements, and scientist review and feedback. Despite unforeseen technical problems and interaction differences, the HEAO-2 was built on schedule and to specification.

Kirchner, T. E.↗

Selection of Isotopes and Elements for Fuel Cycle Analysis

Fuel cycle system analysis simulations examine how the selection among fuel cycle options for reactors, fuel, separation, and waste management impact uranium ore utilization, waste masses and volumes, radiotoxicity, heat to geologic repositories, isotope-dependent proliferation resistance measures, and so forth. Previously, such simulations have tended to track only a few actinide and fission product isotopes, those that have been identified as important to a few criteria from the standpoint of recycled material or waste, taken as a whole. After accounting for such isotopes, the residual mass is often characterized as “fission product other” or “actinide other”. However, detailed assessment of separation and waste management options now require identification of key isotopes and residual mass for Group 1A/2A elements (Rb, Cs, Sr, Ba), inert gases (Kr, Xe), halogens (Br, I), lanthanides, transition metals, transuranic (TRU), uranium, actinide decay products. The paper explains the rationale for a list of 81 isotopes and chemical elements to better support separation and waste management assessment in dynamic system analysis models such as Verifiable Fuel Cycle Simulation (VISION)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Incidence and Treatment Patterns in Hospitalizations for Malignant Spinal Cord Compression in the United States, 1998-2006

Purpose: To characterize patterns in incidence, management, and costs of malignant spinal cord compression (MSCC) hospitalizations in the United States, using population-based data. Methods and Materials: Using the Nationwide Inpatient Sample, an all-payer healthcare database representative of all U.S. hospitalizations, MSCC-related hospitalizations were identified for the period 1998-2006. Cases were combined with age-adjusted Surveillance, Epidemiology and End Results cancer death data to estimate annual incidence. Linear regression characterized trends in patient, treatment, and hospital characteristics, costs, and outcomes. Logistic regression was used to examine inpatient treatment (radiotherapy [RT], surgery, or neither) by hospital characteristics and year, adjusting for confounding. Results: We identified 15,367 MSCC-related cases, representing 75,876 hospitalizations. Lung cancer (24.9%), prostate cancer (16.2%), and multiple myeloma (11.1%) were the most prevalent underlying cancer diagnoses. The annual incidence of MSCC hospitalization among patients dying of cancer was 3.4%; multiple myeloma (15.0%), Hodgkin and non-Hodgkin lymphomas (13.9%), and prostate cancer (5.5%) exhibited the highest cancer-specific incidence. Over the study period, inpatient RT for MSCC decreased (odds ratio [OR] 0.68, 95% confidence interval [CI] 0.61-0.81), whereas surgery increased (OR 1.48, 95% CI 1.17-1.84). Hospitalization costs for MSCC increased (5.3% per year, p < 0.001). Odds of inpatient RT were greater at teaching hospitals (OR 1.41, 95% CI 1.19-1.67), whereas odds of surgery were greater at urban institutions (OR 1.82, 95% CI 1.29-2.58). Conclusions: In the United States, patients dying of cancer have an estimated 3.4% annual incidence of MSCC requiring hospitalization. Inpatient management of MSCC varied over time and by hospital characteristics, with hospitalization costs increasing. Future studies are required to determine the impact of treatment patterns on MSCC outcomes and strategies for reducing MSCC-related costs.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Developing an Integrated Model Framework for the Assessment of Sustainable Agricultural Residue Removal Limits for Bioenergy Systems

Agricultural residues have significant potential as a feedstock for bioenergy production, but removing these residues can have negative impacts on soil health. Models and datasets that can support decisions about sustainable agricultural residue removal are available; however, no tools currently exist capable of simultaneously addressing all environmental factors that can limit availability of residue. The VE-Suite model integration framework has been used to couple a set of environmental process models to support agricultural residue removal decisions. The RUSLE2, WEPS, and Soil Conditioning Index models have been integrated. A disparate set of databases providing the soils, climate, and management practice data required to run these models have also been integrated. The integrated system has been demonstrated for two example cases. First, an assessment using high spatial fidelity crop yield data has been run for a single farm. This analysis shows the significant variance in sustainably accessible residue across a single farm and crop year. A second example is an aggregate assessment of agricultural residues available in the state of Iowa. This implementation of the integrated systems model demonstrates the capability to run a vast range of scenarios required to represent a large geographic region.

09 BIOMASS FUELS↗

PIPES (Pipeline for Integrated Projects in Energy Systems) [SWR-24-89]

The Pipeline for Integrated Projects in Energy Systems (PIPES) is a comprehensive project, data, and workflow management tool designed for integrated modeling teams. PIPES facilitates the management of data requirements, tasks, and progress tracking, serving as a higher-level integration layer that works across various data and modeling software. This tool integrates models, data, and tools to perform large-scale, integrated analysis work at scale. PIPES is designed to streamline integrated modeling projects, enhance collaboration, and ensure the quality and efficiency of data management and workflow processes. https://github.com/nrel-pipes/pipes-api https://github.com/nrel-pipes/pipes-web https://github.com/nrel-pipes/nrel-pipes

Gu, Jianli↗

Pipeline for Integrated Projects in Energy Systems (PIPES): A Tool for Integrated System Planning [Slides]

The Pipeline for Integrated Projects in Energy Systems (PIPES) is a comprehensive project, data, and workflow management tool designed for integrated modeling teams. PIPES facilitates the management of data requirements, tasks, and progress tracking, serving as a higher-level integration layer that works across various data and modeling software. This tool integrates models, data, and tools to perform large-scale, integrated analysis work at scale. PIPES is designed to streamline integrated modeling projects, enhance collaboration, and ensure the quality and efficiency of data management and workflow processes. This presentation introduces PIPES a multi-model tool for integrated system planning; it describes the underlying architecture, deep dives into common user workflows, and outlines the upcoming development roadmap beyond its current alpha state.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Government Quality Management Systems: Case Study from the Hawaii Missile Alert

The unfortunate Hawaii False Ballistic Missile Alert event on January 13, 2018 provides many examples of how a Quality Management System (QMS, e.g. ISO 9001 Quality Management Systems-Requirements) can be applied to government operations, and illustrates the need for existing quality standards to provide more clarity in their applicability to services. The event provides a valuable case study for those who ask the question: how do QMS systems and standards apply to government services? The following information is taken from the Hawaii Emergency Management Agency (EMA) investigation report.

Shepherd, Christena C.↗

Reviewing clinical considerations and guideline recommendations of C1 inhibitor prophylaxis for hereditary angioedema

Abstract Background Hereditary angioedema (HAE), a rare disease that is characterized by painful and recurring non‐allergic swelling episodes, is caused by the deficiency or dysfunction of C1 inhibitor (C1INH) protein. A comprehensive HAE management plan may require long‐term prophylaxis (LTP) in addition to on‐demand treatment to help “normalize” patients' lives so that they may fully engage in work, school, family, and leisure activities. Aim The main objective of this narrative review is to provide an overview of updated guideline recommendations specific to LTP of HAE and discuss clinical considerations and pharmacologic management options, with a focus on C1INH. Materials and Methods The authors reviewed relevant HAE literature for current recommendations regarding LTP and the role of C1NH. Results Acute HAE attacks are treated with on‐demand medication; however, there is a consensus that LTP should routinely be considered for risk reduction and prevention of future episodes. The 2017 World Allergy Organization/European Academy of Allergy and Clinical Immunology guidelines recommend that all patients with HAE be evaluated for LTP routinely and the 2020 HAE Association (HAEA) guidelines emphasize that the decision to use LTP should not be based on rigid criteria, but rather should be based on individual patient needs. Both guidelines recommend C1INH as first‐line/preferred therapy for LTP in a range of patient types including adults, children/adolescents, and pregnant/lactating patients. The HAEA also recommends the kallikrein inhibitor, lanadelumab, as a first‐line option for LTP. HAE pathway‐specific agents for LTP have not been associated with notable safety concerns. Discussion Plasma‐derived C1INH has been available for 40+ years in Europe and impacts multiple targets within the HAE pathway. C1INH has been used for on‐demand treatment and LTP. A subcutaneous formulation of plasma‐derived C1INH is approved for LTP and produces functional C1INH activity levels consistently above the threshold needed for protection from HAE attacks. Other pathway‐specific options for LTP include the plasma kallikrein inhibitors, lanadelumab‐flyo and berotralstat, approved for adults and pediatric patients aged ≥12 years. C1INH is approved for adults and pediatric patients aged ≥6 years. Conclusion Assessing the need for LTP is vital in the ongoing dialogue between clinicians and patients, as both disease‐related factors and patient preferences may change over time. Among available options for LTP, plasma‐derived C1INH is the broadly recommended first‐line option for LTP in patients with HAE, including pregnant/lactating women and pediatric patients (≥6 years).

Anderson, John↗

Automated Conflict Resolution, Arrival Management and Weather Avoidance for ATM

The paper describes a unified solution to three types of separation assurance problems that occur in en-route airspace: separation conflicts, arrival sequencing, and weather-cell avoidance. Algorithms for solving these problems play a key role in the design of future air traffic management systems such as NextGen. Because these problems can arise simultaneously in any combination, it is necessary to develop integrated algorithms for solving them. A unified and comprehensive solution to these problems provides the foundation for a future air traffic management system that requires a high level of automation in separation assurance. The paper describes the three algorithms developed for solving each problem and then shows how they are used sequentially to solve any combination of these problems. The first algorithm resolves loss-of-separation conflicts and is an evolution of an algorithm described in an earlier paper. The new version generates multiple resolutions for each conflict and then selects the one giving the least delay. Two new algorithms, one for sequencing and merging of arrival traffic, referred to as the Arrival Manager, and the other for weather-cell avoidance are the major focus of the paper. Because these three problems constitute a substantial fraction of the workload of en-route controllers, integrated algorithms to solve them is a basic requirement for automated separation assurance. The paper also reviews the Advanced Airspace Concept, a proposed design for a ground-based system that postulates redundant systems for separation assurance in order to achieve both high levels of safety and airspace capacity. It is proposed that automated separation assurance be introduced operationally in several steps, each step reducing controller workload further while increasing airspace capacity. A fast time simulation was used to determine performance statistics of the algorithm at up to 3 times current traffic levels.

Erzberger, H.↗

MN471017 Safety basis Manual

National Technology & Engineering Solutions of Sandia, LLC, manages the facilities and infrastructure of Sandia National Laboratories (SNL) on behalf of the U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA). Activities in support of the SNL mission take place at primary facilities located in Albuquerque, New Mexico, and Livermore, California, as well as at supporting facilities located in Nevada, Hawaii, Alaska, Texas, and Washington, D.C. As required by the Management and Operating (M&O) Contract (DE-NA0003525) and DOE orders, standards, and guidance, the M&O contractor maintain a safety basis process, which helps to identify and evaluate hazards related to facilities, operations, and activities at both Sandia-controlled premises (i.e., onsite) and non-Sandia-controlled premises (i.e., offsite) to adequately protect workers, the public, and the environment. This manual describes the SNL safety basis process, which is managed by the Environment, Safety, and Health (ES&H) Planning Department. Safety basis personnel ensure that a centralized and consistent process is implemented for safety basis development, documentation, and evaluation.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Cassini Information Management System in Distributed Operations Collaboration and Cassini Science Planning

Launched on October 15, 1997, the Cassini-Huygens spacecraft began its ambitious journey to the Saturnian system with a complex suite of 12 scientific instruments, and another 6 instruments aboard the European Space Agencies Huygens Probe. Over the next 6 1/2 years, Cassini would continue its relatively simplistic cruise phase operations, flying past Venus, Earth, and Jupiter. However, following Saturn Orbit Insertion (SOI), Cassini would become involved in a complex series of tasks that required detailed resource management, distributed operations collaboration, and a data base for capturing science objectives. Collectively, these needs were met through a web-based software tool designed to help with the Cassini uplink process and ultimately used to generate more robust sequences for spacecraft operations. In 2001, in conjunction with the Southwest Research Institute (SwRI) and later Venustar Software and Engineering Inc., the Cassini Information Management System (CIMS) was released which enabled the Cassini spacecraft and science planning teams to perform complex information management and team collaboration between scientists and engineers in 17 countries. Originally tailored to help manage the science planning uplink process, CIMS has been actively evolving since its inception to meet the changing and growing needs of the Cassini uplink team and effectively reduce mission risk through a series of resource management validation algorithms. These algorithms have been implemented in the web-based software tool to identify potential sequence conflicts early in the science planning process. CIMS mitigates these sequence conflicts through identification of timing incongruities, pointing inconsistencies, flight rule violations, data volume issues, and by assisting in Deep Space Network (DSN) coverage analysis. In preparation for extended mission operations, CIMS has also evolved further to assist in the planning and coordination of the dual playback redundancy of highvalue data from targets such as Titan and Enceladus. This paper will outline the critical role that CIMS has played for Cassini in the distributed ops paradigm throughout operations. This paper will also examine the evolution that CIMS has undergone in the face of new science discoveries and fluctuating operational needs. And finally, this paper will conclude with theoretical adaptation of CIMS for other projects and the potential savings in cost and risk reduction that could potentially be tapped into by future missions.

Equils, Douglas J.↗

Comparative Analysis of Direct and Indirect Cooling of Wide-Bandgap Power Modules and Performance Enhancement of Jet Impingement-Based Direct Substrate Cooling

With the development of high-power and high-torque machines, requirements for high-power density electronics are increasing. Thermal management of such systems requires high heat extraction. Conventional air cooling based heat sinks and cold plate based liquid cooling have their own benefits for various applications but has limitations for high power density applications. The current study explores a jet impingement based direct substrate cooling system that was implemented for a SiC based direct bonded Cu substrate for various power losses. Numerical comparison between jet impingement cooling and conventional horizontal/indirect cooling (pin fin heat sink and genetic algorithm-optimized heat sink) showed that the area weighted average of the heat transfer coefficient (HTC) is high for both horizontal cooling designs, and the local HTC is higher for jet impingement. Design iterations were undertaken to resolve the bottleneck of this cooling system. Increasing the number of nozzles helped to cover more area at the direct bonded Cu bottom plate, which drops the chip temperature considerably. With a constant flow rate, increasing the number of nozzles would decrease local jet velocity, which reduces the heat extraction by jet impingement. This issue can be addressed by reducing the diameter of nozzle but doing so results in a high pressure drop where the design constraint is 2 psi. A flared nozzle design is proposed, which has a higher spreading angle of the jet that increases the flow coverage and reduces the pressure drop of the coolant loop.

Barua, Himel↗

Functional Requirements Document for HALE UAS Operations in the NAS: Step 1. Version 3

The purpose of this Functional Requirements Document (FRD) is to compile the functional requirements needed to achieve the Access 5 Vision of "operating High Altitude, Long Endurance (HALE) Unmanned Aircraft Systems (UAS) routinely, safely, and reliably in the national airspace system (NAS)" for Step 1. These functional requirements could support the development of a minimum set of policies, procedures and standards by the Federal Aviation Administration (FAA) and various standards organizations. It is envisioned that this comprehensive body of work will enable the FAA to establish and approve regulations to govern safe operation of UAS in the NAS on a routine or daily "file and fly" basis. The approach used to derive the functional requirements found within this FRD was to decompose the operational requirements and objectives identified within the Access 5 Concept of Operations (CONOPS) into the functions needed to routinely and safely operate a HALE UAS in the NAS. As a result, four major functional areas evolved to enable routine and safe UAS operations for an on-demand basis in the NAS. These four major functions are: Aviate, Navigate, Communicate, and Avoid Hazards. All of the functional requirements within this document can be directly traceable to one of these four major functions. Some functions, however, are traceable to several, or even all, of these four major functions. These cross-cutting functional requirements support the "Command / Control: function as well as the "Manage Contingencies" function. The requirements associated to these high-level functions and all of their supporting low-level functions are addressed in subsequent sections of this document.

Source record↗

HRP Data Management Plan

The purpose of Human Research Program Data Management Plan (DMP) is to define the processes and activities required for the overall management of the research data collected and managed by HRP throughout their life cycle. New updates to the Data Management Plan in 2023 include 1. CAPABILITIES AND SERVICES Data Repositories. Principal Investigators (PIs) funded by HRP may be asked to submit data to one of several NASA data repositories. HRP archives data in the NASA Life Sciences Portal (NLSP) that it considers to be unique and high value. This includes data from human subjects in space flight (ISS and commercial flights) and ground analogs to spaceflight; spaceflight tech demos involving humans; human omics data including the microbiome; parabolic flight studies; and the NASA Space Radiation Laboratory (NSRL). The Open Science Data Repository (OSDR) includes The Ames Life Sciences Data Archive (ALSDA), used to archive non-human biological data (e.g., animal) generated by the Human Research program, and GeneLab, available to HRP PIs to archive non-human omics data. Catalog for search and retrieval. A catalog of non-human HRP life science experiments, with all associated descriptions (mission, payload, hardware, and personnel related information), and biospecimens is provided on the NLSP public web site for search and retrieval. 2. IRB ROLE IN RETURN OF INDIVIDUAL RESEARCH RESULTS The NASA IRB manages the process for incidental findings and for returning results to subjects for studies for which NASA IRB is the IRB of record. Omics data, especially genomics data, may generate information significant to the health of or risk to a research subject. These data potentially hold the keys to understand lifetime risks of chronic diseases, such as cancer, as well as risks associated with exposures common in space flight. 3. UPDATE OF TERMS – IDENTIFIABLE AND ATTRIBUTABLE DATA HRP now follows Federal and NASA policy by using “identifiable” instead of “attributable” for Personally Identifiable Information (PII). 4. POLICY ABOUT INTERNAL NON-RESEARCH USE OF DATA The HRP Chief Scientist grants access to data from HRP-funded research for non-research internal use that includes program management, customer facilitation, strategic planning, and risk research planning. Typical HRP personnel granted access to HRP research data for internal use include the Element Scientist, Subject Matter Experts (SME), and Data/bioinformatics Scientists. If data accessed for Internal Use is provided to an intramural or extramural scientist for hypothesis driven research, all Federal and NASA regulations (e.g., IRB review) regarding human subject research apply.

Data Management Plan↗